Paul Industries designs, builds and services data center cooling in Minnesota: chilled water plants, dry coolers, cooling towers, economizer heat exchangers and the piping that carries heat from the white space to the outdoors, for halls in the Twin Cities suburbs, Rochester, St. Cloud, Duluth and across greater Minnesota. Minnesota hands a cooling plant two gifts and two tests: months of cold air for free cooling and a modest summer peak, set against deep winter freezes and a 2025 state law that ties large data centers to water permits and utility tariffs. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, takes cooling plant work across Minnesota and in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Data center law 100 MW definition and DNR water rules, signed June 14, 2025
Water permit DNR permit above 10,000 gal/day or 1 million gal/yr
Winter Minneapolis: 72 days a year at or below freezing (NOAA 1991-2020)
Power price Minnesota industrial average 9.31 cents/kWh in 2025 (EIA)
Reviewed November 2026

What does data center cooling in Minnesota involve?

Data center cooling in Minnesota involves the same chain as anywhere else, from rack heat to air or liquid, to a facility water loop, to a chiller or economizer, to outdoor heat rejection, but the outdoor end is designed around a climate where the air sits below freezing for much of the winter. A Minnesota plant spends most hours in some form of economizer mode, uses glycol or isolation heat exchangers wherever water meets cold air, and treats snow, ice and frozen intakes as design loads rather than surprises.

The national overview of plant types, CRAH and fan wall options, chillers and liquid cooling is on the data center cooling systems page. This page covers what Minnesota adds: the weather, the water law, the power market, the state codes and the regions where halls are going up.

Are there data centers in Minnesota, and where are new halls going?

Data centers in Minnesota range from enterprise and colocation halls across the Twin Cities metro to hyperscale campuses now under construction, and the state’s 2025 data center law was written with 100-megawatt facilities in mind. The clearest public example is Meta’s campus in Rosemount, which the company lists as an investment of more than $800 million, with ground broken in 2024 and about 100 operating jobs once it is complete. The answer to “are there data centers in Minnesota” is yes, and the newer ones are larger, denser and thirstier for power than the halls built a decade ago.

For a cooling contractor the shift matters in three ways. Plants are now sized in tens of megawatts per building rather than single megawatts. A growing share of each hall is designed for liquid-cooled racks, which raises facility water temperatures. And every large data center Minnesota permits now passes through Department of Natural Resources water review and Public Utilities Commission tariff decisions that reach straight into the mechanical design.

How Minnesota winters change the cooling plant

Minnesota winters change the cooling plant by turning cold outdoor air into the main source of cooling for months at a time. NOAA’s 1991 to 2020 normals for Minneapolis show an average January high of 24°F and low of 9°F, about 72 days a year when the temperature never rises above freezing, and 82 nights a year at or below 20°F. Summer is short by comparison: an average July high of 83°F and about 13 days a year at 90°F or above.

That profile favors water-side economizers and dry coolers that carry the whole IT load without compressors through the cold months, with chillers trimming only on warm afternoons. It also means the plant has to be designed for the coldest night as carefully as the hottest afternoon: the same heat exchangers, valves and coils that save energy in January are the ones that freeze if a pump stops at 20 below.

Data center free cooling in a Twin Cities year

Data center free cooling in a Twin Cities year depends on how warm the facility water is allowed to run. A plant supplying chilled water near 55°F gets full economizer hours only in the colder part of the year; a plant supplying 65°F to 75°F water to rear-door coils or liquid-cooled racks can reject heat through dry coolers for most of the year and use chillers as a summer trim. Paul Industries models the hours against the site’s weather file and the owner’s chosen ASHRAE TC 9.9 envelope before selecting equipment, because the water temperature decision drives every other part of the plant.

Climate zones 6A and 7 under the Minnesota energy code

Climate zones 6A and 7 split Minnesota under the 2024 Minnesota Commercial Energy Code, which incorporates ASHRAE 90.1-2019 and, in Minnesota Rules part 1323.0514, places 23 northern counties in zone 7 and every other county in zone 6A. Zone 7 includes St. Louis, Carlton, Lake, Cook, Itasca, Crow Wing, Beltrami, Polk and Roseau counties, so a hall near Duluth or on the Iron Range is designed to colder criteria than one in Hennepin, Dakota or Olmsted County.

