Paul Industries is a US process equipment contractor for India that engineers and fabricates skids, pressure vessels, tanks, purified water and WFI systems and complete process systems in the United States, documents them for the Boilers Act, PESO and revised Schedule M, ships them to Nhava Sheva or Mundra, and installs and commissions them in the plant or supervises the installation. Every system is built for India’s 50 hertz supply and quoted in US dollars. Its headquarters are at 256 Shore Drive in Kilmarnock, Virginia; the company was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Steam equipment law Boilers Act, 2025, in force May 1, 2025
Compressed gas vessels SMPV(U) Rules 2016, PESO
Drug plant GMP Revised Schedule M
Power 50 Hz, 230/400 V
Main ports Nhava Sheva (JNPT) and Mundra
Reviewed November 2026

What Paul builds and ships as a US process equipment contractor for India

A US process equipment contractor for India supplies the engineered systems an Indian plant wants built to US and international codes, tested before shipment and documented for Indian law: GMP water and steam systems, pressure vessels, process skids and turnkey utility packages. Paul Industries designs each system, fabricates it in the United States, runs the factory acceptance test, crates it for the voyage to the Arabian Sea ports, and then sets, connects, starts up and commissions it at the Indian plant, or supervises the installation with Paul in charge of start-up and testing.

The systems Indian plants order most from Paul are purified water and WFI systems, clean steam generators, CIP and SIP skids, ASME pressure vessels and reactors, steam piping packages, and ultrapure water systems for electronics. Three contract routes are available: Paul supplies the equipment and supervises its installation, takes a design-build role covering the plant layout and utilities, or installs everything through qualification. The full country list sits on the international projects page.

Pharmaceutical companies in Hyderabad, India and the other drug clusters

Pharmaceutical companies in Hyderabad, India form the densest drug manufacturing base in a country that has more FDA-approved plants than any other outside the United States, about 500 active sites according to Indian government figures from 2026. Invest India reports that Telangana alone has more than 214 USFDA-approved facilities and about 1,000 pharmaceutical and biotech companies. Genome Valley, Hyderabad, the country’s first organized biotech cluster and its vaccine hub, hosts more than 200 companies and over 15,000 professionals, and several MNC pharmaceutical companies in Hyderabad run research and production sites alongside Indian manufacturers.

Process industries in India extend well beyond Hyderabad. The Department of Pharmaceuticals’ cluster survey names Visakhapatnam in Andhra Pradesh among the large bulk drug clusters, the Baddi pharma hub in Himachal Pradesh among the places where large-scale formulation plants concentrate, while Gujarat’s Ahmedabad and Vadodara corridor is another mature cluster of active ingredient and formulation makers. Plants exporting to the United States and Europe design their utilities to the expectations of those regulators as well as India’s own, which is why the work on the pharmaceutical industry page applies directly to Indian projects.

Semiconductor fab in India: Dholera and Sanand

India’s first commercial semiconductor fab in India is under construction at Dholera in Gujarat, where Tata Electronics is building a plant with technology transfer from Taiwan’s PSMC at a stated investment of about Rs 91,000 crore, for nodes in the 28 to 110 nanometre range. At Sanand, also in Gujarat, Micron’s assembly and test plant opened in early 2026. Fabs and packaging plants need ultrapure water, chemical distribution, process cooling water and exhaust treatment on a scale new to the region, and Paul builds UPW trains and process cooling skids for that market, described on the semiconductor industry page.

What is revised Schedule M, and what does it change for plant equipment?

Revised Schedule M is India’s updated good manufacturing practice schedule under the Drugs Rules, notified by the Ministry of Health as G.S.R. 922(E) on 28 December 2023, and it brings Schedule M GMP much closer to WHO GMP and the PIC/S guide. The CDSCO revised Schedule M adds a pharmaceutical quality system, quality risk management, product quality reviews, explicit qualification and validation of equipment, and controls for computerized systems. For a plant buying equipment, the practical change is that utilities and process systems arrive with design qualification, IQ and OQ records and data integrity controls built in, rather than as paperwork assembled after start-up.

