Paul Industries is a US process equipment contractor for Hungary that designs and fabricates pressure vessels, WFI and purified water systems, clean steam generators, CIP skids, process tanks and utility packages for Hungarian pharmaceutical, battery, automotive, refining and food plants, built to the EU Pressure Equipment Directive as Hungary applies it and wired for 400 V at 50 Hz. The equipment crosses the Atlantic to a North Sea or Adriatic port, continues by rail to Budapest or the plant, and Paul installs, starts up and commissions it or supervises the installation. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and was formerly based in northern New Jersey and then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pressure equipment PED via NGM decree 44/2016; in service, NGM decree 2/2016
Power 230/400 V, 50 Hz
Medicines authority OGYI from 1 November 2026; PIC/S since 1995
Sea gateways Bremerhaven, Rotterdam or Koper, then rail
VAT 27 percent standard rate
Reviewed November 2026

What a US process equipment contractor for Hungary delivers to the plant

A US process equipment contractor for Hungary delivers a working system and a complete file, and both have to satisfy two audiences: EU product law for placing the equipment on the market, and Hungarian rules for operating it once the plant switches it on. Paul Industries engineers purified water and WFI systems, clean steam generators, CIP and SIP skids, pressure vessels, process tanks and process cooling systems, then qualifies them through its validation and commissioning work.

Hungarian owners pick the delivery route that fits their project. Supply with supervision gives a plant a tested skid plus Paul’s direction of setting, hook-up and start-up. Design-build wraps the equipment in room layouts, utility tie-ins and controls. Turnkey delivery hands Paul the whole system, from the user requirement specification to executed qualification protocols, under one contract. Hungary sits in the Central and Eastern Europe group on the international projects page, which lists every country where Paul takes work.

Pharmaceutical companies in Hungary and the utilities they run

Pharmaceutical companies in Hungary run active ingredient synthesis, biotech and finished dosage plants, clustered around Budapest and in the east of the country around Debrecen, with further sites in western Hungary. The plants named here are market facts that show what Hungarian buyers operate; none of them describes a Paul project.

Gedeon Richter keeps its headquarters in Budapest, is making Dorog its active ingredient manufacturing site, and runs a biotechnology plant in Debrecen that produces drug substance and drug product from mammalian cell cultures. Egis, part of the Servier group, makes active ingredients and finished products at two Budapest sites, produces tablets in Körmend, and opened a new active ingredient plant in Budapest in November 2025. EUROAPI runs a prostaglandin active ingredient site in Budapest’s Újpest district and has committed about 50 million euros to expand it, and Teva operates in Debrecen.

Hungarian manufacturing regions and the equipment Paul Industries supplies to them
RegionPlants named as market factsMain process needsEquipment from Paul Industries
Budapest and Pest countyRichter, Egis and EUROAPI active ingredient and dosage sites; Samsung SDI battery site at GödSolvent handling, purified water, clean utilities, electrolyte and coating supportReactors and receivers, water systems, chillers, solvent recovery skids
Hajdú-Bihar (Debrecen)Richter biotech plant, Teva, BMW Plant DebrecenCell culture media and buffers, WFI, process cooling, paint shop utilitiesMedia and buffer vessels, WFI loops, glycol and chilled water systems
Western Transdanubia (Győr, Körmend)Audi Hungaria, Egis tablet plantMachining coolant, parts washing, purified water, compressed airFiltration skids, tanks, compressed air piping, water treatment
Central Danube (Százhalombatta, Kecskemét)MOL Danube Refinery, Mercedes-Benz KecskemétTurnaround equipment, hydrogen and process piping, paint shop waterPressure vessels, exchangers, pump skids, alloy spools
Southern and eastern counties (Szeged, Kaposvár, Tiszaújváros)PICK Szeged, Kaposvár sugar factory, MOL Tiszaújváros polyol complexSanitary processing, evaporation, CIP, chemical dosingSanitary tanks, CIP skids, heat exchangers, dosing systems

