Paul Industries is a US process equipment contractor for Egypt that designs, fabricates and commissions purified water and WFI systems, CIP and SIP skids, pressure vessels, process tanks, chemical dosing skids and process piping for pharmaceutical, fertilizer, chemical and food plants, engineered for the Egyptian supply of 380 V at 50 Hz. Systems are built and factory tested in the United States, shipped to Alexandria, Damietta, Port Said or Sokhna under an ACI filing, and installed, started up and commissioned by Paul or installed under Paul’s supervision, with qualification records ready for an Egyptian Drug Authority inspection.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Medicines regulator Egyptian Drug Authority, PIC/S GMP Guide adopted 2026
Power 220/380 V, 50 Hz
Boiler licensing EOS document study, Ministerial Decree 348/1977
VAT 14 percent standard, 5 percent on production machinery
Sea freight filing ACI with an ACID number before loading
Reviewed November 2026

Equipment a US process equipment contractor for Egypt designs and delivers

A US process equipment contractor for Egypt takes responsibility for the whole chain between an Egyptian plant’s specification and a qualified, running system: engineering to the code the owner names, 50 Hz electrical design, US fabrication, a witnessed factory acceptance test, export packing and the Mediterranean or Red Sea sailing, the ACI filing that Egyptian customs requires, and the site work through start-up. Paul Industries builds purified water and WFI systems, CIP and SIP skids, ASME pressure vessels, dosing and transfer skids, fabricated tanks and prefabricated pipe spools.

Egyptian owners work with Paul in one of three ways. A supply contract with installation supervision puts Paul’s engineers in charge of setting, alignment, tie-ins and pressure tests on site. Design-build adds the process area, the utility headers and the control system. Complete turnkey delivery, explained on the turnkey process systems page, gives one Paul contract from user requirements to executed qualification protocols. Egypt is listed in the Africa group on Paul’s international projects page.

Pharmaceutical companies in Egypt and the industrial cities where they build

Pharmaceutical companies in Egypt manufacture in the new industrial cities around Cairo, chiefly 10th of Ramadan City, 6th of October City and Badr City, and in Alexandria. Those cities now host large new investment: EIPICO opened its third factory in 10th of Ramadan City in July 2026, an investment of more than 100 million US dollars. New plants and expansions buy purified water and WFI generation and loops, pure steam generators, compounding vessels, CIP systems, HVAC chilled water and process piping, and Paul’s pharmaceutical industry page sets out the utilities a medicines plant shares.

Egyptian Drug Authority guidelines and the PIC/S GMP Guide

Egyptian Drug Authority guidelines changed in 2026, when the EDA announced its adoption of the PIC/S GMP Guide, edition PE 009-17, with its introduction, Part I, Part II and annexes, for human, herbal, veterinary and disinfectant products, and said it would check compliance during factory inspections. The EDA was set up under Law No. 151 of 2019, earlier adopted WHO GMP texts including the WHO guideline on sterile products, and reached WHO maturity level 3 for medicines regulation in December 2024.

Under the Egyptian GMP guidelines now in force, a water or steam system needs the same evidence any PIC/S inspector expects: user requirements, a design qualification, installation and operational qualification, a performance qualification sampling period, and a monitored sanitization routine. Paul Industries builds water systems to ASME BPE with orbital welds, borescope records, passivation reports and slope checks, and executes IQ and OQ protocols written to the plant’s quality system, as described on the validation and commissioning page.

Fertilizer, petrochemical and chemical plants

Nitrogen fertilizer production in Egypt runs on natural gas feedstock at large complexes on the Mediterranean coast. Abu Qir Fertilizers operates at Abu Qir Bay east of Alexandria, and MOPCO in Damietta produced about 1.72 million tonnes of urea and 1.07 million tonnes of ammonia in 2024. These named plants are market facts showing what Egyptian industry buys: pressure vessels, heat exchangers, chemical injection and dosing skids, cooling water treatment and alloy piping for turnarounds. Paul’s chemical manufacturing page covers that equipment.