The revised Schedule M implementation date depended on company size. Manufacturers with turnover above Rs 250 crore had six months from notification, while smaller and medium makers received an extension to 31 December 2025 under G.S.R. 127(E) of 11 February 2025, on condition that they applied with an item-by-item upgrade plan. That revised Schedule M 2025 deadline has now passed, so inspections test the upgraded plant against the full schedule. Paul runs a gap analysis for revised Schedule M on water, steam and process systems, lists what each one lacks against the schedule and the GMP guide the plant exports under, and builds the replacement or upgrade.

Revised Schedule M topics and the equipment records that answer them
Revised Schedule M topicWhat it means for utilities and process equipmentWhat Paul builds or delivers
Pharmaceutical quality systemEquipment changes, deviations and maintenance run through documented quality processesChange-controlled drawings, maintenance plans and spare part lists
Quality risk managementDesign choices justified by risk to the productRisk assessments for water, steam and process systems at design stage
Qualification and validationEquipment proven fit for use before productionDQ, IQ and OQ protocols, executed FAT and SAT records
Computerized systemsControls and data records held to data integrity rulesAudit trails, user levels and validated control software
Water for pharmaceutical usePurified water and WFI systems designed, sanitized and monitored to the plant’s pharmacopoeiaGeneration, storage and loops built to ASME BPE with surface finish and passivation records

WHO GMP vs revised Schedule M is a smaller gap than it was under the old schedule, because the revision drew on WHO and PIC/S texts. Plants that already meet US FDA or EU expectations still use the revision to tidy their utility documentation, and Paul designs to whichever of those guides sets the higher bar for the product, so one system satisfies the Indian inspector and the export customer at the same time.

Purified water and WFI design for Indian plants

Purified water and WFI systems for Indian plants start from feed water that varies widely by site, from municipal supplies to borewells high in hardness, silica and dissolved solids. Paul sizes pretreatment for that analysis, typically multimedia and activated carbon filtration or ultrafiltration, softening and antiscalant dosing, then double-pass reverse osmosis with electrodeionization for purified water, and multiple-effect distillation or a membrane route for WFI where the plant’s pharmacopoeia and registrations allow it. Storage and distribution loops are built in 316L stainless steel to ASME BPE, orbitally welded, sloped to drain and sanitized with hot water or ozone. Online conductivity and TOC analyzers sit on the return of each loop, and sample points are placed where the plant’s monitoring plan needs them, so the system enters qualification with its data already flowing.

Boilers Act 2025, IBR certificate and PESO approval for pressure equipment

Pressure equipment shipped to India falls under two separate regimes, depending on what it holds: steam boilers and steam pipes come under the Boilers Act and the Indian Boiler Regulations, and vessels that store or carry compressed gases come under PESO’s Static and Mobile Pressure Vessels (Unfired) Rules, 2016. Many skids carry items under both, so Paul classifies every part at the start of design.

IBR certificate rules after the Boilers Act 2025

The Boilers Act 2025 received assent on 4 April 2025 and came into force on 1 May 2025, repealing the Boilers Act of 1923 while keeping the regulations made under it, including the Indian Boiler Regulations, in force until new ones replace them. The Act applies to boilers, which it defines to exclude vessels under 25 litres, and to steam pipes, meaning any pipe carrying steam above 3.5 kilograms per square centimetre, or above 254 millimetres internal diameter with steam above 1 kilogram per square centimetre. That definition answers when IBR certification is required: a small clean steam header at 3 bar gauge sits just below the first threshold, while a plant steam main at 10 bar sits well inside it.

What is IBR approval in practice? It is the set of design appraisals, material and welder certifications and stage inspections that let a boiler, steam pipe or fitting be registered and used in India, documented on IBR forms such as Form III-A for steam pipe. For equipment made abroad, an Inspecting Authority recognised by the Central Boilers Board appraises the design and inspects fabrication to IBR at the place of manufacture. Pipes, mountings and the IBR certificate for valves and fittings follow the same rule, so every IBR item on a skid reaches the site with its certificate. Paul builds IBR-scope steam piping and boiler components with that inspection written into the fabrication plan and hands the IBR certificate set to the plant with the turnover file.

