Industrial water treatment is the set of filtration, softening, purification, conditioning and wastewater systems that make raw water fit for each use in a plant, and make used water fit to discharge or reuse. Paul Industries designs, fabricates, installs, starts up and services those systems nationwide, from the raw water inlet to the sewer connection. This page is the overview: it explains each part of a plant’s water system briefly and links to the detailed page for each one.
What is industrial water treatment?
It is treatment matched to a use rather than to a single standard. A public water system treats water to one drinking water standard; a plant treats the same incoming supply to several specifications at once: soft enough not to scale a boiler, pure enough for a product or a final rinse, controlled enough not to corrode a cooling loop, and clean enough on the way out to meet a sewer or discharge permit. What is industrial water, in that sense? Any water a facility takes in or produces for a purpose other than drinking: process water, boiler feed, cooling water, washdown and cleaning water, and the wastewater all of them become. Each stream has a quality target, and the industrial water treatment process for that stream is the shortest chain of equipment that reaches the target reliably at the lowest operating cost.
Plants treat water for four reasons: to protect equipment from scale, corrosion and fouling; to meet a product or process specification; to meet the limits in a wastewater permit; and, more and more often, to recover water for reuse because supply or discharge is expensive or capped. Most plants have all four reasons at once, which is why the treatment train is designed as a system, not bought as a single piece of equipment.
Who installs water treatment trains for manufacturing plants, from raw water to discharge?
Paul Industries designs, fabricates, installs, starts up and services industrial water treatment systems, from raw water filtration and softening through RO, DI and EDI purification to wastewater treatment and reuse. It works from Kilmarnock, Virginia and takes treatment projects at plants across the United States, including Ohio, Texas, North Carolina, West Virginia and Connecticut.
To scope a water treatment system, send:
- The raw water source and a recent analysis
- Each use and its quality target, such as boiler feed, rinse water or cooling makeup
- Daily volumes in and out, with peak flows
- Discharge permit limits or reuse goals for the wastewater
Each stage is started up and checked against the quality target set for it before the plant takes it over. Call 201-450-8280 or request a quote.
The process of water treatment, stage by stage
The process of water treatment removes contaminants in order of size, from solids that strain or settle out, down to dissolved ions and living organisms, until the water meets the quality its use requires.
What is the process of water treatment on a public supply?
On a surface water supply it is a five-step sequence: coagulation, flocculation, sedimentation, filtration and disinfection. The process of treating drinking water has numeric limits at its last two steps, as the table shows.
| Step | What happens | Control point |
|---|---|---|
| Coagulation | A coagulant makes fine particles clump together | Dose set by jar testing and raw water changes |
| Flocculation | Gentle mixing grows the clumps into heavier floc | Mixing energy and detention time |
| Sedimentation | Floc settles and the clearer water moves on | Settled water turbidity |
| Filtration | Water passes through filter media | Conventional and direct filtration plants: 0.3 NTU or less in 95 percent of monthly measurements, and never above 1 NTU |
| Disinfection | Chlorine or another disinfectant, sometimes UV or ozone, kills what remains | Maximum residual disinfectant level of 4.0 mg/L for chlorine |
This process for drinking water treatment is also the model for plant raw water systems on rivers and lakes, where clarification comes ahead of the filters.
Where the industrial treatment of water goes further
The industrial treatment of water often starts where the public plant stops, because drinking water can still hold enough hardness, chlorine and dissolved solids to damage a boiler, a membrane or a product. The process of water purifying for those uses takes out chlorine first, then hardness, then dissolved solids, then the last ions and organisms, and stops as soon as the target for that stream has been reached.
Water treatment diagram: process steps in flow order
A water treatment diagram reads from raw water on one side to the points of use on the other, with every drain and chemical feed drawn in. A typical plant train runs this way:
- Raw water inlet with meter, backflow preventer and sample valve.
- Break tank and booster pumps.
- Multimedia filter, with its backwash line to drain.
- Carbon filter or bisulfite injection.
- Softener, with brine tank and regeneration drain.
- Cartridge filter ahead of the membranes.
- Reverse osmosis unit, with permeate forward and concentrate to drain or reuse.
- Polishing and UV on the branches that need them.
- Storage tank and distribution piping to each use.
- Collected drains to neutralization and the sewer connection.
Paul Industries draws this train for the actual site during process engineering and design, then fabricates and installs it.
What is process water?
