Paul Industries is a US process equipment contractor for Colombia that engineers and fabricates pump skids, pressure vessels, tanks, purified water plants and complete process systems for the 60 Hz Colombian grid, ships them under the US-Colombia Trade Promotion Agreement, and installs and commissions them at refineries, drug plants and food factories or supervises their installation. Boilers arrive with the Spanish manuals and test records that Resolucion 1857 de 2024 asks for, and electrical parts are selected for RETIE. The company is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and was formerly based in northern New Jersey and then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler rule Resolucion 1857 de 2024, Ministry of Labor
Electrical regulation RETIE, Resolucion 40117 de 2024
Power 60 Hz; 208/120 V and 440 V three-phase
Trade terms US-Colombia TPA in force since 15 May 2012
Main ports Cartagena, Barranquilla, Santa Marta, Buenaventura
Reviewed November 2026

What Paul Industries builds as a US process equipment contractor for Colombia

A US process equipment contractor for Colombia starts with an advantage that few export markets offer: Colombia runs at 60 Hz, the same frequency as the United States, so motors, pumps and drives keep their US speed and duty curves. Paul Industries takes a Colombian order from process design through fabrication, factory acceptance testing and ocean freight to start-up on the plant floor. Typical scope covers transfer, dosing and CIP pump skids, pressure vessels and receivers, stainless and carbon steel tanks, purified water and WFI systems and process piping spools cut and welded to fit the site.

Colombian buyers choose among three routes. Supply with installation supervision fits a plant whose own construction contract is already let. Design-build adds the layout, utility tie-ins, controls and structural interface. Complete installation keeps setting, piping, wiring, start-up and commissioning with Paul until the plant signs the handover. Every route ends with one turnover file in Spanish and English and one contract for the whole scope. The international projects page lists every country Paul takes work in, and the Mexico page and Peru page cover two neighboring markets with their own rules.

Oil companies in Colombia, drug makers and the other plants that buy process equipment

Oil companies in Colombia, pharmaceutical manufacturers in Bogota, Medellin and Cali, and food, beverage and flower exporters are the main Colombian buyers of engineered process equipment. Each cluster sits in a different climate and altitude band, from the Caribbean coast at sea level to the Bogota plateau at about 2,640 meters, and that spread shapes the design basis as much as the process does. The table maps the regions to the systems they buy.

Colombian regions, their process industries and the equipment they order
RegionIndustriesSystems Paul builds for them
Bogota and CundinamarcaPharmaceuticals, cosmetics, beverages, cut flowers on the Bogota SavannaPurified water, clean utilities, CIP skids, irrigation water treatment
Medellin and AntioquiaPharmaceuticals, food, textiles, flowers around RionegroProcess tanks, heat exchangers, water treatment, steam systems
Cali and the Valle del CaucaSugar, food, pharmaceuticals, consumer productsEvaporator support, boiler feed systems, CIP and transfer skids
Barrancabermeja and Magdalena MedioRefining and petrochemicalsChemical injection skids, pressure vessels, cooling water treatment
Cartagena, Barranquilla and Santa MartaRefining, petrochemicals, plastics, food, port industryPressure vessels, pipe spools, effluent treatment, tank farms
Llanos and MetaCrude oil productionProduced water treatment, separators, injection skids

Oil and gas industry in Colombia: Barrancabermeja and Cartagena

The oil and gas industry in Colombia is anchored by Ecopetrol, the majority state-owned producer, which runs the country’s two big refineries: Barrancabermeja on the Magdalena River, with a nameplate capacity of about 250,000 barrels per day and a record load of about 245,000 in late 2025, and the Cartagena refinery, which reached about 202,000 barrels per day in 2025. Oil and gas companies in Colombia also operate fields in the eastern plains around Meta, where produced water handling, separators and chemical injection are steady purchases. Refinery and field buyers ask for ASME Section VIII vessels and ASME B31.3 piping, which is how Paul designs and documents them, along with hydrostatic test charts, material traceability and weld maps in the turnover file. The oil and gas industry page describes the systems Paul supplies to that sector.

