Paul Industries is a US process equipment contractor for Ecuador that designs, fabricates and tests refrigeration, water treatment, pump skids, pressure vessels and complete process systems for the 60 Hz Ecuadorian grid, ships them to Guayaquil or Posorja, and installs and commissions them at shrimp packers, banana and food plants, refineries and pharmaceutical laboratories or supervises the installation. Because Ecuador prices everything in US dollars and runs on the same frequency as the United States, a US-built system arrives without currency risk and with its motors at their rated speed. The company’s headquarters is at 256 Shore Drive in Kilmarnock, Virginia; it was formerly based in northern New Jersey and later in Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Power 60 Hz; 120 V, 208/120 V and 220/127 V
Currency US dollar since 2000
Import tax IVA 15% since April 2024
Product rules RTE INEN regulations, INEN recognition at import
Main ports Guayaquil, Posorja, Manta, Esmeraldas
Reviewed November 2026

Working with a US process equipment contractor for Ecuador: what one contract covers

A US process equipment contractor for Ecuador takes on the whole chain, from the heat and mass balance through fabrication, factory testing, export, installation and start-up. Paul Industries designs ammonia refrigeration systems for freezing and cold rooms, process and boiler water treatment, pump and dosing skids, pressure vessels and receivers and wastewater treatment packages, and builds them in the United States to the owner’s specifications.

Ecuadorian owners choose the depth of Paul’s site role. Under supply with supervision, the plant’s construction contract sets the equipment while Paul directs the work and signs off each step. Design-build adds the plant layout, utility tie-ins, controls and structural details. Complete installation keeps every task from setting to performance testing with Paul. All three end with one turnover dossier in Spanish and English and one point of accountability. The international projects page lists every country Paul serves, and the Colombia page and Peru page cover the two neighbors on either side.

What is the main source of income in Ecuador, and which plants buy equipment?

For decades crude oil was the answer to what is the main source of income in Ecuador, but in 2025 farmed shrimp overtook oil as the country’s top export, and bananas remained another large earner. Each of those sectors runs process plants, and they sit in different climates: the hot, humid coast around Guayaquil, Machala and Manta, the Andean highlands around Quito at about 2,800 meters, and the refinery towns of Esmeraldas and La Libertad.

Ecuadorian sectors, where their plants sit and the systems they order
SectorMain locationsSystems Paul supplies
Shrimp packing and freezingGuayas, Los Rios and El Oro, with packers around GuayaquilAmmonia refrigeration, brine chilling, ice plants, process water and wastewater treatment
Bananas and fruitEl Oro and the other coastal provincesWash water recirculation and treatment, chemical dosing, cold rooms
RefiningEsmeraldas, La Libertad, ShushufindiPressure vessels, chemical injection skids, cooling water treatment, pipe spools
PharmaceuticalsQuito and GuayaquilPurified water, clean steam, CIP, formulation tanks
Food and beveragesGuayaquil, Quito, Cuenca, AmbatoCIP, pasteurizer support, boiler feed systems, heat exchangers

Shrimp industry in Ecuador: freezing, chilling and water

The shrimp industry in Ecuador exported about US$7.5 billion of farmed shrimp in 2025, a record year and an increase of about 23 percent over 2024, with China and the United States as the two largest buyers. For shrimp production, Ecuador relies on coastal ponds, with most of the farmed area in Guayas, Los Rios and El Oro, and the packing plants that process the harvest run on refrigeration and clean water. Ecuador shrimp producers and Ecuador shrimp exporters buy IQF tunnel and plate freezer systems, ammonia engine rooms, brine chillers, flake ice plants, chlorinated process water systems and wastewater treatment sized for peak harvest weeks.

Shrimp exports, Ecuador’s top earner since 2025, face the food safety audits of every destination market, so the equipment has to be cleanable, documented and stable at full load. Paul designs ammonia systems to ASME B31.5 piping and ASME Section VIII vessels, specifies stainless and coated components for the salt-laden coastal air, and supplies the operating instructions, relief valve schedules and test records an auditor reads. The cold storage page covers the refrigerated buildings that hold the product.

