Paul Industries is a US process equipment contractor for Peru that designs and fabricates reagent and dosing skids, pressure vessels, tanks, water and effluent treatment plants and complete process systems for Peru’s 60 Hz grid, ships them through Callao under the US-Peru Trade Promotion Agreement, and installs and commissions them at mines, fishmeal and food plants and drug factories or supervises their installation. Mine equipment is sized for altitudes above 4,000 meters, boilers and air receivers carry the fittings and records Peruvian safety rules expect, and manuals come in Spanish. Paul’s headquarters are at 256 Shore Drive, Kilmarnock, Virginia; the company was formerly based in northern New Jersey and then Pennsylvania.
Request a quote or call 201-450-8280
Scope Paul Industries covers as a US process equipment contractor for Peru
A US process equipment contractor for Peru works across two very different design worlds: copper and gold mines high in the Andes, where thin air and freezing nights shape every motor and pipe, and the coastal desert, where fishmeal plants, food factories and Lima’s drug makers operate in fog, salt and dust. Paul Industries carries a Peruvian order from process engineering through fabrication, factory acceptance testing and ocean freight to start-up at the site. Equipment includes reagent, lime and flocculant dosing skids, pressure vessels and air receivers, agitated and storage tanks, heat exchangers, water treatment plants and effluent treatment systems.
Peruvian owners take one of three routes. Supply with installation supervision fits a mine whose construction contractor is already on site. Design-build adds layout, foundation loads, utility tie-ins and controls. Complete installation keeps erection, piping, wiring, start-up and commissioning with Paul through handover. Every country on Paul’s export list appears on the international projects page, and the Chile page and Colombia page cover Peru’s neighbors on the Pacific and the Caribbean.
Copper mining in Peru and the other sectors that order process systems
Copper mining in Peru drives the country’s largest equipment orders: Peru produced about 2.7 million tonnes of mined copper in 2025, third in the world after Chile and the Democratic Republic of the Congo by a US Geological Survey estimate. The mining industry in Peru also produces gold, silver, zinc and molybdenum, and fishmeal, agro-exports, food and pharmaceuticals complete the list of process buyers. The table pairs Peru’s main regions with the systems their plants buy.
| Region | Industries | Systems in demand |
|---|---|---|
| Ancash | Copper and zinc mining at high altitude, fishmeal on the coast | Reagent skids, concentrate thickener support, water treatment, stickwater evaporator support |
| Arequipa and Moquegua | Copper mining and processing, cement, food | Leach and dosing systems, process tanks, effluent and water recovery |
| Apurimac and Cusco | Copper mining in the southern Andes | Reagent preparation, potable and process water plants, air receivers |
| Lima and Callao | Pharmaceuticals, food and beverage, chemicals, port industry | Purified water, CIP skids, pressure vessels, heat exchangers |
| Piura, La Libertad and Ica | Fruit and vegetable packing for export, fishmeal, food processing | Washing and cooling systems, water treatment, boiler feed packages |
| Cajamarca and La Libertad highlands | Gold and copper mining | Cyanide destruction and water treatment, dosing skids, tanks |
Mining companies in Peru and the mines that buy equipment
Mining companies in Peru run some of the world’s largest copper operations: Las Bambas in Apurimac produced about 411,000 tonnes in 2025, Cerro Verde near Arequipa about 391,000 tonnes and Antamina in Ancash about 368,000 tonnes, and Antamina works at about 4,300 meters. At that height air is about a third thinner than at sea level, so motors lose cooling capacity, compressors and blowers move less mass, water boils near 86 degrees Celsius and pump suction margins shrink. Flotation concentrators buy lime, collector, frother and flocculant dosing systems, and the leach, solvent extraction and electrowinning plants in the south buy acid handling, solution tanks and heat exchangers. Buyers searching for mining equipment Peru suppliers also need water: tailings water recovery, mine water treatment and camp potable water plants are standing purchases.