Pharmaceutical companies in Colombia

Pharmaceutical companies in Colombia cluster around Bogota, Medellin and Cali, where national producers and the plants of multinational groups make tablets, liquids, injectables and cosmetics for the domestic market and the Andean region. The pharmaceutical industry in Colombia buys purified water generation and loops, clean steam, CIP systems, formulation tanks and transfer skids. Pharmaceutical manufacturing companies in Colombia qualify that equipment against INVIMA’s GMP rules, covered below, and the pharmaceutical industry page shows the systems involved.

Flowers, coffee, sugar and food processing

Colombia is the world’s second-largest exporter of cut flowers after the Netherlands, and most of its production comes from greenhouses on the Bogota Savanna, with most of the rest around Rionegro in Antioquia. Those farms buy irrigation and fertigation water treatment and cold chain support. Coffee processing, sugar mills in the Valle del Cauca, dairies and beverage plants add CIP, pasteurization support, heat exchangers and boiler feed systems, covered on the food and beverage page.

Which Colombian regulations govern boilers and pressure vessels?

Colombian boilers fall under Resolucion 1857 de 2024 from the Ministry of Labor, in force since 29 November 2024, and other pressure vessels still come under Resolucion 2400 de 1979, the Estatuto de Seguridad Industrial. Resolucion 1857 covers work on boilers of every type together with their auxiliary equipment and associated pressure piping, and it sorts boilers into four categories by power: up to 50 kW, from 50 kW to 1,000 kW, from 1,000 kW to 3,000 kW, and above 3,000 kW. It repealed articles 500 to 504 of the 1979 statute.

The 2024 resolution sets an inspection calendar the owner has to keep. Each boiler gets a pre-shift checklist, an annual hydrostatic test by an accredited body, and a yearly test of its inlet and outlet piping; safety and relief valves need a calibration certificate from a laboratory accredited by ONAC, Colombia’s accreditation body, under ISO/IEC 17025, every year and after any lift in service; and pressure and temperature gauges are calibrated annually. Manuals and technical sheets must be in Spanish and kept where workers can read them. Paul builds boilers, steam packages and their piping so those tests are straightforward to run: valve and gauge connections are accessible, test points are marked, and the Spanish manuals, data sheets and factory test records ship with the unit.

For unfired vessels, the 1979 statute requires construction to standards approved by ICONTEC, the national standards body, legible safety and control devices, and inspection and a pressure test at 1.5 times the working pressure after installation or repair. Paul designs receivers, filters, separators and heat exchanger shells to ASME Section VIII, hydrotests them in the factory, and repeats the site test after installation so the record the statute expects is in the owner’s file on the day of start-up.

Colombian rules that apply to imported process equipment
RuleAuthorityWhat it asks of the equipment
Resolucion 1857 de 2024Ministry of LaborBoiler categories by power, annual hydrostatic tests, accredited valve calibration, Spanish manuals
Resolucion 2400 de 1979Ministry of LaborPressure vessels built to approved standards, safety devices, test at 1.5 times working pressure after installation
RETIE, Resolucion 40117 de 2024Ministry of Mines and EnergyCertificates of conformity for covered electrical products, safe design of the electrical installation
NSR-10Ministry of HousingSeismic design of buildings and of the nonstructural elements and fixed equipment in them
Resolucion 1160 de 2016Ministry of Health, INVIMAGMP for medicines and sterile medicines, including water systems and qualification
US-Colombia Trade Promotion AgreementDIAN customsPreferential duty for qualifying US goods, supported by origin information

RETIE certification and electrical design for imported skids

RETIE, the Reglamento Tecnico de Instalaciones Electricas, is Colombia’s mandatory technical regulation for electrical installations and the products used in them, and its current version is Resolucion 40117 of April 2024 from the Ministry of Mines and Energy. RETIE Colombia rules require covered electrical products to carry a certificate of conformity before they are imported, sold or distributed, issued per product family and per factory by bodies accredited by ONAC; the 2024 version replaced the 2013 text, and its transition terms and some articles were adjusted in 2025 and 2026.

For a buyer, RETIE certification shows up in two places on a skid. Components such as breakers, contactors, cables, enclosures and motors are selected from families that already hold Colombian certificates of conformity, and the control panel and field wiring are designed and documented so the finished installation meets the regulation’s safety requirements. Paul sends a component schedule with the certificate references, single-line diagrams, grounding and protection details and test records with every Colombian panel.