Turnarounds at gas-based fertilizer complexes

Turnarounds at gas-based ammonia and urea complexes set hard dates for replacement equipment, because a reformer, synthesis loop or urea section restarts only after every exchanger, vessel and line in the outage scope is back in service. Paul Industries plans those jobs from the turnaround date backward: material orders for alloy plate, forgings and tube, fabrication and examination in the United States, a hydrostatic test witnessed by the plant’s inspector, and a sailing that lands the equipment at Alexandria or Damietta with margin before the shutdown opens. Spool pieces arrive prefabricated, cleaned, capped and tagged to the isometrics, so the site welds are limited to the field joints, and Paul installs them or supervises the installation with the plant’s permit system and isolation plan. Each item returns to service with its weld map, examination reports and pressure test chart already in the plant’s inspection records.

Food, sugar, beverage and textile plants

Food, sugar and beverage processing in Egypt spreads from the Nile Delta to Upper Egypt, and the textile industry centers on El-Mahalla El-Kubra, home of Misr Spinning and Weaving since 1927. Food and beverage plants buy CIP sets, sanitary tanks, pasteurizer and heat exchanger skids and wastewater pretreatment, and textile dyeing and finishing plants buy water softening, boiler feed and effluent treatment systems. The food and beverage page describes the hygienic design Paul applies.

Egyptian industrial areas, their process industries and the ports serving them
AreaProcess industries (market facts)Serving portSystems Paul Industries builds
Greater Cairo industrial cities (10th of Ramadan, 6th of October, Badr)Medicines, food, beverage, consumer goodsPort of Alexandria, Damietta or SokhnaWFI, purified water, CIP and SIP, chilled water
Alexandria and Abu QirFertilizers, chemicals, food, medicinesPort of AlexandriaPressure vessels, heat exchangers, dosing skids
Damietta and the eastern DeltaFertilizers, gas processing, furniture and foodDamietta portAlloy piping, cooling water treatment, injection skids
Suez Canal Economic Zone (Sokhna, East Port Said, Qantara West)Manufacturing, chemicals, logisticsAin Sokhna port or East Port SaidProcess water, tanks, pump skids, compressed air
Nile Delta and Upper EgyptSugar, food processing, textilesAlexandria or Damietta, then roadEvaporator support skids, softeners, effluent treatment

Which Egyptian rules apply to boilers and pressure vessels?

Egyptian rules for steam boilers are the most specific part of the pressure equipment picture: the Egyptian Organization for Standardization and Quality (EOS) studies the licensing documents for each new boiler under Ministerial Decree 348 of 1977 and issues a certificate that the owner presents to the licensing body, and imported boilers are filed with documents for each unit, including the manufacturer’s guarantee. A 2023 ministerial decree also made ES 4748-5, the Egyptian standard for inspection of shell boilers during construction, which adopts EN 12953-5, binding on producers and importers after a six-month transition.

Unfired pressure vessels at Egyptian plants are designed to the code the owner names in its specification, which for US-built equipment is ASME Section VIII Division 1, with ASME B31.3 for process piping and ASME Section I for power boilers. Paul Industries builds to the named code and delivers the full construction record: design calculations, drawings, material certificates, welding procedures and welder qualifications, NDE reports, hydrostatic test charts and nameplate data, ready for the owner’s insurer, the plant’s inspection department and the licensing file.

Comparing a pressure vessel manufacturer in Egypt with a US builder

A plant engineer weighing a pressure vessel manufacturer in Egypt against a US fabricator checks three points: the code and documentation the vessel carries, the alloys and finishes available, and how the vessel fits into a larger tested skid. Paul answers all three in the first submittal, with the code basis, material list, inspection and test plan, and a general arrangement showing the vessel on its skid with instruments, valves and piping already tested together in the United States.

