A chilled water system makes cold water at a central chiller plant and pumps it through closed piping to air handlers, coils and process equipment, where it absorbs heat before returning to be chilled again. Paul Industries designs, installs, flushes, commissions and services chilled water plants and distribution piping for industrial plants, commercial buildings and process facilities nationwide. This page explains how the systems work, how they are piped and pumped, and what keeps them efficient for decades.

What is a chilled water system?

It is a hydronic cooling system: instead of running refrigerant to every room or machine, a chiller cools water in one place, and pumps carry that water wherever cooling is needed. The water never leaves the pipes, so the chilled water loop is a closed circuit, and the refrigerant stays inside the chiller. That arrangement is why large buildings, campuses, hospitals, data halls and manufacturing plants use chilled water: one plant serves many loads, capacity can be added by adding chillers, and the cooling medium is cheap, safe water rather than miles of refrigerant piping.

A chilled water air conditioning system serves people: chilled water air handlers and fan coil units pass building air across coils. A process system serves equipment: jacketed vessels, heat exchangers, molding machines, lasers and product coolers. Many plants run both from one chilled water plant, sometimes at different temperatures. For dedicated machine cooling and packaged process units, see process chillers and our industrial process chillers guide.

Who installs and commissions chilled water plants for manufacturing facilities?

Paul Industries designs, installs, flushes and commissions chilled water plants and the distribution piping that carries cold water to air handlers, process coils, heat exchangers and jacketed vessels, and it services those systems once they run. Working from Kilmarnock, Virginia, it takes chilled water projects at plants across the United States, including Texas, Ohio, Georgia, Illinois and Maryland.

To scope a chilled water project, send:

  • Cooling load in tons and the supply and return water temperatures the process needs
  • Chiller make, model and count, with the pumping arrangement: primary-secondary or variable primary flow
  • Pipe sizes, materials and a route sketch or isometric of the loop
  • Glycol percentage and the most recent water treatment report

The loop is handed over flushed, filled, vented and commissioned, with startup records for each chiller and pump. Call 201-450-8280 or request a quote.

Chilled water system air conditioning and building use

Chilled water system air conditioning cools a building by sending cold water to coils in air handlers and fan coils instead of running refrigerant to each space, so one plant room can serve every floor. A chilled water cooling system does the same job for equipment and processes, and the terms below describe its parts as they appear on HVAC drawings and bids.

TermWhat it meansWhat it affects
Commercial chiller systemChillers, pumps, controls and heat rejection serving an occupied buildingTonnage, redundancy, noise and roof or plant room space
Building chiller systemThe same plant viewed from the building side, including risers and floor branchesRiser sizing, static pressure at the lowest floor, balancing
Chiller unit (HVAC)The packaged machine that makes the cold water, air cooled or water cooledElectrical service, rigging path, service clearance
Chilled water air handling unitA fan, filter and chilled water coil treating air for a zoneCoil velocity, condensate drain trap, valve authority
Chiller, air handler and coil matchCoil design temperatures agreed with the chiller supply temperatureWhether the coil can use warmer water and a wider temperature difference
Chilled water air conditionerA room or rack unit with a chilled water coil, such as a fan coil or computer room unitLeak detection, condensate removal and valve location

Chiller lines are the supply and return pipes between the machine and the distribution headers. Each chiller line needs insulation with an intact vapor retarder on the cold side, and isolation valves that let one machine come out while the others run. Paul Industries installs and services all of this equipment, from the chiller to the coil connection.

How does a chilled water system work?

Water is cooled in the chiller’s evaporator, pumped out to the loads, warmed by the heat it picks up, and pumped back to the chiller. Inside the chiller a refrigeration cycle moves that heat from the evaporator to the condenser, and the condenser rejects it to outdoor air or to a cooling tower loop. The traditional rating point, used in AHRI Standard 550/590, is 44 degrees Fahrenheit leaving chilled water and 54 degrees returning, a 10 degree difference.

Chilled water supply and return temperatures set the flow the pumps must move. For water, the heat carried in Btu per hour equals 500 times the flow in gallons per minute times the temperature difference, so one ton of cooling, 12,000 Btu per hour, needs 24 divided by the temperature difference in gallons per minute. A wider difference means less water, smaller pipe and less pump energy.

