Paul Industries is an international process equipment contractor that takes projects outside the United States, designing and fabricating skids, pipe spools, tanks, vessels and complete process systems in its US shop, testing them before shipment, and then installing, starting up and commissioning them at the destination plant or supervising the installation there. Headquartered at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries works for pharmaceutical, biotech, medical device, food and beverage, chemical, semiconductor and data center plants in the countries listed below as well as in all 50 states. Validation documentation, as-built drawings, weld records and service follow the equipment to its new home.
Request a quote or call 201-450-8280
Which countries does Paul Industries take projects in?
Paul Industries takes projects in 70 countries across eight regions, plus Puerto Rico, in addition to its work in every US state. The lists are grouped by region because power frequency, pressure equipment law, pharmacopoeia and shipping route all change by region. For coverage inside the United States, see the US service area.
North America and the Caribbean
Canada, Mexico, Puerto Rico, Dominican Republic, Costa Rica, Panama, Bahamas, Jamaica, Trinidad and Tobago. Puerto Rico is a US territory, so FDA jurisdiction applies to drug and device plants there exactly as it does on the mainland, and the island runs on 60 Hz power like the rest of the United States.
South America
Brazil, Argentina, Chile, Colombia, Peru, Uruguay, Ecuador.
Western Europe
Ireland, United Kingdom, Germany, France, Netherlands, Belgium, Luxembourg, Switzerland, Austria, Italy, Spain, Portugal.
Northern Europe
Denmark, Sweden, Norway, Finland, Iceland.
Central and Eastern Europe
Poland, Czech Republic, Slovakia, Hungary, Slovenia, Croatia, Romania, Bulgaria, Greece, Estonia, Latvia, Lithuania.
Middle East
Israel, Saudi Arabia, United Arab Emirates, Qatar, Kuwait, Bahrain, Oman, Jordan, Turkey.
Asia Pacific
Japan, South Korea, Taiwan, Singapore, Australia, New Zealand, India, Malaysia, Thailand, Vietnam, Philippines, Indonesia.
Africa
South Africa, Egypt, Morocco, Kenya, Nigeria.
What an international process equipment contractor delivers to a plant abroad
An international process equipment contractor delivers a working, documented system at a plant in another country: the engineering, the fabricated equipment, the testing that proves it before it leaves, the packing and paperwork that get it through customs, and the field work that turns crates into a running line. Paul Industries carries that whole chain under one contract and one schedule.
The equipment itself is the same range Paul builds for US plants: pump skids and dosing skids, high-purity water systems for purified water and WFI, CIP and SIP systems, fabricated tanks, pressure vessels, pipe spools and turnkey process systems that combine all of them. Cleanroom suites and their utilities are part of the scope too, described on the cleanrooms page. The plants Paul builds for are listed on the industries page.
Buyers abroad pick the route that suits their own resources. Supply-only means Paul designs, fabricates, tests and ships the equipment, and supervises the installation that the plant’s own site team carries out. Design-build adds the process engineering, layout and utility design for the area the equipment goes into. Complete installation puts Paul on site for setting, piping, wiring, start-up, commissioning and validation, so the plant receives a running system rather than a delivery.
For a plant comparing process equipment manufacturers in the United States, the fabricated object is the easy part. The hard parts are the destination’s code, its power, its units and an installation led by the firm that built the system. Paul Industries, as the process equipment supplier and installer, settles all four before fabrication starts.
How does a project outside the United States run?
