Paul Industries is a US process equipment contractor for Croatia that designs, fabricates and commissions WFI and purified water systems, clean steam, sterile and formulation vessels, CIP skids, pressure vessels, heat exchangers, process cooling and piping for pharmaceutical plants around Zagreb, Koprivnica and Rijeka, food and beverage producers, and refinery and energy sites on the Kvarner coast. Every system is built to the EU Pressure Equipment Directive as Croatian law applies it, wired for 400 V at 50 Hz, documented in Croatian and landed at the port of Rijeka, and Paul installs and starts it up on site or supervises the installation. Paul Industries, whose head office is 256 Shore Drive, Kilmarnock, Virginia, and which was formerly based in northern New Jersey, then Pennsylvania, accepts projects in every US state and at plants abroad.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
PED and inspection rules NN 79/2016 and NN 75/2020
Electricity 230/400 V, 50 Hz; HEP ODS network
GMP inspectorate HALMED, PIC/S member since 2016
Container gateway Port of Rijeka (AGCT and Rijeka Gateway)
VAT and currency 25 percent standard; euro since 2023
Reviewed November 2026

How does a US process equipment contractor for Croatia work with a plant?

A US process equipment contractor for Croatia works with a plant from the first process data to a qualified, running system: Paul Industries writes the design basis, engineers the equipment, fabricates and tests it in the United States, ships it to the Adriatic and installs, commissions and qualifies it in the Croatian plant. Its scope covers high purity water systems, clean steam generators, process tanks, pressure vessels, heat exchangers and pump skids.

Croatian owners select the contract shape that suits the site. Under supply and supervision, Paul delivers tested equipment and a Paul engineer directs its setting, connection and start-up. Under design-build, Paul also lays out the utility area, headers and controls. Under turnkey delivery, Paul carries the whole job from user requirements to signed qualification reports. Croatia is listed with the rest of Central and Eastern Europe on Paul’s international page, and Croatian proposals are written in US dollars.

Major industries in Croatia that buy process equipment

Major industries in Croatia that buy process equipment are pharmaceuticals and animal health, food and beverages, refining and energy, and chemicals, spread across Zagreb, Podravina, the Kvarner coast around Rijeka and Dalmatia. Croatia manufacturing companies in those sectors share a common shopping list of water treatment, steam, cooling, tanks, pumps and piping, and Croatian manufacturing is adding capacity in medicines, food logistics and energy, as the investments below show. The table maps the regions, the plants named as market facts and the equipment those plants use.

Croatian regions, plants named as market facts, and the equipment Paul Industries supplies to plants of that kind
RegionPlants and sites (market facts)Port of entryEquipment Paul Industries supplies
City of Zagreb and Zagreb CountyPliva in Zagreb and Savski Marof, the Pfizer and Sobi biologics plant at Savski Marof, Genera at Kalinovica, Kraš, Dukat, Zagrebačka pivovaraRijekaWFI, clean steam, sterile vessels, CIP, brewery and dairy tanks
Podravina (Koprivnica)Belupo and PodravkaRijekaPurified water, formulation vessels, food process tanks, cooling
Kvarner (Rijeka, Krk)JGL Pharma Valley at Svilno, INA Rijeka refinery at Urinj, Krk LNG terminalRijekaSterile utilities, pressure vessels, exchanger bundles, alloy piping
Sisak-MoslavinaINA’s Sisak industrial hub, converted to new usesRijekaTanks, pump skids, biomethane and utility piping
DalmatiaFood, beverage and port industriesPloče or RijekaSanitary tanks, chillers, water treatment

The Croatia manufacturing industry and Croatia industrial production lean on process-heavy sectors, where one water or steam system often decides the start-up date of a new line, so Paul plans that system first and builds the rest of the schedule around it.

Pharmaceutical companies in Croatia and their sites

Pharmaceutical companies in Croatia are grouped around Zagreb, Koprivnica and Rijeka, and their plants range from active ingredient synthesis to sterile injectables and biologics. Pliva, part of Teva, runs its main plant and research center in Zagreb and makes active ingredients at Savski Marof, where a solar plant now covers about 30 percent of the site’s electricity. Belupo, part of the Podravka group, makes medicines in Koprivnica and is running a 36 million euro investment cycle in production, logistics and a dermatology center. JGL in Rijeka completed its 53 million euro INTEGRA project at the Pharma Valley campus in Svilno in 2023, lifting sterile capacity by 60 percent.

