Paul Industries is a Southeast process equipment contractor that engineers, builds, installs, commissions and maintains process systems, piping and plant utilities for manufacturers in Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Tennessee, Kentucky and Mississippi. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, the East Coast contractor was formerly based in northern New Jersey, then Pennsylvania. It delivers Southeast projects, from greenfield biologics plants to retrofits in decades-old food plants, under one contract. Call 201-450-8280 or request a quote.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Southeast states Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Tennessee, Kentucky, Mississippi
Industrial power 6.21 cents/kWh (TN) to 8.99 (VA); US average 8.13 (EIA, 2024)
Largest builds Toyota battery plant, Liberty, NC ($13.9B); Hyundai Metaplant, Ellabell, GA ($7.6B)
Biomanufacturing Holly Springs and Clayton, North Carolina
Reviewed November 2026

What does a Southeast process equipment contractor build?

A Southeast process equipment contractor builds the systems that turn a new plant shell into a producing factory: clean utilities for biologics, chilled water and process cooling for battery and vehicle plants, ammonia refrigeration for poultry, steam for food and chemical plants, and the piping that connects all of it. In this region much of the work is greenfield, so the contractor often arrives while the building is still going up and has to hand over a tested, documented system on a fixed startup date.

Paul Industries works as that contractor across the nine states on this page. A Southeast industrial contractor in this sense owns process engineering, fabrication of skids, spools, tanks and code vessels, supply of equipment and valves, field installation, pressure testing, commissioning, qualification records for regulated plants and service after startup.

Owners choose the route that fits the project. Supply-only orders deliver tested, documented skids and vessels to the site, ready to set. Design-build orders start from a process need and end with a running system. Complete installation covers everything from the slab to the startup report, including tie-ins in plants already in production.

Nine Southeast states and the plants that drive their process work

The nine Southeast states share low industrial power prices and a steady flow of new plants, yet each has its own mix of industries and its own regulators. The table lists every state, the industries that generate most process projects there and its 2024 average industrial electricity price from EIA, with a link to the Paul Industries page for that state.

Process industries and 2024 power prices in the nine Southeast states
StateMain plant typesIndustrial cents per kWh (2024)Paul Industries page
VirginiaData centers in Loudoun and Prince William, pharmaceutical plants in Petersburg and Albemarle County, port and shipyard industry in Hampton Roads8.99Virginia, the headquarters state
North CarolinaBiologics and fill-finish in Holly Springs, Clayton, RTP and Concord; a battery plant in Liberty; food and textiles7.77North Carolina biomanufacturing and battery work
South CarolinaVehicle assembly and battery packs around Spartanburg and Woodruff, foreign-owned regulated manufacturing, tire and chemical plants6.84South Carolina automotive and pharma plants
GeorgiaPoultry processing, the Hyundai Metaplant near Savannah, biologics around Atlanta, cold storage and port logistics7.21Georgia poultry, vehicle and biologics projects
FloridaMedical devices, dietary supplements, generic drugs, beverages and citrus processing8.50Florida device, supplement and beverage plants
AlabamaVehicle assembly at Vance and Montgomery, poultry, an active pharmaceutical ingredient plant under construction in Huntsville, shipbuilding in Mobile7.25Alabama automotive, poultry and API work
TennesseeChemicals in Kingsport, cold chain pharmaceuticals and devices around Memphis, food and beverage, vehicle and battery manufacturing6.21Tennessee chemical and cold chain plants
KentuckyBourbon distilling, vehicle assembly in Georgetown and Louisville, battery plants in Glendale, chemicals in Louisville6.50Kentucky distilling and automotive systems
MississippiPoultry and seafood processing, shipbuilding in Pascagoula, vehicle assembly, timber products6.81Mississippi food and shipyard plants

Seven of the nine states priced industrial power below the 2024 US average of 8.13 cents per kilowatt-hour, and only Virginia and Florida sat above it. Low energy cost is one reason the region attracts power-hungry plants, from battery cell lines to data centers.

Where Southeast manufacturing companies are building

Southeast manufacturing companies are building in four broad clusters: biologics in central North Carolina, a battery and vehicle corridor running from Kentucky through the Carolinas and Georgia to Alabama, a food and beverage base spread across every state, and chemical and device plants in Tennessee, Kentucky and Florida. The companies and sites named here are public market facts that show where demand sits.