The same rule chapter defines a computer room as a room with a design equipment density above 20 watts per square foot or a connected IT load above 10 kilowatts, which brings nearly every server room and data hall inside the energy code’s computer room provisions. Paul Industries designs economizer controls, pump and fan sizing and insulation to the edition in force on the permit date and documents the energy compliance path the plan reviewer expects.

How Minnesota regions shape a data center cooling plant
RegionEnergy code climate zoneWhat the cooling plant has to handle
Minneapolis, Saint Paul and the inner suburbs6ATight urban sites, rooftop and yard space limits, district chilled water in downtown Saint Paul
South metro: Rosemount, Eagan, Farmington, Lakeville6ACampus-scale halls, large yard equipment, DNR water review on big plants
Rochester and southern Minnesota6AHospital and research computing loads alongside enterprise halls, open sites with wind exposure
St. Cloud and central Minnesota6A, zone 7 to the northLong economizer season, snow drifting around dry cooler banks
Duluth, Carlton County and the Iron Range7Deepest cold, lake-effect snow and icing, glycol rated for the zone 7 design low
Moorhead and the Red River Valley6A in Clay County, 7 in Polk and NormanOpen prairie wind, blowing snow at air intakes, cold-start controls

What the 2025 Minnesota data center law means for the cooling plant

The 2025 Minnesota data center law, chapter 12 of the 2025 First Special Session, signed June 14, 2025, defines a data center as a facility designed for a load of 100 megawatts or more, and it writes cooling into the definition by including the facilities for environmental control and cooling. For an owner, the law matters to the cooling plant in three places: the water permit, the electric tariff and an annual state fee.

Every Minnesota data center law question an owner asks during design comes back to one of those three. The water rules, described below, push large plants toward closed loops and water reuse. The Public Utilities Commission must define a very large customer class for each public utility by December 15, 2026, and tariffs for that class must assign its costs to it and protect other customers from stranded costs. A qualified large-scale data center also pays an annual fee set by peak demand, from $2 million for 100 to 250 megawatts up to $5 million at 750 megawatts or more. None of those terms changes the physics of cooling, but each one changes which plant costs the owner least over its life.

How much water can a Minnesota data center cooling plant use?

A Minnesota data center cooling plant can use as much water as its DNR water-use permit allows, and a permit is required once a site draws more than 10,000 gallons a day or 1,000,000 gallons a year from its own wells or surface water. A plant on a city supply draws through the city’s permit instead, but the city’s capacity and contract terms set the same practical limit. Data center cooling water for evaporative towers is the main draw on most sites, because towers reject heat by evaporating water and blowing down concentrated solids.

Minnesota data center water rules tighten further at the top end. For a data center whose new or added consumptive use would exceed 100,000,000 gallons a year, the 2025 law adds two steps. Before applying, the data center can ask the DNR for a preapplication evaluation: it describes the project, its maximum-day, maximum-month and average-year water use, its source and its quality needs, and the DNR answers in writing about water availability constraints at each proposed site. When the permit itself is issued, the DNR must make sure public health and safety are protected and that conservation measures are reasonably considered, naming recycling water before discharge, using reclaimed water, reuse of the data center’s discharge by municipal water utilities, and closed-loop systems. The DNR may also require an aquifer test.

A separate Minnesota rule matters to older sites: the DNR may not issue a permit that increases groundwater use for once-through cooling, and once-through systems above 5,000,000 gallons a year must convert to water-efficient alternatives. Any legacy computer room still cooled with well water on a once-through condenser is on borrowed time.

