Paul Industries builds the sanitary process equipment and piping that cosmetic and personal-care manufacturers depend on — mixing and blending vessels, treated and high-purity water, hygienic process piping, CIP/COP cleaning, heat transfer, and filtration. As a single-source contractor with 30+ years of cGMP/FDA-compliant experience, we handle design, fabrication, installation, and validation across all 50 states, including New Jersey, New York, Pennsylvania, Delaware, Maryland, and Connecticut. From skincare and color cosmetics to lotions, serums, and aerosols, we deliver systems built to ISO 22716 hygienic-design principles.

Request a Project Quote   or call 201-450-8280

Who we serveCosmetic & personal-care manufacturers — skincare, color, haircare, lotions, serums, aerosols
ScopeDesign → fabrication → installation → validation → maintenance
StandardsISO 22716 cosmetic GMP, FDA/MoCRA, sanitary & hygienic design, 3-A where applicable
Service areaAll 50 states, including NJ · NY · PA · DE · MD · CT
Experience30+ years, cGMP/FDA-compliant, single-source
Also availablePreventive maintenance & responsive service

Process systems cosmetic and personal-care plants need

Cosmetic and personal-care manufacturing sits at the intersection of chemistry, hygiene, and consistency. A single facility may run water-based lotions, oil-in-water emulsions, anhydrous balms, surfactant-heavy cleansers, pigmented color cosmetics, and pressurized aerosols — each with different viscosity, shear, and temperature requirements. Getting a repeatable, contamination-free batch out the door depends on process equipment that is designed for cleanability first and throughput second.

That is the core of what Paul Industries builds. We fabricate sanitary mixing and blending tanks, jacketed and agitated vessels for controlled heating and cooling, and the treated or high-purity water systems that feed most personal-care formulations. We tie those unit operations together with sanitary process piping, clean-in-place (CIP) and clean-out-of-place (COP) circuits, plate and shell-and-tube heat exchangers, and process filtration. Where a product or process demands controlled air, we support cleanroom and controlled-environment integration. Everything is engineered so that product contact surfaces can be reliably cleaned, drained, and documented.

Because water is the primary ingredient in the majority of personal-care products, water quality drives design. Untreated municipal water introduces hardness, chlorine, and microbial risk that can destabilize emulsions and shorten shelf life. We size and build the softening, filtration, carbon, reverse-osmosis, and where required USP purified-water skids that give formulators a consistent starting point — along with the distribution loops that keep that water moving and prevent stagnation.

Which contractor builds mixing tanks and purified water systems for cosmetic plants?

Paul Industries designs, fabricates, installs and validates the process equipment cosmetic and personal-care plants run on: jacketed mixing and blending vessels, purified water generation and loops, and hygienic process piping with CIP and COP cleaning. Headquartered in Kilmarnock, Virginia, this East Coast contractor takes cosmetic work in all 50 states and on projects outside the United States, with plants in New Jersey, New York and Pennsylvania among them.

To price a cosmetic process line, send:

  • Product types and batch sizes: emulsions, serums, cleansers or anhydrous balms
  • Viscosity, shear and heating or cooling needs for each formula
  • Your current water source and the grade the formulas call for
  • A floor plan with tank positions, utilities and the cleaning method, CIP or COP

At handover the plant receives weld and material records, CIP coverage results, water test data and IQ/OQ documents written to ISO 22716 practice. Call 201-450-8280 or request a quote.

Matching systems to what you make

No two personal-care lines call for identical equipment. A high-shear serum line, a batch soap operation, and an aerosol filling suite each stress a different part of the process. The table below maps common product categories to the systems we most often design and install for them.