Process water is water that touches the product or the process: ingredient water, rinse and wash water, dilution water, and water used to raise steam, cool equipment or carry material. The uses of water in industry fall into a handful of groups, and each group sets a different treatment target.
| Use | What matters | Typical treatment |
|---|---|---|
| Ingredient and product water (food, beverage, cosmetics) | Chlorine, taste, microbes, consistent mineral content | Carbon, filtration, RO, UV, sometimes remineralization |
| Rinse and cleaning water (CIP, parts washing, final rinse) | Spotting, hardness, dissolved solids | Softening, RO or DI |
| Pharmaceutical and laboratory water | Conductivity, total organic carbon, microbial limits | RO with EDI or distillation, sanitized storage and loops |
| Boiler feedwater | Hardness, dissolved oxygen, silica, alkalinity | Softening or RO, deaeration, chemical feed |
| Cooling tower makeup and closed loops | Scale, corrosion, biological growth | Softening or RO on makeup, filtration, inhibitor and biocide feed |
| Washdown and utility water | Suspended solids, chlorine residual | Filtration, sometimes softening |
Process water treatment, then, is not one technology but a decision made stream by stream. One process water treatment system often feeds several of these uses: a softener and carbon filter supplying a utility header, with an RO unit downstream of the same pretreatment for the streams that need low dissolved solids. Designing the shared pretreatment once, for the combined flow, is almost always cheaper than giving each use its own. Industrial process water treatment also has to follow the process as it changes: a new product, a tighter rinse specification or a production increase can push a stream past what its equipment was sized for, so headers and pretreatment are best laid out with room to add a unit.
Water treatment process steps in an industrial plant
The steps follow the same order nearly everywhere: remove what can be strained or settled, remove what would damage the next step, remove dissolved minerals to the level the use requires, protect the water in storage, and treat what goes down the drain. Each stage protects the one after it, which is why a failure upstream, such as a carbon filter that stops removing chlorine, shows up downstream as ruined resin or membranes.
| Stage | Purpose | Typical equipment |
|---|---|---|
| 1. Raw water pretreatment | Remove suspended solids, iron, manganese, chlorine and organics | Strainers, clarifiers, multimedia, iron and carbon filters, cartridge filters |
| 2. Hardness removal | Prevent calcium and magnesium scale | Ion exchange softeners or antiscalant feed |
| 3. Dissolved solids removal | Lower total dissolved solids, silica and chloride | Reverse osmosis, deionization |
| 4. Polishing and high purity | Reach compendial or very low conductivity water | EDI, UV, ultrafiltration, sanitized storage and distribution |
| 5. Boiler feedwater | Protect boiler, steam and condensate system | Deaerator, chemical feed, blowdown control |
| 6. Cooling water | Control scale, corrosion and Legionella | Chemical feed, side stream filtration, conductivity-controlled blowdown |
| 7. Wastewater | Meet sewer or discharge limits, or recover water | Equalization, pH adjustment, solids and oil removal, membranes for reuse |
A water treatment process flow diagram, the drawing that shows every unit, its flows, its controls and its drains, is the first deliverable on any new system. It is where redundancy, bypasses, sample points and drain capacity are settled before anything is bought, and it becomes the basis for the piping and instrument drawings.
What is raw water treatment?
Raw water treatment is the first stage: conditioning the incoming supply, whether city water, well water or surface water, so it can feed everything downstream. City water usually needs chlorine or chloramine removal and some filtration. Well water often carries iron, manganese, hydrogen sulfide and high hardness. Surface water brings turbidity, organics and seasonal swings that may call for clarification ahead of filtration.
Hardness is usually the first number a plant looks at. The USGS classifies water as soft at 0 to 60 mg/L as calcium carbonate, moderately hard at 61 to 120, hard at 121 to 180 and very hard above 180, and one grain per gallon equals about 17.1 mg/L. Industrial hard water treatment is normally ion exchange softening ahead of boilers, cooling towers, kitchens, laundries and RO units, covered in detail on our water softener installation, service and repair page. Where RO follows, antiscalant dosing can sometimes replace the softener; the water analysis decides which.
Chlorine is the second. It protects the public supply but damages polyamide RO membranes and oxidizes softening resin, so it is removed with activated carbon or sodium bisulfite injection. Chloramine, used by many utilities, is slower to remove and is normally handled with catalytic carbon and longer contact time. Iron and manganese are oxidized and filtered on dedicated media, because they foul resin and membranes and stain product.
Industrial water filtration
Filtration removes particles by size, and the right filter depends on how small the particles are and how much of them there is. An industrial water filter can be a media bed that backwashes itself, a bag or cartridge that is replaced, or a membrane that is cleaned in place.
| Filter type | Removes | Maintenance | Typical use |
|---|---|---|---|
| Strainers and self-cleaning screens | Coarse debris and sand | Automatic flush or basket cleaning | Raw water intakes, cooling water |
| Multimedia filters | Suspended solids down to roughly 10 to 25 microns | Automatic backwash | Raw water and RO pretreatment |
| Activated carbon | Chlorine, chloramine (catalytic grades), organics, taste and odor | Backwash, periodic media replacement | Ahead of RO and softeners, ingredient water |
| Bag and cartridge filters | Particles at the element’s rating, coarse to sub-micron | Replace on differential pressure | Final protection ahead of RO, points of use |
| Ultrafiltration | Particles, colloids and bacteria; pores roughly 0.01 to 0.1 micron | Backwash and chemical cleaning | Water reuse, difficult RO feed, polishing |
An industrial water filter system is sized on flow per square foot of filter area, not on pipe size: undersized media filters channel and pass solids, and undersized cartridge banks plug in days. Each industrial water filter housing should carry differential pressure gauges or transmitters, because the pressure drop is what tells operators when to change elements, and it should be rated for the line pressure and for any cleaning chemicals it will see. Specify each industrial water filter cartridge by micron rating, absolute or nominal, and by material, and keep a set of spares on site. A process water filter at a point of use, ahead of spray nozzles or a plate heat exchanger, protects one piece of equipment for far less than filtering the whole header finer than it needs. Housings, skids and elements are covered on our process filtration systems page.