Minnesota water-use thresholds and what they mean for a data center cooling plant
Annual water useWhat Minnesota requiresCooling plant response
Under 10,000 gallons a day and 1,000,000 gallons a yearNo DNR water-use permit for the appropriationSmall enterprise halls; dry coolers or air-cooled chillers usually keep use well below this
Above those amountsDNR water-use permit with an annual processing feeMetering, makeup and blowdown records, cycles of concentration set by water treatment
Above 100,000,000 gallons a year of consumptive use at a 100 MW data centerOptional preapplication evaluation; permit conditions on conservation, closed loops and reuse; possible aquifer testHybrid or closed-loop heat rejection, reclaimed water studies, blowdown reuse
Once-through groundwater coolingNo permit to increase use; systems above 5,000,000 gallons a year must convertReplace with closed-loop dry coolers, towers or chillers

Closed loop data center cooling and data center cooling without water

Closed loop data center cooling in Minnesota usually means dry coolers or fluid coolers rejecting heat from a glycol loop to outdoor air, with no evaporation and no blowdown. Data center cooling without water is more practical here than in most of the country, because the dry bulb temperature sits low for so much of the year: a dry cooler sized for the Minnesota summer design point carries the load alone through the long cold season and with a chiller’s help on the hottest days.

The trade-off is equipment and land. Dry coolers need more coil area and fan power than towers for the same summer duty, and a 100-megawatt campus needs a large yard to hold them. Adiabatic coolers, which spray or wet a pad only on the hottest days, sit between the two: modest water use during a few summer weeks and dry operation the rest of the year. Paul Industries compares annual water, annual energy and yard area for each option against the DNR permit position and the utility tariff before the owner commits to one.

Dry cooler data center plants, towers or hybrids for a Minnesota hall

A dry cooler data center plant, an evaporative cooling tower plant and a hybrid each fit Minnesota sites under different conditions, and the choice is usually settled by water availability, water cost, yard space and the facility water temperature the IT equipment allows. The table below summarizes how Paul Industries frames that decision for a Minnesota owner.

Heat rejection options for a Minnesota data center
OptionWater useMinnesota strengthsMinnesota cautions
Dry coolers on glycolNear zeroLong cold season, no blowdown, simple DNR positionLarge yard, higher fan power, snow drifting and coil icing
Adiabatic dry coolersLow, summer onlySmaller yard than pure dry, water used only on peak daysSpray water treatment, drain-down before freezing nights
Evaporative cooling towers with plate heat exchangersHigh in summer, low in winterCompact, efficient at summer peak, long water-side economizer seasonBasin heaters, plume icing, makeup and blowdown permits
Air-cooled chillers with free-cooling coilsNear zeroPackaged, good for smaller halls and edge sitesCompressor energy on warm days, low-ambient controls in deep cold
Water-cooled chillers with towersHigh in summerLarge campuses with reliable water and a strong economizer designMost water-intensive; permit and city supply limits

Data center cooling tower operation through a Minnesota winter

A data center cooling tower in Minnesota runs through the winter only with freeze protection designed in: basin heaters or remote sump tanks indoors, heat-traced and insulated makeup and drain lines, variable-speed fans that slow or reverse to clear ice, and controls that bypass water around the fill on the coldest nights. Plume from the tower can coat adjacent equipment, fences and roofs with ice, so the tower location is chosen with prevailing winter winds in mind. Most Minnesota designs put a plate heat exchanger between the tower and the facility loop so the critical loop stays clean and the tower side can run on its own freeze strategy.

Freeze protection for a Minnesota data center cooling system

Freeze protection for a Minnesota data center cooling system starts with deciding which loops carry glycol and which carry treated water, because glycol lowers heat transfer and raises pumping power while water freezes at 32°F. A common pattern is a glycol loop for everything outdoors, a plate heat exchanger at the building wall, and treated water indoors where the IT equipment and the coils sit.

  • Glycol concentration set to the zone 6A or zone 7 design low, tested at least yearly and topped up with inhibited glycol only.
  • Air separators, expansion tanks and fill stations sized for the glycol volume, with makeup arranged so raw water never dilutes the loop.
  • Heat tracing and insulation on every exposed water line, with alarms on tracing circuits.
  • Outdoor air intakes, louvers and dry cooler fans protected from snow ingestion and drifting.
  • Cold-start sequences that prove flow before opening valves to outdoor coils after an outage.

Paul Industries designs, installs and tests these protections as part of the plant, and walks the owner’s operators through the winter sequences before the first cold season.

Minnesota data center electricity prices and the cooling overhead

Minnesota data center electricity prices sit close to the national averages: the U.S. Energy Information Administration reports 2025 average prices of 9.31 cents per kilowatt-hour for Minnesota industrial customers and 12.35 cents for commercial customers, against national averages of 8.51 and 13.37 cents. Large campuses negotiate their own terms with Xcel Energy, Minnesota Power, Otter Tail Power or a cooperative, but the published averages show what a kilowatt-hour of cooling overhead is worth.