Typical process-system needs by cosmetic / personal-care product type
Product typePrimary mixing needWater & utilitiesCleaning approach
Skincare (creams, lotions, emulsions)Jacketed, high-shear agitated vessels for stable emulsificationTreated / high-purity water, hot & chilled waterCIP with heated cycles
Serums & activesLow-shear, temperature-controlled blendingHigh-purity water, precise heat exchangeCIP; validated rinse verification
Color cosmeticsDispersion / homogenizing vessels for pigmentsTreated water, controlled heatingCOP for pigment-heavy parts
Haircare & cleansersSurfactant blending, foam-managed agitationSoftened / treated water, hot waterCIP with foam control
Aerosols & spraysPre-mix and holding vessels ahead of fillingTreated water, compressed utilitiesCIP/COP per product contact

What sets the lead time on a cosmetic process line?

Schedule on a cosmetic line is set by a handful of long-lead items and by how early key decisions are made. These factors move it most.

FactorEffect on scheduleHow to shorten it
Formula and batch size confirmationVessel size, agitator and jacket design all wait on itFreeze batch sizes and viscosity ranges before vessel drawings start
Jacketed vessel fabricationUsually the longest item on the jobApprove vessel drawings early and order agitators with them
Purified water skidPretreatment, membranes and controls are built and tested before shipmentSend a current feed water analysis with the inquiry
Sanitary valves and instrumentsDiaphragm valves and sanitary sensors arrive on their own schedulesFix the instrument list at design review
Tie-ins to the running plantShutdown windows decide when connections happenPlan tie-ins around scheduled changeovers
Validation documentsIQ/OQ protocols need approved drawingsWrite protocols during fabrication so testing follows start-up directly

What we build

  • Process tanks & vessels — sanitary mixing and blending tanks, jacketed and agitated vessels for emulsification, heating, cooling, and holding.
  • Sanitary process piping — orbital-welded, hygienic-design product piping with proper slope, drainability, and clamp connections.
  • High-purity water systems — softening, carbon, RO, and USP purified-water skids with recirculating distribution loops.
  • CIP/SIP systems — clean-in-place and clean-out-of-place circuits engineered for repeatable, documentable cleaning.
  • Process filtration — particulate, carbon, and membrane filtration for water and product streams.

Standards & compliance

ISO 22716 (Cosmetic GMP)
The international good-manufacturing-practice standard specific to cosmetics. It covers production, control, storage, and shipment, and it puts real weight on premises and equipment that are designed to be cleaned, sanitized, and maintained. We build to those hygienic-design principles so your equipment supports, rather than undermines, an ISO 22716 program.
FDA & MoCRA
Cosmetics sold in the US fall under FDA oversight, and the Modernization of Cosmetics Regulation Act (MoCRA) expanded that authority — adding facility registration, product listing, adverse-event reporting, and a framework for good-manufacturing-practice expectations for cosmetics. While specific GMP rules continue to be developed, the direction is clear: cleaner, better-documented, well-controlled manufacturing. Our systems are built with the sanitary construction and documentation that a modern, inspection-ready facility needs.
Sanitary & hygienic design
Crevice-free welds, drainable geometry, appropriate surface finishes, and easily cleaned connections are the foundation of contamination control. We apply these principles across tanks, piping, and skids so product-contact surfaces can be cleaned and verified.
3-A Sanitary Standards (where applicable)
For lines that share design DNA with food and dairy processing — or where a customer specifies it — we build to 3-A hygienic criteria for equipment and fittings.

Why Paul Industries

Cosmetic manufacturers lose time and money when a project is split among a tank shop, a pipe fitter, a water-system vendor, and a separate installer — each pointing at the other when something does not line up. Paul Industries is a single-source contractor: one team designs the system, fabricates the equipment, installs it, and supports validation, so accountability never gets handed off. Thirty-plus years of cGMP/FDA-compliant work means we understand what an auditor looks for and how to document a build so it holds up. Working across all 50 states, we serve manufacturers in New Jersey, New York, Pennsylvania, Delaware, Maryland, Connecticut and beyond — on site to walk a plant floor, scope a retrofit, and stand behind the work with responsive service and preventive maintenance. We describe our capabilities in detail, and the fit is best confirmed with a conversation about your specific process.