Industrial water purification: RO, DI and EDI
Purification removes dissolved minerals, which no filter can touch. Reverse osmosis forces water through a semipermeable membrane and typically rejects about 95 to 99 percent of dissolved salts, sending them to drain in a concentrate stream. Deionization exchanges dissolved ions for hydrogen and hydroxide on cation and anion resins, which are regenerated with acid and caustic on site or swapped out as exchange tanks. Electrodeionization, EDI, polishes RO permeate with resin that an electric current regenerates continuously, with no acid or caustic. A typical industrial water purification system is pretreatment, then RO, then DI or EDI where the use needs lower conductivity than RO alone delivers.
Recovery rate, membrane cleaning, array staging and concentrate disposal decide what RO costs to run, and are covered on our commercial reverse osmosis systems page. Packaged units are described under RO skids and water treatment skids, and the two purification routes are compared in RO vs DI water.
Industrial water purification methods compared
Industrial water purification methods differ in what they take out of solution: reverse osmosis, nanofiltration, ion exchange, electrodeionization and distillation all remove dissolved matter, at different purity and running cost.
| Method | How it works | Best fit | Main running cost |
|---|---|---|---|
| Nanofiltration | Membrane that passes much of the monovalent salt and holds back larger ions and organics | Partial softening, sulfate and color removal | Pumping power and membrane cleaning |
| Reverse osmosis | Tighter membrane that rejects most dissolved salts | General low-TDS water and pretreatment for polishing | Pumping power and water sent to drain |
| Ion exchange | Resin swaps dissolved ions for hydrogen and hydroxide | Polishing, or small flows of low-TDS feed | Acid and caustic, or exchange tanks |
| Electrodeionization | Resin regenerated by electric current | Continuous polishing of RO permeate | Electricity and stack replacement |
| Distillation | Water is evaporated and condensed, leaving dissolved solids behind | Water for Injection and high-salinity feed | Heat |
The right process for purifying water is the simplest one that meets the numeric target, because each added stage brings its own drain, chemicals and maintenance. Cost per thousand gallons is the fair basis for comparing those options, and the RO vs DI guide goes further into the most common choice.
UV disinfection system for water treatment
A UV disinfection system for water treatment passes flowing water through a reactor where ultraviolet light, traditionally at 254 nm, inactivates organisms without adding a chemical. NSF/ANSI 55 sets two classes for small systems: Class A delivers at least 40 mJ/cm² at its alarm set point and carries a sensor and alarm, while Class B delivers 16 mJ/cm² and is meant for nuisance organisms only. Larger industrial reactors are selected from flow, required dose and UV transmittance of the water. Clear water is a requirement, since turbidity and color shield organisms from the light, so a filter belongs upstream. Paul supplies and installs the reactor, along with a sample port on each side and a bypass arranged to keep untreated water out of the product line.
High-purity water for pharmaceutical and laboratory use
Where water is itself a regulated ingredient, as with USP Purified Water and Water for Injection, purification is followed by a sanitized storage and distribution loop, continuous conductivity and total organic carbon monitoring, and validation. That work differs enough in materials, design and documentation to have its own page: high-purity water system installation. The plant-level point is that a high-purity system usually shares raw water pretreatment with the rest of the plant, so the two are best designed together, with the pretreatment sized for both.
Boiler feedwater and steam
A boiler concentrates whatever comes in with its feedwater. Hardness forms scale on tubes, dissolved oxygen pits the boiler and feedwater piping, and carbon dioxide released from alkalinity makes condensate corrosive. The usual treatment is softening for low and medium pressure boilers, RO or demineralization where pressure or steam purity requires it, a deaerator to strip oxygen and carbon dioxide, and chemical feed for oxygen scavenging and internal treatment. The U.S. Department of Energy notes that most boilers above 200 psig need dissolved oxygen at 5 parts per billion or less, which is the level a pressurized deaerator is built to approach. Feedwater limits tighten as pressure rises, as set out in the ASME consensus on feedwater and boiler water chemistry for industrial boilers. Equipment, deaerators and blowdown are covered on our boiler feedwater and deaerator page.