Design temperature differenceFlow per tonFlow for 500 tonsEffect
10 °F (44/54 °F)2.4 gpm1,200 gpmTraditional rating point; largest pipe and pumps
12 °F2.0 gpm1,000 gpmCommon modern compromise
14 °Fabout 1.7 gpmabout 860 gpmSmaller distribution; coils selected for it
16 °F1.5 gpm750 gpmLowest pumping energy; needs coils and chillers designed for the range

Chiller lift is the other number worth knowing: the difference between the temperature at which the chiller condenses refrigerant and the temperature at which it evaporates it, roughly tracking condenser water leaving temperature minus chilled water leaving temperature. Every degree of lift costs compressor work, so warmer chilled water and cooler condenser water both save energy.

How do commercial chillers work inside? Most use the vapor-compression cycle: liquid refrigerant boils in the evaporator as it takes heat from the chilled water, a compressor raises the pressure and temperature of the vapor, the condenser rejects that heat, and an expansion device drops the pressure so the cycle repeats. Scroll, screw and centrifugal compressors cover roughly rising ranges of capacity, from small modular units to the largest plant machines.

Chilled water system components

A working system is more than chiller units and pipe. Each component below has a job, and most service problems trace back to one of them being missing, wrongly placed or wrongly sized.

ComponentWhat it doesInstallation point that matters
ChillersCool the water by refrigerationService clearance for tube pulls, vibration isolation, flow switches, isolation valves
Chiller pumpsMove water through chillers and loadsStraight suction piping, suction diffuser or strainer, check valve, alignment
Air handlers and coilsTransfer heat from air or process to the waterTwo-way control valves, balancing, condensate drainage
Expansion tankAbsorbs the water’s change in volume and holds system pressureConnected near pump suction; precharge set to fill pressure
Air separatorRemoves entrained air from the loopIn the return to the chiller, where water is warmest, ahead of the pumps
Buffer tankAdds loop volume so chillers do not short cycleSized to the chiller maker’s minimum volume
Makeup, fill and reliefReplaces lost water and protects against overpressureBackflow preventer, meter, relief valves piped to drain
Strainers and side-stream filterKeep debris out of coils and exchangersAccessible for cleaning, with pressure gauges across them

A chilled water system expansion tank is needed even in a loop that never sees heat, because water expands as it warms from fill temperature toward ambient during shutdowns, and a closed loop with nowhere for that volume to go will lift relief valves. The expansion tank connects near the pump suction, the point of no pressure change, so the pumps cannot pull the system below its fill pressure. The air separator in chilled water system return piping catches air where its solubility is lowest, and an automatic air vent valve for chilled water system high points releases what collects there. A buffer tank for chilled water system loops with small volume is common in process plants: chiller makers typically ask for about 3 to 5 gallons per ton for comfort cooling and 6 to 10 gallons per ton where temperature stability is critical. Every chilled water system pressure relief valve must be sized to the code and piped to a safe drain. Most expansion and buffer tanks are pressure vessels built to ASME Boiler and Pressure Vessel Code Section VIII.

Control valves deserve their own note. A 3 way valve chilled water system sends unused water around the coil and back to the plant, which keeps flow constant but lowers the return temperature. Two-way valves throttle flow to the load, letting variable speed pumps slow down and keeping return water warm, which is why modern systems use two-way valves almost everywhere except at the ends of long runs.

Chiller water pump selection, air separators and buffer tanks

A chiller water pump is selected from the flow the load needs and the head the loop loses: flow in gpm equals tons times 24 divided by the temperature difference, and brake horsepower equals gpm times head in feet, divided by 3,960 times pump efficiency. A 500 ton loop at a 12 F difference needs 1,000 gpm, and at 80 feet of head and 80 percent efficiency that CHW pump draws about 25 brake horsepower.

CHW pumps are normally piped in parallel with a standby, each with its own check valve, isolation valves and a straight run or suction diffuser at the inlet. Pump head is calculated along the longest circuit with chiller, coil, valve and strainer losses added at design flow. Variable speed then trims the pump to the actual load. See pump skids for packaged arrangements.