A project outside the United States runs in nine stages, from a destination code review at the start to service after handover, and the order matters because the decisions made in the first two stages fix what can be shipped, how it is registered and what it costs to land. The table sets out each stage and the record it produces.
| Stage | What happens | What the buyer receives |
|---|---|---|
| 1. Scope and destination code review | Process requirements, site utilities and the destination’s pressure equipment, electrical and GMP rules are fixed before design | Scope document, code basis, list of registrations the equipment needs |
| 2. Design | Process and mechanical design, P&IDs, general arrangement drawings sized to fit the shipping envelope, electrical design for the destination supply | Drawings for approval in metric or imperial units, data sheets, design calculations |
| 3. US shop fabrication | Welding, assembly, piping, wiring and instrumentation in the shop, with material traceability from mill certificates onward | Weld maps, weld logs, material certificates, surface finish and passivation records |
| 4. Factory acceptance test | Pressure, function, controls and alarm testing against an approved protocol, with the buyer present or watching remotely | Signed FAT protocol, punch list and its close-out |
| 5. Export crating and shipping | Draining, drying, preservation, ISPM 15 crating, loading, export filing and freight under the agreed Incoterm | Commercial invoice, packing list, certificate of origin, bill of lading |
| 6. Installation or installation supervision | Setting, leveling, tie-in piping and electrical connection, by Paul or by the plant’s site team under Paul’s supervision | Installation records, tie-in weld records, as-installed markups |
| 7. Start-up | Flushing, instrument checks, rotation checks, first run on water and then on process fluid | Start-up report, setpoint list |
| 8. Commissioning and validation | Site acceptance test, then IQ and OQ, with PQ support data for regulated plants | Executed SAT, IQ and OQ protocols, deviation reports |
| 9. Handover and service | Training, spare parts list, turnover package, then service visits and remote troubleshooting | As-built drawings, operating and maintenance manuals, service schedule |
Stages 4 and 8 decide the budget. A fault found in the US shop costs hours; the same fault found after an ocean crossing costs flights and a delayed start-up. Paul therefore runs the FAT as a full rehearsal of the site test and writes the validation and commissioning protocols before the equipment ships.
Which codes and standards apply in each destination?
Each destination applies its own pressure equipment law, and that law, more than the process itself, decides how a vessel or skid is designed, documented and marked before it can be put into service. The table below gives the rule that governs pressure equipment in the destinations that most often shape a project, and what the equipment has to carry when it arrives.
| Destination | Governing rule | What the equipment needs |
|---|---|---|
| European Union, Norway, Iceland, Liechtenstein | Pressure Equipment Directive 2014/68/EU | Category assessment, conformity assessment module, CE marking and EU declaration of conformity for equipment above 0.5 bar in Categories I to IV |
| United Kingdom (Great Britain) | Pressure Equipment (Safety) Regulations 2016 | UKCA or CE marking; the UK government has extended recognition of CE marking indefinitely |
| Canada | Provincial and territorial safety acts, CSA B51 | A Canadian Registration Number for the design in each province or territory where it operates |
| Mexico | NOM-020-STPS-2011 | Records the employer needs for its equipment inventory, periodic inspection and pressure testing; Category III equipment is reported to the STPS |
| Brazil | NR-13 (current text approved by Portaria 1.846, July 2022) | Documentation for boilers, pressure vessels, interconnecting piping and metal storage tanks that the plant’s integrity program draws on |
| Australia | AS 1210 and the WHS Regulations, Schedule 5 | Plant design registration before use for pressure vessels of hazard level A, B or C under AS 4343 |
| Puerto Rico | US codes and FDA jurisdiction | ASME construction and the same cGMP documentation as a mainland plant |
What is the difference between PED and ASME?
The ASME Boiler and Pressure Vessel Code is a design and construction code, while the PED (Pressure Equipment Directive 2014/68/EU) is a European law that sets essential safety requirements and the conformity route a manufacturer must follow before applying the CE mark. ASME tells the designer how thick a shell must be and how to test it; the PED tells the manufacturer what result the equipment must achieve and who has to check it. A vessel can be designed to ASME Section VIII and still satisfy the PED, but only through a PED conformity assessment that covers materials, welding procedures, welder qualifications, non-destructive testing and the final inspection.