Cooling water
An open cooling tower evaporates water and leaves the minerals behind, so the recirculating water is held in range by blowdown, makeup pretreatment and chemical feed that control scale, corrosion and biological growth, and Legionella risk is managed under a water management program following ASHRAE 188. Closed loops, including chilled water and data center cooling loops, need corrosion inhibitor, filtration and periodic testing rather than blowdown. Cycles of concentration, blowdown calculations, side stream filtration and Legionella testing are covered on our cooling tower water treatment page, and data center loops on our data center water treatment page.
Industrial wastewater treatment and reuse
What is industrial wastewater? It is everything the plant sends to drain: process rinses, spent cleaning solutions, cooling tower blowdown, softener and filter backwash, RO concentrate and product losses. The treatment it needs is set by where it goes. A plant discharging to a municipal sewer is an industrial user under the EPA National Pretreatment Program, 40 CFR Part 403, and must meet the general prohibitions, any categorical pretreatment standards for its industry, and the local limits set by the treatment works it discharges to. A plant discharging directly to a river or stream needs an NPDES permit under the Clean Water Act.
Process wastewater treatment for sewer discharge is usually pretreatment: screening, equalization to even out flow and strength, pH neutralization, removal of fats, oils and solids, and sometimes biological treatment to cut BOD and sewer surcharges. Reuse goes further. A tertiary water treatment process, typically filtration or ultrafiltration followed by RO and disinfection, can return treated wastewater to cooling tower makeup, washdown or boiler pretreatment, cutting both purchased water and discharge volume. Details are on our process wastewater and effluent and food plant wastewater pretreatment pages.
Industrial water treatment methods compared
Each method removes a specific class of contaminant and leaves the rest, so a treatment train is built by stacking methods until every contaminant that matters is covered.
| Method | Removes or controls | Leaves behind | Where it fits |
|---|---|---|---|
| Clarification and sedimentation | Heavy solids, turbidity with coagulant | Dissolved minerals | Surface water, wastewater |
| Media and cartridge filtration | Suspended particles | Dissolved minerals, most bacteria | Almost every stream |
| Activated carbon adsorption | Chlorine, organics, taste and odor | Hardness, dissolved salts | Ahead of RO and resins, ingredient water |
| Ion exchange softening | Calcium and magnesium | Sodium, chloride, silica, total dissolved solids | Boilers, cooling makeup, kitchens, laundries, RO pretreatment |
| Reverse osmosis | Most dissolved salts, organics, bacteria | Dissolved gases such as carbon dioxide | Process water, boiler makeup, high purity |
| Deionization and EDI | Remaining ions after RO | Particles and organics unless pretreated | Polishing |
| Ultraviolet | Inactivates microorganisms at 254 nm; 185 nm lamps reduce TOC | Minerals, particles; no residual | Storage loops, product water, points of use |
| Deaeration | Oxygen and carbon dioxide | Minerals | Boiler feedwater |
| Chemical conditioning | Controls scale, corrosion and growth in place | Everything; it conditions rather than removes | Boilers, cooling towers, closed loops |
Industrial UV water treatment illustrates the rule behind the table: UV inactivates organisms at the moment water passes the lamp but leaves no residual, so it protects a storage loop or a point of use, not a whole distribution system on its own.
Process water treatment systems
Process water treatment systems are the trains of pretreatment, softening, filtration, reverse osmosis, deionization and polishing equipment that bring a plant’s incoming supply to a stated quality at each point of use, built deeper or shallower depending on what that use demands.
Pretreatment is shared and polishing is where end uses part ways. A plant feeding boiler makeup, CIP rinse and a beverage line from one supply typically runs all three through common filtration, carbon and softening, then branches an RO unit for the low-dissolved-solids uses and adds a polisher only on the branch that needs it. Mixed-bed DI or EDI takes RO permeate down to the conductivity that laboratory, pharmaceutical and finishing rinses call for. UV controls microbes in storage without adding a chemical. Ultrafiltration removes colloids and particles ahead of high-purity loops. Remineralization returns calcium and alkalinity to RO water where taste matters or where very pure water would be aggressive toward the downstream piping.
Every train needs a measurable proof point at its outlet, and a sample valve after each stage so a failing unit can be found without opening the others: a hardness test after the softener, free chlorine below detection at the RO inlet, a permeate conductivity trend, and the compendial conductivity and TOC tests for pharmaceutical water. A process water treatment system that cannot be sampled stage by stage can only be diagnosed by replacing parts until it recovers.