As an example, a 20-megawatt IT load whose cooling improvements bring power usage effectiveness from 1.35 to 1.20 saves 3 megawatts around the clock, or 26,280,000 kilowatt-hours a year. At the 2025 Minnesota industrial average that is about $2.45 million a year; at the commercial average, about $3.25 million. Minnesota’s long economizer season is what makes savings of that size reachable, which is why Paul Industries treats economizer design and controls as the center of the plant rather than an add-on.

Data center cooling requirements a Minnesota permit checks

Data center cooling requirements on a Minnesota permit come from the 2020 Minnesota Mechanical and Fuel Gas Code, which is built on the 2018 International Mechanical Code, the 2024 Minnesota Commercial Energy Code built on ASHRAE 90.1-2019, and the machinery room and refrigerant rules of ASHRAE 15 for the chiller plant. The mechanical code covers equipment access, refrigeration, piping, hydronic systems and ventilation of the chiller room; the energy code covers economizers, pump and fan power, controls and insulation, with ASHRAE 90.4 often used as the reference for data center mechanical efficiency.

Large plants add DNR water permits, utility interconnection and tariff terms, and any municipal zoning conditions on noise from yard equipment, which matters for dry cooler and tower fans near homes. Paul Industries prepares the mechanical drawings and calculations that permit review needs and tests the installed plant against them.

District cooling and campus chilled water in Saint Paul and Minneapolis

District cooling is an option few states offer in their downtowns, and downtown Saint Paul has one: District Energy St. Paul began district cooling in 1993 with 12 customers, has grown to more than 100, and added chilled water thermal storage in 1994. Its chilled water service replaces on-site chillers and cooling towers with heat exchangers, and it lists data center cooling among its uses. A computer room or small hall in a building already on district chilled water can be cooled from that loop through a heat exchanger and a dedicated pumping and control package, with on-site backup cooling where the uptime target calls for it.

University, hospital and corporate campuses across the Twin Cities and Rochester often have their own central chilled water plants as well. Paul Industries connects new data halls to campus or district loops, adds the redundancy and controls a critical load needs, and sizes the tie-in so every building on the loop keeps its flow on a hot afternoon.

Data center cooling methods for dense racks in Minnesota halls

Data center cooling methods in new Minnesota halls are moving toward liquid at the rack: direct-to-chip cold plates fed by coolant distribution units, rear-door heat exchangers on mixed rows, and air cooling for the remaining network and storage equipment. Higher rack densities raise the facility water temperature the IT equipment accepts, and in Minnesota warmer facility water means dry coolers can carry the load for nearly the whole year. The rack-level loops, manifolds and CDUs are covered on the data center liquid cooling in Minnesota page; the plant behind them is what this page describes.

For readers asking how do data centers cool down, the short answer is that every watt a server uses becomes heat, which fans or liquid carry from the chips to a water loop, and the plant then dumps that heat outdoors through coolers, towers or chillers. In Minnesota the outdoor end of that chain does most of the work without compressors for much of the year.

What does data center cooling cost in Minnesota?

Data center cooling cost in Minnesota depends on the IT load and density, the facility water temperature, the heat rejection choice and its yard area, redundancy level, glycol volume and freeze protection, water supply and treatment, the length of yard and riser piping, controls, and whether the work is a new campus or an upgrade inside an operating hall. Water and power terms under the 2025 law, the very large customer tariff and the annual fee for large-scale sites also move the life-cycle cost between options.

Paul Industries gives a budget range from comparable scope once the IT load, phasing, redundancy target and site plan are known, then a firm price when the design is complete. Supply-only equipment packages, design-build plants and complete installation are all offered, so the owner chooses how much of the plant Paul Industries designs and builds.

Who installs data center cooling in Minnesota?

