Paul Industries provides power plant maintenance and mechanical construction for combined cycle, simple cycle, steam, cogeneration and utility plants, repairing and installing HRSG pressure parts, power piping, boiler feed water and demineralized water systems, pumps, valves, cooling water equipment and turbine auxiliaries. The work is planned around outages and forced shutdowns, built to ASME Section I and B31.1, and documented for the jurisdiction and the plant’s own records. Paul Industries designs, fabricates, supplies, installs, tests, starts up, repairs and maintains these systems, with supply-only, design-build and complete installation routes.
Request a quote or call 201-450-8280
What does power plant maintenance cover at generating stations and utility plants?
Power plant maintenance covers the inspection, repair, overhaul and replacement of the pressure parts, piping, rotating equipment, water treatment and cooling systems that turn fuel or heat into electricity, scheduled so the unit is available when the grid and the plant’s contracts need it. On a generating station that means planned outages, short forced outages and the routine work between them; on a utility, campus or industrial power plant it also means keeping steam and power flowing to the buildings and processes that depend on them.
Natural gas produced about 41 percent of US utility-scale electricity in 2025, according to the Energy Information Administration, and much of that comes from combined cycle plants, where a gas turbine’s exhaust feeds a heat recovery steam generator. Those plants now cycle on and off far more than they were designed to, and cycling is what wears out HRSG tubes, drums, attemperators and piping. Steam plants burning coal, biomass or waste, and the cogeneration plants at hospitals, universities and factories, carry many of the same systems at smaller scale.
| Plant type | Main mechanical systems | Typical scope from Paul Industries |
|---|---|---|
| Combined cycle | Gas turbine, HRSG, steam turbine, condenser, cooling tower, demineralized water | HRSG inspection and tube repair, power piping, feedwater and makeup systems, outage mechanical work |
| Simple cycle peaker | Gas turbines, fuel gas systems, inlet cooling, water injection skids | Fuel and water piping, pumps and valves, inlet cooling and demineralized water for injection |
| Steam plant (coal, biomass, waste) | Fired boiler, steam turbine, feedwater heaters, condenser, ash and fuel handling | Boiler pressure part repair, piping, heat exchangers, pumps, deaerators, water treatment |
| Cogeneration and CHP | Gas turbine or engine with HRSG, process steam headers, absorption chillers | HRSG and steam distribution, condensate return, feedwater treatment, tie-ins to plant processes |
| District energy and campus plants | Boilers, chillers, steam and chilled water distribution | Boiler and chiller plant work, distribution piping, heat exchangers, cooling towers |
| Municipal and cooperative utility plants | Mixed generation, water treatment, cooling water, aging auxiliaries | Replacement of pumps, valves, exchangers and piping during scheduled outages |
Who performs mechanical maintenance and construction for power generation facilities?
Paul Industries performs mechanical maintenance and construction for power generation facilities as a power plant mechanical contractor that repairs, fabricates, installs and maintains HRSG and boiler pressure parts, power piping, water treatment, heat exchangers, pumps, valves and cooling systems. Plant owners, operators and engineering firms bring Paul Industries in for planned outages, forced-outage repairs, capital projects that add or replace equipment, and service contracts that cover the routine work between outages.
Plants comparing power plant maintenance contractors usually want three things from one firm: welders and procedures qualified for the alloys in the plant, the ability to plan and staff an outage scope that changes as inspections find damage, and complete records at the end. Paul Industries delivers all three under one contract, with a single schedule, a single quality plan and one set of turnover documents. As a power plant maintenance company, Paul Industries also handles the smaller jobs that keep a unit available: valve packing, pump rebuilds, exchanger repairs, steam leak repairs and controls changes.
Owners looking for power plant construction contractors on a new unit or a major repowering get the same scope at larger scale: pipe and pressure part fabrication, equipment setting, installation, hydrostatic testing, flushing and startup support. Among power plant construction companies, Paul Industries is the one that stays with the plant after commercial operation, so the contractor that built a system also maintains it.
What is a HRSG and how does a HRSG work?
A heat recovery steam generator, or HRSG, is a boiler that makes steam from the hot exhaust of a gas turbine instead of from its own burner, and it is the piece that turns a simple cycle plant into a combined cycle plant. The answer to how does a HRSG work is a counterflow heat exchanger: exhaust gas that can reach about 1,150 F at the inlet passes across banks of finned tubes, first superheaters, then evaporators, then economizers, while water flows the other way, entering cold at the economizer and leaving as superheated steam for the steam turbine.