The same thinking scales from a single process water treatment plant serving one line to industrial process water treatment for a whole site. Typical trains by end use, in flow order:
| End use | Treatment train, in flow order | Proof point at the outlet |
|---|---|---|
| Food and beverage ingredient water | Multimedia filter, carbon, softener or antiscalant, RO, UV, then remineralization where the recipe needs it | Free chlorine absent ahead of the RO; permeate conductivity; microbial counts |
| CIP final rinse and spot-free rinse | Softener, carbon, RO, with DI added for spot-free finishes | Conductivity of the rinse water |
| Low-pressure boiler makeup | Multimedia filter, softener, deaerator | Hardness after the softener; dissolved oxygen after the deaerator |
| High-pressure boiler makeup | Softener or antiscalant, RO, mixed-bed DI or EDI, deaerator | Silica and conductivity after the polisher |
| Cooling tower makeup | Strainer or media filter, softener where hardness limits cycles of concentration | Makeup hardness and tower cycles |
| USP Purified Water | Multimedia filter, softener, carbon or bisulfite, RO, EDI, UV, sanitized storage and loop | Conductivity 1.3 µS/cm at 25 °C and TOC 500 ppb |
| Laboratory reagent water | RO, DI or EDI, UV, final filter at the dispenser | Resistivity at the point of use |
| Plating and finishing rinse | Carbon, RO, DI | Rinse conductivity |
| Humidification | Softener, RO, with DI where specified | Permeate conductivity |
Paul Industries designs and installs process water treatment as complete trains: skid-built pretreatment and reverse osmosis, softeners, DI and EDI polishing, storage, and the distribution piping and tie-ins that carry the water to production. Compendial trains are specified against the limits in our USP Purified Water specifications guide.
How to choose an industrial water treatment system
Start from the water analysis and the quality each use requires, not from equipment. The decision comes down to five inputs:
- A full raw water analysis, with several samples across seasons for surface or blended supplies: hardness, alkalinity, total dissolved solids, silica, iron, manganese, chlorine or chloramine, organics, turbidity, pH and temperature.
- A numeric quality target for each use, written down and agreed with the people who own the product or the boiler.
- Flow: average, peak and daily total, so storage can cover peaks rather than every unit being oversized.
- Redundancy: duplex or N+1 equipment wherever losing the water system would stop production.
- Operating cost: salt, chemicals, membrane and resin replacement, power, and the cost of water sent to drain.
The same logic applies at smaller scale. A commercial water treatment system for a hospital, hotel, campus or food service operation usually means softening, carbon and filtration on the domestic and kitchen supplies. A commercial water filtration system for that kind of building is selected from the same analysis with smaller equipment, and commercial water purification systems such as small RO units serve laboratories, beverage and ice equipment, and humidification. We size and lay out these systems through our process engineering and design group.
Industrial water treatment equipment
The core equipment in most plants is a short list: raw water break tanks and booster pumps, strainers and media filters, carbon filters, softeners, RO units, DI or EDI polishers, UV units, storage tanks with vent filters, deaerators, chemical feed skids with metering pumps and day tanks, and the controls, analyzers and flow meters that tie them together. Interconnecting piping, valves and instruments are as much a part of the system as the units, and they are where most field problems start: the wrong materials, missing sample points, drains that cannot take a backwash flow.
Water treatment process equipment is delivered either as packaged skids, built and tested in a shop and set on a pad, or field-erected for larger flows. A small process water treatment plant for one production line is often a single skid; a full industrial water treatment plant serving a campus is a building with several trains, storage, and its own control room. Industrial water treatment chemicals, the antiscalants, inhibitors, biocides and oxygen scavengers, are dosed through the feed equipment, controllers and injection points we install and service, so they go in accurately.
Industrial water treatment services: design to long-term service
Our work covers the whole life of a system. On new projects that means water analysis review, process design, equipment selection, shop fabrication of skids and piping, installation, tie-ins during a shutdown, hydrotesting, disinfection, start-up and operator training. On existing systems it means troubleshooting, performance testing, membrane and resin replacement, controls upgrades, repairs and scheduled maintenance. Industrial water systems run around the clock, so we set up maintenance under service contracts with logged visits and readings, and plants in regulated industries can add commissioning and qualification through validation and commissioning.
Water treatment plant maintenance services
Water treatment plant maintenance services keep each unit at its design output through logged readings, media and membrane care, instrument calibration and planned repairs.
| Unit | Routine work | What triggers more |
|---|---|---|
| Media filter | Backwash check and bed inspection | Rising pressure drop or solids passing through |
| Softener | Hardness test, brine level, valve timing | Hardness breakthrough before the expected volume |
| Carbon filter | Chlorine test after the bed | Any chlorine detected downstream |
| Reverse osmosis | Normalized flow, pressure and rejection data | A drop of about 10 to 15 percent in normalized permeate flow, or the membrane maker’s limit |
| UV reactor | Sleeve cleaning and sensor check | Lamp hours reaching the maker’s limit, or an intensity alarm |
| Chemical feed | Pump calibration, tubing and tank inspection | Residual drifting off target |
| Analyzers | Calibration against a reference | Reading that disagrees with a field test |
Paul runs this work under service contracts on systems of any origin.
Power plant water treatment
Power plant water treatment makes high-purity boiler makeup, keeps condensate clean through the steam cycle, conditions cooling water and manages plant wastewater under the steam electric effluent guidelines in 40 CFR Part 423.