What is PESO approval for pressure vessels?

PESO approval is the clearance the Petroleum and Explosives Safety Organisation gives under the SMPV(U) Rules, 2016, which cover the storage and transport of compressed gases, including cryogenic liquids, in static and mobile pressure vessels. Rule 4(4) bars the import of a covered vessel without the prior approval of the Chief Controller of Explosives, so the PESO approval process for an imported nitrogen receiver, CO2 tank or cryogenic vessel starts with the design drawing and calculations well before fabrication. When PESO approval is required, Paul prepares the design package the application needs, fabricates to the approved drawing, and delivers the test and inspection records that support the PESO approval certificate and the licence that follows at the site. Pressure vessel manufacturers in India and Paul Industries in the United States meet the same rules on that point, which keeps the decision on design, price and schedule.

Indian pressure equipment rules and how an imported item meets them
ItemGoverning ruleWhat the rule asksWhat Paul supplies
Steam boiler above 25 litresBoilers Act 2025 and Indian Boiler RegulationsDesign appraisal, approved materials and welders, stage inspection, registration before useDesign file, IBR forms, inspection records for registration
Steam pipe above 3.5 kg/cm2Boilers Act 2025 and Indian Boiler RegulationsPipe and fittings carrying IBR certificates, inspected fabrication and testingForm III-A pipe certificates, fitting and valve certificates, weld and test records
Compressed gas or cryogenic vesselSMPV(U) Rules 2016, PESOPrior approval of the Chief Controller before import, then a site licence for the installationDesign drawing and calculations, test reports, nameplate data
Process vessel outside both regimesOwner’s specificationThe design code named on the data sheet, often ASME Section VIIICode calculations, material certificates, pressure test report
Control panels and drivesOwner’s electrical specification50 Hz, 230/400 V equipment to the plant’s standardIEC 60204-1 panels, 50 Hz FAT records

Power, climate and time zone for Indian sites

Indian plants receive power at 50 hertz, with 230 volts between phase and neutral and 400 volts between phases, which means every motor, pump and fan is chosen at its 50 hertz duty point and each skid is run on a 50 hertz supply before it ships. Large plants often distribute at higher voltages and step down at motor control centres, and the panel design follows the plant’s single-line diagram. The monsoon brings months of high humidity and heavy rain to most of India’s coastal and central clusters, which calls for sealed enclosures, anti-condensation heaters and coating systems chosen for wet heat. India Standard Time is five and a half hours ahead of UTC with no daylight saving, which puts Indian plants nine and a half hours ahead of US Eastern time in summer and ten and a half in winter, so Paul schedules witnessed FAT sessions in the US morning, the Indian evening.

Shipping from USA to India and customs on machinery

Shipping from USA to India for process equipment usually ends at Nhava Sheva Port, the Jawaharlal Nehru Port near Mumbai, or at Mundra Port in Gujarat, which suits plants in Ahmedabad, Dholera and Sanand. One forwarder quotes 25 to 35 days from the US East Coast to Nhava Sheva, and routings around the Cape of Good Hope instead of through Suez add 10 to 14 days. Plants in Hyderabad and Visakhapatnam receive cargo through those western ports or through east coast ports such as Chennai, depending on the sailing. Paul sets the shipping envelope during design, keeping skids within container door limits where the process allows and splitting larger systems into modules for flat racks, and books the voyage before the FAT date. Inland legs from the port to plants in Telangana, Himachal Pradesh or central Gujarat can run several hundred kilometres, so Paul checks module heights and widths against the road route, bridges and plant gates as part of the shipping plan, before any crate is built.

