Data center cooling systems collect the heat that servers, storage and network equipment turn their electricity into and carry it outdoors, through air handlers, chilled water plants, heat rejection equipment and, increasingly, liquid loops that run straight to the processors. Paul Industries installs the mechanical side nationwide: chilled and condenser water piping, chillers and pumps, coolant distribution units piped into the hall, flushing, pressure testing, commissioning and service. This page explains how each part of the data center cooling infrastructure works and what installation quality decides.

Planning a new data hall or adding load? We design, install and commission the cooling plant. Request a project quote or call 201-450-8280.

How are data centers cooled?

Every watt delivered to IT equipment becomes heat, so a data center is cooled by moving that heat through a chain of transfers until it reaches outdoor air or water. The chain has three links. Capture happens at the equipment, in room air or in a liquid touching the chips. Transport carries the heat away, usually in chilled water, a glycol loop or a refrigerant circuit. Rejection dumps it outdoors through chillers with cooling towers, dry coolers or air-cooled condensers. A data center cooling diagram drawn at any scale shows the same three links, and data center thermal management is the discipline of keeping each one sized, controlled and redundant so that inlet temperatures stay steady while the IT load moves.

The scale is simple arithmetic. One kilowatt of IT load produces about 3,412 Btu per hour, and one ton of refrigeration is 12,000 Btu per hour, so each megawatt needs roughly 284 tons of cooling before fans, power losses or redundancy. Moving that heat in air takes a lot of it: at a 20 degree Fahrenheit rise across the servers, each kilowatt needs about 158 cubic feet per minute of airflow. Water carries several thousand times more heat per unit volume than air, which is why liquid takes over as racks get denser.

Who installs chilled water piping and CDUs for data center facilities?

Paul Industries installs the mechanical side of data center cooling: chilled and condenser water piping, chillers and pumps, and coolant distribution units piped into the hall, followed by flushing, pressure testing and commissioning. Based in Kilmarnock, Virginia, it takes data center cooling work at sites across the United States, including Virginia, Texas, Ohio, Illinois and Georgia.

To price a cooling installation, send:

  • IT load per hall and the planned rack density
  • Mechanical drawings showing the chiller plant, headers and CDU locations
  • Whether the hall runs air cooling, direct liquid cooling or both
  • Supply water temperature targets and the redundancy level required

The loops are flushed and pressure tested before servers connect, and you receive the test and commissioning records for the cooling plant. Call 201-450-8280 or request a quote.

What sets the schedule for a data center cooling installation?

Equipment deliveries and the windows for testing and tie-ins set most data center cooling schedules, more than field labor does. The table shows what moves the date and how each factor can be pulled forward.

FactorEffect on scheduleHow to shorten it
Chiller and cooling tower ordersLarge heat rejection and chiller equipment is built to order, so its delivery date often fixes the earliest day setting and piping can startRelease equipment submittals and orders as soon as capacity and redundancy are settled
CDUs and technical loop materialsStainless pipe, valves and quick disconnects for the technical loop can arrive later than carbon steel for the facility loopOrder technical loop materials with the CDUs and confirm the coolant and wetted materials early
Piping fabricationWelding in a finished hall is slower and harder to keep clean than shop workPrefabricate headers and spools in the shop while the shell is still going up
Flushing and pressure testingEvery loop is flushed with equipment bypassed and hydrostatically tested before CDUs or coils see flowDraw flushing connections and test boundaries into the design so loops can be tested section by section
Tie-ins to a live plantConnections to running chilled water wait for outage windows the facility sets around its operationsInstall valved, capped tie-in points early and agree the outage dates at the start
Commissioning under load banksRedundancy is proven by failing equipment on purpose, which needs load banks, controls and power readyBook load banks with the mechanical schedule and close punch items before testing begins

The cooling system of data center buildings, stage by stage

The cooling system of data center buildings is a heat transport chain in which every kilowatt drawn by the IT equipment returns as a kilowatt of heat that fans, pumps and compressors must carry outdoors. Each stage hands the heat to a medium that can move it further and cheaper than the last.

StageHeat moves fromHeat moves toMoved by
At the chipProcessor, memory and power suppliesServer airstream or a cold plateServer fans or a coolant pump in a CDU
In the hallRoom air or technical loop coolantChilled or facility waterCRAH coil, fan wall, in-row coil or CDU exchanger
Across the buildingChilled or facility waterThe plantDistribution pumps, headers and risers
At the plantChilled waterCondenser water, glycol or refrigerantChiller compressor, or a plate exchanger in free cooling mode
OutdoorsCondenser water or glycolOutdoor airCooling tower, dry cooler or air-cooled condenser fans

A data center cooling unit in the hall sits in the second stage, so its capacity means little unless the stages behind it can accept the same heat at the same water temperature. That is why Paul commissions the chain end to end through data center commissioning.

Choosing a data center cooling strategy

A data center cooling strategy is a sequence of four decisions, each of which limits the next: rack density, then water temperature, then heat rejection method, then redundancy. Density decides whether air alone will do or whether liquid has to reach the racks. Water temperature decides how many hours the compressors can stay off. Local water and climate decide between evaporation and dry heat rejection, and the uptime target sets how many spare units and piping paths the plant carries. Paul Industries designs, prices and builds whichever combination the design basis states, on new halls and on liquid cooling retrofits.

Types of data center cooling systems

The main approaches differ in where the heat is captured and how far air has to carry it. Most halls combine two or more, and the data center cooling technologies chosen for a site follow from rack density, climate, water availability and how much of the building already exists.

SystemHow heat is capturedWhere it fitsMechanical scope we install
CRAC unitsRoom air across a refrigerant coil inside the unitSmaller rooms and legacy halls; no central plant neededRefrigerant or condenser connections, condensate drains, humidifier water
CRAH units and fan wallsRoom air across a chilled water coilMost enterprise and colocation hallsChilled water branches, isolation and control valves, drains, leak detection points
In-row and rear-door coilsAir cooled within a few feet of the rackDense rows inside a room-cooled hallChilled water or secondary loop distribution to each row, hoses and valves
Direct to chip cold platesLiquid through cold plates on processors and acceleratorsHigh-density AI and high-performance computingCDU setting, facility and technical loop piping, manifolds, flushing and fill
Immersion tanksServers submerged in dielectric fluidSpecialist and very high-density deploymentsFacility water to each tank heat exchanger, drains, fluid handling provisions

Data center cooling strategies are really choices about where to stop using air. A small server room cooling system can be a pair of dedicated split or packaged units; a large hall is almost always served by a central chilled water plant. A comfort-grade air conditioner for data center use falls short because it removes moisture as much as heat, is not built for continuous duty, and lacks the controls and redundancy IT equipment needs. At the dense end, data center water cooling systems deliver water or a water and glycol mix to the rack itself, and air handles only what remains.