Air separator location in chilled water system piping

An air separator for chilled water system service removes air bubbles as they leave solution, using a tangential or coalescing body with an automatic vent on top. The air separator location in chilled water system return piping is the warmest point in the loop and ahead of the pumps, where air comes out of solution most readily. Size it for the full flow through that line at low pressure drop, and connect the expansion tank near it so the system pressure reference is at a known point.

Buffer tank in chilled water system plants

A buffer tank in chilled water system plants with small loop volume stops the chiller from short cycling by adding thermal mass. Using the chiller makers’ range of 6 to 10 gallons per ton for stable process duty, a 100 ton process loop at 8 gallons per ton needs about 800 gallons of total loop volume, and the tank makes up whatever the piping and coils do not already hold. Piped in series with the loop, with an inlet and outlet that prevent short-circuiting, the tank damps the temperature swings the chiller controls would otherwise chase.

Condenser water vs chilled water

Chilled water is the cold, closed loop that serves the loads; condenser water is the warm loop that carries the chiller’s rejected heat to a cooling tower. Both are water, but they behave differently and are treated differently.

FactorChilled waterCondenser water
Typical design temperatures44 °F supply, 54 °F return at the rating point; often warmer today85 °F entering the chiller, about 95 °F leaving at the rating point
Flow at rating point2.4 gpm per ton3.0 gpm per ton
Loop typeClosed, no evaporationOpen at the tower, constant evaporation and blowdown
Main water quality riskCorrosion, sludge, oxygen from makeupScale, corrosion, biological growth including Legionella
InsulationRequired, with vapor retarderUsually not, except freeze protection outdoors

A water cooled chilled water system uses that condenser loop and a tower; an air-cooled system rejects heat through fans on the chiller and has no condenser water at all. Water-cooled plants are more efficient and dominate large installations, from a 1000 ton chiller in a campus plant to multiple machines in a manufacturing plant; air-cooled packaged chiller installations are simpler and suit smaller loads or sites where tower water is a burden. Air cooled chiller units sit outdoors on a pad or roof, so they need clear space for airflow around the coils, and their efficiency drops on the hottest days, when the condensing temperature follows the outdoor air. Most commercial chillers and industrial chiller systems are electric chiller designs driven by motors, with absorption machines used where waste heat or steam is available. A plant’s broader cooling water system may also include once-through or tower water serving process equipment directly. Tower treatment is covered on our cooling tower water treatment page and tower upkeep on cooling tower cleaning.

Primary and secondary pumping and variable primary flow

Pumping arrangements decide how a plant handles changing loads. In a primary and secondary chilled water system, constant-speed primary pumps hold steady flow through each chiller, while variable-speed secondary pumps deliver only the flow the loads ask for. The two circuits are joined by a short common pipe, shown as the decoupler in chilled water system drawings, which lets the primary and secondary flows differ without the pumps fighting each other. When secondary flow exceeds primary flow, warm return water mixes backward through the decoupler into the supply, the classic sign of too few chillers running or low return temperature.

A variable primary flow chilled water system removes the primary pumps: one set of variable-speed pumps moves water through both chillers and loads, and a bypass valve keeps each chiller above its minimum evaporator flow. It saves pump energy and plant space, but the controls must respect the chiller maker’s minimum flow and maximum rate of flow change, and operators need to understand the sequence. Primary-secondary remains common in retrofits and in plants with many small chillers; variable primary is common in new plants with capable controls.

Primary secondary pumping compared with variable primary flow

Primary secondary pumping separates the chiller circuit from the load circuit with a common pipe, so chiller flow can stay steady while load flow varies. A primary variable chilled water system does the same job with one set of pumps and a bypass, and the two compare as follows.

FactorPrimary secondary chilled water systemPrimary variable chilled water system
PumpsTwo sets: chiller circuit and load circuitOne set of variable-speed pumps
Flow through the chillerSteady while that chiller runsVaries between the chiller maker’s minimum and maximum
Flow control deviceDecoupler with no valveBypass with a control valve and flow meter
ControlsSimpler staging; watch decoupler flowDepends on accurate flow measurement and rate-of-change limits
Typical useRetrofits and plants with many small or unequal chillersNew plants with capable controls and trained operators

Primary secondary chilled water systems tolerate a chiller with a narrow flow range, at the cost of extra pumps and plant space. On a primary variable layout, the savings depend on the sequence being tuned and kept tuned through commissioning.

