Water treatment plant construction is the building, expansion or upgrade of the plants that make raw water safe to drink or return wastewater clean enough to discharge, and Paul Industries builds the process systems at the center of those plants: piping, pumps, blowers, chemical feed, tanks, filters, valves and controls, for municipal utilities and industrial owners. The work covers new plants, capacity expansions, process upgrades for tighter permits, and equipment replacement inside plants that must keep treating water the whole time.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Coverage Municipal and industrial plants in all 50 states and abroad
Scope Process piping, pumps, blowers, chemical feed, tanks, filters, valves, controls
Drinking water contact NSF/ANSI/CAN 61 components; AWWA C653 plant disinfection
Wastewater fire code NFPA 820 for treatment and collection facilities
National need EPA: $625 billion drinking water, $630.1 billion clean water, 20 years
Routes Supply-only, design-build or complete installation
Reviewed November 2026

Paul Industries, formerly based in northern New Jersey and then Pennsylvania, now works from 256 Shore Drive, Kilmarnock, Virginia, and takes treatment plant work in all 50 states and at international sites. Its clients include utility engineers, consulting engineers who need a capable mechanical contractor on a bid, and industrial plant managers whose water supply or wastewater discharge has become the limit on production.

What does water and wastewater treatment plant construction involve?

A water and wastewater treatment plant is built from concrete basins and buildings that hold the process, and the mechanical systems that move, dose, mix, aerate, filter and disinfect the water inside them. The mechanical, piping and equipment work carries much of the startup risk, because it is what has to perform on day one.

Drinking water plants and wastewater plants share much of that equipment but run the process in opposite directions. A drinking water plant takes river, lake, reservoir or well water and removes particles, organisms, color, metals and taste; a wastewater treatment plant takes sewage or industrial effluent and removes solids, organic load, nutrients and pathogens before discharge or reuse. The table below lays out the main areas of a surface water plant and the mechanical work in each.

Drinking water plant areas and the mechanical work Paul Industries builds in each
Plant areaPurposeMechanical and piping work
Intake and raw water pumpingDraw source water and lift it to the plantVertical turbine or split-case pumps, discharge headers, check and isolation valves, surge control
Rapid mix and flocculationDisperse coagulant and grow settleable flocMixers, flocculator drives, coagulant injection points
Sedimentation or clarificationSettle floc and remove sludgeSludge collectors, plate settler supports, sludge pumps and piping
FiltrationRemove remaining particlesFilter piping galleries, underdrains, backwash pumps and blowers, actuated valves, turbidimeters
Disinfection and clearwellInactivate pathogens and provide contact timeHypochlorite or UV systems, contact basin piping, sample lines
High-service pumpingDeliver finished water to the distribution systemHigh-service pumps, variable speed drives, discharge headers and meters
Chemical buildingStore and dose treatment chemicalsBulk tanks, metering pumps, transfer and feed piping, containment, eyewash and shower stations
Residuals handlingThicken and dewater sludge and backwash wasteThickeners, recycle pumps, polymer systems, dewatering equipment

Water treatment plant construction process, from planning to startup

The water treatment plant construction process runs through planning, design, approvals, funding, procurement, construction, testing and startup, and the stages before construction often take longer than the building itself. Utilities plan years ahead because state drinking water and water quality programs review the design, and public funding brings its own conditions.

Treatment plant project phases and what each produces
PhaseMain activitiesOutput
Facility planningDemand projections, water quality data, permit limits, alternatives analysisFacility plan and preferred alternative
DesignProcess design, hydraulics, equipment selection, drawings and specificationsBid documents or design-build basis
ApprovalsState review of plans, discharge permit for wastewater, building permitsApproval to construct
FundingState revolving fund loans, bonds, grants, rate planningFunding agreement and its conditions
ProcurementDesign-bid-build, construction manager at risk or design-build selectionConstruction contract
ConstructionEarthwork, concrete, buildings, process mechanical, electrical, instrumentationInstalled plant
Testing and disinfectionPressure and leak tests, basin leakage tests, disinfection of potable water unitsTest and disinfection records
Startup and performanceEquipment startup, process seeding or chemical setup, performance testing, operator trainingAcceptance and turnover documents