Egyptian requirements for boilers, vessels and GMP systems, and what Paul Industries supplies
ItemRule or practice in EgyptWhat Paul Industries supplies
Steam boiler licensingEOS study of licensing documents, Ministerial Decree 348/1977Design file, test reports and manufacturer’s guarantee for each boiler
Shell boiler construction inspectionES 4748-5, adopting EN 12953-5Inspection and test plan with construction inspection records
Unfired pressure vesselsCode named in the owner’s specificationASME VIII calculations, drawings, NDE, hydrostatic test, nameplate
Process pipingOwner specification, ASME B31.3 for US-built spoolsIsometrics, weld maps, examination and pressure test records
GMP water and steamPIC/S GMP Guide adopted by the EDA in 2026DQ, IQ, OQ protocols, orbital weld and passivation records

Feedwater, pretreatment and reuse at Egyptian plants

Feedwater for a pharmaceutical or food plant in Egypt varies with the source, from municipal supply drawn from the Nile in Cairo’s industrial cities to desalinated or well water at coastal and canal zone sites, so the pretreatment ahead of a purified water system is designed from the plant’s own water analysis. Paul Industries sizes multimedia filtration, softening, antiscalant dosing and reverse osmosis staging for the measured hardness, silt density and seasonal swings, and adds recovery steps such as reject water reuse for cooling towers or washdown where the plant’s water balance calls for them. The industrial water treatment page covers those pretreatment trains in more depth.

Hot weather also shapes the design of the water system itself. A purified water loop in a building that reaches high summer temperatures needs heat exchangers to hold the loop below the microbial growth range or a hot sanitization routine sized for the ambient, and WFI loops held hot need insulation and cooled points of use. Paul sets those design temperatures in the user requirement review so the qualification data reflects the hottest months as well as the coolest.

Egypt voltage and frequency for skids and control panels

Egypt voltage and frequency for industrial equipment are 380 V three-phase and 220 V single phase at 50 Hz, the nominal supply on Egyptian distribution networks, so the answer to what is the voltage in Egypt for a process skid is 380/220 V, four-wire, with the neutral solidly earthed. For buyers asking Egypt 50Hz or 60Hz, the grid runs at 50 Hz, and Egypt industrial voltage at larger plants arrives at medium voltage and is stepped down to 380 V at site substations.

Egypt voltage vs USA practice changes the motor, the drive and the control circuit. A skid for Egypt uses IEC motors rated 380 V or 400 V at 50 Hz, drives set for the Egyptian supply, and 220 V or 24 V DC controls, and centrifugal pumps and fans lose about one sixth of their 60 Hz speed, so Paul selects impellers and drives for the 50 Hz duty point. The Egypt voltage 3 phase supply also sets heater, transformer and cable ratings on the skid.

Panels for heat, dust and the Egyptian electricity voltage and frequency

Control panels for Egyptian plants are built to IEC 61439 for assemblies and IEC 60204-1 for machinery wiring, with enclosure ratings and cooling chosen for summer heat and desert dust. Paul sizes panel cooling for the site ambient, adds filtered ventilation or air conditioning where the room needs it, and labels panels and drawings in English, with Arabic translations of operator labels when the plant asks for them. Egypt electricity voltage and frequency are written into every motor and instrument data sheet, and the PLC programming page covers the controls side.

Shipping to Egypt from USA ports: the Port of Alexandria, Damietta and Sokhna

Shipping to Egypt from USA East Coast ports takes roughly three to five weeks port to port, based on forwarder transit data that puts New York to Alexandria at about 18 days on the quickest direct services and closer to 33 days on services with transshipment. The Port of Alexandria, Egypt, on the Mediterranean, is the usual entry for plants around Alexandria and the western Delta, and modules for Cairo’s industrial cities often land there or at the Port of Damietta in the eastern Delta.

Sokhna port on the Gulf of Suez serves plants in the Sokhna industrial zone and eastern Cairo, and Ain Sokhna port is one of the six ports inside the Suez Canal Economic Zone together with East and West Port Said. The SCZone (General Authority for Suez Canal Economic Zone), set up in 2015, runs four industrial zones at Sokhna, East Port Said, Qantara West and East Ismailia, and a project inside the zone follows the zone’s own permitting and customs procedures. Sokhna port, Egypt, is reached from the Atlantic through the Suez Canal or around the Mediterranean, and Paul chooses the routing that keeps oversize modules on the fewest handlings.

How to import in Egypt: ACI, the ACID number and the importer of record

Egypt import regulations for sea freight have required Advance Cargo Information since 1 October 2021: before goods are loaded, the Egyptian importer obtains an ACID number through the Nafeza platform, and the foreign exporter, registered on the CargoX platform, links the invoice, packing list and other documents to that number. For an importer of record Egypt rules make the Egyptian plant the party that holds the ACID and clears the goods, so Paul sends its registration details, the pro forma invoice and the packing list early and files its side of the ACI before the sailing.