Biomanufacturing in North Carolina’s Holly Springs and Clayton

Biomanufacturing in North Carolina has concentrated south of Raleigh. FUJIFILM Diosynth Biotechnologies has committed more than $3.2 billion to its Holly Springs plant, with eight 20,000 liter mammalian bioreactors planned and eight more due by 2028. Amgen announced a $1 billion expansion in Holly Springs in December 2024, bringing its planned investment there to more than $1.5 billion, and Genentech chose the same town for a plant of more than $700 million and 700,000 square feet, its first manufacturing site on the East Coast. Novo Nordisk’s $4.1 billion fill-finish project at Clayton, in Johnston County, adds another large site, and Lilly has a roughly $1 billion injectable products plant in Concord.

Biomanufacturing companies in North Carolina at that scale need purified water and WFI generation, clean steam, CIP and SIP, buffer and media preparation, large-bore ASME BPE tubing and graded cleanrooms, delivered in phases while earlier phases are already being qualified. Biotechnology in North Carolina also includes research and pilot suites around Research Triangle Park that buy the same systems on a smaller scale.

The Southeast battery belt

The Southeast battery belt is the chain of cell, pack and vehicle plants that has formed across the region since 2021. Battery plants in North Carolina are led by Toyota’s $13.9 billion plant in Liberty, Randolph County, which began production in 2025 as Toyota’s first battery plant outside Japan. Battery plants in Georgia supply the Hyundai Motor Group Metaplant America in Ellabell, a $7.6 billion plant that started building vehicles in October 2024. Battery plants in Kentucky include the two Glendale plants that began production in August 2025; Ford took both when its venture with SK On was dissolved in December 2025. Battery plants in South Carolina include BMW’s high-voltage battery assembly plant in Woodruff, part of a $1.7 billion program shared with Plant Spartanburg.

Battery plants in the Southeast are utility-heavy. Cell manufacturing needs very dry rooms, solvent recovery, large chilled water and process cooling plants, compressed air, nitrogen and cooling for formation and aging. Paul Industries designs, fabricates and installs those utility systems and the piping that serves them.

Vehicle assembly from Spartanburg to Georgetown

Vehicle assembly gives the region a second industrial base. BMW describes Plant Spartanburg as its largest plant worldwide. Mercedes-Benz has built vehicles in Vance, Alabama since 1997 and announced a further $4 billion in 2026. Toyota calls its Georgetown, Kentucky plant its largest vehicle manufacturing plant in the world. Paint shops, e-coat lines, parts washers, compressed air and process cooling water at these plants all fall within process contractor scope.

Pharmaceutical companies in the South beyond the Triangle

Pharmaceutical companies in the South have spread well beyond North Carolina. UCB is building a $2 billion biologics plant in Gwinnett County, Georgia, Lilly a $6 billion active ingredient plant in Huntsville, Alabama, and Virginia hosts essential-medicines makers in Petersburg. Pharmaceutical companies in South Carolina include European-owned plants that answer to their parent’s quality system as well as FDA. What pharmaceutical companies are in Florida? The state’s regulated plants include supplement, generic drug and device makers, and Florida ranks second in the nation for medical device manufacturing, according to Select Florida.

Food, distilling and chemicals

Food processing runs across all nine states. Georgia, Alabama and Mississippi process poultry with ammonia refrigeration systems large enough to fall under OSHA process safety management, Kentucky distills bourbon (the Kentucky Distillers’ Association credits the state with 95 percent of the world’s supply), and Florida processes citrus and beverages. Chemicals anchor northeast Tennessee, where Eastman has its headquarters and largest manufacturing facility in Kingsport.

Southeast industry clusters and their usual process scopes
IndustryLocationsTypical scope
Biologics and fill-finishHolly Springs, Clayton, RTP and Concord, NC; Gwinnett County, GA; Huntsville, AL; Petersburg, VAWFI and purified water generation, clean steam, CIP/SIP skids, BPE tubing, graded suites, buffer and media prep
Battery cells and packsLiberty, NC; Glendale, KY; Woodruff, SC; the Savannah area, GADry room support utilities, chilled water and process cooling, compressed air, nitrogen, solvent recovery piping
Vehicle assemblySpartanburg, SC; Vance, AL; Georgetown, KY; Ellabell, GAPaint and e-coat utilities, compressed air, process cooling water, wastewater pretreatment
Poultry and foodGeorgia, Alabama, Mississippi, the Carolinas, FloridaAmmonia refrigeration, chillers, sanitary piping, CIP, boilers and hot water, wastewater
DistillingKentucky and TennesseeMash cookers and fermenters, still and condenser piping, glycol cooling, steam and condensate
ChemicalsKingsport, TN; Louisville, KY; Gulf Coast Florida, Alabama and MississippiASME B31.3 process piping, pressure vessels, heat exchangers, tanks, shutdown work
Data centersNorthern Virginia and growing sites across the regionChiller plants, cooling towers, liquid cooling distribution, commissioning