What voltage is used in Colombia, and does a US skid need changes?

Colombia uses 60 Hz power, with 120 V single-phase circuits for small loads and three-phase systems for industry, commonly 208/120 V four-wire in buildings and 440 V for larger motors. Because the Colombia voltage and frequency match US practice on frequency, a 60 Hz motor delivers its rated speed, and pumps and fans keep their curves. Comparing Colombia voltage vs US practice, the change sits in the motor voltage, where 440 V replaces the 460 V or 480 V windings common on US skids.

Paul confirms the Colombia industrial voltage of each site before ordering motors, because the right Colombia voltage 3 phase supply differs between a refinery motor control center, a pharmaceutical plant in Bogota and a sugar mill in the Valle del Cauca. Altitude matters too: IEC 60034-1 rates motors for up to 1,000 meters, and Bogota sits at about 2,640 meters and Medellin at about 1,495, so motors and air-cooled equipment for plateau sites are selected with altitude derating, and pump suction is checked against the lower boiling point of water at height.

Colombian site conditions and how Paul designs for them
ConditionWhere it appliesDesign response
60 Hz supply, 440 V and 208/120 VEvery Colombian siteUS-speed motor selections with Colombian windings, panel voltages matched to the plant
High altitudeBogota plateau, Boyaca, parts of AntioquiaMotor derating, compressor and blower resizing, NPSH margin checks
Hot, humid, salty airCartagena, Barranquilla, Santa Marta, BuenaventuraMarine coating systems, stainless enclosures, sealed instruments
Seismic loadsAndean cities and the Pacific coastFrames, anchors and supports designed to the NSR-10 basis the owner specifies
RETIE complianceAll electrical workComponents with Colombian certificates of conformity, documented panels
Spanish documentationInspectors, operators, INVIMASpanish manuals, labels and training material, metric drawings

Seismic design under NSR-10

NSR-10, the Colombian seismic building regulation, covers the design of structures and of the nonstructural elements and fixed equipment inside them, and it has been amended since its 2010 adoption. Andean cities such as Bogota, Medellin and Cali and the Pacific coast carry higher seismic demand than much of the Caribbean coast. Paul designs skid frames, vessel legs, tank anchorage and pipe supports to the seismic basis on the owner’s specification, includes the calculations in the turnover file, and checks that shipping restraints come off without leaving the load path incomplete.

INVIMA GMP and the Colombia pharmaceutical regulation for new equipment

INVIMA GMP inspections in Colombia apply Resolucion 1160 de 2016 from the Ministry of Health, which adopted a GMP manual for medicines based on World Health Organization Technical Report Series 37, Annex 4, and a manual for sterile medicines based on Report 45, Annex 6. The resolution was modified in 2019 and 2020, and it is the core of the Colombia pharmaceutical regulation that a new water system, CIP skid or formulation suite is qualified against.

INVIMA registration covers the products a plant makes, while the GMP certificate covers the facility and its equipment, so a new system enters the plant’s file through its qualification. Paul designs pharmaceutical systems with documented materials of construction, surface finish records, slope and drainability checks and passivation, and executes installation and operational qualification through validation and commissioning, with protocols and reports in Spanish.

How to ship to Colombia from USA East Coast ports

Shipping containers to Colombia from USA ports is one of the shortest ocean runs in South America, because the Caribbean ports of Cartagena, Barranquilla and Santa Marta sit only a few days south of Florida and Georgia. Route planners list about 3 days from Miami to Cartagena, about 4 days from Savannah or Port Everglades, about 5 days from Charleston and about 7 days from New York on direct services. Buenaventura, on the Pacific, serves Cali and the Valle del Cauca and adds the Panama Canal transit to the voyage.

How to ship to Colombia from USA ports for an oversized skid is decided at the design stage: a standard 40-foot container takes about 2.3 meters of width and height through the door, so wider modules ride on flat racks, and the road climb from the coast to Bogota or Medellin sets limits on weight and height that Paul checks before the frame is drawn. Crates use ISPM 15 heat-treated wood, and every package carries a Spanish and English packing list matched to the invoice.

Does Colombia have a free trade agreement with the US?