What is a decoupler in chilled water system piping?

It is a short, unvalved pipe that connects the supply and return headers between the chiller pumps and the load pumps, which hydraulically separates the two circuits. Flow in the pipe can be zero when the two circuits match, runs from supply to return when the chillers make more flow than the loads take, and reverses when the loads take more. Keep the pipe short, with minimal pressure drop and no restricting valve, because a decoupler with significant resistance stops decoupling.

Primary secondary chilled water piping diagram

Read the primary secondary chilled water piping diagram by following the water from the chiller: chiller and primary pump, supply header, first decoupler tee, secondary pumps, coils, return header, second decoupler tee, then back to the primary pump suction. Temperature sensors around the decoupler tees, or a flow meter in the decoupler itself, tell the plant controller which way the water is moving. Paul Industries sets these sensors and proves the staging sequence during commissioning.

Chilled water system design

Design starts with the loads, their diversity and their temperature needs, then sets supply temperature, temperature difference, pumping arrangement, chiller count and redundancy. A chilled water system diagram shows the plant as the ASHRAE and manufacturer literature does: chillers, pumps, decoupler or bypass, expansion and air removal, and the distribution to coils with their control valves.

Several choices drive the outcome. Higher supply temperatures improve chiller efficiency when the coils can use them. A larger temperature difference shrinks pipe and pumps. Chiller sizing should cover the low-load months as well as the peak, which is why plants often mix machine sizes. On a campus or a multi-building site, a central chilled water plant serves every building from one plant room, so loads that peak at different times share the same chillers and one crew maintains them. A glycol chilled water system adds inhibited propylene or ethylene glycol wherever piping runs outdoors or fluid temperatures approach freezing, accepting lower heat transfer and higher pumping energy in exchange for protection. Plant rooms housing chillers follow ASHRAE Standard 15 for refrigerant safety, and building systems must meet the efficiency requirements of ASHRAE Standard 90.1.

The most common performance failure is low delta T syndrome: return water comes back too cold, so the plant runs more chillers and pumps than the load needs. The usual causes are three-way valves, oversized or leaking control valves, dirty coils, coil setpoints lower than design, and decoupler flow in the wrong direction. Good design, and good balancing at startup, prevents most of it.

Chilled water piping: materials, sizing and insulation

Chilled water piping material is chosen for size, pressure, installed cost and corrosion behavior. Schedule 40 carbon steel, welded or roll grooved, dominates mains and risers; copper type L is common in smaller branches; stainless steel is used where water quality or process requirements demand it; and polypropylene or high-density polyethylene appears in some systems where the design allows. Building systems are typically installed to ASME B31.9, with ASME B31.3 applied where a plant specifies process piping. Chiller piping at the machine needs flexible connections, isolation valves, strainers, flow switches, thermometer and gauge connections, and removable spool pieces so the tube bundles can be cleaned.

Chilled water piping sizing follows long-standing ASHRAE practice: limit velocity to about 4 feet per second in pipe 2 inches and smaller to control noise and erosion, and size larger pipe for a friction loss of about 1 to 4 feet of head per 100 feet, with 2.5 feet a common target. Velocity that is too low lets air and dirt settle, so minimum velocities matter too. Our pipe schedule chart gives inside diameters and wall thickness for each size.

Chilled water piping insulation is not optional. The pipe runs below the dew point of most indoor air, so any break in the vapor retarder lets humid air reach the cold surface, condense, soak the insulation and corrode the pipe underneath. Closed-cell insulation or fiberglass with a continuous vapor retarder jacket, sealed at every seam, fitting, valve and hanger, is the standard, with insulated pipe supports so hangers do not bridge the insulation. Thickness is set by the energy code, which in ASHRAE Standard 90.1 depends on pipe size and fluid temperature. Underground chilled water piping between buildings usually uses pre-insulated, jacketed pipe with leak detection, since repairs mean excavation.

Chilled water pipe sizer values and coil piping diagrams

A chilled water pipe sizer converts flow to a pipe size, using a velocity limit on small pipe and a friction limit on larger pipe. The figures below apply the sizing limits given above to schedule 40 steel, with friction calculated by Hazen-Williams at C = 100 for aged pipe.