Most large combined cycle units use a three-pressure HRSG steam generator, with high-pressure, intermediate-pressure and low-pressure circuits, each with its own drum, plus reheat sections that warm steam returning from the high-pressure turbine. Smaller cogeneration units often have a single pressure level. Horizontal designs pass gas across vertical tubes; vertical designs pass it over horizontal tubes; once-through designs have no drums at all.
On a duct burner HRSG, supplementary firing between superheater sections raises gas temperature and steam output, adding megawatts at lower capital cost than a new turbine, which is why plants often use duct firing for peak periods. Duct burners add their own maintenance: burner elements, fuel trains, liner and casing hot spots, and purge requirements under NFPA 85. A gas turbine HRSG may also contain a selective catalytic reduction module and a CO catalyst between tube banks, which shape access and outage planning.
HRSG boiler inspection, cleaning and tube repair
HRSG boiler work during an outage combines inspection to find damage, cleaning to restore heat transfer and pressure part repair to restore integrity, and the scope of each depends on how the unit has operated since the last outage. A combined cycle power plant HRSG that starts and stops daily shows thermal fatigue at headers, tube-to-header welds and drums; one in steady service shows more corrosion and flow-accelerated corrosion. HRSG maintenance plans are built from that operating history, plus the plant’s inspection records.
HRSG inspection
HRSG inspection looks at drums and their internals, headers and tube-to-header welds, tube bends, attemperators and the piping downstream of them, casing and liner, duct burners, gas baffles and the stack damper. Ultrasonic thickness surveys track wall loss in flow-accelerated corrosion zones; borescopes reach inside headers; phased-array and other ultrasonic methods examine welds; and dye penetrant or magnetic particle testing finds surface cracks. Each finding is recorded against the location so that the next outage compares like for like.
| Damage | Where it shows | How it is found | Typical repair |
|---|---|---|---|
| Flow-accelerated corrosion | LP evaporators and economizers in two-phase flow; riser piping, tube outlets and tube-to-header welds | Ultrasonic thickness surveys at mapped points, trended outage to outage | Replacement with chromium-bearing alloy at high-wear points; chemistry changes |
| Thermal fatigue | Superheater and reheater headers, tube-to-header welds, drums on cycling units | Surface crack testing, ultrasonic examination, borescope | Weld repair or header replacement; changes to startup ramp and drain practice |
| Attemperator damage | Spray water desuperheaters and the piping downstream | Borescope, ultrasonic examination, liner inspection | Nozzle and liner replacement; spray control tuning |
| Corrosion fatigue and pitting | Economizers and evaporators, especially after poor layup | Tube sampling, ultrasonic testing, chemistry review | Tube replacement, improved wet or dry layup |
| Gas-side fouling | Finned tubes at the cold end and around catalyst modules | Pressure drop trend, stack temperature, visual inspection | Gas-side cleaning of fin tubes |
| Casing and liner failure | Hot spots near duct burners, inlet duct and expansion joints | Thermography in service, internal inspection in outage | Liner and insulation replacement, expansion joint renewal |
HRSG cleaning
HRSG cleaning works on two sides. On the gas side, fin tubes collect deposits from fuel contaminants and from ammonia slip past the catalyst, and the deposits raise back pressure on the gas turbine and lower steam output; cleaning methods include dry ice blasting and other blast media chosen to suit fin spacing and tube condition. On the water side, chemical cleaning removes iron oxide and other deposits from tube interiors when tube samples show deposit loading high enough to cause overheating. Paul Industries plans both around the outage, with waste handling and inspection after cleaning to confirm the result. Hydro blasting covers ducts, drains and other surfaces that suit water jetting.
HRSG tube repair
HRSG tube repair is difficult because the tubes sit in tightly packed harps, often several rows deep, so access to a single leak can mean cutting windows in the casing or removing adjacent tubes. A typical tube repair sequence is leak location by pressure test or acoustic methods, access, removal of the failed section, root cause sampling, fit-up, welding to a qualified procedure, examination, hydrostatic testing and casing closure. Where a tube cannot be reached, plugging at the headers is sometimes the temporary answer until the next outage. Paul Industries carries each repair through to the NBIC paperwork that returns the boiler to service. Fired boilers at steam, biomass and cogeneration plants get the same retubing, header and code repair work through boiler repair.