Sizing refrigeration for harvest peaks

Refrigeration for an Ecuadorian shrimp packer is sized for the heaviest harvest days rather than the yearly average, because ponds are harvested in cycles and product has to reach frozen storage quickly to hold its quality. Paul works from the plant’s peak throughput in kilograms per hour, the product temperature after washing and grading, the freezing method and the hold time in cold storage, then adds the defrost, door and lighting loads of the cold rooms. Condensing equipment is selected for coastal design temperatures and humidity, and evaporative condensers get water treatment matched to the makeup water source. The engine room layout keeps space for another compressor, so the plant grows by adding machines instead of replacing the system.

Bananas, food and beverages

Ecuador remained the first banana exporter in the world in 2025, shipping about 378 million boxes worth about US$4.06 billion, roughly a quarter of world exports. Banana packing stations run washing tanks on recirculated water, so screening, filtration, makeup control and chemical dosing set their equipment list. Packing stations and the fruit and food processors around them also order wash water recirculation, filtration, chemical dosing and cold rooms, while breweries, dairies and beverage plants in Quito, Guayaquil and Cuenca buy CIP, heat transfer and steam systems described on the food and beverage page.

Refining in Esmeraldas and La Libertad

Ecuador has three refineries: Esmeraldas, with a capacity of about 110,000 barrels per day, La Libertad at about 45,000 and Shushufindi at about 20,000. Esmeraldas was working back to full throughput in 2026 after a fire in March, a reminder that refineries buy replacement vessels, exchangers, pipe spools and chemical injection skids on tight outage schedules. Paul designs that equipment to ASME Section VIII and B31.3 with full material traceability, and the oil and gas page lists the systems involved.

Pharmaceutical companies in Ecuador

Pharmaceutical companies in Ecuador manufacture in and around Quito and Guayaquil, where the industry has worked since a Guayaquil laboratory opened in the 1930s. National laboratories supply about 20 to 30 percent of the public hospital network, and the pharma market Ecuador’s patients depend on relies heavily on imports, so pharmaceutical manufacturing companies in Ecuador that expand capacity buy purified water systems, clean steam generators, CIP skids and formulation vessels. Pharmaceuticals in Ecuador are registered by ARCSA, whose GMP rules are covered below, and the pharmaceutical industry page describes those systems.

What is the voltage in Ecuador, and how is a US skid wired for it?

Ecuador runs on 60 Hz power with 120 V single-phase service, and the Ecuador three phase voltage on low-voltage distribution is 208/120 V or 220/127 V, depending on the utility and the transformer. Larger plants take a medium-voltage supply and step it down on site, so the Ecuador industrial voltage at a motor control center is set by the plant’s own transformers. That is why Paul reads the single-line diagram and the transformer nameplates before any motor is ordered.

On frequency, Ecuador voltage vs US practice is an easy comparison: both run at 60 Hz, so pumps, fans and compressors keep their US speeds and published curves. The difference lies in the voltage at the terminals, where 220 V or the plant’s chosen motor voltage replaces the 460 V or 480 V found on many US skids. Paul specifies motor windings, drive ratings and control transformers for the measured Ecuador voltage 3 phase supply, labels the panel in Spanish, and draws it to IEC conventions or NEC-style conventions as the owner’s electrical designer prefers.

Ecuadorian site conditions and how Paul designs for them
ConditionWhere it appliesDesign response
60 Hz, 208/120 V or 220/127 V distributionEvery Ecuadorian siteUS-speed equipment, motor windings matched to the plant transformer, Spanish panel labels
AltitudeQuito, Ambato, Cuenca and the highlandsMotor derating above 1,000 meters per IEC 60034-1, larger air-cooled condensers and compressors
Heat, humidity and salt airGuayaquil, Machala, Manta, EsmeraldasStainless enclosures, marine coatings, sealed instruments, ventilated motor rooms
Seismic loadsCoast and highlandsFrames, anchors and supports to the NEC-SE-DS basis in the owner’s specification
Products under RTE INENItems in controlled tariff subheadingsConformity documents ready for the INEN recognition step at import
Spanish documentationOperators, ARCSA, labor inspectorsSpanish manuals, labels and training material, metric drawings

How coastal heat, humidity and salt air shape equipment for Ecuador

Coastal Ecuador combines heat, high humidity and salt air, and those three conditions decide how long carbon steel, aluminum fins and electrical enclosures last at a shrimp packer in Guayas or a refinery in Esmeraldas. Paul specifies stainless frames and fasteners where washdown and brine contact occur, hot-dip galvanizing or multi-coat epoxy systems on structural steel, coated condenser coils, and stainless or polymer enclosures rated for washdown. Motors in humid rooms get space heaters and drain plugs, and control panels get cooling or purge air where condensation would form. Cold piping gets vapor-tight jacketing over its insulation so moisture stays out.