The wastewater treatment plant construction process follows the same phases, with the discharge permit shaping the design and with biological processes that need weeks of acclimation before they meet their limits. A wastewater treatment plant construction schedule therefore carries a startup period after mechanical completion that a drinking water plant can often shorten. Paul Industries plans procurement of long-lead equipment, such as large pumps, blowers and actuated valves, as soon as submittals are approved, because those items usually set the critical path.

Wastewater treatment plant construction: the stages from headworks to discharge

Wastewater treatment plant construction is organized around the treatment train, and each stage has its own equipment, piping and controls. The wastewater treatment plant process removes coarse solids first, then settleable solids, then dissolved organic load and nutrients, then pathogens, while a parallel train handles the solids removed along the way.

Wastewater treatment plant stages and the mechanical work in each
StageWhat it removesEquipment and piping
Headworks (preliminary)Rags, debris, gritMechanical bar screens, washer compactors, grit chambers and grit pumps, influent pumps
Primary treatmentSettleable solids, floating scumPrimary clarifier mechanisms, scum and sludge pumps
Secondary (biological) treatmentDissolved organic load, ammoniaAeration blowers, air headers and diffusers, mixers, return and waste sludge pumps, secondary clarifiers
Tertiary treatmentRemaining solids, phosphorus, nitrogenFilters, chemical feed for phosphorus removal, denitrification equipment
DisinfectionPathogensUV systems or chlorination with dechlorination, contact tank piping
Solids handlingWater from sludge, volatile solidsThickeners, digesters and gas piping, dewatering presses or centrifuges, polymer feed
Odor controlHydrogen sulfide and other odorous gasesCovers, ductwork, fans, scrubbers or biofilters

A tertiary wastewater treatment plant adds the filtration and nutrient removal steps that permits on sensitive receiving waters increasingly require, and many existing plants are being upgraded to that level. The wastewater treatment plant parts that wear fastest, such as screens, grit pumps, sludge pumps, diffusers and actuated valves, are also where most rehabilitation work happens between major projects.

Residuals deserve the same attention as the liquid train. Drinking water plants produce filter backwash water and clarifier sludge that are recycled to the head of the plant, thickened or dewatered, while wastewater plants produce primary and waste activated sludge that must be thickened, stabilized and dewatered before hauling or reuse. Sludge lines get long-radius bends, flushing connections and clean-outs at each change of direction, and polymer systems are sized for the dose the dewatering equipment needs. Paul Industries builds residuals systems with access for the operators who clear them.

Sewage treatment plant construction on a smaller scale, for a campus, resort, industrial park or institution outside a sewer district, uses the same stages in compact form. Paul Industries builds and installs those systems along with the larger municipal work.

Process piping and valves in treatment plants

Treatment plant piping carries raw water, finished water, sewage, sludge, air, chemicals and digester gas, and each service gets its own material, joint and support design. Large-diameter water and sewage lines are typically ductile iron or steel with flanged, mechanical or restrained joints; aeration headers are often stainless or steel built for the temperature of compressed air; chemical lines are plastics selected for the chemical; and digester gas lines are built and tested as fuel gas.

Every component that touches drinking water in a potable plant must be suitable for it, and NSF/ANSI/CAN 61 is the standard most states require for the health effects of pipe, valves, coatings, gaskets and equipment in contact with drinking water. Paul Industries checks submittals against that requirement before anything is ordered. After installation, potable lines and treatment units are cleaned and disinfected following AWWA C651 for piping and AWWA C653 for the treatment plant itself, with bacteriological samples confirming the result before the plant goes into service.

