Paul Industries is a US process equipment contractor for Vietnam: it designs and fabricates ultrapure and purified water systems, pump and dosing skids, pressure vessels, tanks and complete process systems in the United States for the 50 Hz, 220/380 V supply, and installs, starts up and commissions them at plants in the north and south of the country or supervises their installation. Pressure parts are documented for Vietnam’s technical safety inspection, and GMP systems for the Ministry of Health’s GMP circular. The company’s headquarters stand at 256 Shore Drive in Kilmarnock, Virginia; it was formerly based in northern New Jersey and, after that, Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Power 50 Hz, 220/380 V
Pressure equipment rule QCVN 01:2008/BLDTBXH, inspection above 0.7 bar
Pharmaceutical GMP Circular 28/2025/TT-BYT
Main ports Cai Mep-Thi Vai (south), Haiphong (north)
Time zone UTC+7, 11 or 12 hours ahead of US Eastern
Reviewed November 2026

Where a US process equipment contractor for Vietnam fits in a plant project

A US process equipment contractor for Vietnam serves the foreign-invested factories and Vietnamese manufacturers that buy engineered utility and process systems built to US, Korean, Japanese or European plant standards. Paul Industries supplies ultrapure water systems for chip packaging and electronics, purified water and WFI systems for drug plants, pump, metering and chemical dosing skids, pressure vessels, process cooling systems and turnkey process systems that combine them.

Three delivery routes cover most Vietnamese projects. Supply with installation supervision fits an owner whose general contractor is already building the factory shell. Design-build brings layout, tie-ins and controls into Paul’s scope. Complete installation runs from placement through commissioning and qualification with Paul. The international projects page lists every country Paul serves, and the Singapore page and South Korea page cover two markets whose manufacturers run many Vietnamese plants.

Which industries in Vietnam buy engineered process systems?

Electronics and semiconductor assembly, pharmaceuticals, food and seafood processing, chemicals and the utility plants behind them are the Vietnamese industries that buy engineered process systems most often. Most foreign-invested factories sit in Vietnam industrial parks around Hanoi, Bac Ninh, Thai Nguyen and Haiphong in the north and around Ho Chi Minh City and Dong Nai in the south, and those industrial parks supply roads, power and wastewater treatment but leave each plant to build its own process utilities. The table shows the clusters and what they buy.

Vietnamese manufacturing clusters and the systems they buy
ClusterMain industriesSystems Paul supplies there
Bac Ninh, Bac Giang and Thai NguyenMobile phone assembly, chip packaging and test, electronics componentsUltrapure water, process cooling, chemical distribution, wastewater pretreatment
Haiphong and HanoiElectronics, automotive parts, chemicals, foodDosing skids, boiler feed systems, cooling water treatment, process tanks
Ho Chi Minh City, including former Binh Duong and Ba Ria-Vung TauChip assembly and test, pharmaceuticals, food and beverage, chemicals, port industryPurified water and WFI, CIP skids, clean steam, pressure vessels
Dong Nai and Long AnPharmaceuticals, food processing, consumer goodsGMP water systems, sanitary process piping, heat exchangers
Mekong DeltaSeafood and rice processing, cold storageRefrigeration support systems, water treatment, CIP and washdown skids

Vietnam’s map changed in mid 2025, when the number of provincial units fell from 63 to 34 and Ho Chi Minh City absorbed Binh Duong and Ba Ria-Vung Tau. Plants in Vietnam industrial zones keep their park names, but permits, inspection records and customs paperwork now carry the new provincial names, and Paul uses the current names on every document.

Semiconductor companies in Vietnam and the ultrapure water they need

Semiconductor companies in Vietnam work mainly in assembly, packaging and test, and the sector has grown quickly as chipmakers spread production beyond China. Intel’s Ho Chi Minh City site is one of its largest operations worldwide, Amkor’s $1.6 billion plant in Bac Ninh is the largest in its network, Hana Micron runs packaging lines in Bac Giang, and Samsung’s factories in Thai Nguyen and Bac Ninh produce more than half of its global mobile phone output. The semiconductor industry in Vietnam therefore buys large ultrapure water plants, process cooling loops and chemical distribution, the same systems described on the semiconductor industry page.