Colombia and the United States have had a free trade agreement in force since 15 May 2012, the US-Colombia Trade Promotion Agreement, and more than 80 percent of US industrial and consumer exports became duty-free on the first day, with most remaining tariffs phased out over the following ten years. The US Colombia free trade agreement works without a specific certificate form: buyers looking for a US Colombia free trade agreement certificate of origin form find instead that DIAN, Colombia’s customs and tax authority, accepts the claim and asks for supporting origin information when it reviews it. The full text of the agreement is public, and readers searching for the US Colombia free trade agreement PDF will find the chapters on rules of origin and customs procedures there. Paul prepares the Colombia free trade agreement certificate of origin information for each shipment, with HS codes matched to the invoice, and keeps the records for the five years US rules require.

Colombia import duty rates for goods outside the agreement range from 0 to 5 percent for capital goods and raw materials made outside Colombia to 10 percent for most manufactured goods and 15 to 20 percent for consumer goods. The Colombia import tax that every shipment pays is IVA at the general rate of 19 percent, charged on the customs value plus any Colombia customs duty. Colombia import regulations also call for a registered customs agency, the agencia de aduanas, on imports of US$1,000 or more, an Andean Customs Value Declaration on imports of US$5,000 FOB or more, and import records kept for five years. Under Incoterms 2020, refineries with established logistics often buy FCA at a US port, plants that want the ocean leg handled choose CFR or DAP, and DDP puts clearance and IVA inside Paul’s delivered price.

How a Colombia project with Paul Industries runs

Paul Industries runs a Colombian project in nine stages, and the opening two fix the electrical, altitude, seismic and boiler basis that the later stages depend on. The table lists the record each stage adds to the Colombian file.

Steps in a process equipment project for a plant in Colombia
StageWorkRecord for the Colombian file
1. Basis of designProcess duty, site voltage and altitude, NSR-10 basis, boiler category, GMP scope, HS codesDesign basis memorandum and code list
2. EngineeringP&IDs, layout, vessel and piping design, RETIE component schedule, crate envelopeCalculations, metric drawings, single-line diagrams
3. FabricationWelding, assembly, panel build and instrument fitting with heat-number traceabilityMill certificates, weld maps, NDT reports
4. Factory acceptance testHydrostatic, functional and control tests witnessed in person or on videoFAT report and closed punch list
5. ExportCrating, ocean freight to the Caribbean or Pacific port, road haul to the plantInvoice, packing list and origin information with matching HS codes
6. Installation or supervisionSetting, anchoring, piping and cable connectionsInstallation records and as-installed markups
7. Start-upFlushing, rotation checks, site hydrostatic test, first process fluidStart-up report and pressure test records
8. Commissioning and qualificationPerformance runs, IQ and OQ for INVIMA-regulated plantsExecuted protocols and performance data
9. Handover and serviceSpanish training, spare parts, service scheduleSpanish manuals, as-built drawings, turnover dossier

Bogota keeps Colombia time, UTC-5, all year with no daylight saving, so it runs level with US Eastern time for part of the year and one hour behind it for the rest. Colombian engineers witness factory tests and join design reviews during their normal working day, and after handover Paul keeps drawings, calculations and control programs on file for the life of the equipment.

Who builds process systems for plants in Colombia?

Paul Industries builds process systems for plants in Colombia, from chemical injection skids and pressure vessels for refineries and oil fields to purified water, CIP and formulation systems for pharmaceutical and food plants, and it carries each system through factory testing, export, installation, start-up and commissioning. Paul designs for 60 Hz power at Colombian voltages, altitude and the NSR-10 seismic basis, documents boilers for Resolucion 1857 in Spanish, selects electrical components with RETIE certificates of conformity, and stays with the equipment through service. Plants in Bogota, Medellin, Cali, Barranquilla, Cartagena and Barrancabermeja deal with one contractor and one record set from basis of design to spare parts.

What drives the cost of process equipment delivered to Colombia?

The delivered cost of process equipment for a Colombian plant depends on five items beyond the equipment itself: freight and the inland haul, altitude and seismic engineering, Spanish and code documentation, IVA and any duty under the chosen Incoterm, and the installation route. Paul prices each one as a separate line, in US dollars, so the buyer compares scope rather than totals.