Standards referenced: ASME BPE · 21 CFR 211 · ASTM A967 · ISO 14644-1 · 3-A Sanitary Standards

Services we provide for cosmetic and personal care plants

Cosmetic manufacturing under 21 CFR 700 and ISO 22716 needs hygienic engineering matched to emulsions, surfactants and fragrance oils, and these are the services we bring: sanitary process piping for product and utility piping for glycol, steam and compressed air; jacketed mix and hold tanks and batching and blending systems; CIP systems designed for viscous, oily soils; purified water systems for formulation water and reverse osmosis for rinse water; heat exchangers and chillers for emulsion cooling; filtration; controlled rooms for filling; passivation; and rigging and setting of fillers, mixers and packaging lines.

Related: Cosmetic Emulsion Mixing Tanks and CIP Systems · Cosmetic Manufacturing Purified Water Systems

Where cosmetic manufacturing requirements actually sit

ElementCosmetic and personal-care practice
Governing regulation and clauseMoCRA, the Modernization of Cosmetics Regulation Act, sitting alongside the 21 CFR 700 series. MoCRA introduced facility registration, product listing, safety substantiation and serious adverse event records, and directs FDA to set cosmetic good manufacturing practice requirements. Until those land, ISO 22716 remains the working design basis, which is what this site specifies to.
Typical water gradeTreated water, and it deserves more attention than it usually gets: water is the largest ingredient in most personal-care formulations and the medium anything growing in them grows in. Softening and carbon filtration are the floor. A recirculated, sanitised purified water system belongs on any leave-on or preservative-reduced line.
Typical hygienic zoneNothing is classified by rule. What works is a controlled room with filtered supply air, positive to the corridor, tightened around open filling. Compounding rooms are managed for airborne pigment and powder rather than for a particle count, which is a different ventilation problem with a different solution.
Typical documentation packageFacility registration and product listing under MoCRA, safety substantiation held per product, serious adverse event records, and the ISO 22716 set on top: batch records, equipment cleaning records, water monitoring trends, and a cleaning validation that covers changeover between formulations rather than one generic cycle.
Materials and surface finish316L on aqueous, surfactant and acidic service. 304 is adequate on anhydrous and oil-phase work. Finish set as an Ra ceiling for cleanability. Choose agitator seals, manway gaskets and valve internals for fragrance oil and solvent compatibility, because elastomers that shrug off water swell and crack in a fragrance stream.

Cleaning is the part that defeats equipment bought on price. A pharmaceutical residue generally rinses; a pigment dispersion, a silicone, a heavy emulsifier and a fragrance oil do not. They film, they cling to a shadowed surface under an agitator blade, and they carry into the next batch as a colour or an odour long before they show as an assay result. That drives three decisions: spray device coverage calculated for the actual vessel geometry rather than assumed, cleaning chemistry and temperature chosen per product family, and enough valved breaks in the piping that a colour circuit can be isolated instead of flushed through the whole plant.

Portable mixing vessels vs fixed jacketed tanks

Portable vessels on casters give a personal-care plant something a drug plant rarely needs: the ability to run twelve different formulations through one room in a week. The vessel goes to a wash cabinet, gets cleaned out of place where every surface is reachable, and comes back verified. Changeover risk drops, and a colour or fragrance can be quarantined to a dedicated vessel rather than to a dedicated line.

The price is manual handling. Every move is a disconnect, a transport and a reconnect, each one a hygiene event and a record. Throughput is capped by the largest vessel a person can safely move, and heating and cooling are limited by whatever jacket service the docking station provides.

Fixed jacketed tanks with cleaning in place invert all of that: real heat transfer control, real batch size, automated cycles with printed records, and a permanent piping route. In exchange the vessel is committed to a product family, and changeover stops being a wash and becomes a validation question. Most plants that make both a high-volume core line and a long tail of niche products end up with both, which is a sound answer as long as the two are piped as separate systems rather than tangled together.