Valves in treatment plants work hard and are often difficult to reach. Paul Industries installs gate, butterfly, plug, check and actuated valves with access for operation and removal, and maintains them afterward through its industrial valve repair service. Pumps in raw water, high-service, sludge and chemical duty are set, aligned and tested the same way, with rebuilds handled through industrial pump repair.

Chemical feed systems and wastewater treatment plant chemicals

Chemical feed systems dose coagulants, disinfectants, pH adjusters, polymers and nutrients, and their design decides whether a plant meets its limits on a bad day. Common wastewater treatment plant chemicals include sodium hypochlorite, ferric chloride or alum, caustic soda, polymers and sodium bisulfite, and drinking water plants add fluoride and corrosion control chemicals; treatment chemicals for drinking water generally must meet NSF/ANSI/CAN 60.

Each chemical brings its own piping rules. Sodium hypochlorite gives off gas as it decomposes, and that gas binds metering pumps, causes erratic feed and builds pressure in closed sections of pipe; metal speeds the decomposition, so hypochlorite systems avoid metal wetted parts, use vented valves and are laid out without stagnant legs. Ferric chloride attacks nearly all metals, so its piping, valves and pump heads are plastic or fiberglass, with titanium among the few metals used. Paul Industries designs chemical rooms with double containment where lines pass through occupied or below-grade spaces, spill containment around bulk tanks, and emergency eyewash and shower stations at every unloading and transfer point.

Bulk storage tanks, day tanks and polymer makeup systems are fabricated or supplied to the chemical and set on containment pads. Paul Industries builds custom tanks through its tank fabrication work and installs the metering pumps, calibration columns, pulsation dampeners and back-pressure valves that make a feed rate repeatable.

Pump stations, blowers and aeration systems

Pumps and blowers run around the clock in a treatment plant, so the equipment in these two areas shapes operating cost for decades. Paul Industries sets pumps and blowers on properly grouted bases, aligns couplings with laser tools, and pipes suction and discharge so the equipment sees the inlet conditions its curve assumes.

Raw water, influent and high-service pump stations are built as wet well or dry pit arrangements with isolation and check valves on each pump, flexible couplings or expansion joints to keep pipe loads off the casings, and variable speed drives where flow varies through the day. Sludge pumps, whether progressing cavity, recessed impeller or plunger types, need clean-outs and flushing connections because sludge settles and plugs lines that sit idle.

Aeration blowers feed a header that runs hot near the blower and cools along its length, so the air piping is designed for thermal growth with expansion joints, guides and anchors. Drop pipes carry air down into each basin to grids of fine bubble diffusers, and each grid gets a control valve and flow meter so the plant can trim air to dissolved oxygen demand. Paul Industries installs the blowers, headers, drop pipes, diffuser grids and valves, then balances airflow across the basins at startup.

Instrumentation, controls and plant SCADA

Instrumentation and controls tie the treatment process together, measuring flow, level, turbidity, chlorine residual, pH, dissolved oxygen and pressure, and adjusting pumps, blowers, valves and chemical feed rates from those readings. A treatment plant’s control system must keep the process inside permit limits through flow swings, storms and equipment failures.

Paul Industries installs instruments with sample lines, isolation valves and access for calibration, wires them to control panels, and programs and tests the logic that runs each process area through its PLC programming work. On upgrades, new control panels run alongside the existing system until each loop has been proven, so operators always have a working control path during the changeover.

Wastewater treatment plant odor control and NFPA 820

Wastewater treatment plant odor control captures gases from headworks, primary clarifiers, sludge handling and other enclosed processes, then treats them in chemical scrubbers, biofilters or carbon units before release. Covers, ductwork, fans and dampers are sized so the captured spaces stay under slight negative pressure, and the treatment unit is matched to the gas load measured or estimated during design.

The same gases create fire and explosion hazards. NFPA 820, the Standard for Fire Protection in Wastewater Treatment and Collection Facilities, covers construction, ventilation and electrical classification for collection systems, pumping stations, treatment plants and sludge handling. Its ventilation and classification requirements decide which motors, instruments and lights are rated for hazardous locations, so Paul Industries reviews the classification drawings before ordering any equipment for enclosed wastewater spaces.