PipeLimit usedApprox. gpmTons at 12 F difference
1/2 inch4 ft/s velocity3.81.9
1 inch4 ft/s velocity10.85.4
1 1/2 inch4 ft/s velocity2513
2 inch4 ft/s velocity4221
3 inch2.5 ft per 100 ft7336
4 inch2.5 ft per 100 ft14974
6 inch2.5 ft per 100 ft436218
8 inch2.5 ft per 100 ft897448
10 inch2.5 ft per 100 ft1,630815
12 inch2.5 ft per 100 ft2,5801,290

These are starting figures for a chilled water piping system, and the final size also weighs future load and pump energy over the life of the plant. New, clean pipe will show less friction than this table assumes. See the hydronic piping guide for general practice.

Chilled water coil piping diagram

A chilled water coil piping diagram shows supply entering the bottom connection on the air-leaving side of the coil and return leaving the top connection on the air-entering side, which gives counterflow heat exchange. Around that, the diagram adds isolation valves, a strainer, a two-way control valve, a balancing device with test ports, flexible connections where the unit vibrates, a vent at the top of the coil and a drain at the bottom. Coils are filled slowly with the vent open, since a fast fill leaves air trapped in the upper tubes.

Chilled water piping: chiller piping diagram at the machine

At the machine, the diagram follows the water through the evaporator and shows each connection the chiller maker requires: inlet and outlet isolation valves, a strainer ahead of the evaporator, a flow switch, pressure and temperature test ports, and a removable section so the heads can be opened for tube cleaning. Condenser water piping on a water cooled machine is drawn the same way and labeled separately, so the two loops cannot be confused during a tie-in.

Chilled water system installation

Installation runs in a sequence that matters as much as the parts. Chillers and pumps are rigged and set, aligned and isolated; piping is fabricated, often in shop spools, and installed with supports and anchors; then the system is pressure tested before insulation goes on. ASME B31.9 requires a hydrostatic test of at least 1.5 times the design pressure, held at least 10 minutes, with any component that cannot take that pressure isolated. Rigging and alignment are covered on millwright and rigging services, and general piping practice on process piping.

Chilled water system flushing comes next and is the step most often shortened. Construction debris, mill scale, cutting oil and weld slag have to come out before water reaches chiller tubes, coil passages and control valves. The loop is flushed at velocity with coils and chillers bypassed, chemically cleaned where specified, then refilled and treated. BSRIA BG 29 is a widely used guide to pre-commission cleaning of pipework systems.

Chilled water system testing and commissioning follows: confirming pump rotation and flows, stroking every valve, verifying sensors, running each control sequence and proving chiller staging and alarms. How to balance chilled water system flows is part of it: Paul measures and sets flow at each coil to the design value, and with two-way valves and variable speed pumps that usually means proving each coil gets design flow at its valve fully open. The process is documented as described in ASHRAE Guideline 0. We carry that work through commissioning and validation.

Chilled water system treatment

Treatment protects a closed loop from corrosion, sludge and biological growth. Because the loop does not evaporate, it should need very little makeup, and a closed loop chilled water system that keeps calling for water has a leak that is bringing in fresh oxygen and minerals. Treatment combines a corrosion inhibitor matched to the metals in the loop, side-stream filtration to remove suspended iron and debris, regular testing of inhibitor level, pH and bacteria, and metered makeup so losses are noticed. We supply the chemical program and install and service the treatment equipment, feeders, filters and meters that keep it on target. See our plant water treatment systems.

Chilled water system maintenance and troubleshooting

Maintenance protects both efficiency and reliability, and most of it is routine.

IntervalTaskWhy it matters
Daily or by monitoringLog supply and return temperatures, delta T, pressures, chiller alarmsTrends catch fouling and control faults early
MonthlyCheck strainers, makeup meter, expansion tank pressure, pump sealsDebris, leaks and pressure loss show up here first
QuarterlyTest water treatment, inspect insulation and vapor retarder, exercise valvesCorrosion and condensation damage are slow and silent
AnnuallyChiller service, condenser tube cleaning, pump alignment, control calibration, relief valve inspectionRestores heat transfer and confirms safety devices

When something goes wrong, chilled water system troubleshooting usually starts from one of a few symptoms.