The Egypt VAT rate is 14 percent as the standard rate, and Egypt VAT law sets a reduced 5 percent rate for machinery and equipment used to produce goods or deliver services, with medical devices added to that rate in July 2026. Customs duty on industrial machinery runs from zero to 5 percent depending on the tariff code. Paul lists every module by tariff heading, weight, value and origin, and crates equipment in ISPM 15 heat-treated wood.

Receiving, storing and preserving equipment at an Egyptian site

Receiving equipment at an Egyptian site starts with a heat and dust plan, because modules sometimes wait days or weeks between arrival and setting while civil works or tie-in windows are finished. Paul Industries ships stainless systems drained, dried and capped with nitrogen or desiccant packs inside, wraps instruments and panels against sand, and marks every crate with storage instructions in English and Arabic. Before installation the site team, led by Paul or working under Paul’s supervision, checks seals, desiccant indicators and impact recorders against the shipping record.

Storage is recorded in the turnover file as part of the qualification story. A GMP water skid that waited on site carries a preservation log showing seal checks, nitrogen pressure readings and the inspection made before it was opened, and that log feeds the installation qualification so the inspector sees an unbroken record from the factory test to start-up.

Project stages for an Egyptian plant, from specification to handover

Paul Industries runs an Egyptian project in nine stages, and the first two fix the design code, the boiler licensing file where a boiler is in scope, the 50 Hz equipment selection and the qualification approach. The table lists each stage and what the plant receives.

Stages of a process equipment project for a plant in Egypt
StageWhat Paul Industries doesWhat the Egyptian plant receives
1. SpecificationUser requirements, design code, 380 V, 50 Hz supply, GMP impactApproved specification and code basis
2. EngineeringEngineering to ASME VIII, ASME BPE and B31.3, with panels designed to IEC 60204-1Drawings, calculations, data sheets for approval
3. FabricationOrbital welding, NDE, passivation and panel assembly in the United StatesMaterial certificates, weld logs, borescope records
4. Factory acceptancePressure, function and interlock testing with the plant watching on site or onlineFAT report with signatures and an open-item list
5. ACI and exportACI filing against the plant’s ACID, ISPM 15 crating, sailingInvoice, packing list, bill of lading, origin certificate
6. ArrivalPort clearance by the importer, road move to siteCleared equipment at the plant
7. InstallationPaul sets, connects and wires the modules, or directs the site work as supervisorInstallation checklists and marked-up drawings
8. Commissioning and qualificationStart-up, SAT, IQ, OQ, PQ sampling support dataExecuted protocols and summary reports
9. Handover and serviceTraining, spares, maintenance and requalification planManuals and as-built file in English, metric units

After handover Paul services the equipment it delivered with planned maintenance, requalification, spare parts, derouging and repairs, and keeps each system’s records current for the plant’s next EDA inspection.

Who builds process systems for plants in Egypt?

Paul Industries builds process systems for plants in Egypt: WFI, purified water, pure steam and CIP systems for medicines plants in 10th of Ramadan City, 6th of October City, Badr City and Alexandria; pressure vessels, exchangers, dosing skids and alloy piping for fertilizer and chemical plants in Abu Qir and Damietta; process water, tanks and pump skids for manufacturers in the Suez Canal Economic Zone; and CIP, tanks and treatment systems for food, sugar and textile plants. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work across all 50 states and at plants in Egypt and other countries. It engineers each system for 380 V at 50 Hz, prepares the code and qualification file, and installs and commissions it or supervises the installation. The Saudi Arabia page covers another Red Sea destination.

What drives the delivered cost of a process system for an Egyptian plant?

The delivered cost of a process system for an Egyptian plant turns on six items beyond the equipment, and each one is a separate US dollar line in a Paul proposal.