New capacity keeps arriving: Pfizer and Sobi are building a 100 million euro biologics plant at Savski Marof with first products due in 2026, and Genera at Kalinovica near Zagreb makes poultry vaccines. These companies are named as market facts about the Croatian market and describe no Paul project.

HALMED, EU GMP and the utilities a Croatian sterile plant needs

The pharmaceutical industry in Croatia is inspected by HALMED, the Agency for Medicinal Products and Medical Devices, which employs Croatia’s GMP inspectors, inspects plants at home and in third countries, issues GMP certificates, and has been a PIC/S participating authority since 1 January 2016. Sterile and biologics plants work to the revised EU GMP Annex 1 in force since August 2023, which ties WFI generation, storage and distribution, clean steam quality and vessel cleaning to the site’s contamination control strategy. Pharmaceutical manufacturing companies in Croatia therefore order hot WFI loops or validated ambient systems with ozone, clean steam for autoclaves and SIP, compounding and holding vessels with sanitary finishes, and CIP skids with documented spray coverage.

The Croatia pharmaceutical industry also runs synthesis plants such as Savski Marof, which need reactors, receivers, solvent recovery, scrubbers and process cooling built for flammable and corrosive service. Paul designs both kinds of system: sterile utilities to ASME BPE and the European Pharmacopoeia, and synthesis equipment to the PED with the alloys the chemistry calls for. Its sterile injectables page shows how the clean utilities connect to filling lines.

Food and beverage plants: Podravka, Kraš, Dukat and the brewers

Food and beverage plants in Croatia include Podravka in Koprivnica, which completed a 250 million euro investment cycle from 2021 to 2025 ending with a logistics center, the confectioner Kraš in Zagreb, Dukat, the Zagreb dairy controlled by Lactalis, and Zagrebačka pivovara, the Molson Coors brewery that makes Ožujsko. These plants buy soup, sauce and seasoning process tanks, cookers and kettles, milk reception and pasteurization, CIP, glycol and ammonia refrigeration, brewhouse and cellar tanks, and wastewater pretreatment. Paul builds that equipment with sanitary welds and drainable layouts, wired for the Croatian supply, and its food and beverage page explains the shared utilities.

Rijeka refinery, the Krk LNG terminal and energy projects

The Rijeka refinery at Urinj is where INA concentrates its Croatian refining, and INA is owned 49.08 percent by MOL and 44.84 percent by the Croatian government. The Rijeka refinery upgrade, built around a new delayed coker unit, was declared complete in March 2026 at a cost of nearly 700 million euros, and feedstock entered the coker on 1 September 2026; INA expects diesel yield to rise by about 30 percent. With the upgrade running, the INA Rijeka refinery buys pressure vessels, exchanger bundles, pump skids, alloy piping and relief systems for maintenance and turnarounds, the same equipment any Rijeka oil refinery unit wears out over time.

INA has turned its Sisak site into an industrial hub, with a biomethane plant due in 2026, and is adding a green hydrogen unit at Rijeka as part of a 98 million euro package. On the island of Krk, the Krk LNG terminal, operated by LNG Hrvatska, finished its Krk LNG terminal expansion on 7 November 2025, raising the Krk LNG terminal capacity from 3.9 to 6.1 billion cubic meters of gas a year. Energy sites of this kind order pressure vessels, heat exchangers, glycol and water systems, and pipe spools to the PED, EN 13445 or ASME Section VIII, and Paul’s oil and gas page shows that scope.

Biomethane, hydrogen and new energy work at Sisak and Rijeka

Energy transition projects add a newer kind of order. A biomethane plant needs digesters, gas cleaning and upgrading skids, condensate handling and compression, and a green hydrogen unit needs purified feed water for its electrolyzers, cooling loops, gas drying and stainless or alloy piping rated for hydrogen service. Paul builds the water treatment, cooling, pressure vessel and piping portions of such plants as tested modules, documented to the PED and the Croatian inspection rulebook, so a new energy unit at Sisak or Rijeka connects to finished equipment.