Power plant welding: Grade 91, Grade 22 and code repairs
Power plant welding joins carbon steel, chromium-molybdenum alloys such as Grade 22, creep strength enhanced ferritic steels such as Grade 91, and stainless steels in pressure parts and piping that run hot, at high pressure and under cycling, so procedures, welder qualifications, heat treatment and examination all follow code. Procedures and welders are qualified under ASME Section IX. Boiler pressure parts are built to ASME Section I, and repairs or alterations to them in service follow the National Board Inspection Code, Part 3, with an Inspector accepting the work and an R-1 report of repair or R-2 report of alteration documenting it.
Grade 91 is the alloy that punishes shortcuts. Preheat and postweld heat treatment are mandatory, the window between the minimum tempering temperature and the maximum permitted can be as narrow as 50 to 75 F, and running hot coarsens the microstructure and softens the heat-affected zone, leaving a weld that loses creep strength years before the base metal. Paul Industries controls preheat, interpass and heat treatment with recorded thermocouple data, checks filler chemistry, and verifies the result with hardness testing and examination, so each Grade 91 joint has a complete record. The industrial welding services page covers procedures and inspection methods across all of the codes Paul Industries works to.
Boiler feed water treatment and the demineralized water system
Boiler feed water treatment in a power plant removes the dissolved solids, gases and particles that would scale, corrode or carry over into the turbine, and at HRSG and high-pressure boiler pressures it means producing demineralized water to very tight limits, then conditioning the feedwater cycle chemically. Makeup water is the start of that chain. A demineralized water system for an HRSG power plant usually runs ultrafiltration or microfiltration, then reverse osmosis for bulk demineralization, then mixed-bed ion exchange or electrodeionization as the polisher.
| Stage | Purpose | What to watch |
|---|---|---|
| Pretreatment (UF, MF or media filters) | Remove suspended solids and organics ahead of the membranes | Silt density index, differential pressure, backwash and chemical clean frequency |
| Reverse osmosis | Remove most dissolved solids | Normalized permeate flow and salt passage, scaling and fouling trends |
| Mixed bed or EDI polishing | Bring water to final purity | Specific conductivity at or below 0.1 microsiemens/cm, sodium at or below 2 ppb and silica at or below 10 ppb are common makeup targets |
| Demineralized water storage | Hold makeup for startups and peak demand | Air ingress and carbon dioxide pickup; nitrogen blanket or vent filtering |
| Deaeration and feedwater conditioning | Remove oxygen and set feedwater pH | Dissolved oxygen, pH and iron transport in feedwater and condensate |
| Condensate polishing (where fitted) | Remove corrosion products and condenser leak contamination | Cation conductivity and sodium at the polisher outlet |
A rise in conductivity or silica at the polisher outlet signals exhausted resin or an EDI problem, and silica is typically the first ion to break through an anion bed. Paul Industries designs, supplies, installs, services and upgrades each stage, from RO trains and polishers to the deaerators and chemical feed systems on the feedwater side. The boiler water treatment page explains the chemistry for industrial boilers, and the industrial DI water systems page goes deeper on ion exchange equipment.
Power plant piping under ASME B31.1
Power plant piping, from main steam and hot and cold reheat to feedwater, condensate, extraction, drains and auxiliary steam, is designed, fabricated, installed and tested to ASME B31.1, with boiler external piping falling under ASME Section I jurisdiction and B31.1 construction rules. Boiler external piping starts where the boiler proper ends, at the first circumferential weld or the face of the first flange, and runs to the valves Section I requires; beyond them, the piping is B31.1 power piping.
Paul Industries fabricates spools in carbon steel, Grade 11, 22 and 91 alloys and stainless, installs them with supports and hangers set to design loads, and carries out examination, hydrostatic testing, steam blows or flushing and hanger cold and hot walkdowns. In operating plants, the common jobs are replacing FAC-thinned feedwater and drain lines, repairing steam leaks, replacing failed hangers, and adding tie-ins for new equipment. The steam piping page covers sizing, drainage and supports for plant steam systems.
Cooling water: condenser tube cleaning, towers and heat exchangers
Cooling water systems reject the heat a steam cycle cannot use, and their condition sets condenser back pressure, which directly affects how much power the steam turbine produces. Fouled condenser tubes, poor cooling tower performance and leaking heat exchangers all show up as lost megawatts on hot days.
Condenser tube cleaning
Condenser tube cleaning removes silt, biofilm, scale and debris from inside the tubes so that heat moves from steam to cooling water again. Mechanical methods shoot scrapers or brushes through each tube with water pressure, high-pressure water lances remove harder deposits, and chemical cleaning dissolves scale where mechanical tools cannot. Paul Industries opens the water boxes, cleans and inspects the tubes, plugs tubes that eddy current testing shows are near failure, and restores coatings, gaskets and cathodic protection before closing up.