How do boiler, building and tank rules differ across the Southeast?

Boiler, building and storage tank rules in the Southeast are set by each of the nine states, and the gaps between them are large: most states inspect nearly every boiler on a fixed cycle, while Florida’s boiler law centers on places of public assembly, and Alabama’s state building code reaches only certain building types. Paul Industries designs every project to the rules of the state where it stands.

Boiler law, building code and storage tank rules in the nine Southeast states
StateBoiler and pressure vessel ruleBuilding codeStorage tank rules
VirginiaVirginia’s Boiler and Pressure Vessel Safety Act, enforced by DOLIUniform Statewide Building Code9VAC25-91 oil pollution prevention requirements, which start at 25,000 gallons
North CarolinaG.S. 95-69.8 et seq. (Uniform Boiler and Pressure Vessel Act), enforced by the NCDOL Boiler Safety BureauNorth Carolina State Building Code15A NCAC 02N for underground tanks
South CarolinaBoiler Safety Act of 2005, Department of Labor, Licensing and Regulation2021 South Carolina codes, in effect since January 1, 2023R.61-92 Part 280 for underground tanks
GeorgiaO.C.G.A. Title 25, Chapter 15, Insurance and Safety Fire Commissioner2024 ICC editions with Georgia amendments, effective January 1, 2026Georgia EPD rules 391-3-15 for underground tanks
FloridaChapter 554, F.S., Division of State Fire Marshal, aimed at boilers in places of public assemblyFlorida Building Code, 8th Edition (2023), with the 9th Edition scheduled for December 31, 202662-761 for underground tanks over 110 gallons; 62-762 for aboveground tanks over 550 gallons
AlabamaCode of Alabama Title 25, Chapter 12, with a Board of Boilers and Pressure VesselsState code for state-funded buildings, schools, hotels and theaters; other plants follow the code their city or county adoptsADEM Admin. Code 335-6-15 for underground tanks
TennesseeT.C.A. Title 68, Chapter 122, Department of Labor and Workforce Development; a certificate of operation is required2021 IBC adopted by the State Fire Marshal’s OfficeRule 0400-18-01, Division of Underground Storage Tanks
KentuckyKRS Chapter 236 and 815 KAR Chapter 15, Department of Housing, Buildings and ConstructionKentucky Building Code, 815 KAR 7:120401 KAR Chapter 42 for underground tanks
MississippiMississippi Code Title 45, Chapter 23, State Department of HealthCounties and cities adopt one of the last three IBC editions under a 2014 law, with an opt-out window11 Miss. Admin. Code Part 5 for underground tanks

Three of those rows change project plans. A Mississippi boiler is registered with the State Department of Health rather than a labor or fire agency. An Alabama plant outside the state code’s reach is permitted under whatever edition its county or city has adopted, which Paul Industries confirms before design starts. A Florida project scheduled to permit in early 2027 should be designed to the 9th Edition of the Florida Building Code, since the 8th Edition is due to be replaced at the end of 2026.

How much does it cost to run process equipment in the Southeast?

Process equipment in the Southeast costs less to run than in most of the country, because 2024 industrial electricity prices ranged from 6.21 cents per kilowatt-hour in Tennessee to 8.99 in Virginia. A 1 MW load running all year uses 8,760,000 kWh, and the table gives its annual cost at each state’s average 2024 price.