Air receivers, compressors and blowers for Andean mines
Compressed air systems at an Andean mine show the altitude penalty more clearly than any other utility. A compressor draws its rated volume of air, but at 4,300 meters each cubic meter holds about two thirds of the mass it holds at sea level, so delivering the same free air to flotation cells, filters and instruments takes a larger machine or more stages, and the motor driving it has less cooling air. Receivers are sized on the actual site mass flow, drains are protected against freezing, and safety valves are set and tagged on the site design pressure. Flotation blowers follow the same logic, and their discharge temperature rises at altitude, which affects downstream piping and seals. Paul sizes compressors, dryers, receivers and blowers on the site elevation and records the selection basis in the design file, so the mine’s maintenance team sees why each machine is the size it is.
Tailings water recovery and mine water treatment
Water is a design constraint on both sides of the Andes in Peru: coastal plants sit in desert, and highland mines recover as much water as possible from thickeners and tailings to limit fresh intake. Recovery systems combine thickener overflow pumping, clarification, filtration and, where the discharge or reuse limit calls for it, membrane treatment, with dosing of lime, coagulant and flocculant controlled from the plant system. Paul designs recovery trains, mine water treatment plants and camp potable water systems as packaged skids that arrive tested and need just foundation, power and piping connections at the site, which shortens the work window at altitude.
Fishmeal from Peru and coastal food processing
Peru fishmeal production rests on the anchoveta, which makes up about 77 percent of the country’s fish landings by volume, and Peru has historically supplied about a fifth of the world’s fishmeal and fish oil. Fishmeal from Peru comes out of coastal plants that cook, press, dry and grind the catch and recover oil and solubles from stickwater, so they buy evaporator and dryer support systems, steam and boiler feed packages, heat exchangers and wastewater treatment. Fruit and vegetable packers on the northern and southern coast, breweries and dairies add washing, cooling and CIP systems, shown on the food and beverage page.
Pharmaceutical industry in Peru
The pharmaceutical industry in Peru is centered on Lima, where national laboratories and multinational plants make solid, liquid and sterile products for the domestic market and for export within the region. Those plants buy purified water systems, clean steam, formulation tanks and CIP skids qualified to DIGEMID’s GMP manual, described further down and on the pharmaceutical industry page.
Which Peruvian rules cover boilers, pressure vessels and air receivers?
Peruvian boilers and pressure vessels come under Title VII of DS 42-F, the Reglamento de Seguridad Industrial of 1964, with in-service boiler inspection set out in the technical standard NTP 350.303.2020, while equipment on mine sites also answers to DS 024-2016-EM, the occupational health and safety regulation for mining. The mining regulation, amended in 2017 and 2023, requires steam boilers to carry safety valves, pressure gauges and water level indicators and the operator to keep a cleaning and maintenance record, and it requires compressed air tanks to carry gauges and one or more safety valves and to be inspected periodically together with the main air line. Boilers and air tanks on a mine are entered in the operator’s register.
Paul designs pressure vessels and air receivers to ASME Section VIII and builds boilers and steam packages with the safety valves, gauges and level indicators those rules name, mounted where inspectors reach them. Each unit ships with its nameplate data, design calculations, material certificates and hydrostatic test record in Spanish and English, so the mine’s register and the inspection file open complete.
| Rule | Scope | Effect on the equipment |
|---|---|---|
| DS 42-F (1964), Title VII | Industrial safety, boilers and pressure vessels | Construction, installation and operating conditions for steam boilers and vessels |
| NTP 350.303.2020 | In-service inspection of boilers | Inspection requirements the boiler and its fittings are designed to meet |
| DS 024-2016-EM | Safety and health on mine sites | Safety valves, gauges, level indicators, air tank inspection, equipment register |
| Codigo Nacional de Electricidad – Utilizacion | Electrical installations of users | Design and protection of panels, wiring and grounding |
| Norma E.030 (2018) | Seismic design | Forces on nonstructural elements and equipment, anchorage of frames and tanks |
| DS 021-2018-SA | GMP for pharmaceutical products | Design, qualification and records for drug plant systems |
What is the voltage in Peru, and how is a skid wired for it?