Pharmaceutical companies in Budapest and their active ingredient lines

Pharmaceutical companies in Budapest concentrate on chemical synthesis of active ingredients, which puts glass-lined and stainless reactors, receivers, condensers, solvent recovery and nitrogen inerting at the center of their equipment lists. Paul builds jacketed vessels and process skids for those suites with ATEX-zoned instrumentation where the hazardous area classification calls for it, temperature control units, and pipe spools in 316L or alloy grades, with every weld traceable to its procedure and welder. Manufacturing in Budapest also covers dosage forms and packaging, where purified water, compressed air and HVAC chilled water carry most of the utility load.

Biologics in Debrecen and the Hungarian pharmaceutical industry’s growth in biotech

The pharmaceutical industry in Hungary has added a biotech layer to its chemistry base, and the Debrecen biotechnology plant shows what that layer demands: media preparation and buffer hold vessels, bioreactor utilities, WFI at the point of use, clean steam for sterilization in place, and cold rooms. Paul designs those systems to ASME BPE with orbital welds, documented surface finish, passivation records and drainable slopes, and its biotech page walks through how the utilities connect to upstream and downstream suites.

Hungarian pharmaceutical companies that make sterile products also work to the revised EU GMP Annex 1, in force since 25 August 2023, with its contamination control strategy covering water, steam, gases and cleaning. Pharmaceutical manufacturing companies in Hungary therefore ask for WFI loops held hot or sanitized on a validated schedule, sampling points placed by risk, and clean steam quality tested against the European Pharmacopoeia, and Paul builds those systems with the data an inspector expects to see.

Major industries in Hungary beyond pharmaceuticals

Major industries in Hungary beyond pharmaceuticals include vehicle and battery production, refining and petrochemicals, and food processing, and each of them buys process equipment on its own cycle. For anyone asking what is manufactured in Hungary, cars, engines, battery cells, medicines, fuels, polyols, sugar and meat products all appear in the plants listed below.

Car manufacturing in Hungary and the battery plant in Hungary at Göd

Car manufacturing in Hungary runs at Audi Hungaria in Győr, which builds engines and vehicles, at Mercedes-Benz in Kecskemét, producing since March 2012, and at BMW Plant Debrecen, where series production of the iX3, the first Neue Klasse model, began at the end of 2025. Every one of those plants runs paint shop pretreatment, parts washing, machining coolant systems and large chilled water and compressed air networks. Paul supplies chilled water systems, filtration and coolant skids, tanks and the piping that ties them together.

Samsung SDI’s battery plant in Hungary at Göd, north of Budapest, represents the battery manufacturers in Hungary whose cell lines depend on dry rooms, solvent recovery for electrode coating, precise process cooling and high-purity water. Battery plants buy closed-loop cooling, NMP recovery support systems, deionized water and dust collection, and Paul builds those packages for 400 V supplies with CE-marked controls.

Refining and the chemical industry in Hungary

The chemical industry in Hungary centers on MOL’s Danube Refinery at Százhalombatta, which added a 10 MW green hydrogen unit in 2024, and on MOL’s Tiszaújváros site, where a polyol complex of about 1.3 billion euros opened the same year. Refinery turnarounds and petrochemical expansions buy pressure vessels, heat exchanger bundles, pump skids and alloy piping, and Paul fabricates them to EN 13445, EN 13480 or ASME Section VIII as the owner’s specification sets out, as covered on its chemical manufacturing page.

Food manufacturing companies in Hungary

Food manufacturing companies in Hungary include meat processors such as PICK Szeged, known for salami and meat products and part of the Bonafarm group, and the Kaposvár sugar factory, which has been the country’s single operating sugar factory since 2008. Meat plants run brine injection, cook and chill systems, ammonia or glycol refrigeration and heavy CIP, and a sugar factory runs diffusion, juice purification, evaporation and crystallization with large heat exchangers. Paul builds sanitary tanks, heat exchangers, CIP skids and refrigeration packages for those plants, and its food and beverage page sets out the utilities they share.