Semiconductor manufacturing in Vietnam also brings the water specifications of the parent company with it. A packaging line run by a Korean or US group commissions its ultrapure water against the same resistivity, total organic carbon, particle and metals targets as the home plant, often written around SEMI F63. Electronics manufacturing companies in Vietnam that assemble boards and modules buy smaller deionized water and rinse systems. Paul designs each system on the site’s raw water analysis, which differs sharply between northern river supplies and southern groundwater, and documents it against the owner’s specification.

Pharmaceutical companies in Vietnam and the GMP upgrade

Pharmaceutical companies in Vietnam are upgrading plants to meet higher GMP grades. The Drug Administration of Vietnam counts 243 factories meeting WHO GMP, up from 158 in 2015, with 29 meeting EU-GMP or PIC/S-level standards, and domestic production covers about 60 percent of drug demand by volume and 46 percent by value. The pharmaceutical industry in Vietnam still imports more than 90 percent of its active ingredients, and exports reached about $312 million in 2025. Pharmaceutical manufacturing companies in Vietnam moving to EU-GMP grade, along with foreign pharmaceutical companies in Vietnam building new lines, buy purified water and WFI generation, clean steam, CIP and SIP skids and cleanroom utilities, as covered on the pharmaceutical industry page.

Food, seafood and chemical plants

Food and seafood processing spread from the Mekong Delta to the industrial parks around both big cities, and its plants need cold storage support, washdown and CIP systems, boiler and condensate systems and wastewater pretreatment. The food and beverage industry page explains that equipment. Chemical, fertilizer and refining plants near Haiphong and on the southern coast buy vessels, heat exchangers and injection skids built to their owners’ international engineering standards.

Seafood and frozen food plants pair ammonia or carbon dioxide refrigeration with glycol and chilled water loops for process cooling, and they wash down daily with hot water and chemicals, so stainless frames, sloped drain pans and sanitary fittings matter as much as capacity. Paul sizes the glycol, chilled water and CIP systems on the plant’s production schedule and water analysis, and lays out each skid so that it drains fully and can be cleaned without dismantling.

What does Vietnam require of pressure equipment?

Vietnam treats boilers and pressure vessels as equipment with strict occupational safety requirements under the Law on Occupational Safety and Health, No. 84/2015/QH13, so they need technical safety inspection before use and at intervals during service under Decree 44/2016/ND-CP. Circular 36/2019/TT-BLĐTBXH, in force since 1 March 2020, lists the machines and equipment covered, and the line for pressure vessels follows the long-standing rule: a working pressure above 0.7 bar, excluding hydrostatic pressure, with classification under TCVN 8366:2010. The national technical regulation for boilers and pressure vessels, QCVN 01:2008/BLĐTBXH, sets the safety requirements the inspection checks.

Vietnamese rules that apply to imported process and pressure equipment
RuleSubjectWhat it asks of the equipment
Law No. 84/2015/QH13 and Decree 44/2016/ND-CPOccupational safety and technical safety inspectionInspection before use and periodic re-inspection of listed equipment; no operation on a failed or expired inspection
Circular 36/2019/TT-BLĐTBXHList of equipment with strict safety requirementsBoilers and vessels above 0.7 bar, lifting equipment and other listed items enter the inspection regime
QCVN 01:2008/BLĐTBXHNational technical regulation for boilers and pressure vesselsDesign, manufacture, installation, operation and inspection requirements; trained operators
Circular 01/2021/TT-BLĐTBXHPotentially unsafe products and goodsQuality control of listed boilers and vessels as goods, including imports
Decision 18/2019/QD-TTg, amended by Decision 28/2022/QD-TTgImport of used machineryUsed equipment generally no older than 10 years on arrival and meeting QCVN safety, energy and environmental rules
Decree 43/2017/ND-CP, amended by Decree 111/2021/ND-CPGoods labelsName and origin on the original label; Vietnamese supplementary label before the goods enter the market
Circular 28/2025/TT-BYTGMP for medicines and starting materialsPlant and equipment designed and qualified to the declared WHO, PIC/S or EU GMP principles

Vietnam pressure vessel regulation in practice

The Vietnam pressure vessel regulation works through inspection: a vessel designed and built to ASME Section VIII or another recognized code is checked against QCVN 01:2008 and the inspection procedures before it enters service. Buyers searching for TCVN standards or QCVN standards for vessels should keep the two apart: TCVN documents are national standards, such as TCVN 8366:2010 for pressure vessels, while QCVN documents are mandatory national technical regulations. State management of occupational safety moved to the Ministry of Home Affairs when the labour ministry merged into it in 2025, and the ministry issued Circular 19/2025/TT-BNV on inspection services that October. Paul delivers each vessel with the design calculations, drawings, material certificates, weld records, nondestructive examination and hydrostatic test reports, nameplate data and operating instructions that the inspection organization reviews, with Vietnamese translations of the operating and safety sections.