Materials are where most ASME-to-PED conversions take work. The directive accepts materials that comply with harmonised European standards, materials with a European Approval for Materials, or materials justified by a particular material appraisal, which a notified body reviews for Category III and IV equipment. Pressure Equipment Directive vs ASME comparisons that skip this point produce vessels that are well built but hard to place on the European market.
Pressure Equipment Directive categories and the notified body
Pressure Equipment Directive categories run from I to IV in ascending order of hazard, set by the fluid group (dangerous or other), the maximum allowable pressure and the volume of a vessel or nominal size of a pipe. Category I equipment is assessed by the manufacturer’s internal production control, while Categories II, III and IV bring in a notified body at the module level the category requires. Equipment below the Category I threshold falls under Article 4(3), sound engineering practice: it is designed and built safely, carries instructions, and has no CE mark under the directive. Pressure Equipment Directive certification of a Category III or IV skid therefore starts at the design stage, since the notified body reviews design, materials and welding before it witnesses the final test.
The Pressure Equipment Directive countries are the 27 EU member states plus Norway, Iceland and Liechtenstein through the European Economic Area, which is why a CE-marked vessel can be installed in Lisbon or Oslo on the same paperwork. For Switzerland, Turkey and the other destinations outside the EEA, CE marking pressure vessels is checked against that country’s own rules during the code review.
CRN registration requirements in Canada
CRN registration requirements in Canada come from each province and territory: a pressure vessel, boiler or fitting design is registered with the safety authority of every jurisdiction where it will operate, and the authority reviews the design against its act and adopted codes before issuing the number. A CRN, Canada’s design registration number for pressure equipment, is what legally allows the equipment to be installed and used, so a skid bound for Ontario is registered with the TSSA and the same design bound for Alberta is registered there as well. CSA B51 is the national code the provinces adopt. Paul Industries builds Canadian equipment to ASME construction and prepares the design submission package the registration needs, with calculations, drawings and fitting lists, early enough that registration runs alongside fabrication.
Mexico, Brazil and Australia
Mexico’s NOM-020-STPS-2011 makes the employer inventory, inspect and pressure test every vessel, so Paul’s shipped records feed that program directly. Brazil’s NR-13 asks the plant to manage structural integrity from installation onward. Australia designs vessels to AS 1210, and Western Australia’s regulator lists ASME Section VIII as an accepted alternative design code.
GMP, water and cleanroom rules for pharmaceutical plants abroad
Pharmaceutical plants abroad are inspected against EU GMP, the PIC/S GMP Guide or WHO GMP rather than 21 CFR 211 alone, and the equipment, water system and cleanroom have to support the inspection the plant will actually face. For sterile manufacturing, the revised EU GMP Annex 1 was published on August 25, 2022 and came into force on August 25, 2023, with the lyophilizer sterilization point following a year later. Its contamination control strategy reaches back into how a skid is designed.
PIC/S had 57 participating authorities as of January 2026, after Jordan’s JFDA joined, with Saudi Arabia’s SFDA admitted in 2024, so a plant in Amman, Riyadh, Singapore or Seoul is inspected to a guide that mirrors EU GMP closely. Plants supplying markets through WHO prequalification follow WHO GMP. Cleanroom classification everywhere refers to ISO 14644-1, which grades air cleanliness from ISO Class 1 to ISO Class 9, and EU GMP layers its Grades A to D on top of it.
| Rule | Where it applies | Design consequence |
|---|---|---|
| USP Water for Injection | US and US-export plants, Puerto Rico | WFI by distillation or a purification process equivalent or superior to distillation |
| Ph. Eur. 0169 Water for Injections | Europe and many PIC/S markets | Since April 1, 2017, a process equivalent to distillation, such as reverse osmosis with EDI, ultrafiltration or nanofiltration, is permitted |
| Japanese Pharmacopoeia | Japan | Water from RO and ultrafiltration membrane systems accepted for WFI |
| EU GMP Annex 1 (2022) | Sterile manufacture for EU and PIC/S markets | Contamination control strategy, closed systems, validated sterilization of product-contact equipment |
| ISO 14644-1 | Cleanrooms everywhere | Particle classification from ISO Class 1 to 9, with EU GMP Grades A to D layered on top |
A WFI generator for Ireland and one for Puerto Rico share membrane technology, while their qualification documents cite different monographs. Paul writes the user requirement specification against the destination’s pharmacopoeia from the first page.