Manufacturing companies in Hungary across all of these sectors share one constraint: equipment arrives into running plants with tight shutdown windows. Paul plans module sizes, tie-in points and test sequences so that site work fits the outage the plant has booked.

Which Hungarian rules govern a US-built pressure vessel?

A US-built pressure vessel for a Hungarian plant answers to two Hungarian decrees: 44/2016. (XI. 28.) NGM rendelet, which brings the Pressure Equipment Directive 2014/68/EU and the simple pressure vessels directive into Hungarian law for placing equipment on the market, and 2/2016. (I. 5.) NGM rendelet, which governs pressure equipment in operation and sets the periodic inspections listed in its Annex 2. The PED reaches equipment with a maximum allowable pressure above 0.5 bar and sorts it into hazard categories that decide the conformity assessment module.

Under the 2016 market decree, the instructions and safety information supplied with pressure equipment are in Hungarian, importers and distributors make sure they accompany the product, and a Hungarian version of the EU declaration of conformity belongs in the file. Supervision of pressure equipment in operation sits with the government offices, and the Metrology and Technical Supervision Department of the Budapest Government Office carries the nationwide technical safety tasks. Pressure equipment inside mining-supervised operations follows SZTFH Decree 11/2022 (I. 28.) of the Supervisory Authority for Regulatory Affairs.

Hungarian and EU requirements for a skid shipped from the United States, and what Paul Industries provides
RequirementLegal basisWhat Paul Industries provides
Placing pressure equipment on the marketPED 2014/68/EU through NGM Decree 44/2016Category and module assessment, technical file, CE marking, declaration of conformity in Hungarian
Operation and periodic inspectionNGM Decree 2/2016, Annex 2 inspections, government office supervisionData sheets, relief device sizing, inspection openings, inspection and maintenance plan
Machinery and assembliesDirective 2006/42/EC; Regulation (EU) 2023/1230 from 20 January 2027Risk assessment, safety functions, technical file, Hungarian instructions
Electrical equipmentLow Voltage Directive, EMC Directive, MSZ HD 60364EN 60204-1 panels, CE-marked components, test records, Hungarian labels
GMP equipmentEU GMP with Annex 1 and Annex 15, PIC/S guideDesign, installation and operational qualification protocols and reports

Design codes Hungarian engineers specify for vessels and piping

Hungarian engineers specify vessels and piping to the harmonized European standards, EN 13445 for unfired pressure vessels and EN 13480 for metallic industrial piping, because they give a presumption of conformity with the PED. Owners with a US engineering standard or a global corporate specification often name ASME Section VIII and ASME B31.3, and the PED accepts those codes when the design shows how each essential safety requirement is met, including European material properties and the directive’s test pressures. Paul designs to whichever code the owner names and documents the route in the technical file.

The Machinery Regulation from January 2027

The EU Machinery Regulation 2023/1230 replaces the Machinery Directive for products placed on the market from 20 January 2027, with new requirements for safety-related software, protection against corruption of control systems and digital instructions. Skids with pumps, agitators or mixers that ship to Hungary after that date carry a declaration under the regulation, and Paul prepares the risk assessment and technical file under the rule that applies on the shipping date.

GMP inspection by OGYI, Hungary’s new National Institute of Pharmacy

GMP inspection of Hungarian medicine plants passes to OGYI, the National Institute of Pharmacy, which Government Decrees 323/2026 and 324/2026 set up from 1 November 2026 to take over the medicines and medical device functions previously held by the national public health and pharmacy center, NNGYK. Hungary has belonged to the Pharmaceutical Inspection Convention since 1976 and to the PIC/S scheme since December 1995, so Hungarian inspectors apply the same GMP guide used across Europe.