Which Croatian rules apply to pressure equipment built in the United States?

Pressure equipment built in the United States for a Croatian plant meets the Pravilnik o tlačnoj opremi, published in Narodne novine 79/2016 and in force since 2 September 2016, the Croatian transposition of Directive 2014/68/EU that governs putting equipment on the EU market, together with the 2020 rulebook on inspection and testing of high-hazard pressure equipment, Narodne novine 75/2020, for its first use and life in service. The market rulebook requires instructions and safety information in Croatian and an EU declaration of conformity in Croatian or translated into it, and Paul supplies both.

First inspection and the ministry register under NN 75/2020

Under NN 75/2020, equipment is classed as low or high hazard before first use, and high-hazard equipment cannot run until an authorized inspection body, appointed by the minister and accredited, has completed its first inspection. The inspection body completes the record sheet and the inspection logbook and gives the equipment a registration number in the ministry’s register. After that, vessels follow a cycle of external inspection every 2 years, internal inspection every 6 years and a pressure test every 10 years, fired equipment such as steam boilers runs on 1, 3 and 9 years, and safety valves are tested at least every 2 years. Paul delivers the design data, material certificates, test reports and relief valve records the first inspection draws on, and builds inspection openings into each vessel for the internal examinations to come.

Inspection cycle for high-hazard pressure equipment in Croatia under NN 75/2020, and what Paul Industries provides for it
EquipmentExternal inspectionInternal inspectionPressure testWhat Paul Industries provides
Unfired pressure vesselsEvery 2 yearsEvery 6 yearsEvery 10 yearsManways and inspection openings, design and test records
Fired equipment and boilersEvery yearEvery 3 yearsEvery 9 yearsBurner and control data, water treatment records
Safety valvesTested at least every 2 yearsValve data sheets, set pressure certificates, spares
All high-hazard itemsFirst inspection and registration before useRecord sheet inputs, logbook data, drawings

Electrical, machinery and seismic rules

Low-voltage installations in Croatia follow the technical regulation for low-voltage electrical installations, Narodne novine 5/2010, and the HRN HD 60364 series, and skid panels are built to EN 60204-1 under the Low Voltage and EMC directives. Skids with drives and moving parts count as machinery, covered today by Directive 2006/42/EC and, for anything placed on the market from 20 January 2027, by Regulation (EU) 2023/1230. Seismic design uses Eurocode 8 with the Croatian national annex HRN EN 1998-1:2011/NA:2011 and a hazard map for a 475-year return period. The Zagreb earthquake of March 2020, magnitude 5.3 on the moment magnitude scale, and the Petrinja earthquake of December 2020, magnitude 6.4, showed what that hazard means: reference ground acceleration on rock around Zagreb is about 0.2 to 0.25 g, depending on the site. Paul designs tank anchorage, vessel supports, skid frames and pipe bracing to the seismic actions the owner’s structural engineer sets.

Croatia voltage and frequency for skids and panels

Croatia voltage and frequency for industrial plants are 400/230 V at 50 Hz, delivered through the HEP ODS distribution network, which runs medium voltage at 10, 20 and 35 kV and is converting 10 kV lines to 20 kV. Voltage in Croatia therefore calls for IEC motors, 400 V drives, 230 V control power and CE-marked switchgear on any skid from the United States, and every pump and fan is selected for the 50 Hz speed, about 17 percent slower than at 60 Hz.

Croatia power voltage, earthing and protection follow HRN HD 60364, so Paul designs panels with the protective devices and earthing arrangements that series sets out. A Croatia voltage converter suits a laptop charger, while process equipment is engineered for the Croatian grid from the first drawing. Paul hands over single-line diagrams, cable schedules and test records with Croatian labels on panels and field devices.