Paul Industries installs data center cooling in Minnesota as one of the data center cooling contractors that take the whole plant: design, chillers, dry coolers and towers, pumps, heat exchangers, glycol systems, yard and riser piping, controls integration, testing, startup and service. Owners comparing data center cooling companies can send the IT load and site plan and receive one scope covering the plant from the rack connection to the outdoor equipment. As a data center cooling company with its headquarters in Kilmarnock, Virginia, Paul Industries brings the same scope to halls in every state.

The same work in the headquarters state is described on the data center cooling in Virginia page, and the water-basin rules of an eastern state on the data center cooling in Pennsylvania page. Minnesota pages for related work include data center commissioning in Minnesota, data center mechanical contractor in Minnesota, chiller repair in Minnesota and process piping in Minnesota. For heat rejection equipment in more depth, see data center cooling towers and glycol cooling systems; for the wider region, see the Midwest page.

Data center cooling plants from Paul Industries across Minnesota

Paul Industries designs, supplies, installs, tests and services every data center cooling system in this page’s scope, from a single computer room in a Minneapolis office tower to campus plants in the south metro, Rochester, St. Cloud, Duluth and the Red River Valley. For the state overview see Minnesota. Send the IT load, density, phasing and site plan, and request a quote.

Standards referenced: Minnesota Statutes 103G.265 and 103G.271 (DNR water-use permits) · Minnesota Statutes 216B.02, 216B.1622 and 216B.72 (2025 data center law) · 2024 Minnesota Commercial Energy Code (Minnesota Rules chapter 1323, ASHRAE 90.1-2019) · 2020 Minnesota Mechanical and Fuel Gas Code (Minnesota Rules chapter 1346, 2018 IMC) · ASHRAE TC 9.9 thermal guidelines · ASHRAE 90.4 · ASHRAE 15

Frequently asked questions

Who handles data center cooling in Minneapolis and the inner suburbs?

Paul Industries handles data center cooling Minneapolis owners need, from computer rooms in downtown towers to colocation halls in Bloomington, Plymouth, Maple Grove and Eden Prairie. Urban sites bring roof and yard limits, so dry coolers, packaged chillers and connections to existing building or campus loops are common. Send the IT load and the space available for outdoor equipment to start.

Does Paul Industries build cooling plants for campuses in Rosemount, Eagan and Farmington?

Yes. Paul Industries builds central plants, dry cooler yards, tower plants and yard piping for campus-scale halls across the south metro, including Rosemount, Eagan, Farmington and Lakeville. Projects at the 100-megawatt scale also pass through DNR water review and Public Utilities Commission tariff decisions, and Paul Industries prepares the plant data those reviews ask for.

Who provides data center cooling in Rochester and southern Minnesota?

Paul Industries provides data center cooling Rochester MN hospitals, research computing rooms and enterprise halls rely on, along with sites in Austin, Owatonna, Mankato and across southern Minnesota. Open sites there bring wind exposure for dry coolers and towers, and hospital campuses often add a new hall to an existing central plant, which Paul Industries ties in with redundancy confirmed first.

Is Paul Industries available for data center cooling in Duluth and on the Iron Range?

Yes. Paul Industries designs and installs data center cooling Duluth and Iron Range sites need, where St. Louis, Carlton, Lake and Itasca counties fall in energy code climate zone 7. Glycol strength, heat tracing, snow-tolerant fan arrangements and cold-start controls are set to that colder design point, and economizer operation covers most of the year.

Who installs cooling for data halls in St. Cloud, Moorhead and greater Minnesota?

Paul Industries installs data center cooling St. Cloud, Moorhead, Willmar and other greater Minnesota sites need, from enterprise rooms to new campuses near transmission capacity. Long economizer seasons favor dry coolers, while open prairie wind and blowing snow make intake and coil protection a design item from the first layout.

Does a Minnesota data center need a DNR permit for its cooling water?

A DNR water-use permit is required when a site appropriates more than 10,000 gallons a day or 1,000,000 gallons a year from its own wells or surface water. A data center on a city supply uses the city’s permit, though large draws still depend on the city’s capacity. Above 100,000,000 gallons a year of consumptive use, the 2025 law adds conservation conditions and an optional preapplication evaluation.

What did the 2025 Minnesota data center law change for cooling plants?