Cooling towers in power service carry large fans, gearboxes and fill, and Paul Industries repairs and rebuilds them through its cooling tower repair work. Feedwater heaters, lube oil coolers, hydrogen coolers and closed cooling water exchangers are retubed, plugged, cleaned and hydrostatically tested under heat exchanger repair.
Pumps, valves, gearboxes and steam turbine repair
Rotating equipment and valves are where a power plant spends a large share of its routine maintenance hours: boiler feed pumps, condensate pumps, circulating water pumps, fans, gearboxes and the hundreds of isolation, control and relief valves on the steam and water cycle. Paul Industries rebuilds and replaces pumps through industrial pump repair, repairs and replaces valves through industrial valve repair, and rigs, sets and aligns heavy equipment through millwright and rigging services.
Steam turbine repair and turbine maintenance
Steam turbine repair during an outage involves lifting casings, removing and inspecting rotors and diaphragms, replacing bearings and seals, overhauling stop and control valves, flushing lube oil systems and realigning the turbine and generator train. Turbine maintenance between outages covers lube oil condition, vibration trending, valve stroke testing and gland steam and drain systems. Paul Industries provides the rigging, millwright, piping and valve work for these jobs and carries the alignment and flushing records into the outage file.
Planning a power plant outage
A power plant outage succeeds or fails in planning: the scope has to be known well enough to order materials and staff the work, yet flexible enough to absorb what inspection finds once the unit is open. Plants plan major outages many months ahead, then manage a short power plant shutdown for forced repairs with the same discipline compressed into days.
| Phase | Work | What Paul Industries delivers |
|---|---|---|
| Scope definition | Review inspection history, operating data, chemistry records and open work orders | Scope walkdown, budget range, material list and long-lead orders |
| Pre-outage preparation | Procedures, weld procedures, isolation plans, crane and scaffold plans | Work packages per task, prefabricated spools and replacement tube sections |
| Shutdown and isolation | Cooldown, draining, lockout and tagout under OSHA 1910.269, confined space entry | Verified isolations, access openings, scaffolding coordination |
| Inspection | Thickness surveys, crack testing, borescope, eddy current, visual | Inspection support and findings report the same shift |
| Repair and replacement | Tube and header repairs, piping and valve work, pumps, exchangers, towers | Code welding, heat treatment, examination, repair documentation |
| Testing and return to service | Hydrostatic tests, valve stroke checks, flushing, startup support | Test records, NBIC reports, punch list closeout, turnover file |
The shutdown and turnaround page describes how Paul Industries phases outage work across industries. In power plants, the outage file matters as much as the repairs: the next outage starts from the thickness readings, weld maps and findings recorded in this one.
Codes and standards for power generation mechanical work
Codes and standards for power generation mechanical work set how pressure parts and piping are designed, welded, examined, repaired and operated safely, and Paul Industries builds and repairs to the edition the jurisdiction and the owner specify. The main documents are these:
- ASME Boiler and Pressure Vessel Code Section I: construction of power boilers, including HRSGs, and jurisdiction over boiler external piping.
- ASME Section IX: qualification of welding procedures and welders.
- ASME B31.1: power piping design, fabrication, examination and testing, including construction rules for boiler external piping.
- National Board Inspection Code Part 3: repairs and alterations to pressure-retaining items in service, with Inspector acceptance and R-1 or R-2 reports.
- NFPA 85: combustion hazards for boilers and HRSGs, including Chapter 8 purge, startup and shutdown requirements for combustion turbine exhaust systems and duct burners.
- OSHA 29 CFR 1910.269: operation and maintenance of power generation installations, including energy control in generating plants, alongside the general lockout and tagout rule in 1910.147.
How much does power plant maintenance cost?
The cost of power plant maintenance depends on the scope found once the unit is open, the alloys involved, access, outage duration, the shift pattern needed to meet the return-to-service date, and how much prefabrication can happen before shutdown. Planned work with known scope is the least expensive way to spend an outage budget; emergent work found during inspection costs more because materials and procedures have to be arranged mid-outage.
HRSG cost drivers follow the same logic. A few tube repairs at accessible locations are a modest job, while replacing a harp or header means engineering, prefabrication, casing removal, heat treatment and testing on the critical path. Grade 91 work adds heat treatment and hardness verification. Paul Industries provides power plant maintenance services under a budget range from comparable scope as soon as inspection data and the outage window are known, then a firm price for defined scope, with unit rates agreed in advance for emergent findings.