Power, units and wiring: building for 50 Hz and 60 Hz plants
Power supply is the destination difference that changes the most hardware, because motor speed follows supply frequency and most of the world outside the Americas runs at 50 Hz. A pump specified for 60 Hz in the United States runs at five sixths of its speed on a 50 Hz supply, which by the pump affinity laws gives roughly 83 percent of the flow and 69 percent of the head, so a 60 Hz pump curve says little about how the same skid will perform in Germany. Putting 50Hz equipment on 60Hz supply raises speed and power draw instead. Paul selects motors, pumps, transformers and drives for the destination frequency and voltage from the start.
| Supply | Destinations | Typical voltages |
|---|---|---|
| 60 Hz | Canada, Mexico, Puerto Rico, Dominican Republic, Costa Rica, Panama, Bahamas, Trinidad and Tobago, Brazil, Colombia, Peru, Ecuador, Saudi Arabia, South Korea, Taiwan, Philippines | 120/208 V and 277/480 V in much of the Americas; 347/600 V in Canada; 230/400 V in Saudi Arabia and the Philippines; 220/380 V in South Korea and Peru |
| 50 Hz | Europe, the United Kingdom, Israel, Jordan, Turkey, the Gulf states other than Saudi Arabia, India, Singapore, Malaysia, Thailand, Vietnam, Indonesia, Australia, New Zealand, Africa, Argentina, Chile, Uruguay, Jamaica | 230/400 V in most of Europe, the UK, Singapore, India and Australia; 240/415 V in Qatar, Kuwait and Oman; 220/380 V in Egypt, Vietnam, Argentina and Chile |
| 50 Hz and 60 Hz | Japan | 50 Hz in the east, including Tokyo; 60 Hz in the west, including Osaka |
Wiring practice changes with frequency. Control panels for Europe and most of Asia follow IEC 60204-1 for the electrical equipment of machines, with conductor sizes in square millimetres, green-and-yellow protective earth and blue neutral conductors, while US panels follow NFPA 79, UL 508A and the NEC with AWG conductor sizes. Paul builds each panel to the destination’s practice.
Units follow the same logic. European and Asian plants work in millimetres, bar and DN pipe sizes; North American plants work in inches, psi and NPS. Hygienic tubing differs too: EN 10357 series A follows the older DIN 11850 metric sizes, while series C follows ASME BPE sizes, so Paul builds a skid in either system to match the plant’s spare parts and fittings. Drawings are issued in the system the plant maintains, with dual dimensions where both sides need them.
How are process skids shipped overseas?
Process skids are shipped overseas in standard containers when they fit, on flat racks when they are too tall or wide, and as breakbulk cargo beyond that, with the shipping envelope fixed at the design stage. The agreed Incoterm decides where Paul’s delivery obligation ends.
Incoterms for an overseas equipment order
Incoterms 2020, published by the International Chamber of Commerce and in effect since January 1, 2020, has 11 rules: seven for any mode of transport and four for sea and inland waterway only. Five cover almost every equipment order.
| Term | Where delivery happens | Who arranges what |
|---|---|---|
| EXW (Ex Works) | At Paul’s shop | Buyer collects, clears export and carries all transport, duty and risk from the shop door |
| FCA (Free Carrier) | Handed to the buyer’s carrier at an agreed place | Paul clears export and loads; buyer pays main freight, insurance and import duty |
| CIF (Cost, Insurance and Freight) | On board the vessel at the US port | Paul pays ocean freight and minimum insurance to the destination port; risk passes at loading; sea freight only |
| DAP (Delivered at Place) | At the named destination, ready for unloading | Paul carries freight and risk to the site; buyer clears import and pays duty |
| DDP (Delivered Duty Paid) | At the named destination, import cleared | Paul carries freight, risk, import clearance and duty |
What is a flat rack container?
