Piping Contractor Near Me: Use a Great One Right Here
Find a nearby commercial piping contractor who specializes in the pharmaceutical, biotechnology, cosmetic, and food & beverage industries to ensure greater efficiency and cost savings on your project. These contractors have specialized knowledge and can provide added support and preventative measures.
They should have an expertise in these piping materials:
Carbon Steel
Carbon steel piping is a vital component in many industries, from construction to manufacturing. Its durability and strength make it suitable for transporting liquids and gases under high pressure. Additionally, carbon steel piping is cost-effective and easy to work with, making it a preferred choice for various applications. However, if not properly protected, it can be prone to corrosion.
Stainless Steels
Stainless steel pipes are utilized for a wide range of purposes, from carrying liquids and gases to transporting solids. They are also a crucial material in the construction of storage tanks and process vessels. Stainless steel piping is strong, durable and can withstand high temperatures and pressures. It is also corrosion-resistant, making it a great option for many industrial applications.
Jacketed Piping
Jacketed piping comprises of two pipes, one inside the other, and the space between the two pipes is usually filled with insulation, which helps to maintain a consistent temperature of the contents. Jacketed piping is often used for transporting sensitive materials, such as chemicals or food products. It can also be used for carrying hot or cold liquids, as well as for steam piping. Although jacketed piping is more costly than traditional piping, it offers superior temperature control and increased safety.
PVDF and PP Plastic Piping
Plastic piping is used in these industries, but PVDF can be used for hot liquids.
Quality Control and Testing Procedures
Radiographic Examination
X-ray inspection is a vital stage in the production of various types of piping. The technique utilizes X-rays or gamma rays to produce an image of the pipe's interior. This image can then be used to identify any weaknesses or defects in the pipe's structure. X-ray inspection is a non-destructive testing method, meaning it does not harm the pipe during the examination. This makes it an ideal quality control measure for multiple industries. Additionally, X-ray inspection is fast and straightforward, enabling it to be conducted frequently without interrupting production.
Magnetic Particle Examination
Magnetism inspection is a form of non-destructive testing that detects surface and subsurface defects in ferromagnetic materials. The procedure employs magnetic fields to magnetize the material under examination. Iron filings are then applied to the material's surface, and the pattern of the filings is used to locate any defects that may be present. Magnetism inspection can detect cracks, voids, and other imperfections in a broad range of materials, including metals, welds, and castings. The process is quick, efficient, and relatively easy to execute, making it an essential tool for quality control and failure analysis.
Liquid Penetrant Inspection
Liquid penetrant inspection (LPI) is a non-destructive testing method used to detect cracks, voids, or other types of defects in a material. The process involves applying a penetrant to the surface of the material, allowing it to seep into any imperfections, then removing the excess penetrant, and applying a developer to highlight the areas of penetration. LPI can be used on a variety of materials, including metals, plastics, and ceramics, and is particularly useful for detecting defects in complex shapes or buried interfaces.
Ultrasonic Testing
Ultrasonic testing (UT) is a non-destructive method that uses high-frequency sound waves to inspect industrial pipes for defects. UT is commonly used to detect cracks, corrosion, and other types of damage in metals, plastics, and composites. It can be carried out on both new and installed pipes without the need to remove any coatings or linings. UT is often used in combination with other non-destructive testing methods, such as visual inspection and radiography.
Fluorescent Penetrant Inspection
Fluorescent penetrant inspection (FPI) is a non-destructive test used to locate leaks and defects in industrial pipes. The test is performed by applying a liquid penetrant to the surface of the pipe, allowing it to seep into any leaks or defects, and then inspecting the area with a fluorescent light. FPI is often used on pipes that are difficult to access or contain hazardous materials as it doesn't require the use of any sensors or probes.
Contact us for a complimentary quote today, or if you want a free consultation.