Cooling system for server room spaces

A cooling system for server room spaces is usually one or two dedicated units sized to the IT load, running year round and independent of the building comfort system. A 10 kW room produces about 34,000 Btu per hour, which is a little under 3 tons, so a typical N+1 arrangement is two units of that size with automatic changeover and a high-temperature alarm.

Three details separate rooms that stay stable from rooms that do not. The outdoor condenser needs low-ambient controls, because the load does not fall in winter the way a comfort load does. Condensate has to leave by a route that cannot back up over equipment, with a pump and a float switch where gravity will not do it. Water or refrigerant lines stay out of the space directly above the racks wherever the layout allows. Paul Industries installs these rooms as well as full halls, and ties them into building chilled water where it runs all year.

Data center cooling system components

Whatever the architecture, the same families of equipment appear on the drawings, and each one has installation details that decide whether it performs.

ComponentJob in the systemInstallation details that matter
ChillersRemove heat from the chilled water loop by refrigerationRigging and setting, vibration isolation, evaporator and condenser piping with service clearances, flow proving
Cooling towers, dry coolers, condensersReject heat to outdoor airStructural support, condenser water or glycol piping, freeze protection, drains
PumpsMove chilled, condenser and technical loop waterAlignment, suction piping with straight runs, strainers, check valves, variable speed drives coordinated with controls
Plate heat exchangersFree cooling and loop separationIsolation valves for cleaning, strainers upstream, access to open the plate pack
CRAH units, fan walls, in-row coilsTransfer heat from air to waterControl valve sizing, condensate drains, leak detection, balancing
Coolant distribution unitsSeparate and condition the liquid cooling loopClean secondary piping, compatible wetted materials, filtration, fill and venting
Expansion tanks, air separators, makeupHold pressure and remove air from closed loopsCorrect connection point, sizing for the full loop volume, controlled makeup

Data center cooling equipment is bought from manufacturers who rate it under standard conditions. Chillers, for example, are rated under AHRI Standard 550/590 at 44 degrees Fahrenheit leaving chilled water and 85 degrees entering condenser water, and a data center plant often runs far from that point. The data center cooling units in the hall, the data center cooling pumps in the plant and every data center heat exchanger between them must be selected for the temperatures the site will actually run.

CRAH vs CRAC, fan walls and containment

Air cooling for data centers still carries most of the installed load: cold air is delivered to the server inlets, warmed by the equipment and returned to a coil. A computer room air handler, or CRAH, blows room air across a chilled water coil and has no compressor of its own. A computer room air conditioner, or CRAC, carries its own refrigeration circuit and rejects heat through a condenser or a water or glycol loop. The classic CRAC unit data center layout puts units around the perimeter blowing into a raised floor plenum, with perforated tiles in the cold aisles.

Larger halls now use data center air handlers mounted outside the white space, often as a data center fan wall: an array of plenum fans and a chilled water coil forming one wall of the room, delivering air at low velocity without a raised floor. The water stays out of the IT space, which simplifies leak control. Close-coupled options, in-row coolers between racks and rear-door coils on the cabinets, shorten the air path further, and in rack cooling with an enclosed cabinet and its own coil is used for isolated dense racks.

Data center airflow management decides how much of that equipment is needed. Hot or cold aisle containment, blanking panels and sealed cable openings keep supply air from mixing with exhaust, which lets supply temperature rise and fans slow down. That is where data center HVAC differs most from comfort air conditioning: the target is every server inlet, not a room full of people.

Data center cooling air, fans and air handling units

Data center cooling air has to reach every server inlet inside the ASHRAE recommended range, in a volume set by the heat load and the temperature rise across the equipment. Using the standard air relationship, airflow in cubic feet per minute equals Btu per hour divided by 1.08 times the rise in degrees Fahrenheit.

Air temperature riseAirflow per kW of IT loadAirflow per MW of IT load
15 FAbout 211 cfmAbout 211,000 cfm
20 FAbout 158 cfmAbout 158,000 cfm
25 FAbout 126 cfmAbout 126,000 cfm
30 FAbout 105 cfmAbout 105,000 cfm

Data center fans work at three levels: inside each server, in the CRAH units or fan walls, and on the outdoor heat rejection equipment. All data center cooling fans follow the affinity laws, with power rising as the cube of speed, so slowing a fan by 20 percent cuts its power by about 49 percent. A wider temperature rise across good containment is what makes that slowdown possible.

An air handling unit data center layout places large units in a gallery beside the white space, with the coils, filters and fans outside the IT room and supply air delivered through a wall or plenum. Paul installs these units with the chilled water connection, control valve, condensate drain and leak detection at each one. See chilled water systems for the distribution side.

Data center chillers and the chilled water plant

The chilled water loop in a data center is closed and carries heat from CRAH coils, fan walls, in-row coils and CDUs back to the chillers. The machines are usually water-cooled centrifugal or screw machines on large campuses, rejecting heat through towers, and air-cooled screw or scroll units where water is limited or the site is small. A data center chiller plant groups the chillers with primary or variable primary pumps, a heat rejection system, free cooling heat exchangers, an expansion and air removal system, and controls that stage everything to the load. The general principles of loops, pumping and piping are covered on our chilled water systems page; the data center version differs in temperature, redundancy and continuity.

The data center chilled water temperature is the biggest single design lever. Comfort plants traditionally supply about 44 degrees Fahrenheit. Because IT equipment can accept inlet air anywhere in ASHRAE’s recommended range, data center plants commonly supply chilled water well above that, with supply temperatures of 18 to 20 degrees Celsius or more used to gain efficiency and free cooling hours. Higher water temperatures need CRAH coils selected for them, so the decision comes before equipment is ordered.

Heat leaves the plant through condenser water and data center cooling towers, or through air-cooled condensers and dry coolers. Towers reject heat close to the outdoor wet-bulb temperature and are the most energy-efficient option in most climates; their water treatment is covered on our cooling tower water treatment page and their mechanical upkeep on cooling tower cleaning and maintenance.

What is data center free cooling?