Industrial, process and package wastewater treatment plants

An industrial wastewater treatment plant treats effluent from manufacturing before it reaches a sewer or a receiving water, and its design follows the plant’s own chemistry rather than a municipal model. Food, beverage, dairy, meat, pharmaceutical, chemical and metal finishing plants each produce a different stream, and the treatment train is built to the permit the plant holds.

A process wastewater treatment plant inside an industrial site usually starts with equalization and pH control, then removes fats, oils and solids with flotation or clarification, and adds biological treatment or membranes where the permit requires them. Paul Industries builds those systems as part of its industrial water treatment and process wastewater and effluent work, and covers sector-specific trains on the food plant wastewater pretreatment and meat plant wastewater pretreatment pages.

A package wastewater treatment plant is a factory-built treatment unit, usually in steel or concrete tanks, shipped in modules and set on a prepared pad. Package plants suit small communities, campuses, industrial sites and temporary capacity during an upgrade. Paul Industries sets, pipes, wires and starts package units, and connects them to influent, effluent, air and sludge systems on site.

Design of wastewater treatment plant upgrades in a running plant

The design of wastewater treatment plant upgrades has to account for a plant that must meet its permit every day of construction, which makes sequencing as important as process selection. Wastewater treatment plant design for an upgrade starts by deciding how flow will be carried while each unit is out of service: by taking parallel basins down one at a time, by temporary bypass pumping, or by adding temporary package capacity.

Paul Industries plans tie-ins to existing piping during low-flow periods, prefabricates spools and assemblies so each outage is short, and keeps old and new controls running side by side until the new system is proven. Design criteria in many states come from the Recommended Standards for Water Works and the Recommended Standards for Wastewater Facilities, known together as the Ten States Standards and published by the Great Lakes-Upper Mississippi River Board, along with each state’s own design rules. Process filtration equipment for both drinking water and reuse applications is covered on the process filtration page.

Testing, startup and turnover of treatment systems

Testing a treatment plant proves three things before the owner accepts it: the piping and tanks hold pressure and water, the equipment runs as specified, and the process meets its treatment targets. Paul Industries carries each through a written plan and records every result.

Process and yard piping is pressure and leak tested section by section, with test records tied to the drawings, through Paul’s hydrostatic testing procedures. Tanks and basins are filled and checked for leakage, and chemical systems are tested with water before any chemical is delivered. Pumps, blowers, mixers and drives are bumped for rotation, run and checked for vibration, temperature and current, and actuated valves are stroked from the control system. Process startup then brings the plant online with real water, adjusting chemical doses, air rates and pump settings until the plant meets its targets, followed by operator training on each process area.

Who builds water and wastewater treatment plants?

Paul Industries builds water and wastewater treatment plant systems for municipal utilities and industrial owners in all 50 states, including process piping, pumps, blowers, chemical feed, tanks, filters, valves, instrumentation and controls, from new plants to upgrades inside operating facilities. As one of the water treatment plant contractors that also fabricates tanks, spools and skids, Paul builds much of the equipment it installs.

Owners comparing water treatment plant construction companies, and engineers assembling teams for wastewater treatment plant construction companies to bid, tend to weigh the same things: experience with the plant’s process, the ability to keep an existing plant in compliance during construction, testing and disinfection discipline, and complete records at turnover. Paul Industries delivers each under one contract, with the same team carrying the work from submittals through startup.

Industrial owners whose treatment needs are part of a larger plant program can see the full list of sectors Paul serves on the industries page.

How much does water treatment plant construction cost?

Water treatment plant construction cost depends on capacity, source water quality or permit limits, the treatment process chosen, site and foundation conditions, how much existing plant is reused, and the funding conditions attached to the project. Two plants of the same capacity can differ widely in cost because one treats clean groundwater with filtration and disinfection while the other treats a variable river supply with clarification, filtration, advanced oxidation and residuals handling.