Boiler makeup is typically filtered, passed through RO and polished by mixed-bed DI or EDI, because silica and sodium that reach a high-pressure boiler can carry over to the turbine. Condensate polishers remove corrosion products and any condenser leak before they return to the boiler. Cooling systems run the same tower or closed-loop programs as other plants at much larger flows, and wastewater streams such as flue gas desulfurization water, ash transport water and leachate are regulated individually. Paul builds these systems with the deaerators, sample panels and interconnecting piping included.
Oilfield water treatment
Oilfield water treatment separates oil and solids from produced water so that it can be injected, reused or sent on for further treatment.
Produced water is hard to generalize: total dissolved solids range from about 1,000 mg/L to more than 400,000 mg/L, against about 35,000 mg/L for seawater. A typical train uses gravity separators and skim tanks, then flotation or hydrocyclones for fine oil, then media filtration. High salinity water is usually disposed of or reused instead of being desalted, and EPA Class II wells are the main injection route. Federal rules in 40 CFR Part 435 bar unconventional oil and gas wastewater from publicly owned treatment works, which removes the sewer as an option for most shale operators.
Buyers comparing fracking water treatment companies should ask how flowback solids, oil and scale-forming ions are handled before reuse, and where the residuals finally go. Paul designs, builds and maintains these treatment skids and the piping that serves them, as described on the oil and gas page.
Industries we serve
Food and beverage plants need consistent ingredient water, soft water for CIP and boilers, and pretreatment for high-strength wastewater. Pharmaceutical and biotech plants need compendial water plus all the utility water around it. Data centers need cooling tower makeup treatment and clean closed loops. Oil and gas facilities handle produced water, boiler feed and cooling water at scale; see our oil and gas page. General manufacturing needs rinse water, boiler feed and cooling water, and increasingly reuse to control water and sewer costs.
Choosing among water treatment companies
They fall into three groups, and most projects need more than one. Equipment manufacturers build softeners, RO units and filters. Chemical service companies supply and test treatment chemicals. Contractors design, build, install and maintain the system as a whole and coordinate the other two. Industrial water treatment contractors are the right lead when the job involves piping, tie-ins, shutdown work and several kinds of equipment, which describes most real projects. Many commercial water treatment companies serve hotels, offices and hospitals more than plants, and center on a boiler and cooling tower chemical program with packaged softeners and filters; a production plant usually needs the contractor role as well.
When comparing an industrial water treatment company, or a commercial water treatment company for a smaller building, ask who will be on site for start-up and who answers the phone at two in the morning when a softener stops regenerating. Ask for a review of your water analysis before a price, not after, and ask what the system will cost to operate per thousand gallons, not only what it costs to buy. Good industrial water treatment solutions are the ones operators can actually run, with clear alarms, accessible sample points and room to maintain every unit.
Comparing water treatment chemical companies
Water treatment chemical companies are best compared on whether each product is approved for the use, whether every batch is documented, and whether the program suits the equipment it will run through.
Before a water treatment chemicals manufacturer’s product goes into a feed tank, check the safety data sheet, the certificate of analysis, compatibility with pump heads and tubing, NSF/ANSI/CAN 60 certification where the water is potable, and EPA registration for any biocide. Paul supplies and feeds treatment programs on that basis.
Chiller water treatment chemicals
Chiller water treatment chemicals depend on which side of the machine they serve. The condenser side follows a tower program of scale inhibitor, corrosion inhibitor and biocide. Chilled water treatment chemicals are closed-loop products, usually a nitrite or molybdate inhibitor with an azole where copper is present, and a non-oxidizing biocide only if testing calls for one. See the chilled water systems page for how that loop is built.
Industrial water purification companies: what to ask
Industrial water purification companies should show a design basis from your water analysis, a guaranteed output quality and a stated operating cost per thousand gallons. Lists of the biggest water treatment companies rank revenue, and the leading water treatment companies are often large chemical and equipment groups, so a well-known name tells a plant little about who will start up its RO skid or answer a night call.
Plants looking for local water treatment companies usually want a technician on site quickly when a softener or RO unit trips. Paul Industries runs crews in all 50 states with same-day emergency response, and designs, builds and services the whole system under one contract.
What Paul Industries does
Paul Industries designs, fabricates, installs, starts up and services plant water systems nationwide: raw water filtration, softening, carbon and iron removal, RO, DI and EDI, high-purity water generation and distribution, boiler feedwater equipment and deaerators, cooling tower water treatment equipment, chemical feed systems, storage tanks, wastewater pretreatment, and all the interconnecting piping. We work in operating plants, during shutdowns and on new construction. Request a quote with your water analysis and a list of the uses you need to supply.
Standards referenced: EPA 40 CFR Part 403 · Clean Water Act NPDES · ASHRAE 188 · USP Purified Water monograph · ASME Consensus on Operating Practices for the Control of Feedwater and Boiler Water Chemistry · ASME B31.3 · NSF/ANSI 61
Frequently asked questions
Why is water treatment important for industrial plants?