Custom duty on machinery import in India

Custom duty on machinery import in India is built in layers. Basic Customs Duty applies at the rate for the item’s HS code on the assessable value, usually the CIF value; a Social Welfare Surcharge of 10 percent of that duty is added; and IGST is then charged on the assessable value plus both, at the rate for the goods, commonly 18 percent for machinery. Registered importers generally take credit for the IGST, so the lasting cost is the duty and surcharge. Plants exporting their output can import capital goods at zero Basic Customs Duty under the EPCG scheme, against an export obligation of six times the duty saved over six years. Paul prepares the invoice and packing list with HS codes for each item, and under DDP terms carries clearance and duties inside the price; Indian buyers with their own customs agent usually take FCA at a US port or CIF to Nhava Sheva.

How an Indian project with Paul Industries runs

An Indian project with Paul Industries moves through nine phases, and the first two lock in the IBR and PESO scope, the GMP basis and the crate envelope. The table lists each phase and the record it hands to the Indian plant.

Phases of a process equipment project for an Indian plant
PhaseScopeRecord handed to the plant
1. Basis of designProcess duty, site, IBR and PESO classification, GMP guide, HS codes, IncotermRegulatory and customs matrix for every item
2. Engineering and approvalsP&IDs, layout, 50 Hz selections, IBR design appraisal, PESO design packageApproved drawings and design qualification
3. FabricationVessel and skid building in the United States with IBR stage inspection where it appliesIBR forms, weld logs, material and surface finish records
4. Factory acceptancePressure, function, software and sanitization trials on 50 Hz, witnessed by the plantExecuted FAT protocol and closed deviations
5. DispatchMonsoon-grade preservation, ISPM 15 crates, booking to Nhava Sheva or MundraInvoice, packing list, certificate of origin, bill of lading
6. ErectionSetting, piping tie-ins and cabling at the plant, or supervision of that workErection records and tie-in weld documentation
7. Start-upFlushing, passivation, sanitization, water trials and handover to operationsStart-up report with setpoints and alarm list
8. QualificationSAT, IQ and OQ through validation and commissioning, IBR registration supportExecuted protocols for the Schedule M file
9. SupportOperator training, spares for the shipping lead time, service scheduleManuals, as-built drawings and turnover dossier

Service, spares and remote support after handover

Indian plants run their utilities around the clock, so the handover package includes a spare parts set sized to the ocean lead time: pump seals, gaskets and diaphragms, membrane and filter elements, UV lamps, analyzer sensors and the critical drive and control spares. Paul keeps the drawings, control program and test records for each Indian system on file, reviews alarms and trends with the plant’s engineers by video, and plans service visits to match the plant’s annual shutdown so requalification and maintenance share one window.

Who builds process systems for plants in India?

Paul Industries builds process systems for plants in India, from single CIP and dosing skids to complete purified water, WFI, clean steam, ultrapure water and turnkey process systems, and carries them through IBR and PESO documentation, FAT, export, installation, start-up and qualification at the site. Each system is designed around the plant’s specification and the revised Schedule M, built and tested in the United States, and kept under Paul’s responsibility from the basis of design to service after handover. Plants in Hyderabad, Visakhapatnam, Ahmedabad, Baddi, Mumbai, Dholera and Sanand work with one contractor for the whole delivery Groups with sister plants abroad can see the Singapore and UAE pages for those markets.

What drives the cost of a process system delivered to India?

The delivered cost of a process system in India rests on five items beyond the equipment, and Paul prices each one on its own line so the plant can compare delivery terms and installation routes.

  • Freight and routing. A Cape routing adds days and fuel cost against Suez, and flat-rack modules cost more to move than containerized skids.
  • Indian regulatory scope. IBR design appraisal and stage inspection, PESO design packages and Schedule M qualification documents add engineering and inspection hours in proportion to the number of covered items.
  • Preservation. A monsoon arrival calls for heavier sealing, desiccant and nitrogen blanketing, above all on polished stainless systems.
  • Duty and IGST. Basic Customs Duty, the surcharge and IGST fall on the importer under FCA or CIF and inside Paul’s price under DDP, and EPCG plants pay no Basic Customs Duty on qualifying capital goods.
  • Installation route. Supervision keeps Paul’s field days lower, and complete installation keeps erection, start-up and qualification under one contract.

Paul gives a budget range drawn from comparable projects first, then fixes the price when the drawings, the regulatory matrix and the Incoterm are agreed.

