ASTM F86 is the passivation standard for medical devices and surgical implants. Its full title is “Standard Practice for Surface Preparation and Marking of Metallic Surgical Implants”, and the current revision is F86-21. It is the standard buyers mean when they ask about medical device passivation, and it is not the same document as ASTM A967, which is what most industrial passivation is specified to.

Paul Industries builds and qualifies the process systems medical device manufacturers run on – cleanrooms and controlled environments, high-purity water, clean steam, sanitary process piping and CIP/SIP – and passivates that equipment to ASTM A967 and A380. F86 governs the devices those facilities produce rather than the plant that produces them, and the two get specified against each other constantly, so this guide sets out what F86 requires and exactly how it differs from the standards that apply to your equipment.

What ASTM F86 covers, and the part of the title people skip

Read the title carefully: surface preparation AND MARKING. F86 is unusual among passivation standards because it addresses both the surface treatment and how the device is marked – laser marking, electrochemical etching and the like – and it does so because marking a finished implant disturbs the passive layer it just created. A standard that covered only passivation would leave the most common way of undoing it out of scope.

The treatments it specifies are chemical and electrochemical, used to remove objectionable surface contaminants and to restore or promote an inert, passive surface – a metal oxide film. Some of those treatments are passivation; others are cleaning steps that precede it.

Materials in scope – and why that matters more here than elsewhere

Material Why it is treated What the passive layer is
Stainless steel (implant grades) Remove free iron from machining and forming Chromium oxide, as in industrial passivation
Cobalt chrome (CoCr) The alloy F86 was originally developed for, alongside stainless Chromium-rich oxide
Titanium and Ti alloys (e.g. Ti6Al4V) Not to create the oxide – titanium forms TiO2 spontaneously. The purpose is removing embedded iron and tooling contamination Titanium dioxide, naturally formed and then cleaned
Nitinol (NiTi) Surface nickel is the concern – the treatment influences how much nickel can be released Titanium-rich oxide over a nickel-depleted layer

The titanium case is the one most often misunderstood. Passivating titanium is not about forming the oxide – titanium does that instantly in air and cannot be stopped from doing it. It is about removing iron particles embedded during machining, forming and handling, which corrode in service and compromise a surface that is otherwise excellent. The oxide is not the deliverable; cleanliness is.

Nitinol is different again. Because the alloy is roughly half nickel and nickel release is a biocompatibility concern, surface treatment is not only about corrosion resistance – it determines the composition of the outermost layer and therefore how much nickel is available at the surface. Treatment choice on Nitinol is a biological decision as much as a metallurgical one.

The F86 process sequence

Stage What it does Notes
Organic solvent degreasing Removes oils, cutting fluids and handling residues Passivating over grease passivates the grease
Hot alkaline soak cleaning Removes remaining soils the solvent did not Sequence matters – alkaline before acid
Ultrasonic cleaning Reaches features, threads, blind holes and porous surfaces Implant geometry is far more complex than pipework
Rinsing Removes cleaning chemistry before the acid stage Carryover changes acid concentration unpredictably
Nitric acid passivation 20 to 45% by volume, room temperature, 30 minutes minimum (specific gravity approximately 1.1197 to 1.285) A defined window rather than a designation set
Final rinse and dry Removes all acid residue Residual acid on an implant is a defect, not a variance
Marking Laser or electrochemical, per the standard Marking after passivation disturbs the layer – the sequence and any re-treatment must be controlled

Note what F86 does not do: it does not offer the numbered designation families that ASTM A967 provides. It specifies a nitric process window directly. That makes it simpler to cite and less flexible – there is no citric option written into it the way A967 offers C1 through C5.

ASTM F86 vs ASTM A967 vs ASTM A380 – which applies to what

These three get cited interchangeably and they are not interchangeable. This is the table worth keeping.

