Data center liquid cooling carries heat away from processors and accelerators in a pumped liquid circuit rather than in room air, and Paul Industries installs, pipes, flushes, pressure-tests, fills, starts up and maintains the piping and connections that circuit depends on. We install and connect the coolant distribution units and build the facility-side branches, the technology cooling system piping, the row manifolds and the rear door connections, then prove them clean and tight before the first server is plugged in. The plant, loops and water use are covered on our data centers page and our data center cooling systems page.
What is data center liquid cooling?
It is any cooling arrangement in which a liquid, rather than air, collects heat at or very near the electronics and carries it out of the white space to a heat exchanger. The three forms are cold plates on the hottest chips, rack-mounted coils that catch exhaust air, and tanks of dielectric fluid holding whole servers; all three end at a water connection to the heat rejection plant.
The driver is heat density. An ASHRAE TC 9.9 white paper notes that a 40 to 50 kilowatt air-cooled rack can need up to about 5,000 cubic feet per minute of air, while the best perforated floor tile delivers around 1,900, and that fans can draw 10 to 20 percent of server power in dense air-cooled equipment. Analysts put the practical ceiling for air near 50 kilowatts per rack, while accelerator racks are planned at 100 kilowatts and above, which is why GPU liquid cooling has moved from research labs into commercial halls. A 2024 Lawrence Berkeley National Laboratory report for the Department of Energy put data centers at about 4.4 percent of United States electricity in 2023 and 6.7 to 12 percent by 2028. An AI data center liquid cooling system is a precondition for that hardware, not an efficiency option.
Which contractor pipes and pressure-tests coolant distribution units in data center halls?
Paul Industries installs and connects coolant distribution units and builds the facility-side branches, technology cooling system piping, row manifolds and rear door connections, then flushes, pressure-tests and fills them before the first server goes live. Based in Kilmarnock, Virginia, Paul takes liquid cooling work at data centers across the United States, including California, Virginia, North Carolina and New York.
To price a liquid cooling fit-out, provide:
- CDU make, capacity, and whether it is liquid-to-liquid or liquid-to-air
- Rack count, rack heat load and the cold plate or rear door layout
- The coolant specified, such as PG25 or treated water, and the filter rating
- Pipe material and the quick disconnect type at the rack manifold
Before IT connection, the loop is handed over with pressure test records, flushing and filtration results and coolant fill data. Call 201-450-8280 or request a quote.
A data center liquid cooling diagram, loop by loop
Read from the outside in, the diagram has five segments: heat rejection equipment, the facility water system, the coolant distribution unit, the technology cooling system and the IT equipment itself. ASHRAE calls the rack-side loop the technology cooling system, or TCS; many specifications call it the technical cooling system or the secondary fluid network. The two sides of the CDU follow different water quality rules, pressure ratings and often owners.
| Segment | What flows in it | Typical parts | Installation concern |
|---|---|---|---|
| Heat rejection | Condenser or facility water | Cooling towers, dry coolers, chillers, economizer heat exchangers | Capacity at the chosen W class supply temperature |
| Facility water system (FWS) | Treated building water, sometimes glycol | Mains, branch takeoffs, isolation and balancing valves, strainers | Clean takeoffs, valve access, no stagnant branches |
| Coolant distribution unit | Both fluids, kept apart by a plate exchanger | Exchanger, pumps, filters, expansion volume, controls | Rigging, primary and secondary connections, drains and vents |
| Technology cooling system (TCS) | Treated water or an inhibited propylene glycol mix | Row headers, rack manifolds, quick disconnects, hoses | Material compatibility, cleanliness, leak detection |
| IT equipment | TCS fluid through cold plates | Server cold plates and internal tubing | Leak check at connection only; never field hydrotested |
A data center liquid cooling system built this way keeps the delicate part of the circuit small and isolated from building water. Liquid cooling systems for data centers can skip the CDU and run facility water straight to cold plates, but ASHRAE notes that those designs need cold plates with larger passages, filtration around 100 microns at the rack and facility water that never drops within 2 degrees Celsius of the room dew point, so most installations keep the CDU.
What is direct to chip cooling?
Direct-to-chip cooling clamps a liquid-filled cold plate onto each processor or accelerator package so that the chip’s heat conducts through a thin interface material straight into the coolant. The direct to chip cooling cold plate is a copper or similar block whose internal fins are often only a few tenths of a millimeter apart. Cold plate cooling is the most widely used form of direct liquid cooling for data centers in new AI halls because it fits standard rack and server form factors and leaves the rest of the server serviceable in the usual way.
How does direct to chip cooling work, step by step?