Data center free cooling means using cold outdoor conditions to cool the IT load with the chillers’ compressors off or throttled back. The common form is a waterside economizer: a plate heat exchanger between the condenser water or dry cooler loop and the chilled water loop, so that when outdoor conditions allow, the tower or cooler makes chilled water directly. With 60 degree chilled water and a 7 degree approach, for example, a waterside economizer can carry the load whenever ambient conditions reach about 53 degrees. Partial free cooling, pre-cooling return water ahead of the chillers, extends the hours further. See our plate heat exchanger page for the exchanger itself.

This is why data centers in cold climates run their compressors for only part of the year, and why warmer water temperatures matter so much. A data center dry cooler, a finned coil with fans and no water spray, tracks the outdoor dry-bulb temperature and uses no water but cannot cool as far as a tower. Adiabatic cooling for data centers wets pads or sprays mist ahead of the dry cooler coil during the hottest hours, gaining most of an evaporative cooler’s capacity for a fraction of the year. A direct or indirect evaporative cooling data center design does the same with the air itself, cooling supply air by evaporation instead of a chilled water coil.

Closed loop cooling systems for data centers combine these: a dry cooler or closed-circuit cooler on a glycol loop, a heat exchanger to the building water, and chillers only for trim. Water use is covered on our data center water and piping page; mechanically, a closed glycol loop needs freeze protection measured, not assumed, and outdoor sections need drains, vents and isolation for winter service.

Dry cooler data center design

A dry cooler data center design rejects all of its heat to outdoor dry-bulb temperature through finned coils, so the warmest water the loop leaves the cooler at is set by the hottest afternoon of the year. On a 95 F design day with a 10 F approach, for example, the loop leaves the cooler at about 105 F, just above the 104 F limit of ASHRAE's W40 class. A site in that position either selects racks for a warmer class, adds chiller trim or adds adiabatic assist for those hours. Paul Industries pipes and tests the glycol loops and heat exchangers on all three arrangements; our closed loop cooling page covers the loop itself.

How does liquid cooling work in data centers?

Liquid cooling works by putting a liquid in direct thermal contact with the hottest components, so heat moves into the liquid at the chip and never has to be carried by room air. In the dominant form of liquid cooling for data center halls, a cold plate, a metal block with fine internal channels, sits on each processor or accelerator. Coolant flows through the cold plates, through hoses to a rack manifold, and back to a coolant distribution unit. A direct to chip cooling data center therefore has two water loops: the facility water system from the plant, and the technical cooling system that runs through the servers.

The data center cooling distribution unit, more often called a coolant distribution unit or CDU, sits between them. It contains pumps, a plate heat exchanger that keeps the two loops separate, filtration and controls, and it holds the secondary loop at a supply temperature above the room dew point so nothing condenses on the servers. Liquid-to-liquid CDUs hand the heat to facility water; liquid-to-air CDUs reject it into the room and suit halls with no facility water near the racks. The data center cooling liquid in the technical loop is usually treated water or an inhibited propylene glycol mixture. The Open Compute Project’s PG25 guidelines describe an inhibited fluid of about 25 percent propylene glycol by volume, a concentration at which the fluid is considered bio-static, which matters because cold plate channels are fine enough to foul.

The facility side runs warmer than a traditional plant. ASHRAE’s liquid cooling classes, renamed in 2021 as W17, W27, W32, W40, W45 and W+, are named for the upper limit of facility water supply temperature in degrees Celsius, and the warmer classes are what make dry coolers and heat reuse practical. Every data center cooling hose and quick disconnect is a potential leak point, so racks use dripless couplings and leak detection. Water cooled data center racks also include rear-door heat exchangers, which keep the servers air cooled but capture their exhaust heat in a coil on the cabinet door before it reaches the room.

Liquid immersion cooling for data centers submerges servers in a dielectric fluid, single phase or two phase. Either way the building side is a facility water loop to each tank’s heat exchanger, built to the same cleanliness standard.

How are AI data centers cooled?

AI data centers are cooled mainly by direct liquid cooling, because racks built around current accelerators produce more heat than air can remove. Sources put the practical ceiling for air cooling somewhere between about 30 and 50 kilowatts per rack, and current AI training racks are designed around 100 kilowatts and more with direct liquid cooling as a baseline requirement. Servers still reject some heat to air from memory, storage and power supplies, so an AI hall runs a technical loop, a facility water loop and an air system at once.

Data center power and cooling are planned together for that reason: every megawatt delivered to the racks is a megawatt the plant must reject. Training clusters also run near full load for long periods and can swing quickly, which favors fast, stable pump and valve control, buffer volume, and redundant CDUs so one failure never cuts flow to a rack. Liquid-cooled AI halls are where data center cooling systems change fastest, and where installation cleanliness matters most.

AI data centers water cooling: where the water goes

AI data centers water cooling relies on sealed loops that recirculate the same water past the chips, so water is consumed only if the heat finally leaves through evaporation. The technical loop and facility loop hold a fixed charge. Consumption depends on the last step: a cooling tower evaporates makeup water, while a dry cooler uses almost none and works with warmer facility water. Our data center water usage guide has the figures and the WUE metric.

Fanless, pump-less data center cooling

Fanless, pump-less data center cooling uses a passive two-phase thermosyphon: coolant boils at the chip, the vapor rises to a condenser above it, and the liquid returns by gravity, with no pump in the loop and no fan across the hot part. Published work on the method, including low-height thermosyphons studied for servers, is mostly at the component and single-server level, with air still handling lower-power parts such as memory. The heat still has to reach the plant, so the condenser side needs the same clean, tested water connections as any other liquid system, and Paul builds them.

Data center liquid cooling vs air cooling

The comparison is about density, efficiency and what the building has to provide.

FactorAir coolingDirect liquid cooling
Practical rack densityUp to roughly 30 to 50 kW with good containment100 kW and above per rack
Supply temperatureCold air to the inlets, so cooler chilled waterWarm facility water, which extends free cooling and allows dry coolers
Fan energyLarge room and server fansReduced, though some air cooling remains
Piping in the white spaceNone, or chilled water to perimeter or in-row unitsSecondary loop to every rack, manifolds and hoses
Water quality demandsNormal closed-loop chilled water treatmentStrict cleanliness and fluid control in the technical loop
Retrofit effortLow in existing hallsNeeds CDU space, piping routes, floor loading and leak management

Most existing facilities end up hybrid, with liquid loops added to specific rows. The installation questions are where the CDUs go, how secondary piping reaches the racks, and how new loops tie into a plant already serving live load. Hybrid data center cooling systems need both sides commissioned together.