Relocating used equipment: the 10-year rule

Used machinery imported into Vietnam for production generally has to be no more than 10 years old, counted from the year of manufacture to the year it arrives at a Vietnamese port, under Decision 18/2019/QD-TTg as amended in 2022, and it must meet Vietnam’s technical regulations on safety, energy saving and environmental protection. Owners moving a skid or a production line from a US plant to Vietnam check the manufacture year on every major component first. Paul assesses the equipment, refurbishes and retests it, documents its age and condition, and reinstalls it in Vietnam with the inspection records the new site needs.

Vietnam GMP guidelines for new pharmaceutical equipment

Vietnam GMP guidelines for medicines and pharmaceutical starting materials are now set by Circular 28/2025/TT-BYT, in force since 1 July 2025, which replaced Circular 35/2018/TT-BYT and its 2022 amendment. Manufacturers declare whether they apply WHO GMP, PIC/S GMP or EU GMP principles, and the Drug Administration of Vietnam assesses compliance during inspections linked to the certificate of eligibility for pharmacy business. What buyers call a Vietnam GMP certificate is that compliance assessment, so a new water system or process skid is qualified against the GMP grade the plant has declared. Paul designs purified water, WFI and clean steam systems to the declared grade, executes IQ and OQ through validation and commissioning, and supplies the protocols, reports and drawings for the plant’s inspection file.

What is the voltage in Vietnam, and is Vietnam 50Hz?

Vietnam’s grid runs at a rated 50 Hz, held within 0.2 Hz in normal operation under Circular 39/2015/TT-BCT, and distributes 220 V single phase and 380 V three phase on a three-phase, four-wire system. The Vietnam voltage level for most plant motors and heaters is therefore 380 V, and the Vietnam voltage 3 phase supply comes from the plant’s own transformers fed at medium voltage. Comparing Vietnam voltage vs US practice, both the voltage and the frequency differ: US plants run 480 V or 208 V at 60 Hz.

The Vietnam voltage and frequency together decide the motor selection. A 60 Hz motor on a 50 Hz supply runs about 17 percent slower, so its pump loses flow in proportion and head with the square of the speed. A Vietnam voltage converter or step-down transformer corrects voltage but leaves frequency unchanged, which is why Paul selects motors, pumps, fans and compressors on 50 Hz data or on drives configured for the site, and wires the panel for the Vietnam industrial voltage from the start rather than adding transformers later.

Power, climate and language basis for a skid going to Vietnam
Design pointVietnamese plantTypical US plantPaul’s design response
Supply frequency50 Hz60 Hz50 Hz selections or drives set for the site
Three-phase voltage380 V480 V or 208 VMotor windings, heaters and control transformers for 380 V
Single-phase voltage220 V120 VPanel lighting, receptacles and instrument supplies at 220 V
ComponentsIEC components common in Asian-owned plantsNEC and ULPanels to IEC 60204-1 or the owner’s specification, IEC cable sizes in mm2
ClimateHot, humid tropics with a long rainy season, cooler winters in the northVariedPanel cooling and dehumidification, stainless enclosures, sealed junction boxes
DocumentationVietnamese for labels and operator instructions, English for engineeringEnglishBilingual operating and safety sections, metric drawings

Shipping to Vietnam from USA ports and clearing customs

Shipping to Vietnam from USA ports ends at one of two deep-water gateways: Cai Mep-Thi Vai, which serves Ho Chi Minh City and the southern provinces, and Haiphong, including its Lach Huyen terminals, which serves Hanoi, Bac Ninh and the north. Route planners show about 39 days from New York to Haiphong on the quickest routing, and forwarders quote roughly 32 to 45 days between Vietnam and the US East Coast depending on transshipment and on the Panama or Suez routing. Paul sets crate sizes during design, books space on a sailing to the gateway nearest the plant, and plans the FAT date backward from the cutoff.