Which Ecuadorian rules apply to pressure equipment, electrical work and seismic design?

Ecuador regulates imported process equipment through three sets of rules: workplace safety under Decreto Ejecutivo 255 of 2024, product conformity under the INEN technical regulations, and building design under the Norma Ecuatoriana de la Construccion. Decreto Ejecutivo 255 issued the Reglamento de Seguridad y Salud en el Trabajo in May 2024 and repealed Decreto 2393 of 1986, which had governed workplace safety for nearly four decades; the Ministry of Labor added compliance and control rules in October 2024. Owners carry those duties into their equipment specifications, and Ecuadorian refineries and food plants commonly call for ASME Section VIII vessels and ASME B31.3 piping with hydrostatic test records.

INEN, the Ecuadorian standards service, publishes technical regulations known as RTE INEN for products that affect safety. Goods in tariff subheadings controlled under an RTE need proof of conformity before they are nationalized, and the importer obtains an INEN recognition certificate through the Ecuadorian single window before customs release. Paul checks each item’s subheading against the controlled list during design, so certificates of conformity and test reports are in hand when the equipment ships.

The Norma Ecuatoriana de la Construccion sets seismic hazard and design in chapter NEC-SE-DS and interior electrical installations in chapter NEC-SB-IE. Coastal and highland sites both carry real seismic demand, so Paul designs skid frames, tank anchorage and pipe supports to the seismic basis in the owner’s specification and adds the calculations to the turnover file.

ARCSA GMP rules for new pharmaceutical equipment

ARCSA, the national agency for health regulation and surveillance, certifies good manufacturing practice at Ecuadorian pharmaceutical laboratories under resolution ARCSA-DE-008-2018-JCGO, partially reformed in 2022, and a GMP certificate is a condition for the sanitary registration of each medicine. A new water system or formulation suite therefore enters production through qualification.

Paul builds pharmaceutical systems with traceable stainless materials, documented surface finishes, passivation records, drainability checks and as-built isometrics, then executes installation and operational qualification under validation and commissioning with protocols and reports in Spanish. Plants in Quito also get altitude-adjusted designs, because water boils at a lower temperature at about 2,800 meters, which changes clean steam and sanitization settings.

How to ship from US to Ecuador: Guayaquil, Posorja and the inland route

Shipping from US to Ecuador runs south through the Panama Canal to the Pacific coast, and route planners list about 14 days on the quickest direct services from Savannah to Guayaquil, with departures every one to two weeks. Cargo shipping to Ecuador lands at the Guayaquil river terminals, at DP World Posorja on the Gulf of Guayaquil, or at Manta and Esmeraldas for cargo bound for those regions. Posorja’s access channel is about 16.5 meters deep, against about 9.75 meters at the Guayaquil river terminals, so deep-draft vessels call at Posorja.

How to ship from US to Ecuador for a large module is decided before the frame is drawn. Standard 40-foot containers take loads up to roughly 2.3 meters in width and height through the door, anything wider goes on a flat rack, and the road from the coast up to Quito climbs the Andes, which sets weight and height limits for highland deliveries. Export crating is ISPM 15 heat-treated lumber, and each crate is marked and listed in Spanish and English against the commercial invoice.

Ecuador import regulations, duties and IVA

Ecuador import regulations require the importer to register with SENAE, the national customs service, hold a tax number, and file through the ECUAPASS system, with the commercial invoice, bill of lading, insurance policy and any INEN certificate attached. Ecuador import duties on machinery vary by tariff line: under World Trade Organization data, mechanical machinery averages about 2.6 percent, with most tariff lines duty-free, while electrical machinery averages about 10.3 percent. Ecuador import duty rates for a complete skid therefore depend on how each item is classified, and Paul assigns the codes with the importer’s customs agent before shipment.