Choosing a fabricator for personal-care process equipment

  • Agitator selection justified against the viscosity and shear profile of your worst product, not the average one.
  • Spray device coverage modelled per vessel, including the shadow under the agitator and behind baffles.
  • Elastomer and seal schedule issued as a list, matched to fragrance, solvent and surfactant exposure per circuit.
  • Jacket design and service sized for the cooling curve an emulsion needs, since a broken emulsion is a lost batch.
  • Colour and pigment circuits physically separable, with valved breaks that let a line be isolated for dedicated service.
  • Water system specified with recirculation and a sanitisation method, not a dead-ended feed to a filling room.
  • Transfer pump selection appropriate to shear-sensitive product, because the wrong pump undoes the mixing you paid for.
  • Cleaning validation approach that addresses visual and odour carryover, not solely an analytical residue limit.

One contractor for design, fabrication, installation and start-up keeps those decisions consistent. Dial 201-450-8280, or outline the formulation range and vessel list at the project quote page.

Published figures for cleaning and water equipment

The CIP system cost guide carries one real published price, roughly $16,500 for a basic 200 L cleaning unit, and is straightforward that larger multi-tank skids are quoted against a specification rather than list priced. Treat the small number as the floor of a range, not as a budget. On the water side, the high-purity water cost guide lists a 20,000 gallon-per-day reverse osmosis system at $40,000 to $80,000 in equipment cost, a band it names against industrial bottling and cosmetics specifically, working out at $2 to $4 per gallon per day of capacity.

Frequently asked questions

What process systems does Paul Industries build for cosmetic manufacturers?

Mixing and blending vessels with demonstrable spray coverage, sanitary transfer piping, process water systems, clean-in-place, heat exchangers for heating and cooling emulsions, and the transfer panels and point of use assemblies connecting them. The specification question worth settling first is finish: cosmetic manufacture rarely needs the electropolished ASME BPE surfaces a parenteral drug requires, and 316L with a documented mechanical finish frequently satisfies the standard at roughly 40 percent less per linear foot.

What water quality do cosmetic products require?
Many cosmetic and personal-care formulations use purified water as the primary ingredient and for equipment cleaning, requiring good microbial and chemical control to protect product stability and shelf life. Paul designs RO/DI and purified water systems sized and distributed for the microbial quality cosmetic manufacturing needs.
Are cosmetic manufacturers regulated like pharmaceutical companies?
Cosmetics are regulated under FDA authority but generally to a less prescriptive standard than drugs, though many manufacturers follow ISO 22716 cosmetic GMP and cGMP-style practices, especially for OTC-drug cosmetics like sunscreens. Paul builds water, piping, and cleaning systems that support those good-manufacturing expectations.
Why do cosmetic facilities need sanitary process piping?
Cosmetic batches, especially emulsions, creams, and surfactant systems, benefit from smooth, cleanable, drainable piping that limits residue buildup and microbial growth between products. Sanitary stainless piping with proper finish and slope makes changeovers cleaner and reduces contamination risk in personal-care production.
How does CIP help cosmetic production?
Clean-in-place systems clean mixing vessels and transfer lines in place between formulations, cutting changeover time and reducing residue carryover between colors, fragrances, and formulas. For cosmetic lines running many SKUs, reliable CIP protects product integrity and throughput. Paul designs CIP skids with the coverage the process needs.
What standard applies to cosmetic good manufacturing practice?

ISO 22716, the international standard for cosmetic good manufacturing practice, which covers production, control, storage and shipment. It is far less prescriptive than pharmaceutical cGMP: it requires equipment to be suitable, cleanable and maintained with documented procedures, but it does not mandate compendial water grades, electropolished product contact surfaces or the qualification regime 21 CFR 211 implies. In the United States, cosmetic manufacture also now sits under the Modernization of Cosmetics Regulation Act framework.

