Sanitary process tanks are 316L stainless vessels built to be fully drainable, cleanable-in-place, and crevice-free – the hygienic design that separates a GMP process tank from a general storage tank. Paul Industries installs and integrates process, storage, and mixing tanks with the piping and utilities that serve them.
Types of sanitary tanks
| Type | Use |
|---|---|
| Storage / hold tanks | Buffer, WFI, and product storage |
| Mixing / agitated tanks | Blending, formulation, suspension |
| Jacketed tanks | Heating or cooling the contents |
| Pressure / reactor vessels | Reactions and sterile processing |
What makes a tank sanitary
- 316L stainless, electropolished, crevice-free interior
- Dished or sloped bottom for full drainability
- Spray balls for clean-in-place coverage
- Hygienic fittings, vent filters, and documented finish
Related: Process tanks service · Sanitary process piping · CIP/SIP systems · Request a quote · Tank and Vessel Passivation · Food and Beverage Process Tanks and Vessels · Tank Fabrication: Custom Stainless and Carbon Steel Tanks
Standards referenced: ASME BPE · ASTM A967 · ASME Boiler and Pressure Vessel Code · 21 CFR 211 · 3-A Sanitary Standards · 21 CFR 117
Dimple jacket vs half-pipe coil: choosing the heat transfer surface
Jacket choice fixes how fast a vessel heats or cools, what pressure the utility side can carry, and how the shell behaves under thermal cycling. The two designs seen most on sanitary process tanks are the dimple jacket and the half-pipe coil.
| Feature | Dimple jacket | Half-pipe coil |
|---|---|---|
| Construction | Thin outer sheet plug-welded to the shell in a dimple pattern | Split pipe wound around the shell and fillet welded in a spiral |
| Utility side | Suited to glycol, chilled water and tower water | Suited to steam and higher pressure hot water |
| Heat transfer | Large wetted area; the dimples create turbulence | High utility velocity and a strong film coefficient |
| Weight and price | Lighter, less weld length, lower cost | Heavier, more weld length, higher cost |
| Zoning | Easy to split into bottom head and sidewall zones | Separate coils wound for each zone |
| Shell distortion | Many small welds spread the stress | Continuous welds need a planned sequence |
Match the jacket to the utility. Where the tank is heated with clean steam or plant steam, the half-pipe coil is the usual answer. Where the duty is cooling with glycol or holding a buffer at temperature, a dimple jacket gives more area for less money. Either way the product side must stay free of jacket weld distortion, which is why the interior is polished after all jacket welding is complete, never before.
Costs that arrive after the tank is delivered
The fabrication price is the visible number. Three more lines follow a sanitary vessel to the point where it can hold product, and they are set by the vessel’s size and duty rather than by the fabricator.
- Interior passivation after installation. In-place passivation of vessel interiors runs about $3 to $9 per square foot of wetted surface, acceptance testing to ASTM A967 adds roughly $500 to $3,500 per system, and the documentation package a further $800 to $4,000 (figures from our passivation service page).
- SIP lethality mapping, if the vessel is sterilized in place. Thermocouple and biological indicator mapping runs about $18,000 to $78,000 per vessel, because several development runs normally precede the protocol run (see GMP facility cost).
- Cleaning validation. Each product cleaned from a shared vessel carries its own study, about $20,000 to $92,000 per product on the same page, and it recurs whenever a product is added to the train.
Passivation scales with surface area, mapping with the number of cold spots to prove, and cleaning validation with the number of products. A spray ball that reaches every surface on the first coverage test keeps all three lines near the bottom of their ranges.
Documents to require with a sanitary tank at delivery
A vessel arrives with a data package or it arrives incomplete. These are the items to list in the purchase order so they are priced, produced and checked before the truck leaves the shop.
- Mill test reports for the shell, both heads and every nozzle, with heat numbers stamped or etched where the drawing says.
- Weld map and the WPS and PQR each weld was made to, qualified to ASME Section IX.
- Interior roughness report: instrument, cut-off length, reading locations and every value, with the maximum against the Ra limit.
- Riboflavin coverage test report naming the spray device part number, supply flow and pressure, and the inspection lamp used.
- Passivation certificate to ASTM A967 stating the practice and the acceptance test performed.
- Drainability check: fill, drain and a measured residual, with the vessel set at its installed tilt.
- Hydrostatic or pneumatic test record for the product side and, separately, the jacket.