Ecuador import taxes include IVA, the value added tax charged on imports and domestic sales, and buyers asking what is IVA in Ecuador should know the rate rose from 12 to 15 percent on 1 April 2024. The Ecuador VAT rate of 15 percent and any duty make up most of the Ecuador import tax rate on equipment, and payments sent abroad also carry the currency outflow tax, which has had differentiated rates since January 2026, including 0 percent for listed pharmaceutical and power generation items. For process equipment, the Ecuador import restrictions that matter are technical ones: items under an RTE INEN regulation need their conformity proof at the border, and labels and manuals are expected in Spanish.

Does Ecuador have a free trade agreement with the US?

Ecuador and the United States signed an Agreement on Reciprocal Trade on 13 March 2026, and it takes effect once both governments complete their internal approval procedures. Buyers asking does Ecuador have a free trade agreement with the US should read the Ecuador US trade agreement as a reciprocal trade arrangement rather than a full free trade agreement, and Ecuador trade agreements with other countries, including its Andean Community membership, sit alongside it. Until the agreement is in force, US equipment enters at Ecuador’s applied tariff rates. Paul quotes under any Incoterms 2020 term and shows duty, IVA and clearance as separate lines.

A common question from overseas suppliers is does Ecuador have its own currency, and the answer is that Ecuador adopted the US dollar as its official currency in January 2000. Paul’s proposals, invoices and the plant’s budget all sit in the same currency, so no exchange margin is built into the price.

How a project for an Ecuadorian plant runs with Paul Industries

Paul Industries delivers an Ecuadorian project in nine steps, and the early design steps settle the voltage, altitude, seismic basis and INEN classification that the shipping and start-up steps depend on. Each step adds its own documents to the plant’s file.

Project steps for process equipment bound for Ecuador
StepWhat happensDocuments produced
1. Scope and basisProcess duty, site voltage and altitude, seismic basis, GMP or food safety scope, tariff subheadingsBasis of design and applicable code list
2. DesignP&IDs, equipment layout, vessel, piping and refrigeration design, motor and panel selectionCalculations, metric drawings, single-line diagrams
3. BuildWelding, assembly, panel wiring and instrument fitting, all traceable to heat numbersMaterial certificates, weld maps, examination reports
4. Factory testingHydrostatic, leak, functional and control tests, witnessed on site or by videoSigned FAT report and closed punch list
5. Export and customsCrating, sailing to Guayaquil or Posorja, INEN recognition, ECUAPASS filing, inland haulInvoice, packing list, bill of lading, conformity certificates
6. Site workInstallation or supervision of setting, anchoring, piping and wiringInstallation checklists, marked-up drawings
7. Start-upFlushing, pressure tests, refrigerant charging, first productStart-up and site test records
8. CommissioningPerformance runs, IQ and OQ for ARCSA-regulated plantsExecuted protocols, performance data
9. HandoverSpanish training, spare parts list, service planSpanish manuals, as-built drawings, turnover dossier

Ecuador’s mainland keeps UTC-5 all year, matching US Eastern Standard Time in winter, so design reviews and factory tests fall inside normal office hours in Quito and Guayaquil.

Who builds process systems for plants in Ecuador?

Paul Industries builds process systems for plants in Ecuador, including ammonia refrigeration and ice plants for shrimp packers, water and wastewater treatment for fruit and food processors, vessels and injection skids for refineries, and purified water, clean steam and CIP systems for pharmaceutical laboratories. Paul designs for 60 Hz power at Ecuadorian voltages, highland altitude and the NEC seismic basis, prepares conformity documents for the INEN step at import, and installs, starts up and commissions each system or supervises its installation. A project in Guayaquil, Duran, Machala, Manta, Quito, Cuenca or Esmeraldas runs under one contractor and one record set from basis of design to spare parts.

What drives the cost of a process system delivered to Ecuador?

Five items beyond the equipment itself drive the delivered cost of a process system for an Ecuadorian plant: the sailing and inland haul, altitude and climate engineering, conformity documentation in Spanish, the duty and IVA that the Incoterm assigns, and the scope of site work. Paul prices each item on its own line in US dollars, the currency both sides already use.