A flat rack container is a shipping unit with a floor and two end walls but no roof or side walls, so cargo is loaded by crane from above or by forklift from the side, and loads that stand taller or wider than the rack ship as out-of-gauge cargo. Flat rack container shipping is the usual answer for a skid with a tall vessel, a column or a frame wider than a standard container door. Flat rack container size varies by owner and age, so every booking is checked against the carrier’s own data; the figures below are typical published values.
| Unit | Internal length | Width | Height limit | Payload |
|---|---|---|---|---|
| 20 ft dry container | 5.90 m | 2.34 m door opening | 2.28 m door opening | Varies by box |
| 40 ft high cube container | 12.03 m | 2.34 m door opening | 2.58 m door opening | Varies by box |
| 20ft flat rack container | 5.64 m | 2.35 m between posts, more as out-of-gauge | 2.35 m to the top of the end walls | About 30,140 kg |
| 40 ft flat rack | 11.66 m | 2.40 m, more as out-of-gauge | 2.14 m to the top of the end walls | About 40,000 kg |
The 40ft flat rack container dimensions above explain why many skids are designed at 2.3 metres wide or less: that width ships in a high cube container through its 2.34 metre door, and anything wider moves to a rack. A 40 foot flat rack container carries about 40 tonnes, and flat rack container capacity rarely limits a process skid; height and width do. Flat rack container vs open top container is a choice between side access and weather protection: an open top suits cargo that fits the box width but needs crane loading from above, while a flat rack takes cargo wider than the box itself. Larger systems are built as modules that split at flanged joints.
Export crating requirements and ISPM 15
Export crating requirements start with ISPM 15 wood packaging rules, which require solid wood crates, skids and dunnage to be heat treated to a core temperature of 56 degrees Celsius for 30 continuous minutes, or treated by an approved alternative, and stamped with the IPPC mark. Plywood and other processed wood are exempt, as is thin wood of 6 mm or less. Export crating for process equipment also means draining and drying every line, capping nozzles, protecting polished surfaces, adding desiccant and vapor barrier, bracing instruments and marking lift points on every crate.
Export documents
Every shipment carries a commercial invoice, a packing list that matches each crate’s marks and weights, a certificate of origin where the destination requires one, and a bill of lading or air waybill. US exports valued over 2,500 dollars under a single Schedule B number, or needing a license at any value, require Electronic Export Information filed in the Automated Export System; most shipments to Canada are exempt unless a license applies. Equipment whose wetted parts use alloys with more than 25 percent nickel and 20 percent chromium, titanium, tantalum, glass lining or fluoropolymers falls under export control classification 2B350, which requires a license for some destinations, so Paul classifies the materials during design.
What does a FAT (factory acceptance test) cover before a skid ships?
A factory acceptance test is the documented proof, run in the fabricator’s shop before shipment, that a skid or system was built to its drawings and works as specified, and for an overseas project it is the last chance to find a fault at shop prices. The purpose of factory acceptance test work on an export job is to make the site test a formality: if the FAT runs every function the plant will run, the site test only confirms that nothing changed in transit.
| Check | How it is verified |
|---|---|
| Documentation | Drawings, P&IDs and bill of materials match the as-built skid; material certificates and weld logs complete |
| Pressure integrity | Hydrostatic or pneumatic test at the code test pressure, with records signed |
| Surface and drainability | Surface finish readings, slope checks, borescope of welds on sanitary lines |
| Electrical | Insulation resistance, point-to-point wiring checks, panel energized at the destination voltage and frequency where a supply or converter is available |
| Instruments and controls | Loop checks, calibration certificates, interlocks, alarms and sequence tests on water |
| Rotating equipment | Rotation, vibration and noise checks, pump curves confirmed against the destination frequency |
| Preservation and crating | Draining, drying, nitrogen or desiccant protection, crate marking and photographs before closing |
The factory acceptance test report records every step, every deviation and how it was closed, and it ships with the equipment so the commissioning team abroad starts from a known baseline. Buyers attend in person or witness remotely by live video.