- If code stamped, the manufacturer’s data report (Form U-1 or U-1A) and a nameplate rubbing.
- Nozzle schedule stating the ferrule standard and the gasket material, with elastomer certificates to USP Class VI or 21 CFR 177 as the process requires.
- As-built general arrangement drawing with agitator, baffle and probe positions.
A fabricator who has to be asked for these after shipment is building them from memory. Ask before the order is placed.
Frequently asked questions
What makes a tank sanitary versus a standard process tank?
A sanitary tank has crevice-free continuous interior welds, a controlled electropolished surface finish, self-draining slope with no dead legs, sanitary tri-clamp or flush connections, and hygienic gaskets. Standard process tanks may tolerate rougher finishes and crevices. Sanitary design exists so surfaces can be reliably cleaned and sterilized.
What surface finish do sanitary process tanks require?
Product-contact surfaces are typically polished to a maximum roughness around Ra 20 microinches or finer, often electropolished, per ASME BPE. A smooth, passivated finish resists product adhesion and bacterial attachment and cleans reliably. The exact Ra is set by the application’s cleanliness requirement.
What is ASME BPE and how does it apply to sanitary tanks?
ASME BPE, the Bioprocessing Equipment standard, defines hygienic design, surface finish, weld quality, drainability and materials for pharma and biotech equipment. For sanitary tanks it governs interior finish, crevice-free construction, sloped drainability and connection types, ensuring the vessel can be cleaned and sterilized to cGMP expectations.
Why is drainability important in a sanitary tank?
Drainability means the tank empties completely with no pooling, essential so cleaning solution, rinse water and product do not sit and breed contamination. It requires sloped bottoms, flush-mounted nozzles and no low points. Poor drainability is a common cause of cleaning and sterilization failure.
What is a dead leg and why does it matter in sanitary tanks?
A dead leg is a length of pipe or nozzle where flow stagnates, letting cleaning fluid and sterilant fail to reach and residue accumulate. ASME BPE limits dead-leg length relative to diameter. Sanitary tanks use flush or minimized nozzles so every surface is cleaned and sterilized.
How are sanitary process tanks cleaned in place?
CIP circulates cleaning and sanitizing solutions through spray balls or rotary jet heads that wet the entire interior, followed by WFI or purified-water rinses, with no disassembly. Coverage is verified, often with riboflavin testing, and the drainable design ensures full removal. Paul Industries designs and validates the CIP.
What is riboflavin coverage testing?
Riboflavin coverage testing sprays a fluorescent riboflavin solution over interior surfaces, runs the CIP cycle, then inspects under UV light for any residual fluorescence. Complete removal confirms the spray devices reach every surface. It is a standard way to qualify CIP coverage in sanitary tanks and systems.
What welds do sanitary tanks require?
Sanitary tanks require full-penetration, crevice-free welds, ground and polished flush with the surrounding surface so no crack or pit harbors residue. Interior seams and nozzle welds are often orbital or manually TIG welded, then inspected and documented. Weld quality is central to cleanability.
Do sanitary process tanks need passivation?
Yes. After fabrication and welding, sanitary stainless tanks are passivated with citric or nitric acid per ASTM A967 to remove free iron and restore the chromium-oxide passive layer, maximizing corrosion resistance and cleanliness. Paul Industries passivates and documents the interior surface.
What connections are used on sanitary tanks?
Sanitary tanks use tri-clamp (Tri-Clover) fittings, flush-mounted or ingold-style instrument ports, and hygienic diaphragm or sanitary valves, all designed to be crevice-free and drainable. These allow tool-free breakdown, clean sealing with USP-Class-VI gaskets, and cleanability that threaded or flanged industrial connections cannot match.
Can sanitary tanks be sterilized in place?
Yes. Sanitary tanks rated for it are sterilized by SIP, circulating clean steam through the closed, drainable vessel and piping. This requires pressure-rated construction, condensate drainage and slope engineered in during fabrication. Paul Industries builds and commissions SIP-capable sanitary tanks.
What industries use sanitary process tanks?
Pharmaceutical and biotechnology manufacturing for media, buffer and formulation duty, cosmetics and personal care for mixing and holding, dietary supplements, and food, dairy and beverage processing. The construction is broadly similar across them; what changes is the governing standard and therefore the documentation. Pharmaceutical tanks are built to ASME BPE with electropolished product contact surfaces and full traceability, while food and dairy work generally follows 3-A Sanitary Standards at materially lower cost.