SymptomLikely causesFix
Supply water too warmLoad above capacity, chiller faulted or limited, condenser water too warmStage another chiller, clear the fault, service the tower or condenser
Low delta TThree-way valves, dirty coils, low setpoints, overpumpingValve conversion, coil cleaning, reset setpoints, pump control
Chiller short cyclingLoop volume too small, oversized chiller at low loadAdd a buffer tank, revise staging
Air noise and air-bound coilsLow fill pressure, failed vents, separator in the wrong placeRestore pressure, repair vents, relocate separator
Frequent makeupLeaks, relief valves lifting, failed expansion tankLeak search, tank precharge check or replacement
Sweating pipe or wet insulationBroken vapor retarderRemove wet insulation, reseal the retarder system

Routine work runs best under a preventive maintenance plan; breakdowns are handled by our emergency repair service.

Chilled water system cost per ton

There is no reliable single figure per ton, because the chiller is often a minority of the installed cost. The main drivers are capacity and redundancy, air-cooled or water-cooled heat rejection, the length and size of distribution piping, insulation, the number of coils and connections, controls, the electrical work, and whether the work is a new building or a retrofit in an operating plant. Retrofit tie-ins, rigging access and outage windows often decide the budget more than tonnage does.

What Paul Industries does

Paul Industries installs and services chilled water systems: chiller setting and piping, pump installation and alignment, plant and distribution piping in carbon steel, copper and stainless, plate heat exchangers and economizers, expansion, air removal and buffer tanks, glycol systems, insulation, pressure testing, flushing and cleaning, commissioning, treatment equipment, preventive maintenance and emergency repair. Related pages cover plant utilities, heat exchangers and data center cooling. We install, pipe, start up and commission chillers and keep them running for the life of the plant. Request a quote for chilled water installation or service.

Standards referenced: ASME B31.9 · ASME B31.3 · AHRI 550/590 · ASHRAE Standard 90.1 · ASHRAE Standard 15 · ASHRAE Guideline 0 · ASHRAE Handbook Fundamentals · BSRIA BG 29 · ASME BPVC Section VIII

Frequently asked questions

What is chilled water?

Water cooled by a chiller, usually to the 40s or 50s Fahrenheit, and circulated in a closed loop to absorb heat from air handlers, coils or process equipment. It is not drinking water; it is treated with corrosion inhibitors and kept separate from potable supplies.

What temperature is chilled water?

The traditional design is 44 degrees Fahrenheit supply and 54 degrees return. Many modern systems supply somewhat warmer water with a wider temperature difference to save energy, while some process systems run colder with glycol. The right value is set by the loads, especially coil dehumidification needs.

What is the difference between dx system and chilled water system?

A DX, or direct expansion, system cools air directly with refrigerant in the coil, piped from a compressor and condenser. A chilled water system cools water at a central chiller and pumps the water to the coils. DX suits smaller buildings and individual zones; chilled water suits large buildings, campuses and plants because one plant serves many loads and refrigerant stays in the equipment room.

Why do chilled water piping systems need to be vapor sealed?

Because the pipe is colder than the dew point of the surrounding air. Without a continuous vapor retarder, moisture migrates into the insulation, condenses on the pipe, destroys the insulation value and corrodes the steel. Every seam, fitting and hanger has to be sealed.

How much glycol in a chilled water system?

Enough for the lowest temperature the fluid or piping will see, and no more, because glycol lowers heat transfer and raises pumping energy. Glycol makers publish concentration tables: by Dow's typical data, about 30 percent propylene glycol by volume protects against freezing to roughly 10 degrees Fahrenheit. Choose a protection point at least 5 degrees below the lowest expected temperature and use inhibited industrial glycol, never automotive antifreeze.

How to fill a chilled water system without trapping air?

Fill slowly from the lowest point with high-point vents open, close each vent as solid water appears, bring the system to its fill pressure, then run the pumps to sweep remaining air to the separator. Glycol systems are premixed and pumped in so the concentration is right from the start.

How much pressure in chilled water system piping is normal?