ASTM F86 ASTM A967 ASTM A380
What it is Surface preparation and marking of metallic surgical implants Chemical passivation treatments for stainless steel parts Practice for cleaning, descaling and passivating stainless equipment and systems
Sector Medical devices and implants General industrial, pharmaceutical, food General industrial, pharmaceutical, food
Materials Stainless, CoCr, titanium, Nitinol Stainless steel Stainless steel
Chemistry specified Nitric only, 20-45 v%, room temp, 30 min min Nitric AND citric, as numbered designations N1-N5 and C1-C5 Procedural – covers cleaning and descaling as well as passivation
Covers marking Yes No No
Covers systems in place No – discrete components Primarily parts; in-place work is common practice Yes – explicitly addresses equipment and systems
Typical acceptance test Corrosion testing per the standard Copper sulfate, high humidity, salt spray, Cr:Fe References A967 methods

Two practical consequences. If you make implants, F86 is your document and citing A967 alone does not cover the marking requirement or the non-ferrous materials. If you build process systems, A967 and A380 are yours, and citing F86 imports an implant-focused nitric-only process into work where citric is usually the better choice. Specifying the wrong one of these is a surprisingly common error in supplier requirements.

Why medical device passivation is judged differently from process equipment

The metallurgy is the same. The consequences are not, and that changes what evidence is expected.

  • Residence time. Process equipment contacts product for minutes or hours. An implant is in contact with tissue for years or decades, so slow corrosion mechanisms that never matter in a pipe become the governing concern.
  • Biocompatibility. Device surfaces are assessed under the ISO 10993 family. Surface treatment affects what the body sees and what is released, so passivation is part of a biological evaluation rather than only a corrosion one.
  • Ion release. Nickel, chromium and cobalt release are specific concerns for implants and have no equivalent in food or pharmaceutical piping.
  • Geometry. Implants have threads, porous coatings, blind features and fine detail. Coverage and complete rinsing are far harder than in a tube, which is why ultrasonic cleaning is in the sequence.
  • Batch traceability. Device regulation expects treatment records traceable to the finished device, not merely to the lot of raw material.

The single biggest practical difference: an implant cannot be re-treated after it is implanted, and it cannot be inspected in service. All of the assurance has to exist before it leaves the factory. A process pipe can be derouged, repassivated and re-inspected for the whole of its life.

Related guides

Get a single-source quote

Standards referenced: ASTM F86 · ASTM A967 · ASTM A380 · ASME BPE · 21 CFR 820 · ISO 13485

Related: Medical Device Cleanroom Construction (ISO 7, ISO 8, CNC) · Medical Device Passivation Services (ASTM F86, A967)

What drives the cost of an F86 surface preparation and marking scope

Device passivation is priced on handling, segregation and verification rather than on chemistry. The items below are what separate two quotations for what looks like the same lot.

  • Alloy mix in the lot. Implant grade stainless, titanium alloys and Nitinol take different treatments, and running them together risks cross contamination, so a mixed lot becomes several separate runs with separate baths.
  • Fixturing. Implants cannot rest on each other or on carbon bearing racks, so each geometry needs a rack that holds it in free rinse without contact marking, and that rack is often built once per part number.
  • Part geometry. Blind holes, lumens, threads, cannulations and porous coatings hold solution and hold rinse water, which extends immersion and multiplies the rinse stages needed to prove removal.
  • Lot size. A bath and a rinse train cost close to the same whether the load is full or a single prototype, so low volume development work carries the whole run.
  • The marking step. F86 covers marking because laser marking and electrochemical etching disturb the layer just formed, so a marked device generally needs treatment after marking, which is a second pass through the whole sequence.
  • Rinse water quality and the number of rinse stages, since final rinse specifications for implants are tighter than for process equipment and the water is produced rather than drawn from a tap.
  • Verification depth. A visual and corrosion test is one level. Surface analysis for a chromium to iron ratio is a laboratory service with its own sample preparation, queue and report.
  • Process validation. Device manufacturing treats passivation as a process whose output cannot be fully verified by inspection of the product, so it is validated and kept under control, and that documentation is real recurring work.
  • Packaging and transfer. Cleaned devices move into controlled packaging immediately, and the handling standard after treatment is part of the price rather than an afterthought.

What to require from a supplier treating finished devices

An implant passivation purchase order that names only a standard leaves the important decisions to the vendor. Fix these points before the first lot ships.