The law, signed June 14, 2025, defined data centers at 100 megawatts or more and included cooling within that definition, set DNR permit conditions favoring closed loops, recycled and reclaimed water for plants using over 100 million gallons a year, created a very large customer class for electric tariffs, and set an annual fee of $2 million to $5 million for qualified large-scale data centers.

Can an older Minnesota computer room keep its once-through well water cooling?

Minnesota law bars any permit that increases groundwater use for once-through cooling, terminates once-through permits above 5,000,000 gallons a year, and requires existing systems to convert to water-efficient alternatives within the design life of the equipment. Paul Industries replaces once-through condensers with dry coolers, closed-loop fluid coolers or air-cooled equipment sized for the room’s load.

How cold should glycol be rated for in a Minnesota data center loop?

Glycol strength is set from the site’s winter design temperature with a margin, and zone 7 sites around Duluth and the Iron Range need more protection than zone 6A sites in the Twin Cities. Higher concentrations cost heat transfer and pump power, so Paul Industries keeps glycol to the outdoor loops where possible and uses a plate heat exchanger to keep indoor loops on treated water.

Can a Minnesota data center run on free cooling all year?

A plant with warm facility water can come close. Halls supplying 65°F or warmer water to liquid-cooled racks or rear-door coils can reject heat through dry coolers for most of the year and use chillers only on hot afternoons; Minneapolis averages about 13 days a year at 90°F or above. Plants running colder chilled water get fewer economizer hours, so the water temperature decision comes first.

How do cooling towers survive a Minnesota winter at a data center?

Towers that run year-round use basin heaters or indoor remote sumps, heat-traced makeup and drain lines, variable-speed fans that slow or reverse to shed ice, and bypass valves that keep water off the fill on the coldest nights. A plate heat exchanger between the tower and the facility loop keeps the critical loop clean and lets the tower side follow its own winter sequence.

What does Minnesota electricity cost a data center cooling plant?

EIA reports 2025 Minnesota averages of 9.31 cents per kilowatt-hour for industrial customers and 12.35 cents for commercial customers. Every megawatt of cooling overhead running all year uses 8,760,000 kilowatt-hours, worth roughly $815,000 at the industrial average. Large campuses negotiate their own terms, and the very large customer class the PUC sets by December 15, 2026 will shape those terms further.

Can a data hall in downtown Saint Paul use district chilled water?

District Energy St. Paul supplies chilled water to more than 100 downtown customers and lists data center cooling among its uses. A computer room or small hall in a connected building can take its cooling through a heat exchanger with dedicated pumps and controls. Paul Industries designs that interface and adds on-site backup cooling where the uptime target requires it.

Does Paul Industries supply data center cooling equipment for a Minnesota project without installing it?

Yes. Paul Industries supplies chillers, dry coolers, cooling towers, pumps, heat exchangers, glycol fill and makeup packages and prefabricated pump skids on a supply-only basis, as well as design-build plants and complete installation. Each route carries the same submittals, test records and startup support for the Minnesota permit and the owner’s operators.

Can a running Minnesota data hall get a new cooling plant without an outage?

Yes, when the work is sequenced around redundancy. Paul Industries confirms remaining capacity, installs new equipment beside the old, makes tie-ins under hot taps or planned valve isolations, and transfers load one loop at a time. In Minnesota, cutovers are often planned for spring or fall, when free cooling covers much of the load and chiller capacity is less critical.

Which energy code edition applies to a Minnesota data center cooling plant permitted today?

The 2024 Minnesota Commercial Energy Code, effective January 5, 2024 and built on ASHRAE 90.1-2019, applies to new permits, with mechanical work under the 2020 Minnesota Mechanical and Fuel Gas Code. Minnesota defines a computer room as one above 20 watts per square foot or 10 kilowatts of IT load, so most data halls fall under the energy code’s computer room provisions.

What should a Minnesota data center send to price a cooling plant?

Send the IT load by phase, rack densities and any liquid-cooled share, the redundancy target, the site plan with yard space, the water source and any DNR permit position, the utility and service voltage, and the schedule. With that, Paul Industries returns a budget range and a plant concept, then a firm price when the design is set. Call 201-450-8280 or request a quote.

Planning a cooling plant for a Minnesota data hall?

Send the IT load by phase, rack densities, redundancy target, site plan and water source. Call 201-450-8280 or request a quote.