Data center cooling requirements and design

Requirements start with the IT load and the inlet conditions the equipment needs. The ASHRAE TC 9.9 thermal guidelines give a recommended range of 18 to 27 degrees Celsius, about 64 to 81 degrees Fahrenheit, at the server inlet for the common equipment classes, with a dew point between minus 9 and 15 degrees Celsius. The temperature of data center supply air can sit anywhere in that band, and running near the top of it is one of the cheapest efficiency gains available, provided containment keeps hot air from recirculating.

Data center cooling design then adds growth phases, partial loads in early years, the climate’s design wet-bulb and dry-bulb temperatures, and energy targets. Data center cooling efficiency is reported through power usage effectiveness, defined in ISO/IEC 30134-2 as total facility energy divided by IT equipment energy, and new facilities are subject to ASHRAE Standard 90.4, the energy standard written specifically for data centers. Those are the main data center cooling standards a mechanical contractor works within, alongside the piping code, usually ASME B31.9 for building services or ASME B31.3 where a process code is specified.

Data center cooling redundancy is described as N, the capacity the load needs, plus spares: N+1 adds one extra chiller, pump or CDU, and 2N duplicates the whole system. The Uptime Institute’s Tier III asks for concurrent maintainability, meaning any component can be taken out for maintenance without shutting down the load. In piping terms, that means looped headers or dual feeds, isolation valves placed so every chiller, pump, coil and CDU can be valved out, and bypasses designed and tested before go-live.

Piping installation, testing and tie-ins

Data center chilled water piping is usually carbon steel, welded or roll-grooved, in the plant and mains, with insulation and vapor retarder wherever the water runs below the dew point. Technical cooling loops are commonly stainless steel or another material on the CDU and cold plate manufacturer’s wetted-materials list, because one incompatible fitting can introduce corrosion into a loop that must stay clean. Our stainless steel piping and process piping pages cover materials and joining in depth.

Installation quality shows up in four places. First, cleanliness: pipe is capped in storage, spools are shop fabricated, and every loop is flushed with equipment bypassed before CDUs or coils see flow. Second, testing: hydrostatic testing to the code, which for ASME B31.9 means at least 1.5 times the design pressure, followed by leak checks on every mechanical joint. Third, valve placement for concurrent maintenance and isolation of each row. Fourth, tie-ins to a live plant are planned as a shutdown or done by hot tap, with a written method and rollback. Chillers, CDUs and pumps are set by riggers and aligned by millwrights; see millwright and rigging services.

Commissioning, maintenance and troubleshooting

Commissioning proves the system works as one: flows balanced, controls sequenced and redundancy tested by failing equipment on purpose under load banks. We deliver that through commissioning and validation. After handover, data center cooling maintenance keeps those conditions true: strainer and filter changes, glycol and inhibitor testing, pump checks, exchanger cleaning and valve exercising, under a preventive maintenance plan.

Most data center cooling problems trace back to a small set of causes, and the symptom usually points to the cause.

SymptomLikely causeMechanical fix
Hot spots at some racks while others are coldMixing of supply and exhaust air, missing blanking panels, poor tile placementContainment, airflow management, balancing
Chillers short-cycling at low loadToo little loop volume, oversized plant in early phasesBuffer tank, staging changes, smaller trim chiller
Low return water temperature at the plantCoil bypasses, open three-way valves, overpumpingValve correction, pump control, coil checks
Rising pressure drop across a CDU or exchangerFouling or debris from an unflushed loopStrainer service, exchanger cleaning, loop flushing
Glycol or coolant lossLeaking couplings, relief valves lifting, unmetered makeupLeak search, makeup metering, relief checks
Free cooling hours below designChilled water setpoint too low, heat exchanger fouled, controls overridingSetpoint review, exchanger cleaning, sequence correction

Data center cooling best practices follow from that table: warm supply temperatures with good containment, generous delta T at the coils, clean loops, metered makeup, and maintenance done one redundant unit at a time. When something does fail, our emergency repair service covers piping, pumps, exchangers, chillers, controls and the rest of the cooling plant.

Data center cooling cost

The cost has two parts: the installed cost of the plant and distribution, and the energy and maintenance to run it for decades. Installed cost is driven by capacity and redundancy, the heat rejection method, the piping and connections in the hall, liquid cooling scope, technical loop materials, and whether work happens in a new shell or a live facility. Operating cost is driven mostly by compressor hours, which is why free cooling, warmer water and containment usually repay their first cost. Prefabricated spools and skid-mounted pump packages shorten field time.

How to choose a data center cooling contractor

Data center cooling companies fall into three groups: manufacturers of chillers, CRAH units, CDUs and heat rejection equipment; engineers who design the system; and contractors who install, start up and maintain it. The best cooling solutions for data centers come from all three working to one set of drawings, temperatures and acceptance tests, and Paul Industries designs, supplies, installs and maintains to that one set. When choosing the installer, ask for welding procedures, flushing procedures for liquid loops, pressure test records, live-facility tie-in experience and a documentation package that matches the owner’s requirements. Data center cooling systems are only as reliable as the weakest of those.

Closed loop cooling systems for data centers

A closed loop cooling system for data centers circulates the same water or glycol through the cooling equipment and back again, sealed from the atmosphere, and rejects heat through a dry cooler, a closed-circuit cooler or a heat exchanger instead of evaporating water. It is how many new facilities cut their water use to near zero, and it is the piping and loop work Paul Industries installs, tests and maintains.

What is a closed loop cooling system?

What is a closed loop cooling system, in plain terms? It is a sealed piping circuit with a pump, an expansion tank, an air separator and a heat rejection device, filled once and topped up only for small losses. Nothing in the loop touches outside air, so the fluid stays clean, inhibitor levels hold, and the coils, cold plates and heat exchangers it serves do not foul the way open-tower water does.

How does a closed loop cooling system work?

How does a closed loop cooling system work in a data hall? Heat moves outward through two or three loops. A technology cooling loop carries coolant to cold plates, rear-door coils or CRAH coils; a coolant distribution unit or plate heat exchanger passes that heat to a facility water loop; and the facility loop sends it to dry coolers on the roof or yard, with chillers or adiabatic assist only for the hottest hours. Each loop is a closed circuit, which is why the closed loop cooling system data center designers specify is really a set of separate loops joined by heat exchangers.