Paul Industries for plants in India

Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, supplies pharmaceutical, biotech, semiconductor, chemical and food plants across India with process equipment that is engineered, fabricated and tested in the United States and commissioned at the plant. Each system ships designed for 50 hertz power and Indian site conditions, documented for the Boilers Act, PESO and revised Schedule M, and backed by records that stay with it through qualification and service. Indian plants begin by sending their process data, site and delivery terms through request a quote.

Standards referenced: Boilers Act, 2025 · Indian Boiler Regulations, 1950 · Static and Mobile Pressure Vessels (Unfired) Rules, 2016 · Revised Schedule M, Drugs Rules, 1945 (G.S.R. 922(E)) · WHO GMP · PIC/S GMP Guide · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · IEC 60204-1 · Incoterms 2020 · ISPM 15

Frequently asked questions

What is the revised Schedule M implementation date for small and large drug makers?

Revised Schedule M was notified on 28 December 2023. Manufacturers with turnover above Rs 250 crore had six months to comply, and smaller and medium makers that applied with an upgrade plan received an extension to 31 December 2025 under G.S.R. 127(E). Both deadlines have now passed. Paul Industries upgrades and replaces water, steam and process systems with the qualification records the schedule expects.

WHO GMP vs revised Schedule M: what changes for water systems?

The revision brought Indian GMP close to WHO GMP and the PIC/S guide, so water systems are now expected to have documented design qualification, risk assessment, IQ and OQ, routine monitoring and change control. Plants already meeting WHO or US FDA expectations see fewer changes. Paul Industries designs purified water and WFI systems to the stricter guide the plant exports under and delivers the full qualification set.

When is IBR certification required for steam piping on a skid?

Under the Boilers Act 2025, a pipe is a steam pipe when it carries steam above 3.5 kilograms per square centimetre, or when it exceeds 254 millimetres internal diameter with steam above 1 kilogram per square centimetre. Piping inside those limits needs materials with IBR certificates, inspected fabrication and its IBR forms. Paul Industries classifies each line during design and builds IBR lines under the required inspection.

What is IBR approval for equipment built outside India?

IBR approval for equipment built abroad covers design appraisal, approved materials, qualified welders and stage inspection by an Inspecting Authority recognised by the Central Boilers Board, recorded on IBR forms so the item can be registered and used in India. Paul Industries plans that inspection into fabrication and delivers the IBR certificate set with the boiler components, steam pipe and valves it supplies.

When is PESO approval required for a vessel shipped to India?

PESO approval is required when a vessel stores or transports compressed gas or cryogenic liquid within the scope of the SMPV(U) Rules, 2016, such as nitrogen receivers, CO2 tanks and cryogenic storage. Rule 4(4) bars import of a covered vessel without prior approval of the Chief Controller of Explosives. Paul Industries prepares the design package early and fabricates to the approved drawing.

Do pharmaceutical companies in Hyderabad buy WFI systems from US builders?

Drug and vaccine plants in Hyderabad and Genome Valley buy WFI stills, membrane WFI generation, purified water systems and clean steam generators from builders who deliver them qualified to the GMP guides the plants export under. Paul Industries designs, builds and tests those systems in the United States, ships them to India and installs and qualifies them at the plant.

Which port should equipment for a Hyderabad or Visakhapatnam plant use?

Cargo for Hyderabad often lands at Nhava Sheva near Mumbai and continues by road, while plants near Visakhapatnam can receive it through east coast ports when a suitable sailing is available. Gujarat sites usually take cargo through Mundra. Paul Industries picks the port with the plant, checks the road route for oversize modules, and names both in the shipping plan.

How long does shipping from the US East Coast to Nhava Sheva take?

One forwarder quotes 25 to 35 days from the US East Coast to Nhava Sheva, and vessels routed around the Cape of Good Hope instead of through Suez take 10 to 14 days longer. Port clearance and road transport to the plant come on top of the voyage. Paul Industries books the sailing once crate sizes are final and plans the factory test backward from it.

How is customs duty calculated on a process skid imported into India?