Shipping to Croatia through the port of Rijeka

Shipping to Croatia from US East Coast ports runs mostly through the port of Rijeka on the northern Adriatic, at roughly 20 to 25 days port to port on Mediterranean services, including routings through Salerno. The port of Rijeka, Croatia, handled about 501,000 TEU in 2024, and the port of Rijeka TEU volume is climbing with a second container terminal. Rijeka Gateway, run by APM Terminals and ENNA on a 50-year concession with 380 million euros of investment, received its first commercial vessel in September 2025 with a first-phase capacity of about 650,000 TEU, alongside the Adriatic Gate terminal operated by ICTSI.

Cargo from either port of Rijeka container terminal moves inland by road or rail toward Zagreb, Koprivnica and Sisak, while Ploče serves Dalmatia and bulk and general cargo. For shipping to Croatia from US ports, the container sets the first design limit: Paul fits skids to the roughly 12-meter length, 2.35-meter width and 2.69-meter height inside a 40-foot high cube box whenever the process permits, and books flat racks for wider vessels. Container shipping to Croatia uses ISPM 15 heat-treated wood in every crate and Incoterms 2020 terms, typically FCA at the US port, CIF Rijeka or DAP at the plant.

From the quay at Rijeka to an inland plant

From the quay at Rijeka the road to Zagreb and Podravina climbs through the mountains of Gorski kotar before descending to the Pannonian plain, so a wide or heavy module moves under a special transport permit with an escort and a route checked for tunnels, bridges and toll plazas. Paul sizes modules for that route as well as for the ship, marks lifting points and centers of gravity, and sends rigging drawings ahead of the cargo, so the crane at the plant is booked and the foundation bolts are in place before the truck arrives.

VAT in Croatia, the euro and customs clearance

VAT in Croatia is charged at a standard rate of 25 percent, with reduced rates of 13 and 5 percent. The VAT rate in Croatia for industrial equipment is the standard rate, levied when the goods clear customs on their customs value with duty added, and a VAT-registered plant recovers the standard VAT rate in Croatia through its returns. The VAT in Croatia 2026 changes concern energy products such as gas, district heating and firewood and leave equipment at 25 percent. Croatia adopted the euro and joined the Schengen area on 1 January 2023, imports are cleared under the EU Common Customs Tariff, and the importer needs an EORI number. Paul classifies each item on the invoice and packing list by heading, weight and value.

Project steps for a Croatian plant with Paul Industries

Project steps for a Croatian plant with Paul Industries follow nine stages, and the first two fix the hazard class and PED category of each item, the 50 Hz equipment selection, the seismic design actions and the qualification strategy.

Steps of a process equipment project delivered to a plant in Croatia
StepWhat happensWhat the Croatian plant holds at the end
1. DefinitionUser requirements, PED category, NN 75/2020 hazard class, 400 V, 50 HzSigned design basis
2. DesignProcess, mechanical, electrical and seismic designApproved drawings, DQ report
3. BuildFabrication, welding, examination and finishing in the United StatesMaterial and weld traceability
4. Factory testHydrostatic, functional and software tests, witnessed in person or remotelySigned FAT report
5. DocumentsTechnical file, Croatian declaration of conformity and instructionsConformity package
6. SailingCrating, ocean freight to Rijeka or Ploče, customs entryBill of lading and import file
7. Site workInstallation and wiring by Paul or under Paul’s supervision; first inspectionRegistration number, installation records
8. Start-upCommissioning, IQ, OQ and PQExecuted qualification reports
9. ServiceTraining, spares, inspection calendar, maintenanceCroatian and English manuals, as-built set

After start-up Paul maintains and repairs the equipment it supplied, keeps the documents in step with the NN 75/2020 inspection cycle and requalifies GMP systems after changes, through its validation and commissioning service.

Who builds process systems for plants in Croatia?

Paul Industries builds process systems for plants in Croatia: WFI, clean steam, sterile vessels and CIP for pharmaceutical plants in Zagreb, Savski Marof, Koprivnica and Rijeka, process tanks, cooling and sanitary systems for food and beverage plants, and pressure vessels, exchangers, pump skids and piping for the Rijeka refinery, the Krk terminal and other energy sites. Each system is designed for the Croatian 50 Hz supply, documented to the PED and NN 75/2020 in Croatian, and placed in service by Paul or under Paul’s supervision on a single contract. The Italy page covers the market across the Adriatic.

What does it cost to deliver a process system to a Croatian plant?