QuestionClosed loopOpen loop (evaporative tower)
How heat leaves the siteSensible heat through dry cooler or closed-circuit coil finsEvaporation of tower water
Water useNear zero in dry mode; small makeup for leaks and drainsContinuous makeup for evaporation, drift and blowdown
Supply temperature it can reachLimited by dry-bulb temperature plus the cooler approachLimited by wet-bulb temperature, so colder water on hot days
Water treatmentInhibitor dosing, filtration and periodic testing of a sealed loopOngoing scale, corrosion and Legionella control
Freeze protectionGlycol in the outdoor loopBasin heaters, drain-down or indoor sumps

Closed loop cooling system vs open loop

The closed loop cooling system vs open loop decision is a trade between water and energy. An evaporative tower produces colder water on a hot afternoon because it works against wet-bulb temperature, so the chillers behind it run less. A dry cooler works against dry-bulb temperature and needs more fan power, more coil area, or chiller trim when it is hot. Liquid-cooled racks tilt the answer toward closed loops, because cold plates accept warm supply water and a warm loop can reject heat dry for most of the year. That is the logic of a closed loop cooling system for AI data center halls, where high-density racks run on warm-water direct-to-chip cooling and the dry coolers carry most of the load.

Do closed loop cooling systems lose water?

Do closed loop cooling systems lose water? Only a little, and only through the piping: small leaks at pump seals and valve packing, sampling, drains during maintenance, and relief valve discharge. On a sound system, closed loop cooling system water usage is a small top-up rather than a continuous flow, so a makeup meter that keeps climbing is the first sign of a leak, not normal consumption. Where a site adds adiabatic pre-cooling or a hybrid cooler, that equipment does use water during peak hours, which is worth stating in the design basis so the water figure is not overstated.

Closed loop glycol cooling system and design points

Any outdoor section of the loop is normally a closed loop glycol cooling system, because water left in a dry cooler coil will freeze and split tubes in a cold snap. Glycol lowers the freeze point but also lowers heat capacity and raises viscosity, so pumps, coils and pipe sizes are selected for the actual mix rather than for plain water. The other points of closed loop cooling system design we check on every project:

  • Expansion tank sized for the full loop volume and temperature swing, with a pressurization point that keeps every high point above atmospheric pressure.
  • Air and dirt separation at the warmest, lowest-pressure point of the loop, plus fine filtration on any loop that feeds cold plates.
  • Wetted materials that are compatible with each other and with the coolant, and an inhibitor package matched to them.
  • Flushing, cleaning and fluid testing before servers connect, with the results recorded at turnover.
  • Makeup metering and leak detection so the loop stays closed in practice, not just on the drawing.

Paul Industries installs and pipes the loops, dry coolers and heat exchangers, pressure tests and flushes them, and services them afterward. For the heat rejection side and its water treatment, see our cooling tower water treatment and chilled water systems pages.

What Paul Industries does

Paul Industries installs and services the mechanical systems behind data center cooling: chilled water and condenser water piping, chiller and pump installation, plate heat exchangers and waterside economizers, CDU piping and technical loops, glycol systems, flushing, cleaning and passivation of stainless loops, pressure testing, commissioning, preventive maintenance and emergency repair. We also provide makeup water treatment equipment, described on our water treatment systems page, and process chiller installation for plants beyond the data hall. We supply and install the cooling equipment each project needs and connect it to the chilled water and condenser water systems. Request a quote for data center cooling installation or service.

Standards referenced: ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASHRAE Standard 90.4 · ISO/IEC 30134-2 · OCP PG25 Guidelines · AHRI 550/590 · ASME B31.9 · ASME B31.3 · Uptime Institute Tier Standard

Frequently asked questions

What is the best cooling system for a data center?

There is no single best system. Air cooling with containment and chilled water CRAH units or fan walls suits most enterprise and colocation halls; direct to chip liquid cooling is required for AI and other racks above roughly 30 to 50 kW; and the heat rejection choice, towers, dry coolers or a combination, follows from climate and water availability. The best design is the one sized to the real density and run at the warmest water temperatures the equipment allows.

Why do data centers need cooling?

Nearly all of the electricity a server uses becomes heat. Without continuous removal, inlet temperatures climb past what processors, memory and drives tolerate, equipment throttles or shuts down, and component life shortens. Cooling keeps inlet conditions inside the ASHRAE ranges the hardware is built for.

What happens during a data center cooling failure?

Temperatures rise fast, especially in dense halls, because the heat source keeps running. Redundant chillers, pumps and CDUs take over automatically in a well-designed plant, and some sites keep thermal storage or pumps on backup power to ride through a chiller restart. Failure drills during commissioning prove that the switchover actually works.

What is the difference between a CRAC and a CRAH?

A CRAC has its own compressor and refrigerant circuit and rejects heat through a condenser. A CRAH has no compressor; it blows air across a coil fed by chilled water from a central plant. CRAHs dominate larger facilities because the central plant is more efficient and easier to make redundant.

Why must liquid cooling supply temperature stay above the dew point?

Any surface colder than the room dew point condenses moisture, and water forming on cold plates, manifolds or hoses inside a rack is a failure risk. The coolant distribution unit holds the technical loop supply above the room dew point, which is one reason warm-water liquid cooling designs are favored.

What coolant is used in direct liquid cooling?

Most cold plate systems use treated water or an inhibited propylene glycol mixture of about 25 percent, as described in Open Compute Project guidance. The exact fluid, filtration level and wetted materials are set by the cold plate and CDU manufacturers, and the loop must be built and flushed to suit them.

Can liquid cooling be added to an existing air-cooled data center?

Yes, usually row by row. The work is finding space and power for CDUs or using liquid-to-air units, routing secondary piping to the racks, confirming floor loading, and tying into the existing chilled water plant without interrupting live load. Rear-door heat exchangers are a lower-disruption step for moderate densities.

What chilled water temperature do data centers use?

Higher than comfort cooling. Many data center plants supply chilled water well above the traditional 44 degrees Fahrenheit to gain chiller efficiency and free cooling hours, and liquid cooled halls can use facility water in ASHRAE's warmer W classes. The coil and CDU selections must match the chosen temperature.

How much cooling does a data center need?

Start from the IT load: each kilowatt is about 3,412 Btu per hour, so a megawatt of IT load is about 284 tons of cooling. Add the heat from fans, power distribution losses and lighting, then add redundancy, typically N+1 or 2N on major equipment.

How many hours of free cooling can a data center get?

It depends on climate and on how warm the facility water can run. Warmer supply temperatures, which liquid cooling allows, raise the number of hours an economizer can carry the load with the chillers off. Cold, dry sites get the most free cooling hours; hot, humid sites the fewest.

Are rear-door heat exchangers a form of liquid cooling?

They bring water to the rack, but the servers themselves stay air cooled. A coil on the rear door captures the hot exhaust before it enters the room, which raises the density a rack can support without changing the IT hardware.

