Paul Industries is a process equipment contractor in Maine that designs, fabricates, installs, tests, starts up and maintains process piping, steam and condensate systems, high-purity water, tanks and clean utilities for paper mills, food and seafood plants, breweries, research laboratories and diagnostics manufacturers across the state. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work from York County to Aroostook County, along the coast and up the river valleys where Maine’s mills stand. One contract covers design, supply, installation, testing and the records your inspector and quality group expect.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Maine boiler law 32 MRSA Chapter 131, run by the Office of Professional and Occupational Regulation
Power boilers Inspected annually; pressure vessels every three years
Building code MUBEC with the 2021 IBC and IMC, enforced from April 7, 2025
Industrial power 12.46 cents/kWh, against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

What does a process equipment contractor in Maine build?

A process equipment contractor in Maine builds the systems that move, heat, cool, clean and contain product inside a plant: process and sanitary piping, steam and condensate lines, boiler feed and water treatment trains, pressure vessels and tanks, pump skids, chilled water and refrigeration, and the controls that tie them together. Maine adds three conditions that shape every one of those jobs: long, hard winters that put freeze protection and heating load at the center of the design, a heavy industrial base built around steam, and a growing life sciences sector that demands validated, documented utilities.

Paul Industries treats each Maine plant as its own case. A Kennebec Valley mill running high-pressure steam, a Portland-area diagnostics line drawing purified water and a Downeast seafood plant washing down twice a shift need different materials, different codes and different shutdown plans, and the scope is written around the plant rather than around a catalog.

Maine manufacturing industries that rely on process systems

Maine manufacturing industries that rely on process systems fall into five groups: pulp and paper, life sciences and diagnostics, food and seafood processing, beverages and brewing, and shipbuilding and defense work on the coast. Together they explain what products are made in Maine: paper and market pulp, veterinary and human diagnostic tests, research models for biomedical science, frozen and fresh seafood, potato and blueberry products, beer and spirits, and Navy ships.

Maine industries, where they cluster and the process systems they run
IndustryWhere in MaineProcess systems at the corePaul Industries scope
Pulp and paperSkowhegan, Rumford, Baileyville, Madawaska and the mill towns of the interiorHigh-pressure steam, condensate return, chemical feed, white water and effluent piping, large tanksSteam and condensate piping, pressure vessel work, tank repair and replacement, shutdown scopes
Life sciences and diagnosticsWestbrook, Scarborough, South Portland, Bar HarborPurified water, clean steam, sanitary piping, controlled environments, lab utilitiesValidated water and piping systems, cleanroom utilities, passivation and turnover packages
Food and seafood processingCumberland and York counties, the midcoast, Washington County, Aroostook CountyWashdown water, CIP, ammonia and glycol refrigeration, wastewater pretreatmentSanitary piping, CIP circuits, refrigeration piping, pretreatment systems
Breweries, distilleries and beveragesGreater Portland and statewideBrewhouse and cellar piping, glycol cooling, CO2 recovery, process waterCellar expansions, glycol loops, hygienic transfer piping, water treatment
Shipbuilding and defenseBath on the Kennebec, Kittery on the PiscataquaCompressed air, steam, cooling water and support utilities in large industrial buildingsUtility piping, compressed air systems, rigging and equipment setting

Pulp and paper mills in Maine

Pulp and paper mills in Maine remain the heaviest steam users in the state, with integrated and market pulp operations at Skowhegan, Rumford, Baileyville and Madawaska among those still running. A paper mill is a steam plant with a paper machine attached: recovery and power boilers raise high-pressure steam, turbines and pressure-reducing stations step it down, and dryer cans, digesters and evaporators consume it. The condensate coming back carries the plant’s energy balance, and a failed trap station or a cracked return header shows up as fuel cost within weeks.

Paul Industries builds and repairs the steam and condensate side of that picture: header replacements, pressure-reducing stations, condensate return systems, chemical feed piping and the pressure vessels and tanks that sit between them. Mill work is planned into scheduled outages, with prefabricated spools, tested assemblies and a sequence that respects the mill’s lockout and confined-space rules. The steam piping page covers the design rules behind that work.