The cost to deliver a process system to a Croatian plant is the equipment price plus five delivery items, and Paul Industries shows each item as a separate US dollar line.

  • Grid and component changes. 50 Hz motors, 400 V drives and CE-marked panels to EN 60204-1.
  • Croatian documents. PED conformity work, Croatian translations, first inspection data and GMP protocols.
  • Freight. Ocean freight to Rijeka or Ploče, flat racks for wide items, and the road leg to the plant.
  • Duty and VAT. EU duty by tariff heading, then 25 percent VAT on the duty-inclusive value, which the plant’s VAT registration lets it reclaim.
  • Seismic and site work. Anchorage design for the site’s hazard and the chosen installation route.

A budget range comes from the equipment list and process data; a firm price follows once the design basis, the Incoterm and the installation route are agreed.

Paul Industries for Croatian pharmaceutical, food and energy plants

From engineering through service, Paul Industries carries Croatian process systems from the first sketch to a qualified line, for plants from Rijeka to Koprivnica. To start, request a quote with the process data, site, supply details and target date; the answer sets out a delivery route through Rijeka and a proposal in US dollars. Austrian plants that also land equipment at Rijeka will find the Austria page useful.

Standards referenced: Pressure Equipment Directive 2014/68/EU · Pravilnik o tlacnoj opremi (NN 79/2016) · Pravilnik o pregledima i ispitivanju opreme pod tlakom visoke razine opasnosti (NN 75/2020) · Tehnicki propis za niskonaponske elektricne instalacije (NN 5/2010) · HRN HD 60364 · Machinery Directive 2006/42/EC and Machinery Regulation (EU) 2023/1230 · Low Voltage Directive 2014/35/EU · EMC Directive 2014/30/EU · EN 60204-1 · EN 13445 · HRN EN 1998-1 (Eurocode 8) with the Croatian national annex · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · EU GMP and Annex 1 · PIC/S GMP Guide · Incoterms 2020 · ISPM 15

Frequently asked questions

Which US firm supplies WFI loops to sterile plants around Zagreb?

For sterile and biologics plants in Zagreb and Savski Marof, Paul Industries engineers, builds and qualifies WFI generation and loops, purified water and clean steam systems, designed to the European Pharmacopoeia, ASME BPE and EU GMP Annex 1. Croatian-language instructions and the factory test file ship with every unit, and start-up and qualification at the plant are Paul’s work as well.

Which pharmaceutical companies in Croatia are adding capacity?

Pfizer and Sobi are building a 100 million euro biologics plant at Savski Marof with first products due in 2026, Belupo is running a 36 million euro investment cycle in Koprivnica, and JGL in Rijeka completed a 53 million euro sterile expansion in 2023. Utilities for projects like these, from WFI and clean steam to vessels and CIP, are what Paul Industries builds for Croatian pharmaceutical sites.

What is the VAT in Croatia on equipment shipped from the United States?

Equipment shipped from the United States into Croatia carries VAT at the standard rate of 25 percent, charged on the customs value plus EU duty at import, and a VAT-registered plant recovers it through its returns. The 13 and 5 percent rates cover listed goods. Paul Industries itemizes invoices so the customs agent files the entry accurately.

What transit time should a Croatian plant plan for a skid sailing to Rijeka?

Plan on roughly 20 to 25 days at sea from the US East Coast to Rijeka on Mediterranean services, some calling at Salerno, then add time for clearance and the inland leg. Paul Industries books the sailing that lands the equipment before the installation window and follows the container to the quay.

Does a pressure vessel need a first inspection before it runs in Croatia?

High-hazard pressure equipment in Croatia needs a first inspection by an authorized inspection body before it runs, under NN 75/2020, and the body enters the equipment in the ministry’s register with a registration number. Paul Industries supplies the design data, material certificates and test records that inspection relies on.

How often are pressure vessels inspected in Croatia after start-up?

Unfired pressure vessels in Croatia have an external inspection every 2 years, an internal inspection every 6 years and a pressure test every 10 years under NN 75/2020, while boilers and fired equipment run on 1, 3 and 9 years and safety valves are tested at least every 2 years. Paul Industries builds inspection access into each vessel.