  • The F86 revision, written out, since the practice has been revised and the parties should be reading the same text.
  • The treatment named by alloy, with a separate line for stainless, titanium and Nitinol rather than one instruction covering all metallic parts.
  • Bath chemistry, concentration, temperature and immersion time recorded per lot, not held as an unnamed proprietary process.
  • Segregation controls: how lots of different alloys and different customers are kept apart, and what is done between runs.
  • A declared position on where marking falls in the sequence, and confirmation that devices are treated after marking rather than before.
  • Rinse water specification with the measured parameter and its limit, plus the record showing the final rinse met it.
  • Acceptance testing named with the pass criterion, and a statement of which test applies to which alloy, since a method appropriate to one is not appropriate to all.
  • Chromium to iron ratio requirements, if any, with the analytical technique and the acceptance figure stated rather than implied.
  • Evidence the process is validated and monitored, with the parameters held under control and the frequency they are reviewed.
  • Traceability from the incoming lot to the treatment record to the certificate, so a device history record can be reconstructed from the vendor file alone.

Frequently asked questions

What is the passivation standard for medical devices?

ASTM F86, titled “Standard Practice for Surface Preparation and Marking of Metallic Surgical Implants”. The current revision is F86-21, replacing F86-13. It covers stainless steel, cobalt chrome, titanium and Nitinol used in surgical implants, and it addresses both the surface treatment and the marking of the device – unusual among passivation standards, because marking disturbs the passive layer that was just created.

What is the difference between ASTM F86 and ASTM A967?

F86 is the medical device and surgical implant standard; A967 is the general industrial standard for chemical passivation of stainless steel parts. F86 specifies a nitric process directly – 20 to 45% by volume at room temperature for at least 30 minutes – while A967 offers numbered nitric and citric designations, N1 to N5 and C1 to C5. F86 also covers titanium and Nitinol and includes marking; A967 does neither.

What are the ASTM F86 passivation parameters?

Cleaning first – organic solvent degreasing, hot alkaline soak and ultrasonic cleaning – then nitric acid at 20 to 45 percent by volume, at room temperature, for a minimum of 30 minutes, at a specific gravity of roughly 1.1197 to 1.285, followed by thorough rinsing and drying. The cleaning sequence is not optional: passivating over residual oil passivates the oil rather than the metal.

Does titanium need passivation?

Yes, but not for the reason most people assume. Titanium forms a titanium dioxide layer spontaneously in air and cannot be prevented from doing so, so the treatment is not about creating the oxide. It removes iron particles embedded during machining, forming and handling, which corrode in service and compromise an otherwise excellent surface. On titanium the deliverable is cleanliness, not oxide formation.

Why does Nitinol need special consideration?

Because Nitinol is roughly half nickel, and nickel release is a biocompatibility concern. Surface treatment determines the composition of the outermost layer and therefore how much nickel is available at the surface, so the choice of treatment is a biological decision as much as a metallurgical one. This has no equivalent in stainless process equipment, where nickel release is not an assessed endpoint.

Can I use citric acid passivation for medical devices?

Not under ASTM F86 as written – it specifies a nitric process. Citric passivation is covered by ASTM A967 for stainless steel parts and is widely used industrially. If a device specification cites F86, the nitric process is what has been called for, and substituting citric is a deviation requiring justification and, usually, customer or regulatory agreement.

Why does ASTM F86 cover marking as well as passivation?

Because marking a finished implant – by laser or electrochemical etch – disturbs the passive layer that passivation just created. A standard covering only the treatment would leave the most common way of undoing it out of scope. F86 therefore addresses the sequence and any re-treatment needed after marking, which is a control point that industrial passivation standards have no reason to include.

How does medical device passivation differ from process equipment passivation?

The metallurgy is identical; the consequences are not. An implant contacts tissue for years, so slow corrosion mechanisms that never matter in a pipe become governing. Device surfaces are assessed under ISO 10993 for biocompatibility, ion release is a specific endpoint, and geometry is far more complex. Most importantly, an implant cannot be re-treated or inspected once implanted – a process pipe can be derouged and repassivated for its whole life.

Building or upgrading a medical device facility?

The first question worth settling is whether device manufacture actually requires the pharmaceutical specification in front of you, because it usually does not. ISO 13485 and 21 CFR 820 require validated processes and product contact surfaces that are suitably clean and non-contaminating; they do not mandate ASME BPE or compendial water. Where passivation is a product operation on implants, ASTM F86 applies and sits inside design control rather than being a service report. We build to whichever genuinely applies.