The cold fill pressure has to cover the static height of the system, about 0.433 psi per foot of water, plus a margin so the highest point stays positive. Operating pressure then adds pump head. Components must be rated for the highest pressure at the lowest point of the system, which in tall buildings can be substantial.

Why would chillers of unequal size be installed in a chilled water plant?

To match the load profile. Many plants run far below peak for most of the year, so a smaller chiller can carry low loads efficiently without short cycling, while the large machines handle summer peaks. Unequal sizes also give finer staging steps.

What are chilled water systems used for?

Comfort cooling of large buildings and campuses, cooling of process equipment and products in manufacturing, cooling of data halls and laboratories, and dehumidification. Food, pharmaceutical, plastics and chemical plants rely on them for both process and space cooling.

Why is my chilled water system not cooling?

Check whether supply water is cold at the plant first. If it is warm, the chiller is limited, faulted or short of condenser capacity. If it is cold at the plant but not at the load, look for air-bound coils, closed or failed valves, clogged strainers or insufficient flow. Low delta T at the plant points to bypassing and coil problems.

Who services chillers?

Chiller manufacturers' service organizations and qualified refrigeration technicians handle refrigerant circuits and controls under warranty. Mechanical contractors like Paul Industries service the whole system: the chiller itself plus pumps, piping, heat exchangers, valves, tanks, flushing and treatment equipment.

Does a chilled water system need an expansion tank?

Yes. Water expands as it warms, even in a cold loop that warms during shutdowns, and a closed system without room for that expansion will lift relief valves and lose water. The tank also sets the system's reference pressure.

Can a chilled water system be expanded later?

Usually, if the original design left valved connections, space for another chiller and pump, and headers sized for the future flow. Adding load without checking pump head, pipe capacity and chiller capacity is how plants end up with low delta T and warm spaces.

How long does chilled water pipe last?

Properly treated and insulated steel piping commonly lasts for decades. Failures usually come from corrosion under wet insulation, poor water treatment, or oxygen brought in by constant makeup, all of which are preventable.

What is a decoupler bypass flow reversal?

In a primary-secondary plant, when the secondary loads draw more water than the primary pumps supply, warm return water flows backward through the common pipe into the supply. Supply temperature rises, and the fix is staging another chiller or correcting the low delta T causing it.

How is a chilled water pump head calculated for a retrofit?

Add the pressure losses along the longest circuit at the new design flow: chiller, piping and fittings, coil, control valve, strainer and any heat exchanger. On an existing loop, measuring pressure at the pump and at a far coil gives a real figure to check against the calculation before a new impeller or pump is ordered.

Who can add a chiller to a factory chilled water plant in Ohio or Illinois?

Paul Industries installs chillers, pumps and tie-in piping for chilled water plants at factories in Ohio, Illinois and across the US, with its base in Kilmarnock, Virginia. Adding a machine also means checking pump head, the decoupler and the expansion tank against the larger loop, so the new chiller shares load with the existing ones. Call 201-450-8280 or request a quote.

Can old chilled water piping be reused when a plant replaces its chillers?

Often, but check it first. Look at internal corrosion and scale, the condition of the insulation and vapor barrier, and whether the pipe sizes still suit the new flow rates and temperatures. A flush with strainer inspection and a review of the water treatment history show whether the loop can carry the new plant or needs sections replaced. Call 201-450-8280 or request a quote.

How do you calculate what chilled water costs a plant to make?

Chilled water cost is usually figured per ton-hour. Multiply the plant’s measured kW per ton by the tons delivered and the hours run, add pump and cooling tower fan energy, then apply your electricity rate. Tower makeup water, treatment chemicals and maintenance labor complete the picture. Logged supply and return temperatures with flow give the real tons delivered, so a metered plant gets a far truer figure than one working from nameplate ratings. Call 201-450-8280 or request a quote.

Which installation standards apply to chilled water piping and pipe supports?

Building chilled water piping is normally installed to ASME B31.9, or to ASME B31.3 where the plant calls for process piping rules, and hangers and supports are selected to MSS SP-58. On cold lines the hanger sits outside the insulation, with a rigid insert and shield at each support so the vapor retarder stays continuous. Support spacing, seismic bracing and test pressure come from the project specification. Paul Industries installs, supports and pressure tests chilled water piping to the code you specify. Call 201-450-8280 or request a quote.