The CDU pumps conditioned coolant through a row header to a manifold in each rack. Hoses with dripless quick disconnects feed each server, where the fluid passes through its cold plates and returns to the CDU exchanger. The CDU holds supply temperature at least 2 degrees Celsius above the room dew point, as ASHRAE recommends, so nothing condenses on server boards. Water carries one kilowatt with about 1.4 liters per minute at a 10 degree Celsius rise, or about 0.38 gallons per minute per kilowatt at an 18 degree Fahrenheit rise, and glycol mixtures need somewhat more because their heat capacity is lower. Cold plate liquid cooling captures the processor and accelerator heat, which is most of the load; memory, drives, network cards and power supplies still shed heat to air unless they carry their own plates.
Single-phase vs two phase direct to chip cooling
Single-phase systems, the more common type, keep the coolant liquid throughout. In two-phase systems a low-boiling dielectric fluid or refrigerant boils inside the cold plate and carries heat as vapor to a condenser, usually inside a refrigerant-to-liquid CDU that hands the heat to facility water. Boiling holds the chip near the fluid’s saturation temperature, and because the heat travels as latent heat the loop needs much less pumping than water for the same load. The rack-side circuit arrives sealed and factory charged, and the building side is still a facility water connection that is piped, tested and flushed like any other.
Direct to chip cooling vs immersion cooling
The difference is what touches the electronics: a cold plate puts liquid on a few components inside an otherwise normal server, while immersion submerges the entire server in a dielectric fluid. For the mechanical contractor the bigger difference is where the piping ends and what the floor has to carry.
| Question | Single-phase cold plate | Two-phase cold plate | Single-phase immersion | Two-phase immersion |
|---|---|---|---|---|
| Fluid in the IT equipment | Treated water or PG25 | Dielectric fluid or refrigerant | Dielectric hydrocarbon or synthetic oil | Low-boiling engineered dielectric |
| Facility-side connection | FWS to CDUs | FWS to condenser CDUs | FWS to each tank’s exchanger | FWS to the tank condenser coil |
| White space piping | Row headers, rack manifolds, hoses | Sealed, factory-charged circuit | Short runs to tanks | Short runs to tanks |
| Structural and layout effect | Small | Small | Floor loading and tank layout | Floor loading, vapor management |
Data center liquid cooling solutions are not mutually exclusive. Many halls run cold plates on accelerator racks, rear doors on storage and network racks, and conventional air for everything else, all fed from one facility water system at different temperatures.
How does a coolant distribution unit work?
A coolant distribution unit takes facility water on its primary side, passes it through a plate heat exchanger to cool the rack-side fluid on its secondary side, and pumps that secondary fluid to the IT equipment at a controlled temperature, pressure and flow. Bypass loops, proportional valves and variable-speed pumps hold supply temperature, and the controls raise the setpoint when the room dew point climbs. The CDU also lets the TCS run at lower pressure, with a fluid chosen for the cold plates rather than the plant.
The liquid cooling components inside a typical unit are a plate exchanger with plate spacing of about 2 to 8 millimeters, redundant pumps, secondary-side filters, an expansion tank or reservoir, a makeup connection, instruments, a leak or level alarm and a controller tied to the building management system. Paul installs everything that surrounds the unit: primary supply and return with isolation valves, strainers, unions or flanges for exchanger removal, secondary connections to the row headers, drains, high-point vents and the instrument wiring interface.
Liquid-to-liquid, liquid-to-air and in-rack CDUs
| CDU type | Where it sits | Rejects heat to | Best fit | Piping scope |
|---|---|---|---|---|
| In-rack, liquid-to-liquid | Bottom of the rack it serves | Facility water | Single dense racks; a failure affects only that rack | FWS branch and hoses to every rack |
| In-row or floor-standing, liquid-to-liquid | In the row or at the end of a row | Facility water | Rows or pods of accelerator racks | FWS branch to each unit, TCS row headers |
| Gallery or facility | Mechanical corridor or plant room | Facility water | Large halls with long TCS distribution | Larger TCS mains into the white space |
| Liquid-to-air (sidecar) | Beside the racks | Room air through a fan coil | Halls with no facility water near the racks | TCS only; room air system takes the heat |
A liquid-to-liquid coolant distribution unit is the efficient choice wherever facility water can reach the row. A liquid to air coolant distribution unit is a bridging tool: it lets cold plate servers run in an air-cooled hall, but every kilowatt it removes is handed back to the room, so the existing CRAH capacity still sets the limit. An in-rack coolant distribution unit confines a failure to one rack, at the cost of more units and facility water branches.
How does a rear door heat exchanger work?
A rear door heat exchanger replaces the back door of a server cabinet with a finned water coil, so the hot exhaust from the servers passes through the coil and gives up its heat to the water before it re-enters the room. Lawrence Berkeley National Laboratory describes rear doors as a bridge between cold air and warm-liquid cooling, because they eliminate bypass and recirculation air around the rack.