The national scale of the work is large. EPA’s seventh Drinking Water Infrastructure Needs Survey put drinking water infrastructure needs at $625 billion over 20 years, and the 2022 Clean Watersheds Needs Survey put clean water needs at $630.1 billion, of which wastewater accounted for $345.7 billion. Those figures cover pipes and storage as well as plants, but they show why utilities are planning upgrades now.

Utilities often compare water treatment plant cost per MGD of capacity across projects, but the comparison only holds for plants with similar source water, process and site conditions. Wastewater treatment plant construction cost follows the same logic, with permit limits for nutrients and the solids handling approach as the main variables. The cost to build a wastewater treatment plant also includes the funding conditions: projects using state revolving fund money must meet American Iron and Steel requirements, and Build America, Buy America sets domestic content thresholds of 100 percent for iron and steel, 55 percent for manufactured products and 100 percent for construction materials. Paul Industries prices the mechanical scope from drawings and equipment lists, and confirms domestic content documentation for every item on funded projects.

Water treatment plant construction from Paul Industries

Paul Industries offers treatment plant work through three routes: supply-only of fabricated tanks, piping spools, skids and chemical feed systems; design-build of process upgrades and package systems where Paul carries the design; and complete installation of the process mechanical scope on bid or negotiated projects. Each route closes with pressure test records, disinfection and bacteriological results for potable systems, startup reports, operation and maintenance manuals and as-built drawings.

Plants that need help with water supply, discharge limits or a process expansion can call 201-450-8280 or request a quote with the drawings, flows, permit limits and schedule in hand.

Standards referenced: AWWA C651 Disinfecting Water Mains · AWWA C652 Disinfection of Water-Storage Facilities · AWWA C653 Disinfection of Water Treatment Plants · NSF/ANSI/CAN 61 Drinking Water System Components, Health Effects · NSF/ANSI/CAN 60 Drinking Water Treatment Chemicals, Health Effects · NFPA 820 Standard for Fire Protection in Wastewater Treatment and Collection Facilities · Recommended Standards for Water Works (Ten States Standards) · Recommended Standards for Wastewater Facilities (Ten States Standards) · ASME B31.3 Process Piping · American Iron and Steel and Build America, Buy America requirements for SRF projects

Frequently asked questions

How long does it take to build a water treatment plant?

The time from planning to startup often spans years for a municipal plant, because facility planning, design, state approvals and funding come before construction begins. Construction time depends on capacity, process and site conditions. Paul Industries shortens its part by ordering long-lead equipment early and prefabricating piping during site work.

What type of construction is a water treatment plant?

A water treatment plant is heavy industrial construction: reinforced concrete basins and buildings, large-diameter process piping, mechanical equipment, chemical systems, electrical distribution and instrumentation, all built to waterworks standards. Paul Industries builds the process mechanical, piping and equipment systems that make the plant treat water.

What is the difference between a water treatment plant and a wastewater treatment plant?

A water treatment plant turns raw source water into drinking water for distribution, while a wastewater treatment plant cleans used water from homes and industry before discharge or reuse. Both use pumps, piping, chemical feed and filtration, but wastewater plants rely heavily on biological treatment and solids handling. Paul Industries builds systems for both.

How does a wastewater treatment plant work?

A wastewater treatment plant screens out debris and grit, settles solids in primary clarifiers, uses microorganisms in aerated basins to consume dissolved organic matter, settles that biomass in secondary clarifiers, and disinfects the effluent before discharge. Removed solids are thickened, stabilized and dewatered. Paul Industries installs the pumps, blowers, piping and controls that run each step.

What does a wastewater treatment plant do for a community?

A wastewater treatment plant protects public health and receiving waters by removing solids, organic load, nutrients and pathogens from sewage before the water returns to a river, lake or ocean, or is reused. It also handles industrial discharges under pretreatment permits. Paul Industries builds and upgrades the equipment that lets plants meet their permits.