  • Electrical conversion. IEC motors, 380 V drives, IEC 61439 panels, heat-rated enclosures and pumps resized for 50 Hz.
  • Code and licensing documents. ASME construction records, the boiler document file for EOS where a boiler is in scope, and translations the plant asks for.
  • Freight and routing. Container and flat-rack count, the choice of Alexandria, Damietta or Sokhna, and the road leg to the industrial city.
  • Border charges. Duty by tariff code and VAT at 5 or 14 percent, under the Incoterm the plant chooses.
  • Qualification. GMP protocols and sampling support for medicines plants.
  • Installation route. A full installation scope inside a running plant is priced higher than supervision alone, and the proposal shows both routes.

Paul Industries for Egyptian pharmaceutical, fertilizer and food plants

Paul Industries designs, fabricates and tests water and steam systems, skids, vessels, tanks and piping for plants across Egypt, ships them to Alexandria, Damietta, Port Said or Sokhna under the ACI system, and installs and commissions them or supervises installation, with construction, electrical and qualification records in a single handover file. Send the specification, the site supply and the target start-up date, and request a quote in US dollars.

Standards referenced: PIC/S GMP Guide PE 009-17 (adopted by the Egyptian Drug Authority) · WHO GMP for pharmaceutical products (TRS 986 Annex 2) · Ministerial Decree 348 of 1977 (boiler licensing documents) · ES 4748-5 (shell boilers, inspection) · ASME Boiler and Pressure Vessel Code Section VIII · ASME Section I · ASME B31.3 · ASME BPE · IEC 60204-1 · IEC 61439 · Incoterms 2020 · ISPM 15

Frequently asked questions

Is Egypt on 50 Hz or 60 Hz power for three-phase plant equipment?

Egypt runs on 50 Hz, with 380 V three-phase and 220 V single phase as the nominal low voltage supply. Paul Industries builds skids for Egyptian plants around that supply, with IEC motors rated for 380 V or 400 V at 50 Hz, drives set for the Egyptian network, 220 V or 24 V DC controls, and pumps and fans selected for the slower 50 Hz speed.

Which GMP guide does the Egyptian Drug Authority apply in factory inspections?

In 2026 the Egyptian Drug Authority adopted the PIC/S GMP Guide, edition PE 009-17, including Part I, Part II and the annexes, and said it would monitor compliance during factory inspections. Paul Industries designs and qualifies water, steam and process systems for Egyptian medicines plants against that guide, with the design qualification, construction records and executed IQ and OQ protocols an EDA inspector reviews.

Who builds WFI systems for pharmaceutical plants in 10th of Ramadan City?

Paul Industries designs, fabricates and qualifies WFI generation, storage and distribution systems for pharmaceutical plants in 10th of Ramadan City, built to ASME BPE with orbital welds and borescope records and wired for 380 V at 50 Hz. Equipment ships to Alexandria, Damietta or Sokhna, and Paul installs and commissions it or supervises the installation, then executes the qualification protocols with the plant’s quality team.

How does an Egyptian plant license a new steam boiler built in the United States?

The Egyptian Organization for Standardization and Quality studies the licensing documents for each new boiler under Ministerial Decree 348 of 1977 and issues a certificate the owner presents to the licensing body. Paul Industries supplies the design file, test reports, construction records and manufacturer’s guarantee for each boiler, organized in the order the EOS file needs.

Does an ASME Section VIII vessel suit a fertilizer plant in Abu Qir or Damietta?

Fertilizer and chemical plants in Abu Qir and Damietta name the vessel design code in their purchase specifications, and ASME Section VIII Division 1 is the code a US-built vessel is designed and built to under that specification. Paul Industries supplies the calculations, material certificates, NDE and hydrostatic test records and nameplate data the plant’s inspection department and insurer review before the vessel goes into service.

What is an ACID number, and when does the Egyptian importer need it?

An ACID number is the Advance Cargo Information identifier the Egyptian importer obtains through the Nafeza platform before goods are loaded, and it has been mandatory for sea freight since October 2021. Paul Industries, registered as exporter on CargoX, links its invoice and packing list to the plant’s ACID before the sailing, so the shipment arrives with its customs data already filed.

What VAT does Egypt charge on imported production machinery?

Egypt’s standard VAT rate is 14 percent, and machinery and equipment used to produce goods or deliver services carry a reduced 5 percent rate under the VAT law, with buses and passenger cars excluded. Customs duty on industrial machinery runs from zero to 5 percent by tariff code. Paul Industries itemizes each module so the importer’s customs agent applies the right rates.