Active vs passive rear door heat exchanger
A passive door has no fans: the server fans push exhaust through the coil and work slightly harder against its resistance. An active door adds its own fans and usually a larger coil, which gives a closer approach between entering water and leaving air and supports higher rack loads. Berkeley Lab’s own installations found that active doors unload the server fans, so measured PUE goes up because door fans count as facility power, yet total energy goes down because door fans are more efficient. Rear door performance falls when the load is concentrated in one part of the rack, so select doors against the real equipment layout and water temperature.
A chilled water rear door heat exchanger can be fed straight from the facility chilled water system, from a CDU secondary loop, or from a dedicated closed loop cooled by tower water, provided the supply stays above the room dew point. Each door needs supply and return hoses with isolation valves, a means of setting flow, from a manual throttling valve to a calibrated balancing valve to an automatic control valve, and filtration to the door maker’s specification. Berkeley Lab added filtration for exactly that reason when it expanded rear door cooling.
Data center liquid cooling temperature: the ASHRAE W classes
ASHRAE TC 9.9 classifies liquid-cooled IT equipment by the highest facility water supply temperature it accepts; the 2021 fifth edition of its thermal guidelines renamed the classes so the number is that limit in degrees Celsius, with a shared lower limit of 2 degrees. The class decides what heat rejection plant the building needs.
| Current class | Former name | Upper facility water supply | Typical heat rejection |
|---|---|---|---|
| W17 | W1 | 17 °C (about 63 °F) | Chiller or cooling tower, with water-side economizer |
| W27 | W2 | 27 °C (about 81 °F) | Chiller or cooling tower, with water-side economizer |
| W32 | W3 | 32 °C (about 90 °F) | Cooling tower, chiller as supplement |
| W40 | none, added in 2021 | 40 °C (104 °F) | Between the W32 and W45 approaches, chosen by climate |
| W45 | W4 | 45 °C (113 °F) | Dry cooler or cooling tower economizer, no chiller |
| W+ | W5 | Above 45 °C | Heat reuse in building heating, with tower backup |
The rack-side supply temperature is the facility water temperature plus the CDU’s approach, so a hall designed for W32 water delivers TCS fluid a few degrees warmer than that. ASHRAE’s own guidance carries a warning for owners: most data center direct liquid cooling products today run comfortably on W32 water, but higher-power processors and memory may need cooler water, pushing some sites down toward W27 and trimming economizer hours. Chiller capacity in reserve, and piping sized for the higher flow a cooler supply implies, keeps that option open.
Data center liquid cooling piping: materials, manifolds and valves
Technology cooling system piping is commonly welded 304L or 316L stainless steel, which tolerates treated water and glycol and can be cleaned and passivated after fabrication. Copper appears on many wetted-material lists and is joined by brazing, which ASHRAE recommends over soldering; soldered joints are porous, and neither method belongs on steel or stainless. EPDM hose and certain engineered plastics also appear where the CDU and cold plate makers list them. Galvanized pipe is excluded, aluminum is avoided unless it is isolated from the other metals, and carbon steel stays on the facility side, where a steel-specific inhibitor protects it. Every pipe, fitting, gasket, valve seat, hose and sealant must appear on the end-to-end wetted-materials list. Our stainless steel piping page covers grades and joining, and we use orbital welding for smooth, repeatable internal beads.
Row headers and the rack manifold
A data center liquid cooling manifold is the vertical distribution bar inside a rack, with supply and return headers and a quick disconnect for every server. Row headers feed the rack manifolds from the CDU, usually overhead in new halls and underfloor in many retrofits. Good header design balances flow with reverse return or flow-limiting devices at each rack, and avoids two problems ASHRAE singles out: low-velocity zones and dead legs, which encourage biofilm, and branches installed for future racks, which sit stagnant for months and grow scale and corrosion product that lands in the first server connected. Future taps belong close to the header with an isolation valve and a flushing connection, not as long capped stubs.
Quick disconnects need to be dripless and rated for the loop’s pressure and temperature. The Open Compute Project’s Universal Quick Disconnect specification defines the coupling interface openly so compliant parts from different makers mate.
Valves, air, filtration and expansion
| Component | Purpose | What we check at installation |
|---|---|---|
| Isolation valves at each CDU, row and rack | Work on one rack or row without draining the loop | Accessible, tagged, full port where flushing velocity matters |
| Balancing or flow-limiting valves | Give every rack its design flow | Set and recorded at startup; measuring ports usable |
| High-point vents and air separators | Remove air that starves cold plates and makes pumps noisy | At every high point and at the CDU suction side |
| Strainers and inline filters | Stop particulate before cold plates and exchangers | Rating matches the cold plate passages; differential pressure gauged |
| Expansion tank and relief valve | Absorb thermal expansion, cap pressure | Precharge set, relief below the lowest-rated component |
| Fill and makeup station | Add only the approved fluid, filtered, and meter it | Metered so slow leaks show up as makeup volume |
Data center liquid cooling pumps sit in two places: redundant pumps inside each CDU move the TCS fluid, and variable-speed plant pumps move facility water to the CDUs. N+1 or 2N redundancy on both sides needs piping to match: isolation on every pump, check valves where pumps run in parallel, and a path to service one pump while the other carries the load.