East Coast headquarters, all 50 states and plants abroad
From its Kilmarnock, Virginia headquarters on Shore Drive, Paul Industries serves generating stations, cogeneration plants and utility plants up and down the East Coast, including New York, New Jersey, Pennsylvania, Delaware, Maryland, Virginia, North Carolina, South Carolina, Georgia and Florida, and takes power plant work in all 50 states. Fleet owners with plants in several regions use one contractor to keep procedures, records and repair methods consistent across units. Paul Industries also takes power plant work outside the United States; the international page explains how those projects are run.
Power plant maintenance and construction from Paul Industries
Paul Industries is one of the power plant contractors that carries the whole mechanical scope: HRSG and boiler pressure part repair, power piping, welding of carbon and alloy steels, boiler feedwater and demineralized water systems, cooling water equipment, pumps, valves, rigging and outage execution, with the code documents that close each job. Plants in every part of the industries Paul Industries serves rely on the same accountable approach. Send the outage window, inspection history and scope list, and request a quote.
Standards referenced: ASME Boiler and Pressure Vessel Code Section I · ASME Section IX · ASME B31.1 · National Board Inspection Code (NBIC) Part 3 · NFPA 85 · OSHA 29 CFR 1910.269 · OSHA 29 CFR 1910.147
Frequently asked questions
How often should an HRSG be inspected?
Most plants inspect HRSG pressure parts at every planned outage, and many jurisdictions, Virginia among them, require an annual internal inspection of power boilers for certification. The depth of each inspection should follow the unit’s operating history: a unit that cycles daily needs more attention to headers, drums and tube-to-header welds, while flow-accelerated corrosion zones need thickness readings at mapped points each time so wall loss can be trended. Paul Industries plans inspections around the outage and records findings by location.
Who does HRSG tube repair during an outage?
Paul Industries does HRSG tube repair during planned and forced outages: leak location, casing access, removal of failed sections, root cause samples, welding to qualified procedures, heat treatment where the alloy requires it, examination and hydrostatic testing. Each repair is documented for acceptance under NBIC Part 3 and the jurisdiction’s rules. Replacement tube sections and spools can be prefabricated before shutdown when the scope is known from earlier inspection.
What causes flow-accelerated corrosion in an HRSG?
Flow-accelerated corrosion dissolves the protective oxide on carbon steel where water or wet steam flows fast and turbulently, and it is worst at roughly 250 to 350 F under reducing chemistry. In HRSGs it concentrates in low-pressure evaporators and economizers, at riser piping, tube outlets and tube-to-header welds. Control combines feedwater chemistry, alloy replacement with chromium-bearing steel at high-wear locations, and ultrasonic thickness surveys at mapped points every outage.
What demineralized water system does a combined-cycle plant need?
A combined cycle plant usually needs pretreatment by ultrafiltration, microfiltration or media filters, reverse osmosis for bulk removal, and mixed-bed ion exchange or electrodeionization to polish, feeding a demineralized water storage tank. Common makeup targets are specific conductivity at or below 0.1 microsiemens per centimeter, sodium at or below 2 ppb and silica at or below 10 ppb. Capacity is sized for normal makeup plus startups, blowdown and any water injection for the gas turbines.
Do mechanical contractors work inside power plants?
Yes. Mechanical contractors carry much of the outage and capital work in power plants: pressure part and piping repairs, equipment replacement, pumps and valves, water treatment systems, cooling towers and rigging. Plant staff run and maintain the units day to day, and the contractor supplies the welders, fitters, millwrights and the planning needed for large scopes. Paul Industries works under the plant’s safety, isolation and permit systems and turns over documents that fit the plant’s records.
How often do power plant pipelines and steam lines need inspection?
Inspection frequency for power plant piping is set by the owner’s program, the jurisdiction and the damage mechanisms in each line. High-energy steam lines are inspected for creep and weld damage on intervals tied to operating hours and temperature, feedwater and wet steam lines are surveyed for flow-accelerated corrosion every outage or two, and hangers are walked down hot and cold. Paul Industries carries out the examinations, repairs and hanger adjustments the program calls for.
What is the difference between a HRSG and a conventional boiler?