Factory acceptance test vs site acceptance test
The FAT proves the equipment in the shop; the site acceptance test proves it again after installation, on the plant’s own utilities and connected to its own control system. For export projects, Paul writes both protocols together so the SAT repeats only what shipping, installation or site utilities can affect, which keeps the time spent at the destination short.
Installation, start-up and commissioning at the destination plant
Installation at the destination plant is handled in one of two ways, decided during the scope review: Paul installs, starts up and commissions the system on site, or Paul supervises the installation carried out by the plant’s site team while Paul directs setting, tie-ins, start-up and testing. Either way, the contractor that built and tested the equipment commissions it.
A US contractor overseas works inside the plant’s permit-to-work system, safety rules and language. Paul sends work packages and method statements ahead for approval and keeps records in the plant’s own format. After start-up come the site acceptance test, IQ and OQ, with data for the plant’s PQ.
Handover includes operator and maintenance training, the turnover package and a spare parts list sized for the shipping time to the site.
What drives the cost of a process equipment project abroad?
The delivered cost of a process equipment project abroad is driven by five things beyond the equipment itself: freight, crating, destination code work, duties and taxes under the agreed Incoterm, and the installation route. Paul states each as a separate line in the quote.
- Freight. Container moves cost less than flat rack or breakbulk, so skid size is fixed in design; port, inland trucking and season move the price.
- Crating and preservation. ISPM 15 crates, vapor barrier, desiccant and nitrogen blankets scale with equipment size and sensitivity.
- Destination code work. PED conformity assessment with a notified body, CRN registration in one or several provinces, or Australian design registration adds engineering hours and fees that a US-only job never carries.
- Duties and taxes. Under EXW, FCA, CIF and DAP the buyer pays import duty and taxes; under DDP Paul includes them in the price. Rates depend on the destination and the tariff classification.
- Installation route. Supervision of the plant’s own installation costs less in Paul’s field hours than complete installation, while complete installation puts start-up risk with the party that built the equipment.
Overseas buyers receive quotes in US dollars, with each of those lines shown and the Incoterm stated, so the plant’s own finance team can add its import costs and compare like with like. Paul gives a budget range from comparable scope first and a firm price once drawings, destination and delivery terms are fixed.
Who builds process systems for plants outside the United States?
Paul Industries builds process systems for plants outside the United States, from single process skid packages to complete water, CIP, tank and piping systems, and carries them through FAT, export shipping, installation and validation at the destination. Among modular process skid manufacturers, the difference a buyer abroad notices is that Paul stays with the equipment after it leaves the shop: Paul designs, tests and starts up the system, so the plant deals with one process skid manufacturer from scope to service. Layout work is covered by process engineering and design; company background is on the about Paul Industries page.
Paul Industries for projects outside the United States
Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, takes process equipment projects in 70 countries across the Americas, Europe, the Middle East, Asia Pacific and Africa, plus Puerto Rico and all 50 states. Paul designs and engineers the system, fabricates skids, spools, tanks, vessels and complete process systems in the United States, runs the factory acceptance test, crates and ships the equipment, and installs, starts up and commissions it on site or supervises the installation. Every system is built and documented to the destination’s requirements, with validation records, as-builts and weld records shipped alongside. See every service on the services page, then send your scope, destination and preferred Incoterm to request a quote.