What a 1 MW load running 8,760 hours costs per year at EIA’s 2024 industrial rates
StateAverage rate, cents per kWhYearly bill
Virginia8.99$787,524
Florida8.50$744,600
North Carolina7.77$680,652
Alabama7.25$635,100
Georgia7.21$631,596
South Carolina6.84$599,184
Mississippi6.81$596,556
Kentucky6.50$569,400
Tennessee6.21$543,996
US average8.13$712,188

With power this cheap, Southeast design choices weigh capacity, redundancy and uptime more heavily than energy savings. Cooling plants are sized for long, humid summers, standby chillers and pumps protect production that would lose far more in an hour than a year of extra kilowatt-hours costs, and heat recovery is chosen where it also adds capacity. Paul Industries runs those comparisons for the tariff each plant actually pays.

Construction cost depends on scope, materials, fabrication completed off site, the construction schedule or outage, documentation and the state’s permit path. Paul Industries starts with a budget band based on similar completed scopes and fixes the price after drawings, a site visit and the schedule are agreed.

Who designs and installs process equipment in the Southeast?

Paul Industries designs and installs process equipment in the Southeast for biologics, pharmaceutical, battery, automotive, food, distilling, chemical and data center plants. It is an East Coast contractor with its headquarters in Kilmarnock, Virginia, and one agreement carries the engineering, fabrication, supply, field work, testing, startup, service and repair in every one of the nine states.

That matters most to owners building more than one plant. A company with a cell plant in Kentucky, a pack plant in South Carolina and a supplier site in Georgia gets one weld procedure set, one inspection format and one turnover package, with each state’s boiler, building and tank rules built into the scope for that site.

Services Paul Industries delivers to Southeast plants

Services Paul Industries delivers to Southeast plants cover clean utilities, process piping, refrigeration, cooling and steam. The scopes requested most often across the region, with the pages that describe each in depth, are:

What Southeast industrial contractors must deliver on a greenfield plant

Southeast industrial contractors on a greenfield plant must deliver tested systems into a building that is still under construction, on a schedule set by the owner’s first production date. Paul Industries plans that work in phases: utilities that other trades need early, such as compressed air, process water and temporary cooling, come first, then process systems in the order the owner intends to qualify them.

The interfaces decide the schedule. Process piping has to meet structural steel, electrical, controls and the building’s own mechanical systems at hundreds of points, and every one is a chance for delay. Paul Industries prefabricates skids and pipe racks off site in modules sized for the site’s cranes and roads, tests them before shipment and sets them in sequence, which keeps field welding to tie-ins.

On a greenfield job, plants want one welding program across sanitary, process and utility service, documentation that satisfies both the state inspector and the plant’s quality group, and a contractor that stays for the service years after startup. Paul Industries offers all three.

Retrofits in older Southeast plants

Retrofits in older Southeast plants make up as much of the work as new construction, because many factories in the region have run for decades and changed products several times. Manufacturing companies in North Carolina that began in textiles, furniture or tobacco now run food, packaging, nonwovens and chemical lines in the same buildings, and Virginia, Georgia and Tennessee have plants with similar histories.

A retrofit starts with what is already in the building. Paul Industries traces existing utilities, tests the condition of old steam and water lines, checks floor and roof capacity for new equipment and maps every tie-in before pricing. Work is then staged so production keeps running: new equipment is set and tested alongside the old, and cutover happens in a planned weekend or holiday outage.

Industrial contractors in Georgia, the Carolinas and Alabama often find that much of the savings in an older plant sits in its utilities rather than its process line: a boiler with poor turndown, a compressed air system with chronic leaks, or a chilled water plant running constant flow at part load. Paul Industries prices those upgrades alongside the process work so the owner can decide on both together, and it can stage the utility work first so the new process line starts on a reliable supply of steam, air and cooling water.

Heat, humidity and storms in Southeast plant design

Heat, humidity and storms shape Southeast plant design more than winter does. Cooling towers are selected for high design wet-bulb temperatures, chilled water and glycol lines need vapor-tight insulation to stop condensation and corrosion under the jacket, and outdoor carbon steel near the coast needs coatings chosen for salt air.

Florida adds wind design under the Florida Building Code to every rooftop unit, pipe rack and tank anchorage, and coastal Georgia, the Carolinas, Alabama and Mississippi face the same hurricane season. Paul Industries designs supports for those loads and gives each critical utility a written shutdown and restart plan, so a plant can protect equipment before a storm and return to production once power is back.

Beyond the Southeast: all 50 states and abroad

Paul Industries carries the same contract beyond the Southeast to every other state and to plants outside the United States, so a manufacturer with sites in Georgia, Ohio and Mexico can keep one contractor and one documentation standard. The service area page covers coverage across the country, and the international projects page covers export crating, shipping and commissioning at overseas plants.