What piping material is used for data center cooling?

Carbon steel, welded or grooved, is standard for chilled and condenser water mains. Technical cooling loops use stainless steel or other materials approved on the CDU and cold plate wetted-materials lists. Copper and plastics appear in some smaller or specific applications when the design and manufacturers allow it.

How is a new liquid cooling loop cleaned before servers are connected?

The loop is flushed at velocity with the CDU and IT connections bypassed, strainers are checked until they stay clean, stainless sections are cleaned and passivated where specified, and only then is the loop filled with the specified fluid and connected. Water samples and filter checks document the result.

Does Paul Industries supply the cooling equipment?

We procure and install the equipment a project specifies, including chillers, CRAH units and CDUs from their manufacturers. Our scope covers the full mechanical installation: rigging and setting equipment, piping, flushing, testing, commissioning and maintenance.

How often should the cooling equipment in a data center be maintained?

On a schedule set by the manufacturers and the facility's risk tolerance, typically monthly checks of filters, strainers and fluid condition, quarterly inspections of pumps and valves, and annual heat exchanger and chiller service. Redundancy lets each unit be maintained without taking cooling capacity offline.

Do data centers need a dedicated chiller plant?

Large facilities almost always have one, because the plant must run continuously, at data center temperatures and with redundancy that a shared building plant rarely provides. Small server rooms in mixed-use buildings often tie into the building chilled water with a dedicated backup unit.

Do data centers use closed loop cooling systems?

Many do, and most new liquid-cooled halls are designed around them. The loop that touches the IT equipment is almost always closed. Whether heat leaves the site through a closed loop as well, through dry coolers, or through an open evaporative tower depends on the climate, the water available and the supply temperature the racks accept.

How much water does a closed loop cooling system for a data center use?

In dry operation it uses only enough makeup to replace small losses from seals, sampling and maintenance drains. Water use rises only if the system includes adiabatic or evaporative assist, which consumes water during the hottest hours. A steady rise in makeup on a sealed loop points to a leak.

What happens if a closed loop cooling system leaks?

Loop pressure falls, the makeup meter climbs, and the fresh water that replaces the loss dilutes the corrosion inhibitor and can let air in at high points. Small leaks are found by trending makeup volume and pressure; the repair is followed by a fluid test so inhibitor and glycol levels can be restored.

How do data center cooling systems work?

They capture heat at the IT equipment in air or liquid, carry it through water or refrigerant to a central plant, and reject it outdoors through towers, dry coolers or condensers. Controls hold each stage at its temperature and flow setpoint while the load moves, and spare units cover failures.

Are data center cooling systems closed loop?

On the water side, largely yes. Chilled water and technical cooling loops are sealed circuits on nearly every site, and a dry cooler keeps the outdoor side sealed too. The exception is the condenser water loop on a cooling tower, which is open to the air because evaporation is how it rejects heat.

Who installs data center cooling systems?

Paul Industries installs chillers, pumps, chilled water piping, heat rejection equipment and liquid cooling distribution, then flushes, balances and commissions the system against the design load of the data hall. Call 201-450-8280 or request a project quote.

Which contractor pipes data center cooling systems in Virginia or Texas?

Paul Industries installs chilled water, condenser water and CDU piping for data centers in Virginia, Texas and across the US, from its base in Kilmarnock, Virginia. The scope runs through chillers, pumps, flushing, pressure testing and commissioning, with service once the hall is carrying load. Call 201-450-8280 or request a quote.

How is a data center cooling installation phased when IT load arrives in stages?

The plant is usually sized for the final load and built out in steps. Headers and main piping go in at full size with valved, capped connections for future chillers, pumps and CDUs, so later stages tie in with short isolations. Paul Industries plans those connection points with the owner at the start, then installs, flushes and tests each stage as racks arrive. Call 201-450-8280 or request a quote.

What site utilities does a data center cooling plant need?

A cooling plant needs electrical capacity for chillers, pumps, fans and CDUs sized to the redundancy target; makeup water and a discharge route for blowdown where cooling towers are used; and yard or roof space with structure for towers, dry coolers or air-cooled chillers. It also needs rooms for pumps and water treatment. Dry heat rejection cuts the water demand but takes more outdoor area. Paul Industries sets out these utility loads with the mechanical design so the site plan carries them. Call 201-450-8280 or request a quote.

Can Paul Industries service an existing data center cooling plant?

Yes. Paul Industries services chilled water plants, pumps, plate heat exchangers, glycol loops and CDU piping in operating data centers, whoever installed them. Work begins with a survey of the plant, its fluid condition and its redundancy, so each unit can come out for maintenance while the rest carries the load. Strainer service, glycol and inhibitor testing, valve exercising and exchanger cleaning then run on a preventive maintenance plan. Call 201-450-8280 or request a quote.

What should a data center cooling installation quote include?

A complete quote lists the equipment to be set and who furnishes it, the pipe sizes, materials and joining method for each loop, CDU and rack connections, insulation, flushing, hydrostatic testing, fluid fill, controls interfaces and the commissioning level included. It should also state the phasing, the live tie-ins and the outage assumptions behind the price. Paul Industries quotes data center cooling on that full scope, item by item. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Virginia?

Paul Industries is headquartered in Kilmarnock, Virginia, and designs, installs and services data center cooling in Virginia, including chilled-water plants, water-side economizers, thermal storage and gallery piping for Northern Virginia, Richmond and Hampton Roads campuses. Plants are sized against Virginia weather, power and water limits. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in New Jersey?

Yes. Paul Industries designs, installs and retrofits chilled water plants, towers, dry coolers and hall piping for New Jersey data centers from Secaucus to Vineland, sized on Newark weather data and state power prices. See data center cooling in New Jersey. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Pennsylvania?

Yes. Paul Industries designs and installs chilled water plants, cooling towers and dry coolers for Pennsylvania data halls from Philadelphia to Pittsburgh, with heat rejection sized to the Susquehanna and Delaware basin water thresholds. See data center cooling in Pennsylvania for regional weather and water rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in New York?

Yes. Paul Industries designs, installs and upgrades chilled water plants, cooling towers and dry coolers for data halls from Manhattan to Buffalo, including work under the 2026 statewide pause on large builds. See data center cooling in New York for climate, tower rules and costs. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Maryland?

Yes. Paul Industries designs, installs and services chilled water plants, towers, dry coolers and economizers for Maryland data halls, from Frederick County campuses to Baltimore and the I-270 corridor. See data center cooling in Maryland for BWI weather hours, utility territories and noise limits. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in North Carolina?