A conventional boiler burns fuel in its own furnace and transfers heat largely by radiation, while an HRSG recovers heat from gas turbine exhaust by convection across finned tubes, with optional duct burners adding firing. HRSGs have several pressure levels, very large two-phase low-pressure sections and fast thermal transients when the gas turbine starts, so flow-accelerated corrosion and thermal fatigue matter more. Both are power boilers under ASME Section I.
Why is Grade 91 welding treated differently from other alloy welding?
Grade 91 gets its creep strength from a carefully tempered microstructure, and welding disturbs it. Preheat, interpass temperature, postweld heat treatment within a narrow window and filler chemistry all have to be controlled, or the weld and heat-affected zone can be too hard and crack-prone or too soft and weak at temperature. Paul Industries records thermocouple data through each heat treatment and confirms the result with hardness testing and examination.
Who handles power plant welding in Virginia and Maryland?
Paul Industries, headquartered in Kilmarnock, Virginia, handles power plant welding, piping and pressure part repair at generating stations, cogeneration plants and campus utility plants across Virginia and Maryland. Work includes HRSG and boiler tube repairs, high-energy piping in Grade 22 and Grade 91, feedwater and drain line replacement and valve weld repairs, with procedures qualified under ASME Section IX and repair documentation for the jurisdiction.
Does Paul Industries handle outages at plants in Pennsylvania, New Jersey and New York?
Yes. Paul Industries handles planned and forced outages at combined cycle, peaking and cogeneration plants in Pennsylvania, New Jersey and New York, delivering HRSG inspection support and tube repair, piping and valve work, condenser tube cleaning, pump and exchanger repairs and water treatment upgrades. Work packages, materials and prefabricated spools are prepared before shutdown so the outage window is spent on execution.
Can Paul Industries work on power plants outside the United States?
Yes. Paul Industries takes power plant work abroad, for example in Canada, Mexico and the Caribbean, where island utilities depend on a small number of generating units and outages need careful planning. Scope covers prefabricated piping and pressure part sections, water treatment equipment, installation and outage support, built to the codes the owner and jurisdiction adopt, with documentation in the form the authority having jurisdiction requires. The international page describes how these projects run.
What is the purpose of a duct burner on an HRSG?
A duct burner adds fuel to the gas turbine exhaust inside the HRSG, raising gas temperature and steam production so the steam turbine makes more power, often during peak demand. Because the exhaust still holds plenty of oxygen, no extra combustion air is needed. Duct firing adds maintenance on burner elements, fuel trains, liners and casing, and it brings NFPA 85 purge and safety requirements that Paul Industries respects in any duct burner work.
How is boiler feed water treatment checked in a running plant?
Running plants check feedwater with continuous analyzers for specific and cation conductivity, pH, dissolved oxygen, sodium and silica at key points, backed by grab samples and iron transport measurements. Trends matter more than single readings: rising cation conductivity can mean a condenser leak, and rising iron points to corrosion in the feedwater train. Paul Industries repairs and upgrades sample panels, chemical feed and makeup systems when the data shows a problem.
What should a plant send to price an outage scope?
Send the outage window, the unit type and pressure levels, the work list with any known repairs, recent inspection and thickness survey reports, drawings or isometrics for piping work, the alloys involved and any jurisdiction or owner requirements. Paul Industries uses that to plan a walkdown, prepare a budget range from comparable scope, and then price the defined work with unit rates set for emergent findings.
How are condenser tubes tested for leaks and wall loss?
Leaks are found by tracer gas, vacuum or foam methods with the condenser under test, and by watching cation conductivity and sodium in the condensate while the unit runs. Wall loss and pitting are measured with eddy current testing tube by tube, which shows whether a few tubes need plugging or the bundle is near retubing. Paul Industries cleans tubes before testing so readings are accurate, then plugs, sleeves or retubes as the results require.
What records come back after an HRSG or piping repair?
A repair package includes the weld procedures and welder qualifications used, weld maps, heat treatment charts, examination reports, material certificates, hydrostatic test records and, for pressure parts, the NBIC R-1 or R-2 report accepted by the Inspector. For piping, hanger settings and as-built isometrics are added. Paul Industries assembles the package at return to service so the plant’s next outage starts with a complete history.
Can a plant keep generating while auxiliary systems are repaired?
Often, yes. Redundant pumps, polishers, cooling tower cells and many valves can be isolated and repaired with the unit online, provided the isolation plan, permits and risk review allow it. Work on HRSG pressure parts, main steam piping and the turbine needs the unit off. Paul Industries separates online and outage scope during planning so that as much work as possible is finished before the shutdown begins.