Peru’s national grid runs at 60 Hz, with 220 V single-phase service and 380/220 V three-phase, four-wire secondary networks, so the Peru voltage and frequency differ from US practice in voltage only. Is Peru 220V? For outlets and single-phase loads, yes, and the Lima Peru voltage at a commercial building matches the rest of the country; the Peru 3 phase voltage for motors in new networks is 380 V. The Peru industrial voltage at a mine or large plant arrives at medium voltage and is transformed down at each motor control center, so Paul confirms the voltage at every connection point before ordering motors.
Comparing Peru voltage vs US practice, the Peru electricity Hz rating is the same 60 Hz, so pumps, fans and compressors keep their US speeds and curves. That is also why a Peru voltage converter or a Peru voltage adapter, which suits a laptop charger, has no place on a process skid: the answer is motors wound for 380 V and a control transformer for 220 V, built into the panel. Electrical design follows the Codigo Nacional de Electricidad, the Utilizacion part in force since 2006, and panels ship with single-line diagrams, grounding details and test records.
| Condition | Where it applies | Design answer |
|---|---|---|
| 60 Hz, 380/220 V supply | The whole country | 380 V motor windings, 220 V controls, US-speed pump and fan curves |
| Altitude above 4,000 meters | Andean mines in Ancash, Apurimac, Cusco and Cajamarca | Motor derating beyond the 1,000 meter IEC 60034-1 rating, larger blowers and compressors, NPSH checks |
| Freezing nights, strong sun | High Andes | Heat tracing, insulation, drainable piping, UV-resistant coatings |
| Fog, salt and sand | Callao, Paita and the coastal desert | Marine coatings, stainless enclosures, filtered panel ventilation |
| Seismic loads | The whole country, highest along the coast | Frames, anchors and supports checked to Norma E.030 |
| Spanish documentation | Inspectors, operators, DIGEMID | Spanish manuals, labels and training, metric drawings |
Seismic design under Norma E.030
Norma E.030, Peru’s seismic design standard, was updated in 2018 and includes a chapter on nonstructural elements, appendages and equipment, which sets the forces that skid frames, vessel supports and tank anchors carry. Paul designs anchor bolts, base plates and supports to the zone and soil the owner specifies, keeps a continuous load path from each heavy component to the foundation, and files the calculations with the turnover documents.
DIGEMID GMP and the BPM manual for drug plants
DIGEMID GMP rules for Peruvian drug manufacturing are set by DS 021-2018-SA, which approved a new Manual de Buenas Practicas de Manufactura for pharmaceutical products in place of the 1999 manual. DIGEMID issues the GMP certificate to domestic and foreign manufacturers, and that certificate supports product registration and import.
Under the DIGEMID BPM manual, a new purified water system, formulation tank or CIP skid becomes part of the plant’s GMP file through design records and qualification. Paul supplies material and surface finish records, slope and drainability checks, passivation reports and executed IQ and OQ protocols in Spanish through its validation and commissioning work.
Shipping to Peru from USA ports through Callao
Shipping to Peru from USA East Coast ports runs south through the Panama Canal to Callao, the port of Lima, with Paita serving the north; forwarders quote roughly three to four weeks port to port from East Coast and Gulf ports, and route planners list about 17 days from New York to Lima on the faster services. Paul books the sailing, sizes crates and flat-rack loads during design, and plans the road leg, which for an Andean mine means mountain highways with weight and height limits and climbs of several thousand meters.
Mountain logistics decide module size for Peruvian mines more than the ship does. A skid that fits a flat rack on the ocean leg still has to pass tunnels, bridges and switchbacks on the way up, so Paul splits large systems into modules sized for the road survey, with flanged break points, matched wiring harnesses and lifting lugs placed for the cranes available at the mine. Wooden crating uses ISPM 15 heat-treated timber, desiccant and sealed wrapping protect panels and instruments from coastal humidity during port storage, and every crate carries Spanish and English markings that tie it to the packing list and the erection sequence.
Does Peru have a free trade agreement with the US?
The US-Peru Trade Promotion Agreement took effect on 1 February 2009 as the free trade agreement between the two countries, which removed tariffs on almost all US consumer and industrial goods. The US Peru free trade agreement needs no official certificate: the certification of origin follows no prescribed format as long as it carries the data elements in the US regulations, so anyone hunting for a US Peru free trade agreement certificate of origin form needs those elements on letterhead or on the invoice. Paul prepares the certification for each shipment with HS codes matched to the commercial invoice.