Yes. Paul Industries designs, installs and services cooling plants for hyperscale campuses in the Catawba Valley, colocation halls in Charlotte and computing rooms across the Research Triangle. See data center cooling in North Carolina for state weather, water and power guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Massachusetts?

Paul Industries designs, installs and services chilled water plants, towers, dry coolers and economizers for data centers in Boston, Lowell, Route 128 and the Pioneer Valley. See data center cooling in Massachusetts for weather data, power prices and the state’s 2026 rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Connecticut?

Yes. Paul Industries designs, installs and services chilled water plants, economizers, towers, dry coolers and CRAH galleries for enterprise and colocation halls from Stamford to Hartford and Groton. See data center cooling in Connecticut for Bradley and Sikorsky free cooling hours and state power costs. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Delaware?

Yes. Paul Industries designs, installs and services chilled water plants, dry coolers, towers and economizers for computer rooms in Wilmington, New Castle, Newark, Dover and Sussex County. See data center cooling in Delaware for Delaware weather, utilities and the 2026 large-load laws. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Georgia?

Paul Industries designs, installs and services data center cooling in Georgia, from chilled water plants and tower or dry cooler yards to hall piping and liquid cooling loops, for campuses in metro Atlanta, Macon, Columbus and Savannah. Plants are sized from Georgia hourly weather, the site’s water source and the Georgia Power contract. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Florida?

Yes. Paul Industries designs and installs chilled water plants, towers, dry coolers and piping for Florida data centers from Miami-Dade to Jacksonville, built for hurricane wind and flood loads and the 2026 water and power rules. See data center cooling in Florida. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in South Carolina?

Yes. Paul Industries designs, installs and services chilled water plants, towers, dry coolers and facility water piping for data halls in Berkeley and Dorchester counties, Columbia and the Upstate, sized for South Carolina humidity and water rules. See data center cooling in South Carolina. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in West Virginia?

Yes. Paul Industries designs, supplies, installs and services chilled water plants, dry cooler yards and heat rejection for West Virginia data halls, including microgrid district campuses. See data center cooling in West Virginia for climate, water reporting and power guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Maine?

Yes. Paul Industries designs, installs and services chilled water plants, dry coolers, towers and glycol loops for Maine data rooms from Portland to Aroostook County, sized to the state’s cold winters and high power prices. See data center cooling in Maine for economizer hours and freeze protection. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in New Hampshire?

Yes. Paul Industries designs, installs and services chilled water plants, water-side economizers, towers, dry coolers and glycol loops for New Hampshire computer rooms from Nashua and Manchester to Lebanon and Berlin. See data center cooling in New Hampshire for station weather, economizer hours and utility territories. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Vermont?

Yes. Paul Industries designs, installs and services chillers, plate exchanger economizers, towers, dry coolers and glycol loops for Vermont computer rooms from Burlington and Essex Junction to Rutland and Newport. See data center cooling in Vermont for station weather, economizer hours and utility facts. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Rhode Island?

Yes. Paul Industries designs, installs and services chillers, towers, dry coolers, dehumidification and economizer controls for Rhode Island computer rooms from Providence and Warwick to Newport and Westerly. See data center cooling in Rhode Island for station weather, wind design and power costs. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Ohio?

Yes. Paul Industries designs, installs and services chillers, cooling towers, dry coolers and economizer controls for Ohio data halls from New Albany and Columbus to Cincinnati, Cleveland and Toledo. See data center cooling in Ohio for station weather, Central Ohio water figures and discharge permits. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Texas?

Yes. Paul Industries installs chillers, dry coolers, towers, pumps and chilled water piping for data centers in Dallas-Fort Worth, Houston, Austin, San Antonio and West Texas, with freeze protection and curtailment-ready controls. See data center cooling in Texas for climate, grid and water guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in California?

Yes. Paul Industries designs and builds chilled water plants, economizers, heat rejection and controls for California data halls, from Santa Clara to San Diego, to the computer room rules in the state Energy Code. See data center cooling in California for code, climate and water guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Illinois?

Yes. Paul Industries designs, supplies and installs chilled water plants, dry coolers, towers and economizers for Illinois data centers, with freeze protection and winter switchover testing built in. See data center cooling in Illinois for free cooling hours, water limits and energy code detail. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Indiana?

Yes. Paul Industries designs, installs and services chilled water plants, cooling towers, dry coolers and economizers for Indiana data centers, sized for Indiana winters, hard water and IDEM tower permits. See data center cooling in Indiana for regional climate, water and code guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Michigan?

Yes. Paul Industries designs, installs and services chilled water plants, cooling towers, dry coolers and economizers for Michigan data halls, sized to hourly weather from Detroit to the Upper Peninsula. See data center cooling in Michigan for free cooling hours, freeze protection and water rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Louisiana?

Yes. Paul Industries designs, supplies, installs and starts up chiller plants, hybrid heat rejection, pumps and piping for data centers across Louisiana, from the new north Louisiana campuses to halls in Baton Rouge and New Orleans. See data center cooling in Louisiana for climate, water, grid and storm design. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Tennessee?

Yes. Paul Industries designs, installs and maintains chilled water plants, cooling towers, dry coolers and air handlers for Tennessee data centers in Memphis, Nashville, Clarksville and Knoxville. See data center cooling in Tennessee for wet bulb data, aquifer water and TVA power. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Wisconsin?

Paul Industries designs, installs and services data center cooling in Wisconsin, sizing chiller plants, dry coolers and economizers to the state’s county design table and its 100,000 gallon per day water thresholds. See data center cooling in Wisconsin for climate, water and code detail. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Minnesota?

Yes. Paul Industries designs and builds chilled water plants, dry cooler yards and tower plants for Minnesota data halls, with freeze protection for zone 6A and zone 7 sites and DNR water permits in view. See data center cooling in Minnesota for climate, water law and cost guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Kentucky?

Yes. Paul Industries designs, supplies and installs chilled water plants, cooling towers, dry coolers and CRAH systems for data halls in Louisville, Lexington, Northern Kentucky and western Kentucky. See data center cooling in Kentucky for Kentucky weather, water and permit guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Missouri?

Yes. Paul Industries designs, installs and services chilled water plants, cooling towers, dry coolers and economizers for data halls in Kansas City, Independence, St. Louis and across Missouri. See data center cooling in Missouri for Missouri weather, water registration and St. Louis rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Washington?