Send your Southeast project to Paul Industries

Paul Industries is the Southeast process equipment contractor for owners who want process systems designed, fabricated, installed, tested and maintained under one accountable contract, from Norfolk to Biloxi. Share the plant location, what the system must do, drawings or photos and your construction or shutdown schedule, and Paul Industries will answer with a proposed scope and a budget figure. Call 201-450-8280 or request a quote.

Standards referenced: ASME Boiler and Pressure Vessel Code · National Board Inspection Code · ASME B31.1 · ASME B31.3 · ASME BPE · OSHA 29 CFR 1910.119 · Virginia Boiler and Pressure Vessel Safety Act · North Carolina Uniform Boiler and Pressure Vessel Act (G.S. 95-69.8) · South Carolina Boiler Safety Act of 2005 · O.C.G.A. Title 25, Chapter 15 · Florida Boiler Safety Act (Chapter 554, F.S.) · Code of Alabama Title 25, Chapter 12 · Tennessee Code Title 68, Chapter 122 · KRS Chapter 236 · Mississippi Code Title 45, Chapter 23 · Florida Building Code, 8th Edition (2023) · Florida Administrative Code 62-761 and 62-762 · Georgia Rules for Underground Storage Tank Management (391-3-15) · 401 KAR Chapter 42 · Tennessee Rule 0400-18-01 · ADEM Admin. Code 335-6-15 · 9VAC25-91

Frequently asked questions

Who builds clean utilities for biomanufacturing companies in North Carolina?

Paul Industries builds purified water and WFI systems, clean steam, CIP and SIP skids, buffer and media preparation and ASME BPE tubing for biomanufacturing plants in Holly Springs, Clayton, Research Triangle Park, Concord and elsewhere in North Carolina. Boilers and clean steam generators follow the state’s Uniform Boiler and Pressure Vessel Act. Systems are delivered with weld, passivation and qualification records the plant’s quality group needs.

Does Paul Industries work at battery plants in Kentucky and Tennessee?

Paul Industries designs and installs chilled water and process cooling plants, compressed air and nitrogen distribution, solvent recovery piping and dry room support utilities for battery plants in Kentucky and Tennessee. Boilers there follow KRS Chapter 236 in Kentucky and T.C.A. Title 68, Chapter 122 in Tennessee, which requires a certificate of operation. Work is phased to match line startups.

Is Paul Industries one of the industrial contractors in Virginia?

Paul Industries has its headquarters at 256 Shore Drive in Kilmarnock, a Northern Neck town, which makes Virginia its home state. The company works at data centers, pharmaceutical plants, food plants and port industry across Virginia and takes the same contract into every other Southeast state, the rest of the country and plants abroad. Call 201-450-8280 to discuss a project.

Who services ammonia refrigeration at poultry plants in Georgia, Alabama and Mississippi?

Paul Industries designs, installs, repairs and maintains ammonia refrigeration at poultry plants in Georgia, Alabama and Mississippi, including compressors, evaporators, vessels and piping. Systems holding more than 10,000 pounds of ammonia fall under OSHA process safety management, so changes need a management of change review and updated documentation. Paul Industries builds that paperwork into each project.

What pharmaceutical companies are in Florida, and what do their plants need?

Florida’s regulated manufacturers include medical device, generic drug and dietary supplement companies, and the state ranks second nationally in medical device manufacturing according to Select Florida. Their plants need purified water, cleanrooms, compressed air and gases, and sanitary piping, all built for hurricane wind loads under the Florida Building Code. Paul Industries designs, builds and services those systems statewide.

How are boilers regulated in Mississippi?

Mississippi regulates boilers and pressure vessels under Mississippi Code Title 45, Chapter 23, administered by the State Department of Health through its Boiler and Pressure Vessel Safety program, with certificate inspections on a set cycle. Paul Industries designs, installs and repairs boilers at Mississippi food, seafood and shipyard supply plants to that rule and assembles the documents the inspector expects.

Do industrial contractors in Alabama follow a statewide building code?

Alabama’s state building code covers state-owned and state-funded buildings, public schools, hotels and theaters. Other industrial plants follow whichever code edition their city or county has adopted, which can differ between neighboring jurisdictions. Paul Industries confirms the governing edition and permit office for each Alabama site before design starts, so the drawings match the inspector’s book.