Life sciences and diagnostics in southern and coastal Maine

Life sciences in Maine grew into a sector of roughly 500 establishments and nearly 10,000 employees by 2022, by the Bioscience Association of Maine’s count, with diagnostics manufacturing in Westbrook and Scarborough and biomedical research in Bar Harbor, where the Jackson Laboratory was founded in 1929. These facilities need purified water, controlled rooms, sanitary piping and cleaning systems that stand up to audit, and they need the paperwork to prove it.

Paul Industries has a dedicated group of Maine pages for this work: process piping for Maine diagnostics and biologics manufacturers, animal watering and laboratory water systems in Maine, barrier animal facilities and controlled laboratory environments, cage wash and laboratory cleaning systems, and corrosion assessment and passivation for Maine research and diagnostics facilities. Each one goes into the engineering of that system; this hub ties them to the rest of the state’s industry.

Food, seafood and beverage plants

Food processing and cold storage in Maine sit mostly in Cumberland and York counties, according to a January 2025 assessment by the Maine Department of Economic and Community Development, which also counted just over 667,000 square feet of cold storage across 12 buildings statewide. Seafood plants along the coast, potato processing in Aroostook County and blueberry handling Downeast round out the picture. Maine also ranks second among the states in craft breweries per capita, by Brewers Association figures for 2024, so cellar and glycol work is a steady part of the market.

For these plants Paul Industries installs sanitary product piping, CIP supply and return circuits, washdown water systems, glycol cooling and ammonia refrigeration piping for freezers and cold rooms, and the process wastewater and effluent systems that keep a plant inside its discharge permit.

Shipbuilding and defense on the Maine coast

Shipbuilding and defense work anchors two Maine communities: Bath Iron Works, a General Dynamics shipyard on the Kennebec River that builds surface combatants for the Navy, and Portsmouth Naval Shipyard in Kittery, on the Piscataqua River, which overhauls and modernizes submarines. Shipyards and their suppliers run large utility systems: compressed air plants, steam for heating and process, cooling water and the piping that connects shop buildings and dry docks. Paul Industries builds and maintains those plant utilities and sets heavy equipment for supplier shops.

Services Paul Industries delivers in Maine

Services Paul Industries delivers in Maine run from a single repaired valve station to a complete process system designed, fabricated, installed, tested and started up under one contract. Owners choose the route that fits: supply-only for equipment and prefabricated spools, design-build where Paul Industries carries the engineering, or complete installation of a design the plant already holds.

  • Process piping to ASME B31.3 for chemical, water and product lines, carbon steel, stainless and lined pipe.
  • Boiler repair and boiler room piping, feedwater, blowdown and fuel trains for mill and plant boilers.
  • Pressure vessel fabrication to ASME Section VIII for receivers, filters, separators and process vessels.
  • Industrial water treatment, from softening and filtration to boiler feed and cooling tower treatment.
  • Heat tracing and insulation that keep outdoor and unheated runs above their freeze point all winter.
  • Sanitary piping, purified water, cleanroom utilities, CIP and passivation on the five Maine pages listed above.

Paul Industries also fabricates spool pieces and skids before they reach the plant, so the time inside an operating building is spent setting, connecting and testing rather than cutting and welding in a crowded production area.

How a Maine plant project runs from first call to turnover

A Maine plant project with Paul Industries runs in five stages: a site walk and scope definition, engineering and submittals, prefabrication, installation inside the plant’s outage windows, and testing, startup and turnover. Manufacturers in Maine often run lean maintenance teams across long shifts, so the plan is written to keep the plant’s own people focused on production while the project moves.

  1. Scope definition. Paul Industries walks the area, reads the existing drawings and process data, marks tie-in points and isolation boundaries, and lists every permit, inspection and quality record the work will need.
  2. Engineering and submittals. Line sizing, material selection, pipe stress where temperature swings call for it, support design and equipment data sheets go to the owner for review before anything is ordered.
  3. Prefabrication. Spools, skids, headers and supports are built and tested in a shop environment, labeled to the isometric drawings and packed for the site, which keeps hot work in the plant to the minimum.
  4. Installation. Work inside the building follows the plant’s lockout, hot work and confined-space permits, and tie-ins are grouped into the fewest possible shutdowns.
  5. Testing, startup and turnover. Hydrostatic or pneumatic tests, cleaning and flushing, instrument checks, startup with the operators and a complete turnover package close the job.