How do you document a sanitary tank for cGMP?
Documentation includes material test reports with heat traceability, weld maps and inspection records, surface-finish and Ra readings, passivation records, slope and drainability verification, and pressure-test certificates. Paul Industries compiles this turnover package so the tank passes inspection and supports IQ.
Do you fabricate custom sanitary process tanks?
Yes, and we fabricate the vessel itself as well as handle specification, the sanitary piping tie-ins, spray device selection and coverage verification, passivation of the installed assembly and the qualification. That single-source scope is worth stating plainly, because when one contractor fabricates the pressure vessels in-house and installs them, the rest of the scope is described and delivered with the same accountability. What we own is that the installed tank performs and is documented.
How do I specify a sanitary process tank?
Start from duty rather than volume. Working volume and the minimum level at which the agitator must still mix properly, since that low-level requirement often drives impeller and nozzle placement more than capacity does. Then the fluid, temperature and pressure, including whether full vacuum is possible during drain or steam collapse. Then hygienic requirements: product contact finish, drainability, spray device coverage, whether it must be steam sterilizable, and the jacket duty if heating or cooling is needed.
What are sanitary process tanks?
Vessels designed so the product contact surface can be cleaned and, where required, sterilized in place, with geometry that drains completely and leaves no crevice for residue. In practice that means 316L with a specified ASME BPE or 3-A finish, radiused internal corners rather than sharp ones, a dished bottom sloping to a flush-mounted outlet valve, spray devices sized for coverage, and nozzles set so they do not create unreachable pockets. Jacketing, agitation and instrumentation are then designed around those constraints.
What makes a tank sanitary?
Four things together, and all four have to hold. A product contact surface in 316L finished to a hygienic designation with no crevices. Complete drainability, so the tank empties under gravity through a flush-mounted outlet rather than holding a heel. Demonstrable cleanability, meaning spray coverage proven by riboflavin testing at 4,800 to 22,000 dollars per vessel rather than assumed. And hygienic fittings throughout, so every nozzle, sample point and instrument connection is itself cleanable.
What types of process tanks are there?
Storage and hold vessels, which are simple but need attention to drainability and to validated hold time. Mixing and agitated vessels, where impeller type and minimum mixing level drive the design. Jacketed vessels for heating or cooling, with the jacket rated separately from the shell. Pressure vessels and reactors carrying an ASME code stamp. And in biologics, single-use mixers, where the hardware is a support frame and the wetted path is a disposable bag assembly.
Do you install process tanks?
Yes, including rigging and setting, sanitary piping tie-ins, spray device installation with coverage verification, jacket and utility connections, instrument installation, passivation of the installed assembly after final welds, and support through installation and operational qualification. The items that most often cause trouble on a tank installation are mundane: access and door dimensions for the vessel itself, adequate fall on the outlet line so the tank genuinely drains, and vent filter sizing and heating where the tank is steam sterilized.
How is a sanitary tank designed for drainability?
With a dished or conical bottom sloping to a flush-mounted outlet valve, no internal ledges, and nozzles positioned so nothing holds liquid. A flat-bottomed tank with a side outlet cannot be fully drained regardless of the finish.
What agitator arrangements suit sanitary service?
Top-mounted with a sanitary seal, bottom-mounted magnetically driven where a shaft penetration is unacceptable, or side-entry on large vessels. Magnetic drive removes the seal as a contamination and cleaning problem at the cost of torque and capital.
How are tank nozzles specified for cleanability?
Flush or near-flush to the tank wall, within the dead leg ratio, and positioned within spray coverage. A nozzle that projects into the tank or sits in a spray shadow is the point where cleaning validation fails.
What jacket types are used on process tanks?
Conventional annular jackets, half-pipe coils and dimple jackets, differing in achievable heat transfer, pressure rating and cost. Half-pipe suits higher pressure, dimple gives good coverage on large vessels, and conventional jackets are simplest.
Does a process tank need an ASME code stamp?
A vessel operating above the code pressure and size thresholds requires design and stamping under ASME Section VIII. Atmospheric tanks generally do not, though many buyers still specify code construction for the quality assurance it brings.
How is tank cleaning coverage verified?
By riboflavin coverage testing, where the interior is coated with a fluorescent solution, the cycle is run and the interior is inspected under ultraviolet light. Residual fluorescence marks exactly where the spray did not reach.