  • Freight and haul. The ocean leg to the Caribbean ports is short; flat racks for wide skids and the mountain road to Bogota or Medellin add more than the sea voyage.
  • Altitude and seismic design. Derated or larger motors for plateau sites and heavier frames and anchors for the seismic basis add material and engineering.
  • Documentation. Spanish manuals, RETIE component schedules, boiler test packages and GMP protocols add engineering and translation hours.
  • Taxes and duty. Qualifying US goods enter under the trade agreement, and the 19 percent IVA falls to the buyer under FCA, CFR or DAP and to Paul under DDP.
  • Installation. Refinery permits and inductions, cleanroom gowning and shift work shape the site cost, and supervision of installation costs less than full erection.

Paul Industries for Colombian refineries, drug plants and food factories

Paul Industries engineers and fabricates process equipment for Colombian plants, tests it in the United States, ships it under the US-Colombia agreement, and installs and commissions it on site or supervises the installation, handing over boiler, RETIE, seismic and qualification records together. Send Paul the process duty, the plant location and its altitude, the owner’s specifications and the start-up date, and the reply carries a route, a schedule and a price in US dollars. Request a quote for a Colombian project.

Standards referenced: Resolucion 1857 de 2024, Ministerio del Trabajo (boilers) · Resolucion 2400 de 1979, Estatuto de Seguridad Industrial · RETIE, Resolucion 40117 de 2024, Ministerio de Minas y Energia · NSR-10 Reglamento Colombiano de Construccion Sismo Resistente · Resolucion 1160 de 2016, Ministerio de Salud (GMP) · US-Colombia Trade Promotion Agreement · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · ISO/IEC 17025 · IEC 60034-1 · Incoterms 2020 · ISPM 15

Frequently asked questions

What is the Colombia voltage and frequency for industrial process skids?

Colombian plants run at 60 Hz, with 120 V single-phase circuits for small loads, 208/120 V four-wire systems in many buildings and 440 V three-phase for larger motors. Paul Industries confirms the voltage at each motor control center before ordering motors, so a skid for a Bogota pharmaceutical plant and one for a Cartagena refinery each arrive wired for their own supply.

Do US-built pumps need new motors for Colombia's power supply?

Colombia’s 60 Hz frequency matches the United States, so pumps, fans and compressors keep their US speeds and curves, and the change is usually limited to motor winding voltage, 440 V in place of 460 V or 480 V. Altitude can still change the selection for plateau sites. Paul Industries sizes every motor on the actual site voltage and elevation during design.

What does Resolucion 1857 de 2024 require for a new boiler in Colombia?

Resolucion 1857 de 2024 sorts boilers into four power categories and requires a pre-shift checklist, an annual hydrostatic test by an accredited body, annual calibration of safety valves by an ISO/IEC 17025 laboratory accredited by ONAC, annual gauge calibration and Spanish manuals kept at hand. Paul Industries ships each boiler and steam package with Spanish manuals, data sheets and factory test records ready for that program.

How is a pressure vessel tested after installation at a Colombian plant?

Resolucion 2400 de 1979 calls for inspection and a pressure test at 1.5 times the working pressure after a vessel is installed or repaired, and for safety and control devices that stay legible. Paul Industries hydrotests each vessel in the factory, repeats the site test after setting and piping, and adds both test records to the owner’s file.

Which electrical parts on a skid need RETIE certificates of conformity?

RETIE requires covered electrical products, such as breakers, contactors, cables, enclosures and many motors, to hold a Colombian certificate of conformity before import or sale, issued per product family and factory by an ONAC-accredited body. Paul Industries builds Colombian panels from component families that hold those certificates and lists each certificate reference in the component schedule delivered with the panel.

Who builds purified water systems for pharmaceutical plants in Bogota?

Paul Industries designs, fabricates, installs and qualifies purified water generation, storage and distribution systems for pharmaceutical plants in Bogota and on the surrounding plateau. The systems are sized for 60 Hz power and for the reduced boiling point and air density at about 2,640 meters, and they come with IQ and OQ protocols and reports in Spanish for the plant’s INVIMA GMP file.

What does INVIMA GMP expect from a new water system or CIP skid?