Basic Customs Duty is charged at the HS code rate on the assessable value, a Social Welfare Surcharge of 10 percent of that duty is added, and IGST, often 18 percent for machinery, is charged on the value plus both. Registered importers generally take IGST credit. Paul Industries lists HS codes for every item so the plant can estimate duty before ordering.

Can an Indian exporter import a US-built skid without Basic Customs Duty?

Under the EPCG scheme, a plant can import capital goods at zero Basic Customs Duty in return for an export obligation of six times the duty saved, met over six years. Pharmaceutical and chemical exporters often use it for production equipment. Paul Industries supplies the invoices, technical descriptions and HS codes the plant’s EPCG authorization and import filing need.

Does Paul Industries build ultrapure water systems for the Dholera fab region?

For semiconductor and electronics plants in Gujarat, including the Dholera and Sanand area, Paul Industries designs and builds UPW generation, polishing and distribution, along with chemical supply and process cooling water, to the purity targets in the owner’s specification. Each module is run on a 50 hertz test supply in the United States and shipped through Mundra or Nhava Sheva.

What does a gap analysis for revised Schedule M cover on plant utilities?

A gap analysis compares each water, steam, compressed air and process system with the revised schedule and the plant’s export GMP guide: design documents, materials and surface finish, dead legs, sanitization, monitoring, alarms, audit trails, and qualification records. Paul Industries reports the gaps by system with a remedy for each, then designs, builds and installs the upgrades or replacements.

How does India's monsoon affect equipment design and shipping?

Months of humid, rainy weather in most coastal and central clusters call for sealed panel enclosures with anti-condensation heaters, coatings suited to wet heat, and drainage around skids. Arrivals during the monsoon also need heavier preservation inside the crates. Paul Industries sets those conditions in the design basis and sizes desiccant and nitrogen blanketing for the voyage and site storage.

Can Paul Industries install and commission equipment at Baddi and Ahmedabad plants?

Plants in Baddi, Ahmedabad and the rest of India have Paul Industries erect, connect and commission their equipment, or oversee the erection while Paul leads start-up, testing and qualification. Work runs under the plant’s permit and safety system, with method statements approved ahead of each task and the IQ and OQ executed with the plant’s quality team.

How do pressure vessel manufacturers in India and a US builder compare on IBR and PESO rules?

Every vessel or steam item used in India meets the same IBR and PESO rules wherever it is made, so the comparison turns on design, materials, documentation, schedule and price rather than on the rules. A vessel made outside India is appraised and inspected by an Inspecting Authority recognised for IBR work abroad. Paul Industries builds to those rules and delivers the complete certificate file.

Which documents arrive with a US-built GMP water system for India?

A GMP water system for India arrives with design qualification, P&IDs and isometrics, material certificates, weld logs and borescope records, surface finish and passivation reports, the executed FAT, IQ and OQ protocols, calibration records, manuals and spare parts lists, plus any IBR or PESO forms that apply. Paul Industries assembles them into one turnover dossier for the Schedule M file.

Which details does Paul Industries need to price a system for an Indian plant?

Pricing starts from a process description or P&IDs, the site and its nearest port, the GMP guide or purity class, a list of anything holding steam or compressed gas, and the supply voltage. The delivery term and whether Paul installs or supervises complete the picture. Paul Industries answers with an IBR, PESO and customs matrix, a voyage plan and a dollar budget, and a firm price follows agreed drawings.

Which feed water problems do Indian purified water systems have to handle?

Indian sites draw on municipal water, borewells and tanker supplies whose hardness, silica, chloride and dissolved solids vary through the year, with monsoon months bringing turbidity swings. Paul Industries designs pretreatment from a full water analysis, adds margin for seasonal change, and sizes softening, filtration and antiscalant dosing so the reverse osmosis and EDI stages run at steady recovery.

Planning process equipment for a plant in India?

Send the process duty, the site and the GMP or purity basis, and Paul Industries will set out the IBR and PESO scope, the voyage to Nhava Sheva or Mundra and an opening price for the system. Call 201-450-8280 or request a quote.