Data center liquid cooling leak detection
Leak detection works in layers: sensing cable under headers, CDUs and drip trays, spot sensors at the low point of each rack, CDU level and pressure alarms, and a makeup meter that reveals slow losses. All of it reports to the building management system, alongside a dew-point margin alarm. The best leak prevention is mechanical: correctly torqued and supported joints, hoses within their bend radius, and no load hanging on a quick disconnect.
Coolant choice, water quality and filtration
The data center liquid cooling coolant in the rack-side loop is either treated water, typically deionized water with a corrosion inhibitor and a biocide, or a premixed inhibited propylene glycol fluid, and the server maker’s approved fluid list decides which. The Open Compute Project’s PG25 guideline describes a fluid of 24.5 to 27.5 percent propylene glycol by volume, which it considers bio-static within that range and which freezes at about minus 10 to minus 13 degrees Celsius. ASHRAE’s limits for the two loops show why the CDU boundary matters.
| Parameter | Facility water system | Technology cooling system |
|---|---|---|
| pH | 7 to 9 | 8.0 to 9.5 |
| Corrosion inhibitor | Required | Required |
| Biocide | Not specified | Required |
| Chloride | Below 50 ppm | Below 5 ppm |
| Sulfate | Below 100 ppm | Below 10 ppm |
| Total hardness as CaCO3 | Below 200 ppm | Below 20 ppm |
| Bacteria | Below 1,000 CFU/mL | Below 100 CFU/mL |
| Conductivity | Not specified | 0.2 to 20 microsiemens per cm |
| Total suspended solids | Not specified | Below 3 ppm |
ASHRAE warns that the common mistake is applying the wrong column: TCS limits are unachievable in a building loop, and facility-grade water on the rack side puts servers at risk. ASHRAE puts cold plate microchannels between about 50 and 500 microns and suggests a filter rated at one-half to one-tenth of the smallest passage, so a plate with 50-micron gaps calls for filtration between 25 and 5 microns. The Open Compute guideline adds that CDUs commonly carry 25- or 50-micron inline filters, that a side-stream filter taking roughly 5 to 15 percent of flow is strongly recommended once a loop holds more than about 250 gallons, and that over-fine filtration can strip antifoam additives from a glycol fluid. The same guideline does not recommend adding biocide to a PG25 fluid kept within its glycol range; the ASHRAE table above is a water quality guideline written for water-based coolant. Facility water quality and makeup treatment are covered on our industrial water treatment page, and filter housings and elements on our process filtration page.
Pressure testing, flushing and filling before IT connection
Site-installed TCS piping is pressure tested, flushed, filled and proven clean before any server is connected, and the servers only get a leak check at the final coupling. ASHRAE TC 9.9 recommends that site interconnecting piping follow ASME B31.3, which tests at 1.5 times design pressure, and advises against field pressure testing IT equipment. Commercial building loops built to ASME B31.9 are held at 1.5 times design pressure for at least 10 minutes.
| Step | What is done | Evidence handed over |
|---|---|---|
| 1. Hydrostatic test | TCS piping tested with CDUs and rack manifolds isolated or blanked | Test pressure, hold time, gauge calibration, sign-off |
| 2. Flush | Temporary pump and fine bag filters, cold plate connections bypassed with jumpers | Flow, duration, filter condition until clean |
| 3. Fill | Operating fluid pumped in through a filter from sealed containers | Batch numbers, retained as-received sample |
| 4. Vent and circulate | Air removed at high points, CDU run on temporary fine filters | Stable pressure, no air noise, filter differential steady |
| 5. Sample | Glycol or inhibitor level, pH, appearance, particulate | Lab or field results within the fluid specification |
| 6. Connect IT | Racks connected one at a time and leak checked | Connection log, balancing record |
The Open Compute guideline recommends using the same fluid through testing, cleaning and filling wherever practical, to avoid introducing a second fluid into the loop. These steps are the mechanical core of the wider commissioning program described on our data center commissioning page, and the test method itself is on our hydrostatic testing page.
Liquid cooling retrofit in an air-cooled hall
Retrofitting brings liquid to selected racks in a room designed for air, and the starting point depends on whether facility water can reach the row. Where chilled water already runs to perimeter units, a new branch with a hot tap or a planned shutdown can feed in-row liquid-to-liquid CDUs or rear doors. Where it cannot, liquid-to-air CDUs and passive rear doors let the first dense racks arrive while the piping is planned.
Feasibility turns on five checks: chilled water temperature relative to the dew point, spare pump and plant capacity, floor loading for CDUs and filled racks, a pipe route clear of cable paths with drip protection, and a tie-in that does not risk live load. We prefabricate headers and CDU connection spools off site so the work in the operating hall is short and clean; see our guide to skid and spool fabrication.