Scope a sanitary tank
Paul Industries is a single-source supplier, installer, and validator – one accountable partner from design through documented startup. Tell us about your project and we will scope it.
What are the best materials used in sanitary tank fabrication?
316L stainless steel is the default for pharmaceutical and biotech sanitary tanks; 304L is common in food and beverage where chlorides are low. The “L” matters more than most specifications acknowledge, and the grade choice is usually decided by chlorides rather than by industry.
| Grade | Composition, nominal | Where it belongs | Watch for |
|---|---|---|---|
| 304 | 18% Cr, 8% Ni | Dry or low-corrosion service, structural, exteriors | Standard carbon risks carbide precipitation at welds |
| 304L | 18/8, low carbon | Food and beverage product contact where chlorides are low | Less chloride resistance than 316L – the usual reason to upgrade |
| 316 | 16% Cr, 10% Ni, 2% Mo | As 316L but where welding is limited | Same carbide risk in the heat affected zone |
| 316L | 16/10/2, low carbon | The default for pharmaceutical, biotech and high-purity | The molybdenum is what buys chloride resistance |
| Duplex (e.g. 2205) | Austenitic-ferritic | Higher strength, higher chloride service, thinner walls at pressure | Different welding procedures – not a drop-in substitute |
| Super-austenitic (e.g. AL-6XN) | High molybdenum and nitrogen | Aggressive chloride or brine service | Cost, and availability of matching fittings |
| Titanium | Commercially pure or alloyed | Specific aggressive chemistries | Rare in hygienic tanks; specialized welding |
Why the “L” is not optional on a welded tank
The L designates low carbon. During welding, standard-carbon grades can precipitate chromium carbides at grain boundaries in the heat affected zone – sensitization – which locally depletes chromium and leaves that zone measurably less corrosion resistant than the parent metal. On a tank, which is welded extensively, specifying 316 rather than 316L saves almost nothing and introduces a corrosion mechanism exactly where the welds are.
Grade choice is usually a chloride decision
The practical rule: 304L handles low-chloride duty, and the molybdenum in 316L is what buys chloride resistance. Chlorides arrive from more places than the product – city water used for rinsing, hydrostatic test water, cleaning chemistry, and coastal atmospheres on the outside. That is why a food plant sometimes needs 316L for a duty that looks like 304L service on paper, and why hydrostatic test water quality belongs in the specification rather than being left to site.
Surface finish: the second half of the material specification
Grade alone does not make a tank sanitary. The surface does, because bacteria colonize what they can hold onto and cleaning chemistry has to reach all of it.
- Mill finish – the starting condition: 2B, pickled, or bright annealed. Bright annealed starts smoother and costs more
- Mechanical polish – stated as an Ra with measurement records, never as “sanitary polish”
- Electropolish – removes a thin surface layer, lowering roughness and enriching chromium
- Passivation – to ASTM A967, with the designation named and an acceptance test stated
- Weld finish – internal welds ground and polished to the parent finish, or the weld becomes the roughest thing in the vessel
The commonest specification failure is a stated Ra on the shell with nothing said about the welds. A vessel polished to 20 microinches with unpolished internal welds is not a 20-microinch vessel – it is a smooth tank with rough seams running through it, and those seams are where soil sits.
Design features that make a tank sanitary
- Crevice-free internal geometry – no lap joints, no unsealed pockets, no threads in the product zone
- Radiused internal corners rather than square
- Full drainability – dished bottom, outlet at the low point, no flat sections holding a heel
- Flush-mounted nozzles and instruments, neither protruding nor recessed into the product space
- Sanitary connections with correctly sized gaskets that do not intrude into the bore
- Spray device coverage verified rather than assumed, typically by riboflavin test
- Vent filtration – hydrophobic and integrity-testable where sterility is required
- Agitator seals suited to the duty, with no dead space behind them
- Jacket and insulation sealed against ingress
Standards that govern a sanitary tank
| Standard | What it covers | When it applies |
|---|---|---|
| ASME BPE | Hygienic design, surface finish, materials, documentation | Pharmaceutical and bioprocessing |
| ASME Section VIII | Pressure vessel design and code stamping | Any vessel above the code pressure threshold, including many jacketed tanks |
| ASME Section IX | Welding procedure and welder qualification | All welded construction |
| 3-A Sanitary Standards | Hygienic equipment design | Food, beverage and dairy |
| USDA equipment acceptance | Equipment for meat and poultry establishments | USDA-inspected facilities |
| ASTM A240 | Stainless plate and sheet | The shell material itself |
| ASTM A967 and A380 | Passivation, cleaning and descaling | After fabrication, before service |
| 21 CFR 211.65 | Product-contact surfaces not reactive, additive or absorptive | US pharmaceutical manufacture – the regulation behind the rest |
The one most often missed is ASME Section VIII. A jacketed vessel is a pressure vessel on the jacket side even when the product side is atmospheric, and whether it requires code stamping is a question to settle at specification rather than at delivery. See our tank volume calculator for the geometric-capacity versus working-volume distinction, and process tank installation for setting and connecting the vessel.