The same sequence works for a two-week boiler room repair and for a year-long utility expansion; only the depth of each stage changes. Owners get a single schedule with named milestones and a weekly look-ahead, and any change in scope is priced and agreed before the work proceeds.

Maine boiler rules, inspections and the codes process work meets

Maine boiler rules come from Title 32, Chapter 131 of the Maine Revised Statutes, which adopts the ASME Boiler and Pressure Vessel Code as the construction standard and gives the Director of the Office of Professional and Occupational Regulation, within the Department of Professional and Financial Regulation, the authority to set rules for construction, installation, repair, inspection and operation. The program behind those rules is the Maine Boiler and Pressure Vessel Safety Program, and its inspectors are either state deputy inspectors or authorized inspectors holding a Maine inspector’s license.

The Maine boiler code sets different inspection cycles by equipment type. Power boilers are inspected before the first certificate expires and every year after that. Pressure vessels are inspected every three years, completed before the current certificate runs out. Low-pressure boilers must be registered and carry a valid inspection certificate before they operate. A Maine boiler inspector will look at the nameplate and data report, the safety valves and their settings, controls and low-water cutoffs, the condition of the pressure parts and the installation itself, so new work is easiest to certify when the records arrive with it.

Maine boiler operator requirements and the license classes

Maine boiler operator requirements are unusually specific: Section 15109 of the statute requires a state license for stationary steam engineers and boiler operators, graded by the steam capacity of the plant, with exemptions for boilers exempt under the chapter, utility and nuclear plants, and heating boilers in schools and municipal buildings. That matters to anyone adding boiler capacity, because a larger boiler plant can move the site into a higher license class for the person in charge.

Maine boiler license classes under 32 MRSA Section 15109
LicensePlant the holder may have charge ofExperience to sit for itWhat it means for a capacity change
Boiler operatorHeating plant up to 20,000 lb/hrSix months under a boiler operator’s training permit, limited to one plant and one yearSmaller heating plants; check before adding a second boiler
4th-class engineerUp to 50,000 lb/hrHigh school or equivalent and a year as a boiler operatorTypical of mid-size process plants
3rd-class engineerUp to 100,000 lb/hrA year as a 4th-class engineerLarger food, chemical and institutional plants
2nd-class engineerUp to 200,000 lb/hrTwo years as a 3rd-class engineerLarge process steam plants
1st-class engineerUnlimited capacityTwo years as a 2nd-class engineerMill-scale power and recovery boiler plants

The Maine boiler operator training permit is the first step: it lets a trainee gain the six months of operating experience at a named plant. Paul Industries sizes new and replacement boiler plants with the license class in view and gives the owner the capacity figures needed for that decision; the Maine boiler license itself belongs to the operator, and the owner decides who holds it.

Building, mechanical and piping codes

Building and mechanical work in Maine falls under the Maine Uniform Building and Energy Code, whose amended adoption, enforced from April 7, 2025, includes the 2021 International Building Code, International Mechanical Code, International Existing Building Code and International Energy Conservation Code. Process piping follows ASME B31.3, power piping on boiler external work follows ASME B31.1, hygienic systems follow ASME BPE, and refrigeration machinery rooms follow ASHRAE 15. Repairs and alterations to pressure equipment are documented under the National Board Inspection Code so the inspector can close them out.

Winter, freeze protection and outage planning across Maine

Winter in Maine is the single biggest planning factor for process work, because outdoor piping, rooftop equipment, tank farms and loading docks all face weeks of sub-freezing weather and the heating load on the boiler plant peaks at the same time. Piping that would be left bare in a milder state needs heat tracing and insulation here, drain points and low-point valves must be placed where an operator can reach them in snow, and any system that stands idle between seasons needs a written layup and restart plan.

Timing follows the same logic. Steam work is easiest when heating demand is low, from late spring through early autumn, while food plants often prefer the weeks after a harvest or fishing season closes. Outdoor tie-ins, tank work and roof penetrations are scheduled for the frost-free months wherever the plant allows, and when an outage must fall in winter, Paul Industries plans temporary heat and enclosures as part of the scope.