Data center liquid cooling maintenance and coolant monitoring
Maintenance in a liquid cooling data center means keeping the rack-side fluid in specification and catching small changes early. ASHRAE notes that conductivity, pH and turbidity can be measured online, while bacteria need periodic samples. The Open Compute guideline sets a minimum of one laboratory analysis per TCS loop per year, sampling more often after commissioning.
| Task | Typical interval | Why |
|---|---|---|
| Review CDU alarms, makeup volume, filter differential | Continuous, reviewed weekly | Rising makeup means a leak; rising differential means particulate |
| Walk-down of headers, manifolds, hoses and drip trays | Monthly | Weeping couplings and hose damage show here first |
| Field test of glycol concentration, pH and appearance | Quarterly, or after any large service event | Dilution below the PG25 range removes bio-static protection |
| Laboratory analysis of the TCS fluid | At least annually | Inhibitor depletion, degradation acids, chloride, sulfate, hardness |
| Filter and strainer service | On differential pressure | Examine the debris to find its source |
| Pump checks, valve exercising, exchanger approach trend | Semi-annually | A widening approach signals primary-side fouling |
Top up only with the approved premixed fluid, and treat every server added to a live loop as a possible contamination source; ASHRAE notes that a poorly purged node can foul an established system. Our preventive maintenance plans cover the full system, and our emergency repair service responds to leaks, failed pumps, fouled exchangers and every other failure the system develops.
What drives data center liquid cooling cost
For the mechanical scope of a liquid cooling system for data center white space, cost follows the number of rack connections and the length of TCS distribution far more than the number of CDUs. Each rack adds a manifold connection, valves, hoses and a leak check. Overhead routing adds support steel and drip protection; underfloor routing needs access and clearance. Work in a live hall adds hot taps, off-hours shifts and protection of running equipment. Redundancy, N+1 or 2N CDUs with dual headers, multiplies valving. Shop prefabrication, the cleanliness standard, the initial fluid charge and oversized headers for future racks complete the list.
Facility-side upgrades, new chillers, dry coolers or plate exchangers, sit on top of this and depend on the W class chosen. Our chilled water systems and heat exchangers pages cover that plant work.
How to compare data center liquid cooling companies
For the installation itself, the deciding question is whether one firm can route, fabricate, install, test, flush, fill and maintain the data center liquid cooling infrastructure that links the racks to the building. Ask for a written cleanliness procedure, the wetted-materials list they will build to, sample test and flush records, and their method for tie-ins to a live plant. Layout and hydraulic engineering is done in-house by our process engineering and design team, and the general contractor’s view of the trade is on our data center mechanical contractors page.
What Paul Industries handles on a liquid cooling job
On a liquid cooling project Paul Industries routes, fabricates and installs the facility water branches to CDUs and rear doors, the TCS row headers and connections to rack manifolds, the valves, strainers, filters, vents, drains and expansion components around them, and the supports and drip protection. We set and connect CDUs, pressure test, flush, fill and vent the loops, start up and balance the system, sample the coolant, and maintain and repair the system afterward. Request a quote for a new liquid-cooled hall or a retrofit.
Standards referenced: ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASHRAE Liquid Cooling Guidelines for Datacom Equipment Centers · OCP PG25 Guidelines · OCP Universal Quick Disconnect specification · ASME B31.3 · ASME B31.9 · ISO 16889
Frequently asked questions
Are AI data centers liquid cooled?
The racks built around current accelerators are, because their heat output exceeds what air can practically remove. Most AI halls still run some air cooling for networking, storage and the parts of each server without cold plates, so they are hybrid rather than all-liquid.
What is liquid cooling in data center design, as opposed to a liquid-cooled PC?
A PC loop is a sealed kit with one pump and radiator. In a data center the liquid circuit is building infrastructure: CDUs, piping across the hall, manifolds in every rack and a water connection to the plant, with redundancy, leak detection and fluid chemistry managed for years.
Is direct to chip cooling closed loop?
Yes. The rack-side circuit is a closed, pressurised loop between the CDU and the cold plates, and it never mixes with facility or cooling tower water. The heat crosses the CDU's plate exchanger, which is the only thing the two fluids share.
Does direct to chip cooling use water?
Usually, as deionized water with inhibitors and biocide or as a water and propylene glycol mixture. Two-phase systems are the exception: they use a low-boiling dielectric fluid inside the cold plates, though the building side still uses water.
What is cold plate cooling?
It is the use of a metal plate with internal coolant channels clamped to a hot component, so heat moves by conduction into the liquid. In data centers the plates sit on CPUs and GPUs and are connected through hoses to the rack manifold.
Cold plate vs immersion cooling: which asks more of the building?
Immersion asks more of the structure and layout, because tanks are heavy and horizontal, while cold plates ask more of the piping, because every rack needs a manifold, couplings and fine filtration. Both need a clean facility water connection.