Do cosmetic manufacturers need cleanrooms?
Some do, particularly for fill-finish of sensitive or OTC-drug products where environmental control protects the product. Paul designs and installs ISO 14644-classified cleanrooms where a cosmetic process warrants controlled particle and microbial environments, integrated with the utilities the space requires.
How do you control microbial contamination in cosmetic water systems?
Microbial control comes from proper system design: continuous recirculation, drainable dead-leg-free loops, appropriate sanitization, and monitoring. Because water is a primary vehicle for microbial growth in cosmetics, Paul engineers purified water loops so bioburden is controlled at the source rather than corrected in the batch.
What is the difference between cosmetic and pharmaceutical water systems?
Pharmaceutical systems often must meet full USP purified water or WFI limits with extensive validation, while cosmetic systems typically target robust microbial and chemical control appropriate to the product without injectable-grade requirements. Paul scales design and documentation to the grade each application genuinely needs.
Can Paul Industries build tanks and mixing systems for cosmetics?
Yes. Paul fabricates and installs sanitary storage and process tanks and vessels for cosmetic mixing, holding, and batching, integrated with the piping and CIP that serve them. Building the vessels and their connections together keeps the system accountable to one contractor. Call 201-450-8280.
How long does a cosmetic process-system installation take?
It depends on scope, but a purified water system with distribution and sanitary piping commonly spans several weeks to a few months from design through installation, with any qualification adding time. Paul provides a project-specific schedule during scoping. Call 201-450-8280.
Why choose a single-source contractor for a cosmetic plant?
A single-source contractor designs, fabricates, installs, and validates as one accountable party, so the water, piping, and cleaning systems are engineered to work together without gaps between separate vendors. For cosmetic manufacturers scaling SKUs, that coordination reduces changeover and contamination risk. Call 201-450-8280.
Does cosmetic equipment need passivation?
Stainless cosmetic process equipment benefits from passivation to remove free iron and restore corrosion resistance, improving cleanability and product compatibility, especially with acidic or high-salt formulations. Paul performs citric and nitric passivation to ASTM A967/A380 with documentation where the application calls for it.
Can Paul Industries serve cosmetic manufacturers nationwide?

Yes, nationwide, at your cosmetic plant, for planned work and emergency response, with dates confirmed at quotation. Cosmetic projects are often where over-specification is easiest to catch early, because a specification written by someone with pharmaceutical experience will frequently carry BPE finishes and compendial water requirements the product does not need. We raise that before pricing rather than after, since it is usually the largest single saving available on the job.

How do you reduce changeover time between cosmetic batches?
Changeover time drops with drainable sanitary piping, well-designed CIP coverage, and vessels engineered for effective cleaning, so residues clear quickly between colors, fragrances, and formulas. Paul designs the physical system for cleanability, which directly shortens the downtime between SKUs on a cosmetic line.
How do we start a cosmetic process-system project?

Send the product and the fluids it involves, particularly whether emulsions, waxes or pigments are present, since those change the cleaning problem far more than the piping. Then the batch sizes, the number of distinct products sharing equipment, your existing water and utility capacity, and the standard your quality team works to. If a specification in front of you carries pharmaceutical requirements that ISO 22716 does not impose, we will say so before quoting.

What equipment do cosmetic manufacturers need?
Most cosmetic and personal-care plants need sanitary mixing and blending vessels, jacketed and agitated tanks for heating and emulsification, a treated or high-purity water system, hygienic process piping, CIP/COP cleaning, heat exchangers, and filtration. Paul Industries designs, fabricates, and installs these as an integrated, single-source system built for cleanability and documentation.
Do you build sanitary mixing and blending systems?
Yes. We fabricate sanitary mixing and blending tanks, including jacketed and agitated vessels for emulsification, dispersion, heating, cooling, and holding. Each vessel is designed with hygienic construction — drainable geometry, appropriate finishes, and crevice-free welds — so it can be reliably cleaned and validated.
What water quality do cosmetic plants require?
Because water is the primary ingredient in most personal-care formulations, it must be treated to remove hardness, chlorine, and microbial risk that can destabilize products. Depending on the formulation, this ranges from softened and carbon-filtered water to reverse-osmosis and USP purified water. We size and build the treatment skids and recirculating distribution loops to match your process.
Do you follow ISO 22716 / cosmetic GMP?