Vietnam import duty and VAT on process equipment

Vietnam import duty on US-origin equipment is charged at the most favored nation rate for each HS code, since the United States and Vietnam have no free trade agreement in force. In October 2025 the two governments agreed a framework for a reciprocal trade agreement under which Vietnam is to offer preferential access for substantially all US industrial goods, and by October 2026 Vietnam had sent the final text to Washington, so Vietnam import duty rates for US equipment are checked at the time of each order. The Vietnam import tariff applies to the customs value, and import VAT follows at the standard 10 percent, with a reduced 8 percent rate for many goods through 31 December 2026 and exclusions such as metal products.

Other Vietnam import requirements for process equipment cover documents and labels. The commercial invoice, packing list, bill of lading and certificate of origin carry consistent HS codes, inspection-listed boilers and vessels carry the technical file the inspection draws on, and the importer adds a Vietnamese supplementary label before the goods enter the market under Decree 111/2021/ND-CP. Under Incoterms 2020, Vietnamese plants with an established forwarder buy FCA at a US port, owners who want freight risk carried to the factory gate choose DAP, and DDP places clearance, duty and VAT inside Paul’s delivered price.

How a Vietnam project with Paul Industries runs

Paul Industries runs a Vietnam project in nine stages, and the first two fix the inspection-listed items, the GMP grade or water specification, the 50 Hz electrical basis and the gateway port that the rest of the project follows. The table lists the Vietnam-specific record each stage produces.

Steps in a process equipment project for a plant in Vietnam
StepWhat happensVietnam-specific output
1. Scope and code reviewProcess duty, inspection-listed items above 0.7 bar, GMP grade or water specification, HS codes, used equipment agesConformity plan listing each item’s inspection and documentation route
2. DesignP&IDs, layout, 220/380 V 50 Hz electrical design, climate ratings, crate envelopeData sheets, calculations and metric drawings
3. US fabricationPipe and vessel welding, skid assembly, panel wiring and instrument fitting with traceable materialsMaterial certificates, weld records, NDT and test reports
4. Factory acceptance testPressure, function and control logic tests with the owner present or on a video linkFAT record signed by both parties for the inspection and GMP files
5. Crating and shippingHumidity-proof export packing, ocean freight to Cai Mep or HaiphongInvoice, packing list and certificate of origin with matching HS codes
6. Installation or supervisionSetting, anchoring, piping and cable terminations in the plantInstallation records and Vietnamese supplementary labels in place
7. Start-up and safety inspectionFlushing, rotation checks, technical safety inspection of listed equipment before useStart-up report and inspection records for the plant’s files
8. Commissioning and qualificationSite acceptance test, IQ and OQ for GMP plants, ultrapure water performance runsExecuted protocols and water quality data
9. Handover and serviceTraining in English and Vietnamese, spare parts sized for the shipping timeBilingual manuals, as-built drawings, service plan

Indochina Time is UTC+7 with no daylight saving, 11 or 12 hours ahead of US Eastern time, so the US evening overlaps the Vietnamese morning. Paul schedules video-witnessed test sequences and design reviews in that window and plans in-person witnessing for owner engineers around the sailing date. After handover, critical spares are stocked at the plant in quantities sized for the ocean resupply time, and Paul keeps drawings, control programs and test data on file for remote diagnosis and planned service visits.

Who builds process systems for plants in Vietnam?

Paul Industries builds process systems for plants in Vietnam, from ultrapure water trains for chip packaging lines and WFI systems for drug plants to dosing skids, pressure vessels and complete turnkey systems, and carries them through factory testing, shipment, installation, start-up, safety inspection and qualification. Paul designs to the owner’s specification and Vietnam’s technical regulations, wires for 220/380 V at 50 Hz, delivers bilingual documentation, and stays with the equipment through service. Plants in Bac Ninh, Haiphong, Hanoi, Ho Chi Minh City and Dong Nai deal with a single contractor from the first design review to long-term spares.

What sets the delivered cost of a process system for a Vietnamese plant?

The delivered cost of a process system for a Vietnamese plant depends on five lines beyond the equipment: ocean freight and the gateway port, humidity-proof preservation, inspection and GMP documentation, duty and VAT under the chosen Incoterm, and the installation route. Paul shows each line separately.