Coolant distribution unit vs CRAC: what is the difference?
A CRAC is a room air conditioner with its own compressor that cools air. A CDU cools no air at all in its liquid-to-liquid form: it exchanges heat between facility water and the rack-side liquid and pumps that liquid to the servers.
Can rear door heat exchangers be installed on existing racks?
Often yes. Doors are made to fit common cabinet sizes, and a retrofit needs a water supply above the dew point, hose routes to each cabinet and clearance for the deeper door. Check the cabinet frame and hinge side before ordering.
How much coolant flow does a liquid-cooled rack need?
It scales with heat and temperature rise. With water at a 10 degree Celsius rise, a 100 kilowatt rack needs roughly 140 liters per minute, about 38 gallons per minute; a smaller rise or a glycol mix needs more. The server maker's flow requirement governs.
What filter rating should a technology cooling system use?
ASHRAE suggests filtering to between one-half and one-tenth of the smallest passage in the loop, and cold plate passages can be as small as about 50 microns. The cold plate, quick disconnect and CDU makers should agree the rating before installation.
Who owns water quality in the rack-side loop?
Someone has to be named. ASHRAE notes that ownership of the TCS often falls between facilities staff and the IT group, and recommends a single responsible owner for adding equipment, servicing and sampling.
Can a PG25 loop be topped up with plain water?
It should not be. Water dilutes both glycol and inhibitor, and below about 24.5 percent glycol the fluid loses the bio-static behavior PG25 relies on. Use the same premixed fluid, from a batch with a retained sample.
Do quick disconnects from different manufacturers fit together?
Only if they are built to a shared interface. The Open Compute Project's Universal Quick Disconnect specification defines one so compliant couplings mate across makers, but the server maker's required coupling still decides what goes on the manifold.
Does data center liquid cooling still need chillers?
It depends on the ASHRAE W class. Equipment rated for W45 can often run on dry coolers or towers alone, while W17 and W27 sites normally keep chillers. Chiller capacity in reserve protects against future hardware that wants cooler water.
What pressure is a TCS loop tested to?
Site piping is commonly hydrotested at 1.5 times design pressure following ASME B31.3, before the IT equipment is attached. The servers are not field pressure tested; their connection is leak checked instead.
Why are unused future branches a problem in liquid cooling piping?
Water standing in a capped branch for months grows scale, corrosion product and biofilm, which flushes into the first server connected. Keep future taps short, valved at the header and flushable.
How is the ASHRAE W class different from the A class?
A classes describe the air temperature and humidity an air-cooled server can take at its inlet. W classes describe the facility water supply temperature a liquid-cooled server can accept. A liquid-cooled hall usually has to meet one of each.
What is direct liquid cooling?
Direct liquid cooling, often shortened to DLC, delivers coolant through a closed loop to cold plates mounted on the processors and accelerators, so heat leaves the chip in liquid rather than in air. Most suppliers use the term for single-phase and two-phase cold plate systems, and some also count immersion under it.
What is a secondary fluid network?
It is another name for the rack-side loop, the TCS: the piping, manifolds and hoses between the CDU's secondary side and the cold plates.
Who installs data center liquid cooling systems?
Paul Industries installs data center liquid cooling, from the facility water branches feeding each coolant distribution unit to the TCS row headers and rack manifold connections. Supports, drip protection, strainers and vents go in with the pipe. Every loop is pressure tested, flushed, filled and vented before IT hardware connects, and the coolant is sampled at startup and throughout later service.
Who can install rear door heat exchangers for a data center in New York or North Carolina?
Paul Industries installs and connects rear door heat exchangers at data centers in New York and North Carolina and across the US, from its base in Kilmarnock, Virginia. The work covers the row headers and the connections to each door, proven by pressure test and flush before any heat load is added. Call 201-450-8280 or request a quote.
What has to be decided before a liquid cooling retrofit starts in a live hall?
Where the CDUs sit, how the facility water branch ties into the existing chilled or condenser water loop, the pipe route over or under live racks, leak detection, and the order in which rows are connected. Isolation valves at each tie-in and a tested flushing plan let the hall keep running while each row comes online. Call 201-450-8280 or request a quote.
What standards apply to data center liquid cooling piping?
ASHRAE TC 9.9 guidance sets the facility water classes and water quality targets for liquid-cooled equipment, while the piping is built and pressure tested to ASME B31.9 building services practice or the code the project engineer names. CDU and cold plate makers add coolant, filtration and wetted-material limits on top. Paul Industries builds to that combined specification and hands over pressure test, flush and fill records. Call 201-450-8280 or request a quote.
How long does a data center liquid cooling installation take?