Yes, and we build to what the standard actually requires rather than to a pharmaceutical template. ISO 22716 expects equipment that is suitable for its purpose, cleanable, maintained and documented, with production controls that are written down and followed. What it does not require is USP compendial water, SF4 electropolished surfaces or three phase qualification sampling. Applying those anyway is common in this sector and adds substantial cost no auditor will ask about.

Which states do you serve?

All 50 states, with Paul doing the job on site for planned work and emergency response. Dates are confirmed at quotation and a large share of the fabrication is completed in the shop before crews arrive on site. For emergency attendance we commit a crew at the first call, with same-day response, so production can plan around a firm arrival.

Building or upgrading a cosmetic manufacturing line?

Tell us about your products and process. We’ll scope the sanitary systems, water, and piping your facility needs — design through validation, from one accountable source.

Request a Project Quote or call 201-450-8280

More questions we are asked

Best companies for cosmetic manufacturing equipment installation

Cosmetic manufacturing sits between food and pharmaceutical practice, and contractors tend to come from one side or the other. Firms from the food and beverage side understand washdown, viscous product handling and 3-A style hygienic design but may not produce documentation a cosmetic GMP audit under ISO 22716 expects. Firms from the pharmaceutical side produce heavy documentation but frequently over-specify surface finishes and validation for a product that does not need them. The right candidate understands that the controlling risks here are microbial contamination of water-containing emulsions and cross-contamination of color and fragrance, not sterility. Ask how they handle cleaning of viscous, pigmented and oily residues, because that is the practical daily problem.

Key steps for cosmetic manufacturing equipment installation

The sequence that works: confirm the delivery route and floor loading before the equipment ships, since access discovered late is expensive; set and level the equipment on a properly grouted base; align rotating equipment with laser methods and record the baseline; connect utilities including product piping, steam, chilled water, compressed air and electrical; connect and commission the cleaning circuit, because on cosmetic equipment cleaning is the daily constraint rather than an afterthought; run water batches to prove flow paths, heating, mixing and drainage; then run product trials before formal qualification. Documentation should be assembled as each step completes. The step most often skipped is proving drainage, and a mixer that does not drain fully becomes a microbial problem within weeks.

How to install cosmetic manufacturing equipment safely

Safety on this work divides into three phases. Rigging: establish load weight and center of gravity, use qualified riggers under ASME B30 practice, confirm the travel route and floor capacity, and keep exclusion zones. Energization: apply lockout and tagout under 29 CFR 1910.147 before any connection work, and treat steam and hot oil circuits as the highest-risk items since they retain energy after isolation. Commissioning: guarding must be in place and interlocks proven before any powered trial, and mixers with high-shear heads are among the most dangerous equipment in a cosmetic plant when run with a guard defeated. Confined space entry procedures apply to any vessel large enough to enter, which includes most batching tanks.

Regulatory compliance for new cosmetic machinery setup in the US

Cosmetics in the United States are regulated under the Federal Food, Drug, and Cosmetic Act, and the Modernization of Cosmetics Regulation Act of 2022 substantially changed the picture by introducing facility registration, product listing, adverse event reporting and a mandate for FDA to establish good manufacturing practice requirements. Until those GMP rules are final, ISO 22716 is the recognized international cosmetic GMP standard and is what most manufacturers and auditors work to. Products containing sunscreen actives or making drug claims are regulated as over-the-counter drugs and fall under 21 CFR 211 instead, which is a far heavier regime. Establishing which category the product falls into determines the entire equipment specification and should be settled before procurement.