Untreated water scales heat transfer surfaces, corrodes piping and boilers, fouls membranes and can contaminate product, and untreated wastewater can breach a discharge permit. A thin layer of scale on a heat exchanger or boiler tube raises fuel and power use long before anything fails, so treatment usually pays for itself in energy, equipment life and avoided downtime.
How much does an industrial water treatment system cost?
It ranges from the price of a single filter or softener to a major capital project for a multi-train plant with RO, polishing, storage and controls, so a meaningful number needs the water analysis and flows. The drivers are flow, the raw water analysis, the purity required, redundancy, whether equipment is skid-mounted or field-erected, and installation conditions. Compare options on operating cost per thousand gallons as well as purchase price, because salt, chemicals, membranes and drain water often exceed the capital cost over the system's life.
How do industrial water filters work?
Media filters trap particles in a deep bed of graded sand, anthracite and garnet, then reverse flow to backwash the trapped solids to drain. Cartridge and bag filters strain water through a rated element that is replaced when the pressure drop rises. Carbon filters adsorb chlorine and organics onto the surface of the carbon rather than straining them. Membrane filters such as ultrafiltration sieve particles and bacteria at a fixed pore size and are cleaned by backwash and chemicals.
Is process water safe to drink?
Not unless it is specifically treated and maintained as potable water. Process water may be softened, deionized, chemically treated, recycled or stored in ways that make it unsuitable for drinking, and in many plants it is not protected against backflow from equipment. Drinking water outlets should be fed from the potable system, separated from process water by approved backflow prevention.
What industries use water filtration?
Nearly all of them: food and beverage, dairy, breweries, pharmaceutical and biotech, cosmetics, power generation, oil and gas, chemicals, metal finishing, electronics, pulp and paper, data centers, hospitals and commercial buildings. The difference between industries is not whether they filter but what fineness and what level of documentation they need.
How is industrial waste water handled?
It is collected, characterized by sampling, and then pretreated to meet the receiving sewer's limits or treated further for direct discharge or reuse. Typical steps are screening, equalization, pH adjustment, fat, oil and solids removal and, where the load is high, biological treatment. Sludge and residuals from those steps are dewatered and hauled for disposal, and the discharge is monitored and reported under the permit.
What is industrial water management?
It is the plant-wide practice of measuring where water comes in, where it goes and what it costs, then reducing use and discharge. In practice that means metering major users, raising cooling tower cycles, recovering condensate, reusing rinse water and RO concentrate where quality allows, and fixing leaks, all of which reduce both water purchase and sewer charges.
What is the difference between water filtration and water purification?
Filtration removes particles: sediment, rust, some organisms and anything else that exists as a solid. Purification removes dissolved substances such as salts, hardness and silica, which pass straight through filters. Reverse osmosis, deionization and distillation purify; media, cartridge and bag filters only filter, which is why purification equipment always sits downstream of filtration.
What is makeup water?
Makeup water is the water added to a boiler, cooling tower or closed loop to replace what is lost to evaporation, blowdown, steam use or leaks. Its quality matters more than the quality of the water already in the system, because every impurity in makeup water is concentrated in the system over time.
Can you work alongside our existing water treatment chemical vendor?
Yes. Paul Industries installs and services the treatment equipment, feed systems, injection points, controllers and sample connections, and runs the chemical program, including dose points, monitoring and the testing schedule. We install and service the treatment hardware and manage the chemistry, so dosing stays accurate and documented.
What water test results do we need before choosing equipment?
At minimum hardness, alkalinity, total dissolved solids or conductivity, pH, iron, manganese, silica, chlorine or chloramine, turbidity and temperature, and for RO feed also sulfate, barium, strontium and organics. Well and surface supplies should be sampled more than once, because a single sample can miss seasonal changes that decide whether a system copes or fails.
Does a plant need a permit to discharge treated water?
Usually yes. Discharges to a municipal sewer are governed by the sewer authority's pretreatment rules and often an industrial user permit; direct discharges to surface water require an NPDES permit. Even clean streams such as cooling tower blowdown and RO concentrate are covered, so check with the authority before changing what goes to drain.
Can treated wastewater be reused in the plant?
Often, for uses that do not touch product: cooling tower makeup, washdown, boiler pretreatment feed and irrigation. Reuse needs filtration, frequently membranes, and disinfection, plus a monitoring plan so quality is proven before it enters the reuse system. Food and pharmaceutical plants must also confirm what their regulators and quality systems allow.
What causes most water treatment system failures?
Changes in raw water that the design did not anticipate, pretreatment failures that pass chlorine, iron or solids to resin and membranes, and maintenance that lapses after start-up. Logging pressures, flows and conductivity every shift catches most problems weeks before they become outages.
How often should water treatment equipment be serviced?
Operators should log key readings daily. Filters, softeners and RO units typically need inspection and calibration monthly or quarterly, media and resin checks annually, and membrane cleaning when normalized performance shows it is due rather than on a fixed calendar. Systems feeding boilers or production deserve a written schedule that names who does each task.
Do you service systems another company installed?