Planning a Maine process project around the seasons
SeasonPlant conditionWork that fitsWhat to plan for
WinterPeak heating load; frozen ground and snowIndoor piping, controls, skid fabrication, engineering and procurementTemporary heat, enclosures, freeze protection on any opened line
SpringMud season; heating load fallsBoiler inspections and repairs, steam header workRoad weight limits on heavy deliveries, wet sites
SummerLowest steam demand; tourism peak on the coastOutdoor tie-ins, tank work, mill outages, cold storage expansionsSeafood and food plant peak seasons that limit downtime
AutumnHarvest and processing season inlandHeat tracing and insulation, winterization, boiler startup checksFinishing outdoor work before freeze-up

Seasonal plants and systems that sit idle

Seasonal plants and systems that sit idle for months are common in Maine: blueberry and seafood lines that run hard for a few weeks, sugarhouses, summer-only campus and resort plants, and standby boilers held for the coldest days. Water left in a dead leg through a Maine winter splits fittings, and a stainless line left wet and stagnant can pit or grow biofilm before the next season. Paul Industries designs these systems to drain completely, adds blow-down and air connections where a line must be cleared, and writes a layup and restart procedure that covers draining, drying or inert blanketing, valve positions and the checks to run before the first product goes through. A restart that follows the procedure takes hours of checking instead of days of chasing leaks.

Moving large equipment into Maine plants

Large vessels, tanks and skids reach Maine by road and by sea. The state’s three-port strategy concentrates cargo at Portland, Searsport and Eastport, which together handle more than 1.5 million tons of dry cargo a year, and oversize loads moving inland work around spring road weight limits. Paul Industries plans shipping splits, lifting points and site access into the fabrication drawings, then rigs and sets the equipment as part of the installation.

What drives the cost of process work in Maine?

The cost of process work in Maine is driven by the same factors as anywhere, which are scope, materials, pressure class, documentation and how much of the job happens inside an operating plant, plus two Maine-specific ones: energy and winter. Industrial electricity in Maine averaged 12.46 cents per kWh in 2024, against a US average of 8.13 cents (EIA), so pump efficiency, heat recovery, condensate return and insulation pay back faster here than the national average suggests.

Winter adds cost when the outage has to fall in the cold months: temporary heat, enclosures, snow management and slower outdoor progress. Prefabrication offsets much of that by moving welding and testing into controlled conditions. For a firm price, send drawings or a sketch of the system, the service conditions, the materials you want, the inspection and documentation requirements, and your outage windows. Paul Industries returns a budget range based on comparable scope, then a firm price once the scope is fixed.

Who builds process systems in Maine?

Paul Industries builds process systems in Maine for paper and pulp producers, food and seafood processors, breweries, research institutions, diagnostics manufacturers and shipyard suppliers. The company is headquartered at 256 Shore Drive in Kilmarnock, Virginia; it was formerly based in northern New Jersey and then Pennsylvania, and East Coast plants have been the center of its work through each move. In Maine, Paul Industries designs, fabricates, supplies, installs, tests, starts up, services, repairs and maintains the systems described on this page, from a single pressure-reducing station to a full utility package.

Buyers looking at Maine manufacturing companies of every size get the same accountability: one contract, one schedule and one set of records covering the design, the fabrication, the installation and the testing. That is also how Paul Industries works for manufacturing companies in Portland, Maine, for the mill towns of the interior and for plants Downeast and in The County.

Paul Industries across New England, the East Coast and beyond

Paul Industries is an East Coast contractor that takes work across Maine, the rest of New England and all 50 states. Plants with sites on both sides of the Piscataqua can keep one contractor through the New Hampshire hub as well, and companies with plants outside the United States can extend the same scope and documentation through international projects. Every project is run from the Kilmarnock, Virginia headquarters with the same engineering, fabrication and turnover standards wherever the plant sits.

Start a Maine process project with Paul Industries

Paul Industries designs, builds, installs and maintains process equipment, piping, steam, water and refrigeration systems for Maine industrial plants, laboratories and food producers. Send the plant location, the system, the service conditions and your outage window, and the team will scope it. Call 201-450-8280 or request a quote.

Standards referenced: 32 MRSA Chapter 131 (Maine boilers and pressure vessels) · ASME Boiler and Pressure Vessel Code · National Board Inspection Code · ASME B31.1 · ASME B31.3 · ASME BPE · Maine Uniform Building and Energy Code (2021 IBC and IMC) · ASHRAE 15

Frequently asked questions

Which Maine industrial plants does Paul Industries build process systems for?