What CSI MasterFormat sections cover chilled water piping in a project specification?

Chilled water work sits in MasterFormat Division 23. Section 23 21 13 covers hydronic piping, 23 21 23 hydronic pumps, 23 07 19 HVAC piping insulation, 23 25 00 HVAC water treatment and 23 64 00 packaged water chillers. Plant specifications often add a process piping section for lines that serve production equipment. Paul Industries builds to the sections in your specification, so send those pages along with the drawings. Call 201-450-8280 or request a quote.

What affects the price of an air separator for a chilled water loop?

Air separator price follows pipe size and design flow first, then type: a tangential unit with or without a built-in strainer, or a coalescing unit that also captures dirt and microbubbles. Pressure rating, flanged or grooved ends and an ASME code stamp move it further. Installed cost adds the piping to place the separator where the loop runs warmest at the lowest pressure, plus an automatic vent and a blowdown valve. Send the loop size, flow rate and design pressure for a firm price. Call 201-450-8280 or request a quote.

Can a plant rent temporary chilled water while its chillers are replaced or repaired?

Yes. A rental chiller can carry the load through a chiller replacement, a major repair or a seasonal peak, provided the loop has somewhere to connect it. Paul Industries pipes temporary units into the chilled water system with hose or hard-pipe tie-ins, isolation valves and a power feed, then removes them once the permanent plant is commissioned. Leaving permanent tie-in connections in place after any chiller project makes the next rental simpler to hook up. Call 201-450-8280 or request a quote.

How do I choose a contractor for an industrial chilled water piping project?

Choose a contractor that can carry the work from piping through commissioning: chiller setting, pump alignment, carbon steel, copper or stainless piping, insulation, pressure testing, flushing and startup. Ask how the loop is cleaned before chillers see water, and which test and startup records you will receive. Paul Industries installs and services chilled water systems across that whole scope, then stays on for preventive maintenance and emergency repair through the life of the plant. Call 201-450-8280 or request a quote.

What does a chilled water preventive maintenance agreement cover?

A preventive maintenance agreement lists which chillers, pumps, towers and coils are covered, how often each one is visited, and the work done at each visit: chiller service, condenser tube cleaning, pump alignment, strainer checks, treatment testing and control calibration. It also sets how emergency repairs are called in and priced. Paul Industries provides preventive maintenance and emergency repair for industrial chilled water plants, so routine care and breakdown work sit with one contractor. Call 201-450-8280 or request a quote.

Related: Plant Utilities: Steam, Heating, Chilled Water & Ice Builders · Process Chiller Installation & Service · Industrial Process Chillers: How They Work & How to Choose · Data Centers · Data Center Cooling Systems · Plate Heat Exchanger · Request a quote · Hydrostatic Testing of Piping, Vessels and Tanks · Data Center Liquid Cooling: CDUs, Cold Plates, Rear Doors and TCS Piping · Data Center Commissioning: Levels, Flushing, Testing and Mechanical Scope · Data Center Mechanical Contractors: Cooling Plant, Piping and Prefabrication · Data Center Water Usage: Figures, WUE, Cooling Choices and Reduction · Dry Cooler Guide: How Dry and Adiabatic Coolers Work, Compare and Are Maintained · Data Center Cooling Towers: Installation, Redundancy and Repair · Data Center Chillers: Selection, Installation, Service and Retrofit · Chiller Repair, Overhaul and Replacement for Process and HVAC Chillers · Pump Skid Design, Fabrication, Installation and Startup · Glycol Cooling System Design, Installation, Maintenance and Repair · Mechanical Insulation for Industrial Piping, Tanks and Equipment · York Chiller Repair, Overhaul and Maintenance for YK, YT, YMC2, YVAA and YCIV Machines · Trane Chiller Repair, Rebuild and Maintenance: CenTraVac, Series R and CGAM · Carrier Chiller Repair, Overhaul and Maintenance: 19XR, 23XRV, 30XA, 30RB and 30RAP · Closed Loop Cooling System: Design, Installation and Service · Hydronic Piping: Types, Materials, Sizing, Design and Installation · Process Cooling System Design, Installation and Service · Cooling Tower Repair, Replacement and Installation · Research labs and universities