  • Freight and haul. The Panama Canal route is short, while flat racks and the Andean road to Quito add more than the sea leg.
  • Climate and altitude. Coastal plants need corrosion-resistant materials; highland plants need derated motors and larger air-cooled equipment.
  • Documents. INEN conformity files, Spanish manuals, refrigeration safety records and GMP protocols add engineering hours.
  • Duty and IVA. Machinery duty is often low, the 15 percent IVA applies to the import, and DDP terms move both onto Paul’s invoice.
  • Site work. Harvest-season production at shrimp plants, refinery permits and cleanroom gowning set the site labor figure, and a supervision contract carries a smaller site cost than complete installation.

Paul Industries for shrimp packers, refineries and laboratories in Ecuador

Paul Industries designs, fabricates and tests process systems for Ecuadorian plants, ships them through Guayaquil or Posorja, and installs and commissions them or supervises the work, with conformity, seismic and qualification records in the handover file. Send the process duty, the plant location and altitude, the transformer data and the owner’s specifications, and Paul replies with a route, a schedule and a US dollar price. Request a quote for an Ecuador project.

Standards referenced: Decreto Ejecutivo 255 (2024), Reglamento de Seguridad y Salud en el Trabajo · RTE INEN technical regulations and the Certificado de Reconocimiento INEN · NEC-SE-DS Norma Ecuatoriana de la Construccion, seismic hazard · NEC-SB-IE Norma Ecuatoriana de la Construccion, electrical installations · ARCSA-DE-008-2018-JCGO GMP for pharmaceutical laboratories · US-Ecuador Agreement on Reciprocal Trade (signed 2026) · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · ASME B31.5 · IEC 60034-1 · Incoterms 2020 · ISPM 15

Frequently asked questions

What is the Ecuador voltage and frequency for a process skid?

Ecuador uses 60 Hz power, with 120 V for single-phase loads and three-phase distribution at 208/120 V or 220/127 V; large plants step down from medium voltage through their own transformers. Paul Industries reads the plant’s single-line diagram and transformer data before ordering motors, so each skid arrives wired for the supply at its motor control center.

How does voltage in Ecuador vs USA practice change a US-built pump skid?

The frequency is the same 60 Hz in both countries, so pumps and fans keep their speeds and curves, and the change sits in motor and control voltage. Paul Industries orders motors for the plant’s measured supply, sizes drives and control transformers to match, and labels the panel in Spanish, while the mechanical design of the skid stays as engineered.

Who builds ammonia refrigeration for shrimp packing plants in Guayaquil?

Paul Industries designs, fabricates, installs and commissions ammonia refrigeration for shrimp packing plants in Guayaquil and Duran, including IQF and plate freezer systems, engine rooms, brine chillers and ice plants. Piping follows ASME B31.5 and vessels ASME Section VIII, and the turnover file carries relief valve schedules, test records and Spanish operating instructions for audits.

Which water systems do shrimp plants in Machala and El Oro need?

Shrimp plants in Machala and the rest of El Oro use chlorinated process water for washing and glazing, ice plant feed water, boiler feed treatment where cooking lines run, and wastewater treatment sized for harvest peaks. Paul Industries designs and builds those water systems for 60 Hz power and salt-air exposure, and installs and commissions them at the plant.

Does Paul Industries supply equipment to the refinery at Esmeraldas?

Paul Industries designs and fabricates the equipment refineries such as Esmeraldas buy during repairs and upgrades, including pressure vessels, exchangers, pipe spools and chemical injection skids built to ASME Section VIII and B31.3, then sets and connects it inside the refinery or directs that work. Material certificates, weld maps and hydrostatic test charts go into the turnover file.

Who builds purified water systems for pharmaceutical laboratories in Quito?

Paul Industries designs, installs and qualifies purified water generation, storage and distribution systems for pharmaceutical laboratories in Quito, with designs adjusted for the lower boiling point at about 2,800 meters. Each system comes with IQ and OQ protocols and reports in Spanish for the laboratory’s ARCSA GMP file.

What does ARCSA expect from a new CIP skid or water system?

ARCSA certifies GMP under resolution ARCSA-DE-008-2018-JCGO, and new equipment in a laboratory holding an ARCSA GMP certificate needs documented design, traceable materials, surface finish and passivation records, and executed installation and operational qualification before it supports production. Paul Industries supplies that documentation set and runs the qualification protocols in Spanish.