  • Freight. The shipping to Vietnam from USA cost depends on container count, flat racks for oversized skids, transshipment and the canal routing on the sailing.
  • Preservation. A long tropical voyage calls for vapor barrier wrap, desiccant and nitrogen blanketing, more so for polished stainless and electronics.
  • Documentation. Inspection files for listed pressure equipment, Vietnamese translations and GMP protocols add engineering hours.
  • Duty and VAT. Most favored nation duty by HS code and import VAT are paid by the buyer on FCA or DAP terms and included in Paul’s figure on DDP terms.
  • Installation. Supervision costs less than full installation, and cleanroom or operating-plant access rules shape crew planning.

Paul Industries for plants in Vietnam

Paul Industries engineers, builds, factory tests and exports process equipment for Vietnamese plants, then installs and commissions it on site or supervises installation, and hands over inspection, GMP and as-built records together. Share the process duty, the province, the water analysis or GMP grade and the start-up target, and Paul will come back with a shipping route, a program and a US dollar figure. Open a Vietnam project when you request a quote.

Standards referenced: Law on Occupational Safety and Health No. 84/2015/QH13 · Decree 44/2016/ND-CP · Circular 36/2019/TT-BLDTBXH · Circular 01/2021/TT-BLDTBXH · QCVN 01:2008/BLDTBXH · TCVN 8366:2010 · Circular 28/2025/TT-BYT · Decision 18/2019/QD-TTg · Decree 111/2021/ND-CP · Circular 39/2015/TT-BCT · ASME Boiler and Pressure Vessel Code Section VIII · SEMI F63 · IEC 60204-1 · Incoterms 2020 · ISPM 15

Frequently asked questions

Which pharmaceutical companies in Vietnam are upgrading to EU-GMP grade?

The Drug Administration of Vietnam counts 243 plants meeting WHO GMP and 29 already at EU-GMP or PIC/S-level standards, and many of the others are upgrading lines. Those upgrades bring new purified water, WFI, clean steam and HVAC utilities. Paul Industries designs and qualifies those systems to the GMP grade a plant declares under Circular 28/2025/TT-BYT.

What is the voltage in Vietnam for an industrial skid?

Vietnam distributes 380 V three phase and 220 V single phase at 50 Hz on a three-phase, four-wire system, and plants transform down from medium voltage. A skid’s motors and heaters are therefore rated for 380 V and its panel lighting and instrument supplies for 220 V. Paul Industries wires the panel for those voltages, following IEC 60204-1 or the owner’s panel standard.

Does Vietnam voltage and plug type matter for a hardwired skid?

The voltage and frequency matter for every motor and heater, while plug type matters only for the few convenience outlets and portable tools on a skid, since process equipment is hardwired to the plant’s distribution boards. Paul Industries rates the hardwired loads for 380 V and 220 V at 50 Hz and fits any receptacles on the skid panel to the type the plant’s electrical specification names.

Who builds ultrapure water systems for chip packaging plants in Bac Ninh?

Paul Industries builds ultrapure water systems for chip packaging and electronics plants in Bac Ninh and the other northern industrial provinces, from pretreatment and double-pass reverse osmosis through electrodeionization, polishing, ultrafiltration and the distribution loop. Each system is designed on the site’s raw water analysis and the parent company’s water specification, tested before shipment, and commissioned with performance data at the plant.

Does a US-built ASME vessel meet the Vietnam pressure vessel regulation?

Vietnam’s regulation for boilers and pressure vessels, QCVN 01:2008/BLĐTBXH, sets safety requirements and an inspection regime for vessels above 0.7 bar, and an ASME Section VIII vessel is checked against it in the technical safety inspection before use. Paul Industries supplies the calculations, drawings, material certificates, weld, NDT and hydrostatic test records the inspection reviews, with Vietnamese translations of the operating and safety sections.

Can a used skid from a US plant be moved to a factory in Ho Chi Minh City?

Used machinery imported for production generally has to be no more than 10 years old on arrival at a Vietnamese port under Decision 18/2019/QD-TTg as amended, and it must meet Vietnam’s technical regulations on safety, energy and environment. Paul Industries checks component ages, refurbishes and retests the skid, documents its condition, and reinstalls and commissions it at the Ho Chi Minh City plant.

How many days does ocean freight take from New York to Haiphong?

Route planners show about 39 days from New York to Haiphong on the quickest routing, and forwarders quote roughly 32 to 45 days between Vietnam and the US East Coast depending on transshipment and on a Panama or Suez routing. Paul Industries confirms the current sailing at booking, sizes crates for the chosen service and sets the factory acceptance test date backward from the cutoff.