Do Croatian plants need instructions in Croatian for imported pressure equipment?

The Croatian pressure equipment rulebook, NN 79/2016, requires instructions and safety information in Croatian and an EU declaration of conformity in Croatian or translated into it. Paul Industries delivers manuals, warnings, labels and the declaration in Croatian, with English versions for engineering reviewers.

What is the voltage in Croatia for factory equipment?

Croatian factories take a 50 Hz supply at 400 V between phases and 230 V to neutral from the HEP ODS network, with medium voltage at 10, 20 or 35 kV for larger sites. Paul Industries builds skids with IEC motors, 400 V drives and EN 60204-1 panels, and sizes pumps and fans for the 50 Hz speed.

Which equipment does the Rijeka refinery buy for maintenance and turnarounds?

A refinery like Rijeka’s, with its new delayed coker, buys replacement pressure vessels, exchanger bundles, pump skids, alloy piping spools and relief systems before each planned turnaround. Paul Industries builds them under the PED to EN 13445 or ASME Section VIII, traces every plate and pipe to its mill certificate, and schedules delivery around the shutdown.

What did the Krk LNG terminal expansion change?

The Krk LNG terminal expansion, completed on 7 November 2025, raised regasification capacity from 3.9 to 6.1 billion cubic meters a year, according to the operator LNG Hrvatska. Gas infrastructure of this kind relies on pressure vessels, heat exchangers, glycol and water systems and piping, which Paul Industries fabricates to the PED.

Which systems does a dairy or brewery in Zagreb buy from Paul Industries?

Dairies and breweries in Zagreb buy milk reception and pasteurization, process and storage tanks, CIP skids, glycol and ammonia cooling, brewhouse and cellar tanks and wastewater pretreatment from Paul Industries, built with sanitary welds and drainable layouts and wired for the Croatian supply.

Who designs process tanks and cooling for food plants in Koprivnica?

Paul Industries designs and fabricates process tanks, cookers, CIP systems, chillers and water treatment for food plants in Koprivnica and across Podravina, with hygienic welds, drainable layouts and Croatian documentation. The equipment ships through Rijeka and goes into service with Paul installing it or supervising the installation.

How are tanks anchored against earthquakes near Zagreb and Petrinja?

Tanks near Zagreb and Petrinja are anchored to Eurocode 8 with the Croatian national annex, using the 475-year hazard map, which gives reference ground acceleration on rock of about 0.2 to 0.25 g around Zagreb. Paul Industries designs anchor bolts, skirts, legs and bracing to the seismic actions the structural engineer sets for the site.

Does HALMED review qualification records prepared outside Croatia?

HALMED inspects Croatian plants against EU GMP and the PIC/S guide and judges whether qualification evidence is complete and controlled, regardless of the country where it was written. DQ, IQ, OQ and PQ protocols from Paul Industries follow the Croatian plant’s own templates, in English with Croatian translations where the plant asks for them.

Can a Croatian plant join the factory acceptance test remotely?

Croatian engineers join Paul Industries factory acceptance tests by live video or attend at the US fabrication site, covering pressure tests, functional and alarm checks, software and documents. The signed FAT report goes into the conformity and qualification file before the equipment sails for Rijeka.

Which port suits equipment bound for Split or southern Dalmatia?

Equipment for Split and southern Dalmatia usually lands at Rijeka for container services or at Ploče for bulk and general cargo, then continues by road. Paul Industries compares both routes by sailing dates, module sizes and the road permits a wide load needs.

How much does a Croatian plant pay in freight and import charges on a large skid?

Two things set freight on a large skid: the box it needs, a 40-foot high cube or a flat rack, and the length of the road leg from Rijeka. Import charges are EU duty by heading plus VAT at 25 percent on the duty-paid value. Paul Industries prices freight as its own US dollar line once module sizes and the Incoterm are set.

Which project data gives Paul Industries a firm Croatian price?

A Croatian plant should send its process description, capacities and design conditions, GMP classification, site location and seismic data, supply details, the Incoterm it prefers and the start-up target. With that package Paul Industries returns a budget range and the Rijeka routing, then fixes a US dollar price when the design basis is signed.