Which materials does ASTM F86 cover?

It addresses surface preparation and marking of metallic surgical implants, covering stainless steels and other implant alloys including titanium and cobalt-chromium. Each material family gets different treatment, which is why applying a single stainless recipe across an implant range is incorrect.

Why does surface preparation matter more for an implant than for process equipment?

Because the surface is in permanent contact with tissue, so corrosion resistance and surface chemistry affect biological response rather than only equipment life. A surface that would be entirely acceptable in a pipe can be unacceptable on an implant.

How is passivation verified on an implant?

Through the corrosion and free-iron tests described in the standard, supplemented on higher-risk devices by surface analysis techniques that measure the actual chromium to iron ratio and surface composition. Visual inspection alone is not sufficient evidence.

What is the chromium to iron ratio and why is it measured?

It expresses how chromium-rich the outer surface layer is relative to iron, which is the physical basis of corrosion resistance. It is measured by surface analytical methods on a sample or witness coupon, and it turns passivation from an assumed outcome into a measured one.

Does electropolishing replace passivation for devices?

Electropolishing removes material and leaves a smoother, generally chromium-enriched surface, and it is often followed by passivation rather than replacing it. Which sequence applies is specified per device, because electropolishing also changes dimensions.

How does cleaning before passivation differ for devices?

Machining coolants, polishing compounds and handling residues have to be removed completely, typically through multi-stage aqueous ultrasonic cleaning with a purified water final rinse. Residual polishing compound is the most common cause of inconsistent passivation results on devices.

What water quality is used for device rinsing?

Purified water to a defined specification, with chloride and total organic carbon controlled, because the final rinse is the last thing to contact the surface. The specification is set by the cleaning validation rather than by convention.

Does laser marking affect corrosion resistance?

Yes, which is why the standard covers marking as well as passivation. Laser marking alters the surface locally and can create an oxide layer and heat-affected zone that is less corrosion resistant, so marking is normally done before final passivation.

What is the correct order of marking and passivation?

Marking first, then final cleaning and passivation, so the passivation treats the marked surface. Marking after passivation leaves the most vulnerable area untreated, which shows up as corrosion initiating at the mark.

Can citric acid be used for implant passivation?

ASTM A967 recognises citric treatments and they are used in device manufacturing, but whether citric is acceptable for a specific implant is a validated decision per material and device rather than a general substitution. Some specifications still require nitric.

Why does Nitinol need different handling?

Its surface nickel content and oxide structure directly affect biocompatibility and nickel release, so surface processing is a performance parameter rather than a finishing step. Treatments are specified tightly and verified analytically because appearance says nothing about nickel release.

Does titanium get passivated the same way as stainless?

No. Titanium forms its protective oxide spontaneously, so the treatment is aimed at removing embedded iron and processing contamination rather than building a passive layer. Applying a stainless passivation recipe to titanium addresses the wrong mechanism.

What is embedded iron and how does it get onto a device?

Free iron transferred from carbon steel tooling, fixtures, tumbling media or shared work surfaces during machining, polishing and handling. It rusts in service and becomes a corrosion site, and it is why device manufacturing segregates tooling by material.

What documentation does a device passivation need?

The procedure, the specific ASTM A967 treatment or equivalent used, chemistry, concentration, temperature and time, the water quality, the test method and results, and the lot or serial identification of what was treated. It has to fit the device history record.

Does the passivation supplier need to be qualified?

Under a device quality system the supplier is qualified and monitored like any other critical supplier, with the process treated as a special process because the result cannot be fully verified by inspection of the finished device. That is why parameter control and records matter so much.

How is a passivation process qualified as a special process?

By establishing and controlling the parameters, demonstrating with test evidence that they produce the required result, and monitoring them thereafter, because the finished part cannot be fully verified by inspection. Parameter records become the primary evidence.

Can implants be passivated after assembly?

Only where every surface in the assembly is reachable by the chemistry and rinse, and where dissimilar materials in the assembly tolerate the treatment. Assemblies combining materials with different passivation requirements are usually treated as components first.