Yes. We troubleshoot, repair, upgrade and maintain water treatment systems regardless of who built them, and we start with a site survey and the original drawings and data where they exist.
What equipment makes up a process water treatment train?
Most trains start with filtration and carbon or bisulfite to remove solids and chlorine, then softening or antiscalant to control hardness, then reverse osmosis to remove dissolved solids. Polishing is added only where the end use needs it: DI or EDI for low conductivity, UV for microbial control, ultrafiltration ahead of high-purity loops, and remineralization for beverage water.
How do you check that each stage of a water treatment train is working?
Give each stage a sample valve and a measurable target: hardness after the softener, no free chlorine at the RO inlet, a permeate conductivity trend after the RO, and the compendial tests where the water is a regulated grade. Logging those readings shows which unit is drifting before the water at the point of use goes out of specification.
What is make up water treatment, and why is it handled first?
It is the conditioning of the fresh water added to a boiler, tower or loop, and it comes first because every impurity in that water builds up inside the system. Softening, filtration or RO on the makeup line is usually cheaper than treating the consequences downstream.
What does a UV reactor need ahead of it?
Clear water, usually from a filter, plus a flow rate within the reactor rating. UV transmittance from a water sample belongs in the design check, since color and dissolved iron or organics can cut the delivered dose well below the rated figure.
Do chilled water and condenser water use the same treatment chemicals?
They run separate programs. Condenser water is open to air and concentrates minerals, so it needs scale inhibitor and regular biocide. Chilled water is sealed, so it relies on a corrosion inhibitor, and oxidizing biocides stay out of that loop.
Who installs industrial water treatment systems?
Paul Industries installs industrial water treatment systems in operating plants, during shutdowns and on new construction. Work starts from your water analysis and the list of uses to supply, then covers filtration, softening, RO or EDI, boiler feedwater equipment, chemical feed, wastewater pretreatment and the piping that ties each stage together. Service continues well after startup.
Who installs boiler feed and process water treatment at plants in Georgia or Florida?
Paul Industries installs softeners, filters, RO and the rest of the treatment train for plants in Georgia, Florida and across the US, from its base in Kilmarnock, Virginia. Each stream is treated to its target, so boiler feed, product water and cooling makeup each get the shortest equipment chain that reaches spec reliably. Call 201-450-8280 or request a quote.
Should a plant upgrade one treatment stage at a time or replace the whole train?
Stage-by-stage upgrades work when the train is sound and one step, such as an undersized softener or a fouling RO, limits the rest. A full replacement makes sense when demand has grown past the design, quality targets have tightened, or several stages are near the end of their life. Water test data from each stage shows which case applies. Call 201-450-8280 or request a quote.
How much does an industrial wastewater treatment system cost?
Wastewater system cost follows flow, peak loads and what has to come out, whether oil and grease, suspended solids, metals, pH swings or organic load, measured against the limits in the discharge permit. Equalization, sludge handling, controls and any water recovered for reuse also move the price. Paul Industries prices a system from flow records, a composition sample of the waste stream and the plant’s current permit. Call 201-450-8280 or request a quote.
What does it cost to run an industrial wastewater treatment system?
Running cost comes from treatment chemicals, sludge hauling and disposal, energy for pumps, blowers and mixers, operator time for sampling and adjustments, and lab fees for permit testing. Sludge disposal is a large line at many plants, so dewatering equipment can pay back through fewer hauls. Paul Industries reviews chemical use, sludge volume and the sampling schedule to show where the running cost can come down. Call 201-450-8280 or request a quote.
What is the difference between commercial and industrial water treatment?
Commercial water treatment serves buildings: softening for boilers and kitchens, filtration for ice machines and drinking water, and chemistry for cooling towers and closed loops. Industrial water treatment serves a process, with several streams each held to its own specification, plus wastewater that has to meet a discharge permit. Paul Industries handles both plant trains and building equipment such as commercial water softeners. Call 201-450-8280 or request a quote.
Is ozone worth using in an industrial water treatment system?
Ozone earns its place where strong disinfection without a chemical residue matters, such as stored high-purity water loops, wastewater polishing and some cooling water programs. It needs an on-site generator, contact time, an off-gas destruct unit and materials that tolerate it, and because it breaks down quickly, systems needing downstream protection pair it with a second step. Paul Industries weighs it against UV and chemical options using data from the plant’s own water. Call 201-450-8280 or request a quote.
Related: High-Purity Water System Installation (USP, WFI, RO/DI) · Commercial Reverse Osmosis Systems, Skids and Equipment · Process Wastewater, Effluent & Chemical Sanitization · Cooling Tower Water Treatment · Oil And Gas · Data Centers · Request a quote · Deaerator Installation, Inspection and Service · Data Center Water Usage: Figures, WUE, Cooling Choices and Reduction · Industrial DI Water System: Design, Installation and Service · Oil Water Separator Design, Installation, Cleaning and Maintenance · Ethanol, biofuels and RNG