Peru import duty rates for goods outside the agreement are 0, 6 or 11 percent depending on the tariff subheading, and those Peru import tariffs are charged on the CIF value. The Peru import tax every shipment pays is the 16 percent IGV plus the 2 percent municipal promotion tax, 18 percent together, on the CIF value plus any duty. Peru import requirements also include an authorized customs agent, the agente de aduana, for imports over US$2,000 FOB, and advance clearance filing for those shipments. On Incoterms 2020, Lima procurement teams for the big mines tend to take delivery FCA at the US port of loading; coastal plants without a freight desk prefer CFR or DAP terms; and a DDP quotation from Paul folds clearance, duty and IGV into one delivered figure.
How a Peru project with Paul Industries runs
Paul Industries delivers a Peruvian project in nine stages, and the first two lock in the altitude, voltage, seismic and safety-rule basis that fabrication and shipping depend on. The table shows the record each stage leaves.
| Stage | Work | Record for the Peruvian file |
|---|---|---|
| 1. Basis of design | Process duty, altitude and climate, voltage, E.030 zone, mine safety items, HS codes | Design basis memorandum and rule list |
| 2. Engineering | P&IDs, layout, vessel and piping design, 380/220 V electrical design, crate envelope | Calculations and metric drawings |
| 3. Fabrication | Vessel and skid welding, panel assembly, instrument fitting, traceable to heat numbers | Material test reports, weld logs, radiography and dye penetrant results |
| 4. Factory acceptance test | Pressure, loop and sequence tests with the mine’s engineers present or on a live video link | FAT report and closed punch list |
| 5. Export | Seaworthy packing, ocean freight via Panama, mountain road haul | Invoice, packing list and TPA certification with matching HS codes |
| 6. Erection or supervision | Setting, anchoring, piping and cable work under the mine’s induction rules | Erection records and as-installed markups |
| 7. Start-up | Flushing, rotation checks, safety valve and gauge verification, first process fluid | Start-up report and register entries for boilers and air tanks |
| 8. Commissioning | Performance runs for mines and food plants, IQ and OQ for drug plants | Executed protocols and performance data |
| 9. Handover | Spanish training, critical spares, service plan | Spanish manuals, as-built drawings, turnover dossier |
Peru keeps UTC-5 all year, so Lima shares the clock with US Eastern standard time through the northern winter and sits one hour behind during US daylight saving. Mine and plant engineers in Lima join factory tests without night calls, and once the system is handed over Paul holds its drawings, design calculations and PLC programs for later changes and schedules service visits to fit mine shutdowns.
Who builds process systems for plants in Peru?
Paul Industries builds process systems for plants in Peru, from reagent and dosing skids, air receivers and water treatment for copper and gold mines to steam, evaporator support and effluent systems for fishmeal plants and purified water and CIP systems for Lima’s drug makers, carrying every order from the test floor in the United States to export, erection, first run and commissioning. The designs answer 60 Hz, 380/220 V supply, for altitudes above 4,000 meters and for Norma E.030 seismic loads, and fits boilers and receivers with the devices Peruvian safety rules name. Owners in Lima, Arequipa, Ancash, Apurimac, Cajamarca and Piura keep a single contract and a single document trail from the first design memo to the last spare part.
What drives the cost of process equipment for a Peruvian mine or plant?
The delivered cost of process equipment for a Peruvian site moves with five factors outside the fabricated price: the Panama routing and the highway climb, engineering for altitude and earthquakes, Spanish paperwork, IGV and duty as the Incoterm assigns them, and how much of the erection Paul carries. Each appears as its own US dollar line in Paul’s proposal.
- Freight and haul. Flat racks for oversized skids, escorts and permits for heavy loads, and the climb to a mine above 4,000 meters add to the ocean freight.
- Altitude and seismic design. Derated motors, larger compressors and blowers, heat tracing and heavier anchors add material and engineering.
- Documentation. Spanish manuals, register data for boilers and air tanks, and drug plant protocols take engineering and translation time.