Who installs process systems at battery plants in Georgia?

Paul Industries installs chilled water plants, process cooling, compressed air, nitrogen and process piping at battery plants in Georgia, including suppliers around the Hyundai Metaplant in Ellabell. Projects follow Georgia’s 2024 ICC editions with state amendments, effective January 1, 2026, and boilers follow O.C.G.A. Title 25, Chapter 15.

Which plants in South Carolina buy process systems?

South Carolina’s process buyers include vehicle and battery pack plants around Spartanburg and Woodruff, European-owned pharmaceutical and device makers, and tire, chemical and food plants. Pharmaceutical companies in South Carolina often build to their parent’s standards as well as FDA’s. Paul Industries designs to both, under the 2021 South Carolina building codes and the Boiler Safety Act of 2005.

Why is the Southeast a center for food processing?

The Southeast combines large poultry flocks in Georgia, Alabama, Mississippi and the Carolinas, citrus in Florida, distilling in Kentucky and Tennessee, and low industrial power prices that keep refrigeration affordable. Food plants there rely on ammonia refrigeration, chillers, boilers, sanitary piping and CIP. Paul Industries designs, installs and services those systems across all nine states.

How much cheaper is industrial power in the Southeast than the national average?

In 2024, seven of the nine Southeast states priced industrial power below the US average of 8.13 cents per kWh, from 6.21 in Tennessee to 7.77 in North Carolina, while Florida (8.50) and Virginia (8.99) sat above it, according to EIA. A 1 MW load running all year costs about $543,996 in Tennessee and $787,524 in Virginia.

Can one contract cover plants in Virginia, the Carolinas and Georgia?

Paul Industries covers plants in Virginia, the Carolinas, Georgia and the rest of the Southeast under one contract, with the same weld procedures, inspection records and turnover package at every site. Each state’s boiler, building and tank rules are written into the scope for that plant, so corporate engineering reviews one standard instead of nine.

What do Southeast plants look for in process piping contractors?

Southeast plants look for process piping contractors that weld sanitary, process and utility lines under one program, document each line to its code (ASME BPE, B31.3 or B31.1), and keep servicing what they install. Paul Industries does all three, and it prefabricates spools and racks off site so field work on a greenfield site or in a running plant is kept to tie-ins.

Does Paul Industries work at distilleries in Kentucky?

Paul Industries designs, fabricates and installs mash cookers, fermenters, still and condenser piping, glycol cooling, steam and condensate systems and CIP for distilleries in Kentucky and Tennessee. Boilers follow KRS Chapter 236 in Kentucky. Distilling plants are food plants rather than cGMP drug plants, and Paul Industries prices them to that standard.

What does a Southeast process project cost?

A Southeast process project costs what its scope, materials, schedule, documentation and permits require, and greenfield projects often price differently from retrofits because access is easier and phasing is longer. Paul Industries gives an early budget number from similar jobs and a fixed number when the drawings, site visit and schedule are complete. Send P&IDs and equipment lists to begin.

Does Paul Industries ship factory-tested skids to Southeast construction sites?

Paul Industries ships fabricated skids, pipe spools, process tanks and code pressure vessels to Southeast construction sites as supply-only orders, factory tested, documented and ready to set, with the nameplate, data reports and National Board registration the code requires. Installation, startup and service can be added under the same contract at any time.

Does Paul Industries build data center cooling in the Southeast?

For data centers in Northern Virginia and other Southeast markets, Paul Industries engineers and builds chiller plants, cooling towers, liquid cooling distribution units and the chilled and condenser water piping that joins them. Commissioning runs level by level to the owner’s plan, and the plant receives full test and startup records at turnover.

How does Paul Industries prepare Florida and Gulf state plants for hurricanes?

Paul Industries designs rooftop equipment supports, pipe racks and tank anchorage in Florida for wind loads under the Florida Building Code, and applies the same discipline in coastal Alabama, Mississippi, Georgia and the Carolinas. Each critical utility gets a written plan for safe shutdown before a storm and orderly restart after power returns, and outdoor steel gets coatings chosen for salt air.

Building or upgrading a Southeast plant?

Share the plant location, what the system must do, drawings or photos and your construction or shutdown dates. Call 201-450-8280 or request a quote.