Standards referenced: EU Pressure Equipment Directive 2014/68/EU · EN 13445 · UK Pressure Equipment (Safety) Regulations 2016 · CSA B51 · NOM-020-STPS-2011 · NR-13 · AS 1210 · AS 4343 · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · EN 10357 · EU GMP Annex 1 · PIC/S GMP Guide · WHO GMP · ISO 14644-1 · USP Water for Injection · Ph. Eur. 0169 Water for Injections · IEC 60204-1 · IEC 60038 · NFPA 70 (NEC) · NFPA 79 · UL 508A · Incoterms 2020 · ISPM 15 · Export Administration Regulations (ECCN 2B350) · Foreign Trade Regulations, 15 CFR Part 30
Frequently asked questions
Does a US contractor install equipment outside the United States?
Paul Industries installs equipment outside the United States, and it also offers installation supervision when a plant prefers its own site team to do the physical work. In both cases Paul Industries, which designed the system and ran its factory acceptance test, leads start-up, the site acceptance test and qualification at the destination, so the plant receives a commissioned, documented system rather than a crate and a manual.
Can Paul Industries ship a skid to Ireland built to the EU Pressure Equipment Directive?
Paul Industries ships skids to Ireland built and documented to the Pressure Equipment Directive 2014/68/EU. The pressure parts are categorized, the matching conformity assessment module is followed with a notified body for Categories II to IV, and the skid arrives with its CE marking, EU declaration of conformity and the technical file the Irish plant needs, along with 230/400 V, 50 Hz electrical design.
How does a Canadian plant register a US-built pressure vessel?
A Canadian plant registers a US-built pressure vessel by having the design submitted to the safety authority of the province or territory where it will run, such as the TSSA in Ontario, which reviews the calculations and drawings and issues a Canadian Registration Number. Paul Industries prepares that submission package during design, so registration runs in parallel with fabrication and the vessel arrives with its number stamped on the nameplate.
When is CRN needed for equipment shipped to Canada?
A CRN is needed whenever a boiler, pressure vessel, pressure piping system or fitting that falls under the provincial pressure equipment rules is installed and used in Canada, and it is needed in each province or territory where that design operates. A skid with several vessels and many fittings collects several registrations, which is why Paul Industries lists every registrable item during the code review at the start of the project.
Who builds WFI systems for pharmaceutical plants in Puerto Rico?
Paul Industries builds WFI systems for pharmaceutical plants in Puerto Rico, including generation, storage and distribution loops, and validates them on site. Puerto Rico is a US territory, so FDA jurisdiction and USP monographs apply exactly as they do on the mainland, the supply is 60 Hz, and the equipment ships by sea from the mainland with Electronic Export Information filed, as the Foreign Trade Regulations require for shipments to Puerto Rico.
Who does the factory acceptance test, and does the buyer attend?
Paul Industries runs the factory acceptance test in its US shop against a protocol the buyer approves in advance. Buyers abroad either attend in person or follow a remote witnessed FAT by live video, with data shared as each step runs. Many plants attend the integrated sequence tests and witness routine checks remotely, then sign the protocol before the skid is crated.
How long does factory acceptance testing take for an export skid?
Factory acceptance testing time depends on the size of the system, the number of control sequences, whether pressure tests are witnessed, and how many punch items arise. A single pump skid runs in a day or two; an integrated water system with several skids and a full control system runs longer. Paul Industries sets the FAT schedule in the protocol so the buyer books attendance once.
How long does shipping a process skid to Europe or Asia take?
Shipping time to Europe or Asia depends on the departure and arrival ports, the vessel routing and transshipments, whether the skid sails in a container or on a flat rack, the inland leg to the plant, customs clearance at the destination and the season. Paul Industries books freight once the crated dimensions are fixed and builds the shipping window into the project schedule, with the FAT date set so equipment leaves on a planned sailing.
How do overseas buyers get a quote in US dollars?
Overseas buyers get a quote in US dollars by sending Paul Industries the scope, the destination address, the preferred Incoterm and any site standards. The quote lists equipment, engineering, destination code work, crating, freight and installation as separate lines, so the plant’s finance team adds its own import costs and compares the total with confidence. A budget range comes first, then a firm price when the scope is fixed.