Paul Industries builds process systems for paper and pulp mills, food and seafood processors, potato and blueberry plants, breweries and distilleries, cold storage operators, research laboratories, diagnostics manufacturers and shipyard suppliers in Maine. The scope covers process and sanitary piping, steam and condensate, boiler room piping, tanks and pressure vessels, purified water, CIP, refrigeration piping and wastewater pretreatment, designed, installed, tested and started up under one contract.

Does Paul Industries take steam and condensate work at paper mills in the Kennebec and Androscoggin valleys?

Yes. Paul Industries takes steam header, pressure-reducing station, condensate return and chemical feed work at mills in the Kennebec and Androscoggin valleys and across Maine. The work is prefabricated where possible and installed during scheduled outages, with hydrostatic or pneumatic test records, weld records and as-built drawings at turnover, so the mill’s inspector and maintenance group can close the work quickly.

Who installs sanitary piping and purified water for diagnostics plants in Westbrook, Scarborough and South Portland?

Paul Industries installs sanitary process piping, purified water systems and clean utilities for diagnostics and biologics manufacturers in Westbrook, Scarborough, South Portland and greater Portland. Systems are built to ASME BPE with orbital welds, borescope records, slope checks and passivation, and the turnover package supports the plant’s installation and operational qualification. The Maine piping and water pages cover the engineering in more depth.

Does Paul Industries work with food and seafood processors in Aroostook County and Downeast Maine?

Yes. Paul Industries works with potato processors in Aroostook County, blueberry handlers and seafood plants in Washington and Hancock counties, and food plants along the midcoast. Typical scope includes washdown and CIP piping, ammonia and glycol refrigeration piping for freezers and cold rooms, boiler and hot water systems, and pretreatment of wastewater before it leaves the plant. Work is timed to the end of the harvest or fishing season wherever possible.

What products are made in Maine that depend on process piping and steam?

Paper and market pulp, frozen and fresh seafood, potato and blueberry products, beer and spirits, veterinary and human diagnostic tests and research models for biomedical science all depend on process piping, steam or purified water in Maine. Mills and food plants are heavy steam users, diagnostics plants need validated water and clean utilities, and breweries run glycol cooling and hygienic transfer lines. Paul Industries builds and maintains each of those systems.

How often does a Maine boiler inspector inspect power boilers and pressure vessels?

Under Maine’s rules, power boilers are inspected before the initial certificate expires and annually after that, and pressure vessels are inspected every three years, finished before the current certificate expires. Low-pressure boilers must be registered and carry a valid certificate before operating; some are exempt from annual inspection but still need the initial one. Paul Industries schedules repairs and replacements so the equipment is ready and documented when the inspection falls due.

Does a larger boiler change the Maine boiler license class needed at a plant?

It can. Maine grades boiler operator and stationary engineer licenses by plant steam capacity: a boiler operator may have charge of a heating plant up to 20,000 pounds per hour, and the 4th, 3rd and 2nd-class engineer licenses run to 50,000, 100,000 and 200,000 pounds per hour, with 1st-class unlimited. Paul Industries gives owners the plant capacity figures for a new or added boiler early in design so the staffing decision is made before startup.

What does the Maine boiler and pressure vessel safety program require before new equipment operates?

The Maine Boiler and Pressure Vessel Safety Program requires boilers and pressure vessels to be built to the ASME code and inspected by a state deputy inspector or a Maine-authorized inspector before a certificate is issued. Section 15105 of the statute keeps new equipment that fails the installation rules out of service in Maine, and new units are inspected during construction by an authorized inspector or a National Board commissioned inspector. Paul Industries supplies code-stamped equipment, manufacturer data reports, relief valve data and installation records so the first inspection goes smoothly.

Which building code applies to process and mechanical work in Maine?

The Maine Uniform Building and Energy Code applies, and its amended adoption enforced from April 7, 2025 includes the 2021 International Building Code, Mechanical Code, Existing Building Code and Energy Conservation Code, enforced by municipalities that enforce MUBEC. Process piping inside the plant follows ASME B31.3, boiler external piping follows ASME B31.1 and refrigeration follows ASHRAE 15. Paul Industries prepares the drawings and records each authority needs.