INVIMA inspects against Resolucion 1160 de 2016, which follows World Health Organization GMP texts for medicines and for sterile products, so a new system needs documented design, materials and surface finish records, and installation and operational qualification before it supports production. Paul Industries supplies that documentation and executes the IQ and OQ protocols in Spanish.

Which equipment do refineries in Barrancabermeja and Cartagena buy from abroad?

Refineries in Barrancabermeja and Cartagena buy chemical injection skids, pressure vessels, exchangers, pipe spools, cooling water treatment and effluent systems from overseas builders when they need a defined design and a full document set. Paul Industries designs that equipment to ASME Section VIII and B31.3, hydrotests it, and installs and commissions it inside the refinery or supervises the installation.

Does Paul Industries install skids at food and sugar plants around Cali?

Paul Industries installs, starts up and commissions CIP skids, heat exchangers, boiler feed systems and process tanks at food, beverage and sugar plants around Cali and the Valle del Cauca, or supervises the installation, depending on the contract. Equipment for the Valle del Cauca usually lands at Buenaventura on the Pacific coast and reaches the plant by road.

Which port suits a plant in Medellin or Bogota?

Cartagena, Barranquilla and Santa Marta on the Caribbean are the usual entry ports for Bogota and Medellin, with the shortest ocean legs from US East Coast ports, while Buenaventura on the Pacific suits Cali. Paul Industries picks the port by sailing time and by the road route inland, which for plateau cities sets the weight and height limits for oversized modules.

How many days does ocean freight take from Florida to Cartagena?

Route planners list about 3 days from Miami to Cartagena and about 4 days from Port Everglades or Savannah on direct services, with New York near 7 days. Port handling, customs clearance and the road haul add to that time. Paul Industries confirms the current sailing at booking and plans crate and flat-rack sizes for the chosen service.

What are Colombia import duty rates on a US-built skid?

Qualifying US goods enter under the US-Colombia Trade Promotion Agreement, in force since 2012, which removed tariffs on most US industrial products. Every import pays IVA at 19 percent on the customs value plus any duty. Under DDP terms Paul Industries pays the duty and IVA and arranges clearance; under FCA, CFR or DAP the buyer’s customs agency files with Paul’s complete document set.

Does a Colombian importer need a customs agency for process equipment?

Imports of US$1,000 or more go through a Colombian customs agency, the agencia de aduanas, and shipments of US$5,000 FOB or more also need an Andean Customs Value Declaration. The importer keeps the import documents for five years. Paul Industries supplies the invoice, packing list, bill of lading and origin information in a consistent set the agency files without rework.

How does altitude in Bogota change compressor and blower sizing?

Air at about 2,640 meters is roughly a quarter thinner than at sea level, so compressors and blowers move less mass per revolution and air-cooled motors and coolers reject less heat. IEC 60034-1 rates motors for up to 1,000 meters. Paul Industries resizes compressors and blowers for the site elevation and applies motor derating for every plateau project.

What seismic design applies to skids and tanks in Colombian plants?

NSR-10, Colombia’s seismic building regulation, covers buildings and the nonstructural elements and fixed equipment in them, and owners in Bogota, Medellin, Cali and the Pacific coast specify seismic loads for frames, anchors and supports from it. Paul Industries designs skid frames, vessel supports and tank anchorage to the specified basis and includes the calculations in the turnover file.

Which Incoterm do Colombian buyers choose for US equipment?

Refineries and large plants with logistics teams often buy FCA at a US port, plants that want the sea freight handled choose CFR or DAP, and buyers who want a single delivered figure choose DDP, with duty, IVA and clearance included. Paul Industries quotes any Incoterms 2020 term and shows freight, insurance, taxes and clearance as separate lines.

What should a Colombian plant send Paul Industries for a firm price?

A firm price starts from the process duty and flow sheet, the plant location and elevation, the site voltage, the owner’s specifications and seismic basis, any boiler or GMP scope, the start-up date and the preferred Incoterm. From those, Paul Industries prepares a proposal in US dollars covering engineering, fabrication, freight route, installation option and schedule, and fixes the figure once the design basis is signed.

Planning process equipment for a plant in Colombia?

Send the process duty, the plant location and elevation, and the owner specifications, and Paul Industries will set out the shipping route, the schedule and a budget. Call 201-450-8280 or request a quote.