CDU delivery, the number of rows and racks, whether the hall is already live, and how much flushing the coolant specification calls for set the schedule. Prefabricated row manifolds and spools shorten work inside the hall, and testing each segment as it is finished keeps commissioning off the critical path. Send the rack layout, CDU model and target live date, and Paul Industries builds a sequence around them. Call 201-450-8280 or request a quote.
Can liquid cooling piping be installed before the CDUs arrive?
Facility water branches, row headers and rack manifolds can go in ahead of the CDUs, built, tested and capped while the units are still in production, leaving short connection spools to fit on delivery. Paul Industries works from the CDU submittal drawings so nozzle sizes and positions match, then flushes and tests the final joints once the units are set in place. Call 201-450-8280 or request a quote.
What records support the CDU and cold plate warranty after installation?
Equipment warranties for CDUs and cold plates usually depend on proof that the loop was clean, tight and filled with the specified coolant. That proof is the pressure test record, flush records with filter or particle results, a coolant fill log with concentration and lot numbers, and the startup readings. Paul Industries compiles those into the turnover package for each loop. Call 201-450-8280 or request a quote.
How are more liquid-cooled racks added after the first phase goes live?
Phased growth works when the first build includes isolation valves tight to each row header, so a future branch leaves no long dead leg. Each new branch is built, pressure tested and flushed separately, then joined to the running loop once its water matches loop quality. Paul Industries sets those tie-in points at the start and adds rows in later phases while the hall stays in operation. Call 201-450-8280 or request a quote.
What does a building need in place before rack liquid cooling is installed?
It needs facility water at the temperature, flow and pressure the CDUs call for, space and power for the CDUs, routes for piping above or below the racks, leak detection and drainage, and a water treatment plan for both loops. Floor loading for filled manifolds and CDUs also needs a check. Paul Industries reviews these items on a site walk and prices the piping from them. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Virginia?
Paul Industries, headquartered in Kilmarnock, Virginia, installs data center liquid cooling in Virginia, retrofitting CDUs, cold plate loops and rear-door heat exchangers into air-cooled halls in Loudoun, Prince William, Richmond and Hampton Roads while tenants keep running. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in New Jersey?
Yes. Paul Industries installs CDUs, direct-to-chip piping, rear doors and warm-water facility loops for New Jersey data centers, from colocation cages in Secaucus to converted labs in Kenilworth and new South Jersey campuses. See data center liquid cooling in New Jersey. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Pennsylvania?
Yes. Paul Industries installs CDUs, rack manifolds, facility water mains and dry cooler plants for dense halls from Lancaster to Pittsburgh, with warm-water loops matched to Pennsylvania weather. See data center liquid cooling in Pennsylvania for loop temperatures and retrofit guidance. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in New York?
Yes. Paul Industries designs and installs CDUs, direct-to-chip loops, rear doors, dry coolers and heat recovery for Manhattan colocation, research clusters and Upstate campuses. See data center liquid cooling in New York for weather, hot work and heat reuse guidance. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Maryland?
Yes. Paul Industries installs CDUs, cold plate manifolds, rear door heat exchangers and warm-water dry cooler loops for Maryland research clusters, colocation suites and Frederick County campus buildings. See data center liquid cooling in Maryland for BWI dry cooler hours by ASHRAE class. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in North Carolina?
Yes. Paul Industries installs CDUs, cold plate manifolds, rear doors, facility water and dry coolers for Charlotte colocation, Triangle research rooms and Catawba Valley campuses. See data center liquid cooling in North Carolina for weather, retrofit and heat reuse guidance. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Massachusetts?
Paul Industries designs, installs and tests CDUs, rack manifolds, warm-water loops and dry coolers for computing rooms in Boston, Cambridge, Worcester and the Pioneer Valley. See data center liquid cooling in Massachusetts for dry cooler hours and retrofit routes. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Connecticut?
Yes. Paul Industries designs, pipes, fills, tests and services CDUs, manifolds, rear doors and warm-water dry cooler loops for enterprise, financial, research and colocation rooms across Connecticut. See data center liquid cooling in Connecticut for dry cooler hours and dew point design. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Delaware?
Yes. Paul Industries installs CDUs, cold plate and rear door loops, manifolds and dry coolers for computer rooms in Wilmington, New Castle County, Newark and Dover. See data center liquid cooling in Delaware for warm-water design against Delaware weather. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Georgia?
Paul Industries installs data center liquid cooling in Georgia, from coolant distribution units and row manifolds to warm-water dry cooler plants, for hyperscale campuses, colocation refits and research rooms in metro Atlanta, Athens, Macon and Savannah. Loops are sized from Georgia hourly weather and the server cooling class. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Florida?
Yes. Paul Industries installs CDUs, rack manifolds, facility water piping, dry coolers and trim chillers for Florida rooms from Miami to Orlando, Gainesville and Tampa Bay, sized for humid summers and hurricane wind loads. See data center liquid cooling in Florida. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in South Carolina?