- Taxes and duty. Originating US goods pay no duty under the TPA; the combined 18 percent IGV and municipal tax is paid by the buyer on FCA, CFR or DAP terms and by Paul on DDP terms.
- Installation. Mine inductions, camp beds and rotating rosters set the site labor figure, and a supervision-only contract runs lower than a full erection contract.
Paul Industries for Peruvian mines, fishmeal plants and drug makers
Paul Industries engineers and fabricates process equipment for Peruvian mines and plants, tests it in the United States, ships it through Callao under the US-Peru agreement, then erects and commissions it at the mine or plant or supervises that work, and hands over the safety, electrical, seismic and qualification files in one package. Give Paul the duty, the site elevation, the specifications and the target start-up, and the proposal returns with a freight plan, a program and a US dollar figure. Request a quote for work in Peru.
Standards referenced: DS 42-F Reglamento de Seguridad Industrial (1964), Title VII · NTP 350.303.2020 Calderas, inspeccion en servicio · DS 024-2016-EM Reglamento de Seguridad y Salud Ocupacional en Mineria · Codigo Nacional de Electricidad – Utilizacion (RM 037-2006-MEM/DM) · Norma E.030 Diseno Sismorresistente (2018) · DS 021-2018-SA Manual de Buenas Practicas de Manufactura · US-Peru Trade Promotion Agreement · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · IEC 60034-1 · Incoterms 2020 · ISPM 15
Frequently asked questions
Does a US-built skid need a Peru voltage converter or new motors?
A Peru voltage converter or a Peru voltage adapter suits small portable devices, and a process skid is hardwired, so the fix belongs in the design: motors wound for 380 V, a 220 V control circuit and protection set for the Peruvian supply. Peru already runs at 60 Hz, so pump and fan speeds stay as in the United States. Paul Industries builds Peruvian skids that way from the start.
What is the Peru voltage at a mine motor control center?
Peruvian mines take power at medium voltage and transform it down at each motor control center, commonly to 380 V three-phase for motors with 220 V for controls and lighting, at 60 Hz. Larger drives run at higher voltages set by the mine’s electrical design. Paul Industries confirms the voltage at every connection point and builds panels and motors to it.
Is the Peru voltage vs US difference a problem for pumps and compressors?
Peru and the United States share 60 Hz, so pump, fan and compressor speeds match US performance data, and the difference lies in voltage: 380/220 V in Peru against 480/277 V or 208/120 V in US plants. Paul Industries specifies motors for the Peruvian voltage and selects every rotating machine on the site’s altitude, which matters more than voltage at Andean mines.
How does copper mining in Peru at 4,000 meters change equipment design?
Above 4,000 meters the air is about a third thinner than at sea level, so motors run hotter, compressors and blowers deliver less mass, water boils near 86 degrees Celsius and freezing nights reach exposed piping. Paul Industries derates motors beyond the 1,000 meter IEC 60034-1 rating, resizes air equipment, checks pump suction, and adds heat tracing and insulation for copper mining in Peru at altitude.
Which mining companies in Peru buy dosing skids and water plants from abroad?
Operators of large copper mines such as Las Bambas in Apurimac, Cerro Verde near Arequipa and Antamina in Ancash, and gold producers in Cajamarca and La Libertad, buy reagent and dosing skids, water treatment plants, tanks and air receivers from overseas builders when they want a defined design and document set. Paul Industries designs that equipment for altitude and commissions it at the mine.
What is mined in Peru besides copper?
Peru’s mines produce gold, silver, zinc, lead and molybdenum alongside copper, and each ore needs its own process equipment: cyanide handling and destruction for gold, flotation reagent systems for zinc and lead, and molybdenum separation circuits at copper concentrators. Paul Industries builds dosing skids, tanks, heat exchangers and water treatment for all of those plants.
What do Peruvian rules require of a boiler or air receiver at a mine?
DS 024-2016-EM requires steam boilers on a mine to carry safety valves, pressure gauges and water level indicators, with a cleaning and maintenance record, and compressed air tanks to carry gauges and safety valves and be inspected periodically with the main air line. Boilers and tanks go into the mine’s register. Paul Industries fits those devices and supplies the data and test records for the register.