How are water treatment plants funded?

Most municipal plants are funded through utility revenue bonds, water and sewer rates, state revolving fund loans and grants. Revolving fund money carries domestic content requirements such as American Iron and Steel and Build America, Buy America. Paul Industries provides the documentation those programs require for the materials and equipment it supplies.

What standards apply to pipe and equipment in a drinking water plant?

Components in contact with drinking water are generally required to meet NSF/ANSI/CAN 61, and AWWA standards govern pipe, valves, installation and disinfection. State drinking water programs and the Ten States Standards add design criteria. Paul Industries checks submittals against these requirements before ordering.

How is a new water treatment plant disinfected before service?

New treatment units are cleaned, then disinfected with a chlorine solution applied to interior surfaces under AWWA C653, and bacteriological samples must show no coliform organisms before the plant enters service. New mains follow AWWA C651. Paul Industries carries out the cleaning, disinfection and sampling and delivers the results with the turnover package.

What is a tertiary wastewater treatment plant?

A tertiary plant adds treatment after secondary biological treatment, typically filtration and chemical or biological nutrient removal, to meet tighter limits on solids, phosphorus or nitrogen. Plants discharging to sensitive waters or producing reuse water usually need it. Paul Industries builds filter systems, chemical feed and the piping that connects them to existing secondary treatment.

Can a treatment plant keep operating during an upgrade?

Plants keep operating through upgrades by taking parallel units down one at a time, bypass pumping around the work, or adding temporary package capacity. Tie-ins are scheduled for low-flow periods and prefabricated to keep outages short. Paul Industries plans the sequence with the operators so permit compliance holds throughout.

What piping material is used for sodium hypochlorite?

Sodium hypochlorite lines are usually plastic, such as PVC, CPVC or other thermoplastics rated for the concentration and temperature, with no metal wetted parts, vented valves and no stagnant legs where gas can collect. Paul Industries selects the material from manufacturer chemical resistance data for the specific solution and installs it with containment where required.

What does NFPA 820 cover?

NFPA 820 covers fire and explosion protection in wastewater treatment and collection facilities, including construction, ventilation and electrical area classification for pumping stations, treatment processes and sludge handling. Its classification sets which equipment must be rated for hazardous locations. Paul Industries works from the classification drawings when selecting and installing equipment.

What are the Ten States Standards?

The Ten States Standards are the Recommended Standards for Water Works and the Recommended Standards for Wastewater Facilities, published by the Great Lakes-Upper Mississippi River Board and adopted or referenced by many state programs as design criteria. Paul Industries builds to them wherever the project specification or state rules call for them.

Does Build America, Buy America apply to treatment plant equipment?

Projects funded through federal programs such as state revolving funds must meet Build America, Buy America, which requires 100 percent domestic iron and steel, 55 percent domestic content for manufactured products and 100 percent for construction materials, alongside American Iron and Steel rules. Paul Industries documents compliance for each item it supplies.

What is a package wastewater treatment plant used for?

Package plants serve small communities, campuses, industrial sites and resorts, and provide temporary capacity during larger plant upgrades. They arrive as factory-built modules that are set, piped, wired and started on site. Paul Industries installs and commissions package plants and connects them to the systems around them.

What records come with a finished treatment plant project?

A complete turnover includes pressure and leakage test records, disinfection and bacteriological results for potable systems, equipment startup reports, performance test results, operation and maintenance manuals, spare parts lists and as-built drawings. Paul Industries assembles them in the format the utility or owner specifies.

Who installs pumps and chemical feed systems in water treatment plants?

Paul Industries installs pumps, blowers, chemical feed systems, tanks, filters, valves and process piping in water and wastewater treatment plants across the United States. The work runs from submittals through startup, testing and operator training under one contract.

Building, expanding or upgrading a treatment plant?

Send the drawings, design flows, permit limits and schedule. Call 201-450-8280 or request a quote.