How much does sanitary tank fabrication cost?
The prices you will find published online are for commodity stainless water tanks, not sanitary process vessels – and the two are different products at different prices. That distinction is worth making before any number is quoted, because searching this question returns figures that will mislead a pharmaceutical or food buyer badly.
What is actually published, and what it describes
| Published figure | What it describes | Why it does not apply to a sanitary vessel |
|---|---|---|
| $2.50 – $4.00 per gallon | Commodity stainless water storage tanks | Unpolished, no code stamp, no documentation, no sanitary design |
| $1.50 – $5.00 per gallon installed | Premium water tanks including installation | Still a storage tank, not a process vessel |
| $3,000 – $10,000 for 500 gallons | Stainless water tanks at that capacity | A 500-gallon sanitary process vessel is a different order of cost |
| $1,000 – $5,000 | General stainless water tanks | Consumer and light-commercial range |
Those figures come from consumer and light-commercial sources – tank suppliers, forums and general buying guides. We found no published pricing anywhere for sanitary or pharmaceutical process vessels, and the industrial fabricators who build them do not list prices, because these are engineered to a specification rather than sold from a catalogue.
Why a sanitary vessel costs more than a water tank of the same size
Capacity is one of the smaller cost drivers. Everything below is present in a sanitary vessel and absent from a commodity tank:
- Interior polish to a stated Ra, with measurement records – including the welds, not just the shell
- Passivation to ASTM A967 with an acceptance test
- Crevice-free sanitary design – radiused corners, flush nozzles, no lap joints
- Full drainability – dished bottom, low-point outlet, verified by drain test
- Sanitary connections and certified elastomers in product contact
- Code construction where the vessel or its jacket is a pressure vessel – U stamp and Form U-1
- Orbital or qualified welding with weld maps, logs and NDE
- Material traceability to heat number on every product-contact component
- Spray device and verified CIP coverage
- Documentation package – genuinely days of work, and a real line item
What actually drives the number
| Driver | Effect | Note |
|---|---|---|
| Surface finish | Often the largest single swing | Each step finer costs more; electropolish adds again |
| Code requirement | Step change, not incremental | A U-stamped vessel carries design, inspection and documentation cost a non-code tank does not |
| Jacket | Substantial | Dimple, half-pipe or full jacket differ, and the jacket is usually the pressure side |
| Agitation | Substantial | Drive, seal, shaft and baffles – and the seal is a sanitary design question |
| Nozzles and connections | Additive and often underestimated | Every penetration is engineering, welding, polishing and inspection |
| Insulation and cladding | Moderate | Sanitary cladding is finished work, not lagging |
| Instrumentation | Varies widely | Level, temperature, pressure, load cells |
| Documentation scope | Real and frequently omitted from cheap quotes | Priced by some suppliers and quietly skipped by others |
| Capacity | Weaker than expected | Doubling volume does not double cost – the fixed engineering and documentation do not scale |
Capacity being a weak driver is the counterintuitive part. A larger vessel uses more plate, but the engineering, code work, documentation, nozzles and instruments barely change. That is why cost per gallon falls sharply with size – and why quoting a sanitary vessel “per gallon” at all is misleading.
What to send for an accurate quote
- Capacity, and whether that is geometric or working volume
- Product and duty – what it holds, at what temperature and pressure
- Material grade and interior finish as an Ra
- Whether code construction is required, on the vessel, the jacket, or both
- Jacket type and service, and agitation requirements
- Nozzle schedule and instrument list
- Passivation designation and acceptance test
- Documentation deliverables required
- Installed location and access route dimensions
We price each project from that list, because a credible figure depends on it. Send it to us and we will give you a real number. Use our tank volume calculator to settle geometric capacity versus working volume first – they are not the same, and quoting against the wrong one is the commonest source of a mismatched bid.