Which items need an INEN recognition certificate when they arrive in Ecuador?

Goods in tariff subheadings controlled under an RTE INEN technical regulation need proof of conformity, and the importer obtains an INEN recognition certificate through the Ecuadorian single window before release. The controlled list is set by subheading and changes by resolution. Paul Industries checks each component’s subheading during design and ships the certificates of conformity with the equipment.

What are Ecuador import duty rates on US-built machinery?

World Trade Organization data show mechanical machinery entering Ecuador at an average applied duty of about 2.6 percent, with most lines duty-free, and electrical machinery averaging about 10.3 percent. IVA at 15 percent applies on top. Paul Industries classifies each item with the importer’s customs agent so the duty and IVA appear in the proposal before the order is placed.

What does the US-Ecuador Agreement on Reciprocal Trade mean for equipment buyers?

The agreement was signed on 13 March 2026 and takes effect once both governments complete their internal procedures, so equipment shipped before then enters at Ecuador’s applied tariff rates. Paul Industries tracks the status at the time of each quotation and states the duty basis used, so the buyer sees how the figure would change once the agreement applies.

How long does cargo shipping take from Savannah to Guayaquil?

Route planners list about 14 days on the quickest direct services from Savannah to Guayaquil, with departures every one to two weeks; other rotations take longer. ECUAPASS clearance and the trucking leg come on top. Paul Industries reserves space on the sailing, sizes crates and flat racks to suit the vessel, and carries the voyage as a line in the project schedule.

Which port suits a plant in Quito or Cuenca?

Guayaquil and Posorja handle most cargo for Quito and Cuenca, with the final leg by road through the Andes, while Manta and Esmeraldas suit plants near those ports. Paul Industries chooses the port by sailing and by the inland route, which for highland cities sets the height and weight limits for oversized modules.

How does altitude in Quito change refrigeration and compressor design?

Air at about 2,800 meters is markedly thinner than at sea level, so air-cooled condensers, compressors and motors lose capacity, and IEC 60034-1 rates motors for up to 1,000 meters. Paul Industries resizes condensers and compressors for the site elevation, derates motors, and checks pump suction against the lower boiling point of water.

What seismic rules apply to tanks and skids at Ecuadorian plants?

The Norma Ecuatoriana de la Construccion chapter NEC-SE-DS sets seismic hazard and design, and owners on the coast and in the highlands specify loads for frames, anchors and supports from it. Paul Industries designs skid frames, vessel legs, tank anchorage and pipe supports to that basis and includes the calculations in the turnover file.

Does Paul Industries install equipment at food and beverage plants in Cuenca and Ambato?

Paul Industries installs, starts up and commissions CIP systems, heat exchangers, boiler feed systems and process tanks at food, dairy and beverage plants in Cuenca, Ambato and the other highland cities, or supervises the installation under the plant’s construction contract. Highland projects get altitude-adjusted motors and air-cooled equipment from the start.

Can engineers from an Ecuadorian plant attend the factory acceptance test?

Engineers from an Ecuadorian plant are welcome to attend Paul Industries factory acceptance tests in person or follow them by live video, and Ecuador’s UTC-5 time keeps the test inside their working day. Hydrostatic, functional and control checks are recorded in a signed report, and open items are closed before the equipment is crated.

In which currency does Paul Industries quote projects in Ecuador?

Paul Industries quotes Ecuadorian projects in US dollars, which has been Ecuador’s official currency since January 2000, so the proposal, the invoice and the plant’s budget use the same money. The proposal shows engineering, fabrication, freight, duty, IVA and installation as separate lines under the Incoterm the buyer chooses.

What information does Paul Industries need to price an Ecuadorian project?

Paul Industries prices an Ecuadorian project from the process duty and flow sheet, the plant location and elevation, the transformer and switchboard data, the owner’s specifications and seismic basis, any ARCSA or food safety scope, the target start-up and the preferred Incoterm. The reply sets out the route, schedule and a US dollar price, fixed once the design basis is agreed.

Planning a process system for a plant in Ecuador?

Tell Paul Industries the process duty, the plant’s city and elevation, and the transformer data, and the reply sets out the sailing plan, the work program and a dollar budget. Call 201-450-8280 or request a quote.