Who builds steam and evaporator support systems for fishmeal plants on the Peruvian coast?
Paul Industries builds boiler feed and steam distribution packages, stickwater evaporator support systems, heat exchangers and wastewater treatment for fishmeal and fish oil plants on the Peruvian coast, and it installs and commissions them or supervises the installation. The designs use stainless construction and marine coatings for fog and salt air, run on 60 Hz power and come with Spanish manuals.
Which GMP rules apply to a new purified water system for a Lima drug plant?
Drug manufacturing in Peru follows DIGEMID’s GMP manual approved by DS 021-2018-SA, and DIGEMID certifies manufacturers’ compliance, so a purified water system for a Lima plant is designed, documented and qualified to it. Paul Industries designs and builds the system, executes IQ and OQ, and delivers Spanish protocols, reports and drawings for the plant’s GMP file.
How long does shipping from the US East Coast to Callao take?
Forwarders quote roughly three to four weeks from US East Coast and Gulf ports to Callao, and route planners list about 17 days from New York to Lima on the faster services, all via the Panama Canal. Port handling, clearance and the road leg add time. Paul Industries confirms the sailing at booking and plans the haul from Callao to the plant or mine.
What are Peru import duty rates and taxes on equipment from the United States?
Qualifying US goods enter Peru duty-free under the US-Peru Trade Promotion Agreement. Goods outside it pay 0, 6 or 11 percent ad valorem depending on the subheading. Every import pays the 16 percent IGV plus the 2 percent municipal promotion tax on the CIF value plus duty. Paul Industries prepares the origin certification with HS codes matched to the invoice.
What goes into a US Peru free trade agreement certification of origin?
The certification names the certifier, exporter, producer and importer, describes each good with its HS code, states why the good originates, and carries a signature and date, following the data elements in the US regulations. It needs no fixed form and is accepted on letterhead or the invoice. Paul Industries issues it with each Peruvian shipment and keeps the supporting records.
Does a Peruvian buyer need a customs agent to import a skid?
Imports over US$2,000 FOB clear through a Peruvian customs agent, the agente de aduana, and are filed as advance clearance, with the commercial invoice, packing list, bill of lading and origin certification. Under DDP terms Paul Industries arranges the clearance and pays the duties and taxes; under FCA, CFR or DAP it supplies a consistent document set to the buyer’s agent.
Which port suits a mine near Arequipa or a plant in Piura?
Callao, the port of Lima, handles most container traffic and suits Lima, the central highlands and many southern projects, while Paita serves Piura and the northern coast. Paul Industries books the sailing to the port that shortens the road leg and plans permits and escorts for oversized loads climbing to mines around Arequipa or in the northern highlands.
How does Norma E.030 affect tanks and skids at plants in Lima?
Norma E.030, updated in 2018, sets seismic forces for structures and for nonstructural elements and equipment, and Lima and the coast carry high seismic demand. Tanks get checked shells, anchor chairs and bolts, and skids get frames and base plates sized for the forces the owner’s engineer specifies. Paul Industries includes those calculations in the turnover file.
Which Incoterm do Peruvian mines usually choose for US equipment?
Mines whose Lima logistics teams book their own vessels usually buy FCA at a US port, coastal plants that prefer the sea freight arranged for them choose CFR or DAP, and owners after a single landed figure choose DDP. Paul Industries quotes each Incoterms 2020 option and itemizes freight, insurance, clearance and IGV.
Which details let Paul Industries quote a Peruvian mining or plant project?
Quoting a Peruvian job takes the flow sheet and design duty, the site and its elevation, the supply voltage, the owner’s engineering standards and E.030 zone, any boiler, air receiver or GMP items, the target start-up and the Incoterm the buyer wants. Paul Industries returns a US dollar proposal that splits out engineering, fabrication, the freight plan, the erection option and the program.
Planning process equipment for a mine or plant in Peru?
Share the duty, the site elevation and the owner’s standards, and Paul Industries will map the Callao routing, the program and a budget. Call 201-450-8280 or request a quote.