FDA compliant tank manufacturing standards
There is no such thing as an FDA approved tank. The FDA approves food, drugs and additives – not containers. A fabricator claiming an “FDA approved” vessel is either misinformed or overselling, and the correct question is not whether the tank is approved but whether its product-contact materials comply and whether you can evidence it.
Almost everything written on this subject addresses plastic chemical storage tanks. The answer for a stainless sanitary vessel is different in an important way, and it is set out below.
What the FDA actually regulates
| Citation | What it governs | Applies to |
|---|---|---|
| 21 CFR Parts 176-177 | Indirect food additives – materials that contact food | Polymers: resins, liners, gaskets, hoses, seals |
| 21 CFR 177.1520 | Olefin polymers – defines food-grade polyethylene and polypropylene | Plastic tanks, and plastic components in a stainless one |
| 21 CFR 177.2600 | Rubber articles intended for repeated use | Gaskets, O-rings, diaphragms and seals in a sanitary vessel |
| 21 CFR 211.65(a) | Product-contact surfaces shall not be reactive, additive or absorptive | Pharmaceutical equipment – the governing requirement for stainless |
| 21 CFR Part 117 | Preventive controls for human food, including equipment sanitary design | Food facilities |
| NSF/ANSI 61 | Drinking water system components, certified as a complete product | Potable water service – a certification, unlike the above |
The part nobody states for stainless vessels
Here is the distinction that the plastic-tank literature never has to make. 316L stainless is not a food additive, so it is not listed in Part 177 the way a polymer resin is. There is no “FDA letter” for stainless plate equivalent to the resin manufacturer’s letter a plastic tank buyer asks for.
For a stainless sanitary vessel, FDA compliance therefore rests on three things instead:
- The metal – demonstrated by material test reports traceable to heat number, showing the grade specified was the grade installed. This is what 21 CFR 211.184 relies on.
- The surface condition – demonstrated by surface finish records and a passivation record to ASTM A967. This is how you evidence 211.65(a): a free-iron-contaminated or rouged surface is reactive.
- The non-metallic parts – and this is the one that gets missed. Gaskets, O-rings, diaphragms, hoses and seals are polymers, and they DO fall under Part 177, typically 177.2600 for rubber articles. Your stainless vessel contains regulated plastics whether or not anyone mentioned it.
So the elastomer certificates matter more than the steel certificate on this question – the steel is compliant by being the right grade in the right condition, while the gaskets are compliant only if the compound is listed and the supplier can show it. Ask for elastomer certification by name and CFR reference, not “food grade” on an invoice.
FDA compliance versus certification – two different things
| FDA compliance | A certification such as NSF/ANSI 61 or 3-A | |
|---|---|---|
| Who grants it | Nobody – it is a state of conformity you assert and evidence | An accredited certifier, to a defined scheme |
| Who verifies it | You, through your records – and an inspector, after the fact | A third party, before you buy |
| What you receive | Material and treatment records you assemble | A mark and a listing you can look up |
| Who carries the obligation | The manufacturer using the tank, not the FDA and not the fabricator | Shared – the certifier attests, you still operate it correctly |
| Does the FDA inspect the tank | No. The FDA does not inspect or approve storage tanks | Not applicable |
The consequence for a buyer is simple and slightly uncomfortable: the obligation sits with you, not with your fabricator. A fabricator supplies materials, records and a vessel built to your specification. Whether the installed system complies is judged against your written procedures under 21 CFR 211.100(a), which is why specifying the standards by clause and requiring the records at handover is the whole of the practical answer.
What to ask for, specifically
- Material test reports traceable to heat number for every product-contact component
- Elastomer certificates with the CFR reference for every gasket, O-ring, diaphragm and seal
- Surface finish measurement records covering welds as well as the shell
- Passivation record naming the ASTM A967 designation and the acceptance test
- Weld map, weld log and NDE reports
- NSF/ANSI 61 listing where the vessel is in potable water service
- 3-A or USDA evidence where food or dairy applies
- ASME Form U-1 and code stamp where the vessel or jacket is code construction
Related: what certifications a tank fabricator should hold – where, unlike the FDA question, the ASME code genuinely does accredit the shop.