How much does process piping or equipment work cost in Maine?

Cost depends on scope, pipe size and material, pressure class, cleanliness requirements, documentation and how much work happens inside an operating plant. Maine adds winter work and higher energy prices: industrial electricity averaged 12.46 cents per kWh in 2024 against 8.13 nationally, which shortens payback on insulation, heat recovery and efficient pumps. Paul Industries gives a budget range from comparable scope first, then a firm price once drawings and outage windows are defined.

When should a Maine plant schedule an outage for steam or piping work?

Steam and boiler work fits late spring through early autumn, when heating load is low. Outdoor tie-ins, tank work and roof penetrations fit the frost-free months. Food and seafood plants usually prefer the weeks after their peak season, and mills follow their own outage calendar. Paul Industries plans winter work too, with temporary heat, enclosures and freeze protection written into the scope when the outage date is fixed.

Can Paul Industries handle freeze protection and heat tracing for outdoor lines at Maine plants?

Yes. Paul Industries designs and installs electric heat tracing, insulation and jacketing for outdoor process, water and fire lines, tank nozzles, instrument tubing and loading connections at Maine plants. The design starts with the minimum ambient temperature, the fluid’s freeze or viscosity limit and the heat loss of the insulated line, and the installation is tested for insulation resistance and circuit performance before the first cold snap.

Does Paul Industries build cold storage and ammonia refrigeration piping in Cumberland and York counties?

Yes. Cumberland and York counties hold most of Maine’s food processing and cold storage, and Paul Industries builds ammonia and glycol refrigeration piping, evaporator connections, machinery room piping and relief headers for freezers, blast cells and cold docks there. Machinery rooms are laid out to ASHRAE 15 and IIAR practice, and the system is pressure tested, evacuated and documented before charging.

Who handles brewery cellar expansions and glycol systems in Portland, Maine?

Paul Industries handles brewery and distillery work in Portland and across Maine: cellar tank installations, glycol supply and return loops, hygienic transfer piping, CIP circuits, CO2 and process water systems. Maine ranks second in craft breweries per capita, and expansions usually happen while the brewery keeps producing, so work is staged tank by tank with cleaning and pressure testing before each line returns to service.

Can large tanks and pressure vessels be shipped to Maine plants by sea?

Yes. Maine concentrates cargo at three ports, Portland, Searsport and Eastport, and oversize vessels and modules can arrive by sea when road limits make a long haul impractical. Paul Industries designs shipping splits, lifting lugs and field joints into the fabrication drawings, coordinates delivery to the site and rigs and sets the equipment as part of the installation scope.

Do Maine manufacturing companies need supply-only, design-build or complete installation?

Each route fits a different plant. Supply-only suits a plant with its own installers that needs vessels, skids or prefabricated spools. Design-build suits an owner who wants Paul Industries to carry the engineering and the build under one price. Complete installation suits a plant whose engineer already holds the design. Paul Industries offers all three in Maine and can move from one to another as the project develops.

What records does Paul Industries hand over at the end of a Maine project?

Paul Industries hands over as-built drawings, material test reports, weld maps and inspection records, pressure test certificates, relief valve data, equipment manuals and, for regulated systems, the commissioning and qualification documents the quality group needs. For boilers and pressure vessels, manufacturer data reports and repair or alteration forms under the National Board Inspection Code go to the inspector so the certificate can be issued or renewed.

How does Maine fit into Paul Industries' East Coast work?

Maine sits inside Paul Industries’ East Coast, Northeast coverage. Those regional pages compare the codes, industries and project patterns across neighboring states, so a Maine owner with plants in several states sees one contractor and one approach for all of them, from the Kilmarnock, Virginia headquarters to sites across the region. Call 201-450-8280 or request a quote.

Is there a Paul Industries page covering Maine and its region?

Paul Industries groups Maine on its New England page, which sets the state beside its neighbors: the industries that cluster there, how boiler, building and tank rules differ across the line, and how one contract carries a multi-state program from the Kilmarnock, Virginia headquarters. Owners with plants in several states use it to plan work as one program. Call 201-450-8280 or request a quote.

Planning process or utility work at a Maine plant?

Send the plant location, the system and its service conditions, any drawings and your outage window. Call 201-450-8280 or request a quote.