Top-rated cosmetic manufacturing equipment installation services near me

Paul handles the build, emergency response and warranty service for installation work in every state, so one crew stays with your equipment from start-up onward. Screen instead on whether the contractor can handle the whole scope: rigging, millwright setting and alignment, product and utility piping, and the cleaning circuit, because a machine set perfectly but connected to a cleaning circuit that cannot reach the mixer head will not clean. Ask how they verify drainage after installation, what documentation they produce, and whether they understand ISO 22716 expectations rather than applying either a food or a pharmaceutical template. Paul Industries delivers rigging, setting, piping, cleaning circuits and commissioning under one contract nationwide.

Who installs cosmetic and personal care process systems?

Paul Industries installs cosmetic and personal care process systems for skincare, color, haircare, lotion, serum and aerosol lines: jacketed mixing vessels for emulsification, hygienic product piping, CIP and USP purified water loops. The work follows ISO 22716 cosmetic GMP, so equipment stays cleanable and documented, and sloped, drainable piping shortens changeover between batches.

How much does a cosmetic process system cost?

A cosmetic process system is priced by batch size and vessel count, jacketing and agitation for emulsions, water grade (softened, RO or USP purified), the length of hygienic piping between tanks and fillers, and whether cleaning is manual, COP or automated CIP. Viscous creams need heavier agitation and pumps than thin toners, which shifts the mixing budget. The CIP system cost guide covers the cleaning line.

What should a cosmetic plant inspection checklist cover for process equipment?

On the process side, the list should cover product-contact surfaces for pitting and worn welds, gaskets and seals on lids, valves and pumps, spray coverage on every CIP circuit, drainability at low points, and water loop records for conductivity and microbial counts against set limits. ISO 22716 expects these checks to be planned and recorded. Paul Industries builds equipment with access for each check and runs preventive maintenance visits against the same list. Call 201-450-8280 or request a quote.

Which piping codes and standards apply to cosmetic process piping?

Cosmetic product piping follows hygienic design practice drawn from ASME BPE and from 3-A sanitary standards where they apply, with ASME B31.3 governing pressure integrity. In practice that means 316L tube, orbital welds, sanitary clamp connections, sloped runs that drain fully and short branches. ISO 22716 sets the GMP frame around the installation. Paul Industries fabricates and installs sanitary process piping to that combined specification and logs every weld. Call 201-450-8280 or request a quote.

Who designs and installs purified water systems for personal-care manufacturers?

Paul Industries designs and installs them end to end: pretreatment, reverse osmosis with EDI or DI polishing, storage, UV and a recirculating loop that delivers water to each mixer, filler and rinse station. Sanitization, monitoring points and alarms are built in from the start, and the system is commissioned with test data the quality team keeps on file. The cosmetic water systems page explains the grades and loop design. Call 201-450-8280 or request a quote.

Which contractor builds cosmetic process lines for plants in New Jersey or New York?

Paul Industries builds cosmetic mixing, water and CIP systems for plants in New Jersey and New York, working from its headquarters in Kilmarnock, Virginia. The scope runs from design and fabrication through installation, start-up, validation and ongoing service, and tie-ins are scheduled around batch runs and changeovers so filling keeps moving while the new equipment goes in. Call 201-450-8280 or request a quote.

Does Paul Industries build cosmetic plant systems in Canada or Mexico?

Yes. Paul Industries takes cosmetic and personal-care projects in Canada, Mexico and other countries, delivering the same scope it builds for US plants: mixing vessels, purified water, sanitary piping, CIP and the validation documents. Equipment is specified to the market rules the plant ships under as well as ISO 22716. The projects outside the United States page describes how those jobs are run. Call 201-450-8280 or request a quote.