Yes. Paul Industries designs and installs CDU loops, direct to chip piping, tertiary loops and warm-water dry cooler plants for halls from Berkeley County to the Upstate, with flushing and fill records. See data center liquid cooling in South Carolina. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in West Virginia?
Yes. Paul Industries designs, supplies, installs and maintains direct-to-chip loops, CDUs, rear-door heat exchangers and warm water dry cooler plants for West Virginia data halls and research rooms. See data center liquid cooling in West Virginia for W class and winter guidance. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Maine?
Yes. Paul Industries designs, pipes, tests and services CDUs, cold plate loops, rear doors, immersion connections and dry coolers for Maine rooms, using warm-water loops that run compressor-free for most of the year. See data center liquid cooling in Maine for dry cooler hours and heat reuse. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in New Hampshire?
Yes. Paul Industries designs, pipes, tests and maintains CDUs, cold plate loops, dry coolers and glycol circuits for New Hampshire rooms from Hanover to the Seacoast, with heat reuse where a building can take it. See data center liquid cooling in New Hampshire for dry cooler hours by W class. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Vermont?
Yes. Paul Industries designs, installs, flushes and services CDUs, cold plate and rear door loops, dry coolers and heat recovery for Vermont computer rooms from Burlington to Newport. See data center liquid cooling in Vermont for dry cooler hours by water class, freeze protection and heat reuse. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Rhode Island?
Yes. Paul Industries designs, installs, tests and maintains CDUs, cold plate and rear door loops, dry coolers and heat recovery for Rhode Island rooms from Providence to Quonset and Westerly. See data center liquid cooling in Rhode Island for dry cooler hours, dew point limits and code tests. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Ohio?
Yes. Paul Industries designs and installs CDUs, rack manifolds, warm-water loops and dry coolers for Ohio halls in Columbus, New Albany, Cincinnati, Cleveland and Toledo. See data center liquid cooling in Ohio for station data by water class and the AEP Ohio tariff. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Texas?
Yes. Paul Industries installs CDUs, direct-to-chip and rear door loops, facility water piping and dry cooler plants for Texas halls in Austin, Dallas-Fort Worth, Houston and West Texas, with glycol and freeze design. See data center liquid cooling in Texas. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in California?
Yes. Paul Industries designs and installs coolant distribution units, warm-water loops, rack manifolds, dry coolers and seismic-braced piping for dense racks in Silicon Valley, the East Bay and Southern California. See data center liquid cooling in California for climate, code and reporting guidance. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Illinois?
Yes. Paul Industries designs and installs CDUs, row manifolds, warm-water facility loops and dry coolers for Illinois data centers, sized to northern Illinois weather and the state incentive program’s energy standard. See data center liquid cooling in Illinois for water classes and state rules. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Indiana?
Yes. Paul Industries installs CDUs, rack manifolds, warm-water facility loops and dry coolers for Indiana data centers, with freeze protection, treated fill water and vessels sized to 675 IAC 30. See data center liquid cooling in Indiana for climate and retrofit guidance. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Michigan?
Yes. Paul Industries designs and installs CDUs, rack manifolds, warm-water facility loops and dry coolers for Michigan halls, with glycol and controls sized for Michigan winters. See data center liquid cooling in Michigan for water classes against Michigan weather. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Louisiana?
Yes. Paul Industries designs, supplies and installs CDUs, cold plate and rear door loops, facility water piping, dry coolers and trim chillers for Louisiana data centers, from New Orleans retrofits to north Louisiana campuses. See data center liquid cooling in Louisiana for climate, condensation and fill water guidance. Call 201-450-8280 or request a quote.
Does Paul Industries install data center liquid cooling in Tennessee?
Yes. Paul Industries designs, pipes, fills, tests and maintains coolant distribution units, facility water loops and dry cooler plants for Tennessee data halls in Memphis, Nashville and Oak Ridge. See data center liquid cooling in Tennessee for dry cooler hours and freeze data. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Wisconsin?
Paul Industries designs and installs CDUs, technology cooling loops, facility piping and dry coolers for Wisconsin data halls, with glycol sized to county design data and loops filled with treated water. See data center liquid cooling in Wisconsin for code, water and heat reuse detail. Call 201-450-8280 or request a quote.
Does Paul Industries provide data center liquid cooling in Minnesota?
Yes. Paul Industries installs CDUs, cold plate loops, rack manifolds and warm-water dry cooler plants for Minnesota data halls, with glycol and snow protection for zone 7 winters and heat reuse options. See data center liquid cooling in Minnesota for design and cost guidance. Call 201-450-8280 or request a quote.
Related: Data Centers · Data Center Cooling Systems · Chilled Water Systems · Process Chiller Installation & Service · Sanitary Heat Exchanger Installation & Service · Plate Heat Exchanger · Request a quote · Data Center Chillers: Selection, Installation, Service and Retrofit · Server Immersion Cooling: Tanks, Piping and Facility Water for Data Centers