Which port suits a plant in Dong Nai or Ho Chi Minh City?

Cai Mep-Thi Vai, the deep-water gateway in the south, handles direct mainline calls and serves Ho Chi Minh City, Dong Nai and the surrounding provinces by road. Haiphong serves the north. Paul Industries books the sailing to the gateway nearest the plant and plans the inland move, including oversized loads that need a road permit.

What are Vietnam import duty rates on US process equipment?

US-origin equipment pays Vietnam’s most favored nation duty for its HS code, since no US-Vietnam free trade agreement is in force. A framework agreed in October 2025 commits Vietnam to preferential access for substantially all US industrial goods once the final agreement takes effect. Paul Industries classifies each item during design and checks the current rate before pricing a DDP order.

How much import VAT does Vietnam charge on equipment?

Vietnam’s standard VAT rate is 10 percent, charged on imports at clearance on the customs value plus duty. A reduced 8 percent rate applies to many goods from 1 July 2025 to 31 December 2026, with exclusions that include metal products, so the rate depends on the item’s classification. Paul Industries includes the correct VAT in a DDP price and shows it as its own line.

Do labels and manuals for Vietnam have to be in Vietnamese?

Imported goods need their name and origin on the original label, and the importer adds a Vietnamese supplementary label before the goods enter the market under Decree 111/2021/ND-CP. Plant operators also need Vietnamese operating and safety instructions for inspection-listed equipment. Paul Industries prepares bilingual nameplates, labels and operating sections, with English engineering documents alongside.

Which GMP standard should a new WFI system in a Hanoi plant follow?

Circular 28/2025/TT-BYT lets a manufacturer declare WHO GMP, PIC/S GMP or EU GMP principles, and the water system is qualified to the grade the Hanoi plant has declared. A plant moving to EU-GMP grade designs its WFI system to the European expectations, including distillation or a qualified membrane route. Paul Industries designs, builds and qualifies the system to that grade.

Is the semiconductor industry in Vietnam building wafer fabs or packaging plants?

Vietnam’s semiconductor investment so far centers on assembly, packaging and test, with Intel in Ho Chi Minh City, Amkor in Bac Ninh and Hana Micron in Bac Giang, alongside a large electronics assembly base. Packaging plants still need ultrapure water, process cooling and chemical distribution to tight specifications. Paul Industries builds those systems to each parent company’s standards.

Does Paul Industries install and commission equipment in Haiphong industrial zones?

Paul Industries installs, starts up and commissions equipment in Haiphong’s industrial zones, or supervises the installation, depending on the contract. The work includes setting and anchoring, piping and cable terminations, start-up, the technical safety inspection of listed equipment before use, and qualification where GMP applies. Records from fabrication and site work go into one turnover file.

What does a Vietnamese plant need for technical safety inspection of a new boiler?

A boiler above 0.7 bar is on the list of equipment with strict safety requirements, so it is inspected before use and at intervals afterwards, and only trained, assigned workers operate it under QCVN 01:2008/BLĐTBXH. The inspection draws on the design data, material and weld records, test reports and installation records. Paul Industries supplies that file and completes the installation the inspection checks.

How do Vietnam's humidity and rainy season change skid design?

Southern Vietnam is hot and humid all year with a long rainy season, and the north adds cooler, damp winters, so condensation and corrosion drive the design. Paul Industries specifies stainless or coated frames, sealed junction boxes, panel cooling with dehumidification, and humidity-proof export packing that protects electronics and polished surfaces through the voyage and site storage.

Which Incoterm suits a Vietnamese buyer ordering a US-built system?

Plants with an established forwarder usually take delivery FCA at a US port, owners who want freight risk carried to the factory gate choose DAP, and DDP suits a buyer who wants clearance, duty and VAT inside one delivered price. Paul Industries quotes any of the three and lists freight, duty and VAT as separate lines.

What does Paul Industries need to price a project for a plant in Vietnam?

Send the process duty, the plant’s province and industrial park, the raw water analysis or GMP grade, the owner’s engineering specification, the utility voltages and the target start-up date. Paul Industries returns a priced scope in US dollars with the shipping route, the schedule and the installation option, and fixes the price when the design basis is agreed.