Yes. Paul Industries designs, supplies, installs and services chilled water plants, evaporative and adiabatic systems, dry coolers and water treatment for data halls in Quincy, East Wenatchee, Moses Lake, Seattle and across Washington. See data center cooling in Washington for Columbia Basin weather, hard water and state refrigerant rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Colorado?

Yes. Paul Industries designs, installs and services cooling plants for data halls in Denver, Aurora, Colorado Springs and the northern Front Range, with fans, coils and condensers corrected for elevation and heat rejection matched to the site’s water source. See data center cooling in Colorado. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Oklahoma?

Yes. Paul Industries designs, supplies, installs and starts up chiller plants, dry coolers, towers, pumps and piping for data centers across Oklahoma, from the Pryor, Tulsa County, Muskogee County and Stillwater campuses to halls in Oklahoma City. See data center cooling in Oklahoma for climate, water, grid and code detail. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Alabama?

Yes. Paul Industries designs, builds and services chilled water plants, towers, dry coolers and liquid loops for data halls in Huntsville, Montgomery, Birmingham, Mobile and across Alabama. See data center cooling in Alabama for climate, water and utility detail. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Arizona?

Yes. Paul Industries designs, supplies and installs chiller plants, towers, dry coolers and hybrid heat rejection for Arizona data halls, sized for Phoenix heat, monsoon dust and city water limits. See data center cooling in Arizona for climate, water and utility details. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Iowa?

Yes. Paul Industries designs, installs, starts up and maintains chilled water plants, towers, dry coolers and economizers for Iowa data centers, sized for the state’s humid summers, long freezes and DNR water permit rules. See data center cooling in Iowa for station weather data and water rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Kansas?

Yes. Paul Industries designs, supplies, installs and starts up chiller plants, economizers, dry coolers and towers for data centers across Kansas, from Johnson County and Topeka to Wichita and Garden City. See data center cooling in Kansas for climate, water law and tax detail. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Oregon?

Yes. Paul Industries designs, installs and services chilled water, economizer, evaporative and dry-cooler plants for halls in Hillsboro, Portland, The Dalles and Prineville. See data center cooling in Oregon for the state’s two climates, the June 2021 heat event and its pressure piping rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Utah?

Yes. Paul Industries designs and installs chiller plants, dry cooler and tower yards, economizers and glycol freeze protection for data halls across Utah, sized for low humidity, freezing nights and altitude. See data center cooling in Utah for climate, water and code detail. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Mississippi?

Yes. Paul Industries designs, supplies and installs chilled water plants, closed-loop dry cooler plants, CRAH units and piping for Mississippi campuses in Madison County, Vicksburg, Meridian and Southaven. See data center cooling in Mississippi for climate data, water permits and utility planning. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Arkansas?

Yes. Paul Industries designs, installs and starts up chiller plants, towers, dry coolers and economizers for Arkansas data halls, sized to the state’s humid summers, long economizer season and aquifer limits. See data center cooling in Arkansas for climate, water and Act 548 details. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Nebraska?

Yes. Paul Industries designs, installs and services chiller plants, economizers, cooling towers and dry coolers for data centers in Omaha, Papillion, Lincoln and statewide. See data center cooling in Nebraska for the state’s humid east, dry west and water rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Nevada?

Yes. Paul Industries designs, supplies and installs dry cooler, air-cooled chiller and economizer plants for data halls in Reno, the Tahoe-Reno Industrial Center and Las Vegas, built around the Las Vegas Valley’s evaporative cooling rules. See data center cooling in Nevada. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in New Mexico?

Yes. Paul Industries designs, installs and services chilled water plants, dry coolers, cooling towers and economizers for data halls across New Mexico, with fans and coils rated at site elevation and outdoor loops protected for freezing nights. See data center cooling in New Mexico for climate, altitude and water guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Idaho?

Yes. Paul Industries designs and installs economizer, indirect evaporative and chilled water plants for Idaho data halls, corrected for altitude and protected for eastern Idaho winters. See data center cooling in Idaho. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Montana?

Yes. Paul Industries designs, installs and services economizer plants, dry coolers, chilled water and glycol systems for data halls in Butte, Billings, Missoula, Great Falls and across the state. See data center cooling in Montana for climate, water right and power details. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in North Dakota?

Yes. Paul Industries designs, installs and services economizer chilled water plants, dry and adiabatic coolers, cooling towers and glycol loops for data halls across North Dakota, with every outdoor component protected for subzero nights. See data center cooling in North Dakota for climate, water and code guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in South Dakota?

Yes. Paul Industries designs, installs and services data center cooling plants across South Dakota, from Sioux Falls to Rapid City, with freeze-proof dry cooler and glycol designs and the water figures SB 135 requires. See data center cooling in South Dakota for climate data and state rules. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Wyoming?

Yes. Paul Industries designs and installs evaporative, air-cooled chiller and hybrid cooling plants for Cheyenne campuses and other Wyoming sites, with altitude corrections and freeze protection for below-zero nights. See data center cooling in Wyoming for climate data, water and tariff details. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Alaska?

Yes. Paul Industries designs, installs and maintains economizer, glycol and chilled water plants for Alaska data halls in Anchorage, Fairbanks, Juneau and the North Slope, with freeze protection and heat recovery built in. See data center cooling in Alaska for climate, code and power guidance. Call 201-450-8280 or request a quote.

Does Paul Industries provide data center cooling in Hawaii?

Yes. Paul Industries designs, installs and services chilled water plants, towers, dry coolers and liquid loops for data halls in Honolulu, Kapolei and the neighbor islands, sized for a climate with no winter and Hawaii’s power prices. See data center cooling in Hawaii for weather data and state rules. Call 201-450-8280 or request a quote.

Related: Data Centers · Plate Heat Exchanger · Cooling Tower Water Treatment · Process Chiller Installation & Service · Sanitary Heat Exchanger Installation & Service · Chilled Water Systems · Request a quote · Data Center Liquid Cooling: CDUs, Cold Plates, Rear Doors and TCS Piping · Data Center Commissioning: Levels, Flushing, Testing and Mechanical Scope · Data Center Mechanical Contractors: Cooling Plant, Piping and Prefabrication · Data Center Water Usage: Figures, WUE, Cooling Choices and Reduction · Dry Cooler Guide: How Dry and Adiabatic Coolers Work, Compare and Are Maintained · Data Center Cooling Towers: Installation, Redundancy and Repair · Data Center Chillers: Selection, Installation, Service and Retrofit · Server Immersion Cooling: Tanks, Piping and Facility Water for Data Centers · Closed Loop Cooling System: Design, Installation and Service