Which port suits equipment for a plant in the Sokhna industrial zone?

Equipment for a plant in the Sokhna industrial zone usually lands at Ain Sokhna port on the Gulf of Suez, which sits inside the Suez Canal Economic Zone with the zone’s own procedures. Paul Industries plans the routing, the crane lifts at the quay and the short road move together, and sizes modules to the route before fabrication starts.

How long does a sailing from New York to the Port of Alexandria take?

Forwarder data puts New York to Alexandria at about 18 days on the quickest direct services and up to about 33 days on services with transshipment. Paul Industries books the sailing once the factory acceptance test is signed off, files the ACI before loading, and plans fabrication backward from the plant’s start-up date so the voyage fits the schedule.

Which systems do medicines plants in 6th of October City buy for an expansion?

Medicines plants in 6th of October City buy purified water and WFI systems, pure steam generators, compounding and holding vessels, CIP and SIP skids, chilled water for HVAC and process piping when they add lines or buildings. Paul Industries builds that equipment as tested modules in the United States and installs and qualifies it inside the operating plant.

Does Paul Industries supply process systems to plants in the Suez Canal Economic Zone?

Paul Industries supplies process water treatment, tanks, pump skids, compressed air, cooling and process piping to manufacturers in the Suez Canal Economic Zone at Sokhna, East Port Said, Qantara West and East Ismailia. Equipment is built and tested in the United States, shipped to Sokhna or East Port Said, and installed and commissioned by Paul or under Paul’s supervision.

How are control panels protected from heat and dust at Egyptian plants?

Control panels for Egyptian plants use enclosures rated for the dust level of the room, panel cooling sized for summer ambient temperatures, and filtered ventilation or panel air conditioning where the room runs hot. Paul Industries builds panels to IEC 61439, derates drives and power supplies for the site ambient, and tests the panel heat load during the factory acceptance test.

Which equipment do sugar and textile plants in the Delta order from a US builder?

Sugar plants in the Delta and Upper Egypt order evaporator support skids, process tanks, heat exchangers and cooling water treatment, and textile dyeing and finishing plants in El-Mahalla El-Kubra and other Delta cities order water softeners, boiler feed systems and effluent treatment. Paul Industries builds those systems for 380 V at 50 Hz and installs and commissions them.

In which language are manuals and drawings delivered to an Egyptian plant?

Paul Industries delivers manuals, drawings and qualification documents for Egyptian plants in English with metric units, and adds Arabic translations of operator labels, safety signs and operating summaries when the plant asks for them. Document numbering follows the plant’s own system so the file goes straight into its document control.

Can the Egyptian plant's engineers attend the factory acceptance test?

Egyptian engineers and quality staff are welcome at every Paul Industries factory acceptance test in the United States, in person or through a live video link, for the pressure tests, the functional runs, the alarm and interlock checks and a page-by-page document review. Deviations are closed before the equipment is crated, and the signed FAT report goes into the turnover file.

Which Incoterm suits a first order from an Egyptian plant?

A first order from an Egyptian plant often uses FCA at a US port or CIF Alexandria, leaving the importer to clear customs under its ACID, while DAP at the plant gate suits owners who want a delivered price to site. Paul Industries quotes the term the plant chooses and shows freight, insurance and handling as separate US dollar lines.

What service does Paul Industries provide after start-up in Egypt?

Paul Industries services equipment it installed in Egypt with planned maintenance, requalification runs, spare parts, passivation and derouging of stainless systems, and repairs. Each visit adds its findings to the equipment history Paul handed over at commissioning, so the plant has a current record for its next EDA inspection or internal audit.

What does Paul Industries need from an Egyptian plant to prepare a proposal?

Paul Industries needs the user requirements or process description, the site layout, the supply voltage and fault level, the design code and GMP standard the plant works to, the target start-up date, the preferred port and the Incoterm. The proposal comes back in US dollars with engineering, equipment, documentation, freight and site work shown separately.

Planning process equipment for a plant in Egypt?

Send Paul Industries your specification, the site supply and the start-up date, and the reply lays out the code basis, the port and sailing plan, and a budget figure in US dollars. Call 201-450-8280 or request a quote.