Is PED equivalent to ASME for a vessel shipped to Europe?
PED and ASME serve different purposes. ASME Section VIII is a construction code; the PED is European law that sets essential safety requirements and a conformity route. A vessel designed to ASME is placed on the European market once it passes a PED conformity assessment covering materials, welding qualifications, testing and marking, which Paul Industries builds into the design from the start.
Can 50Hz equipment run on 60Hz supply, and what about the reverse?
Running equipment on the other frequency changes motor speed, about 17 percent slower going from 60 Hz to 50 Hz and 20 percent faster the other way, which shifts pump flow, head and power and affects motor heating and nameplate ratings. Paul Industries avoids the issue by specifying motors, pumps, drives and transformers for the destination’s frequency and voltage, and where a plant runs both, as in Japan, by confirming which grid the site is on before selection.
Which countries in the Middle East does Paul Industries take projects in?
Paul Industries takes projects in Israel, Saudi Arabia, the United Arab Emirates, Qatar, Kuwait, Bahrain, Oman, Jordan and Turkey. Saudi Arabia runs on 60 Hz while the other Gulf states run on 50 Hz, and Saudi Arabia’s SFDA and Jordan’s JFDA are both PIC/S participating authorities, so pharmaceutical equipment for those markets is documented to the PIC/S GMP Guide.
Does Paul Industries build cleanrooms for plants in Singapore, Japan or South Korea?
Paul Industries builds cleanrooms and their process utilities for plants in Singapore, Japan and South Korea, classified to ISO 14644-1 and graded to EU GMP or PIC/S requirements where the plant makes sterile products. South Korea and western Japan run at 60 Hz, eastern Japan and Singapore at 50 Hz, so air handling motors, fans and controls are selected for the specific site.
What export documents come with a process skid?
A process skid ships with a commercial invoice, a packing list that matches each crate’s marks, dimensions and weights, a certificate of origin where the destination requires one, and the bill of lading. Paul Industries also files Electronic Export Information where US rules require it and classifies the equipment for export control, then sends the engineering turnover documents with the shipment.
Which Incoterm suits a first overseas equipment order?
Buyers placing a first overseas equipment order often choose DAP, because Paul Industries carries freight and transit risk to the named site while the plant handles import clearance and duty. Plants with established freight forwarders often choose FCA, and plants that want one landed price choose DDP. Paul quotes the term the buyer prefers and shows how the price changes between them.
Does Paul Industries take projects in Brazil, Mexico and the rest of Latin America?
Paul Industries takes projects in Brazil, Mexico, Colombia, Peru, Chile, Argentina, Uruguay, Ecuador, Costa Rica, Panama and the Dominican Republic. Mexico’s NOM-020-STPS-2011 and Brazil’s NR-13 shape the documentation pressure equipment needs, and supply frequency splits the region: Brazil, Mexico, Colombia, Peru and Ecuador at 60 Hz, Argentina, Chile and Uruguay at 50 Hz.
How does Paul Industries handle service after equipment is installed abroad?
Paul Industries handles service abroad with scheduled site visits, remote troubleshooting from the drawings, test records and control programs it already holds, and replacement parts shipped from the United States. The spare parts list delivered at handover is sized for the shipping time to the plant, so the parts most likely to be needed between visits are already on the shelf at the destination.
Can equipment built for a US plant be moved to a plant overseas?
Equipment built for a US plant is moved overseas by reassessing it against the destination’s rules: pressure parts for PED, CRN or the destination’s registration, motors and controls for the new frequency and voltage, and documentation for the new GMP authority. Paul Industries reviews the existing records, modifies and retests what the destination requires, and crates, ships and recommissions the system at its new site.
Planning a process system for a plant outside the United States?
Send the scope, the destination country and site address, the preferred Incoterm and any plant standards, and Paul Industries will return a code review, a shipping plan and a budget range. Call 201-450-8280 or request a quote.