For a water or steam system, that means the inspector reads the user requirements, the design qualification, the factory and site test records, the installation and operational qualification and the performance qualification data as one chain. Paul writes the protocols in the plant’s format, in English with Hungarian versions where the quality unit asks for them, executes them, and closes deviations with documented root causes.

Hungary voltage and frequency for skids and control panels

Hungary voltage and frequency match the European pattern: 230 V single phase and 400 V three phase at 50 Hz, with Type C and F sockets, and MAVIR operates the transmission grid. Hungary 3 phase voltage of 400 V replaces the 480 V, 60 Hz supply a US plant uses, and Hungary electrical voltage at 230 V replaces 120 V for control circuits and convenience outlets.

Hungary power voltage shapes rotating equipment first. A centrifugal pump driven at 50 Hz turns about one sixth slower than the same pump at 60 Hz, which cuts head by roughly 30 percent, so Paul selects impellers, motors and fans for the 50 Hz duty point from the first calculation. Drives, contactors and breakers carry IEC ratings and CE marking, and panels follow EN 60204-1. A Hungary voltage converter suits a laptop charger; a process skid is designed for the Hungarian supply from the start.

Electrical installation rules: MSZ HD 60364

Electrical installations in Hungary follow the MSZ HD 60364 series, which replaced the older MSZ 2364 standard, and initial verification follows MSZ HD 60364-6:2017. Paul supplies single-line diagrams, cable schedules, earthing details, short-circuit ratings and test records that fit that verification, with Hungarian labels on panels and field devices.

Shipping to Hungary from US ports by sea and rail

Shipping to Hungary from US ports combines an ocean crossing with a rail leg, because Hungary has no seaport. Forwarder schedules show direct Atlantic crossings of about 11 days from Wilmington to Bremerhaven and about 15 days from Savannah to Rotterdam, and services from Newark to Koper on the Adriatic of about 24 days with two transshipments; the inland leg to Budapest follows by rail or road. Shipping to Hungary from USA ports is booked to land the equipment before the installation window, with time added for transshipment, customs entry and the inland move.

Container shipping to Hungary favors modules that fit a 40-foot high cube box, roughly 12.0 by 2.35 by 2.69 meters inside, because boxes move by rail without special handling to intermodal terminals such as BILK, the Budapest Intermodal Logistics Centre in District XXIII, which has a direct industrial track connection. Larger modules go as flat-rack or breakbulk cargo with a heavy-haul road leg and a route survey. Every crate uses ISPM 15 heat-treated wood, and spare parts ship on separate, itemized pallets.

Gateway options for equipment bound for Hungarian plants
GatewayOcean leg from the US East CoastInland legSuits
BremerhavenAbout 11 days from Wilmington on direct serviceRail across Germany and Austria to Budapest terminalsContainerized skids for Budapest, Győr and Pest county plants
RotterdamAbout 15 days from SavannahRail or road to HungaryFrequent sailings, mixed container and breakbulk loads
KoperAbout 24 days from Newark with transshipmentRail through Slovenia to HungarySouthern and western Hungarian plants, Adriatic routing

Hungary import duties, customs duty and import restrictions

Hungary import duties follow the EU Common Customs Tariff: each item is classified under the Combined Nomenclature and Hungary customs duty is charged on the customs value, so a pump skid, a control panel and spare instruments carry separate rates. The importer of record holds an EORI number and files the declaration with a commercial invoice, packing list and transport documents. Hungary import restrictions for process equipment come from EU product rules, so the CE documentation, Hungarian instructions and declaration of conformity accompany the shipment. Paul classifies each line on the invoice so the importer’s customs agent files cleanly.

Hungary VAT rate 2026 and how import VAT is settled

The Hungary standard VAT rate of 27 percent applies to imported process equipment, charged on the customs value plus duty, and VAT-registered plants recover it through their returns. The VAT rate in Hungary on prescription-only medicines dropped to zero from 1 September 2026, a change that affects pharmaceutical sales rather than equipment imports. Paul’s proposals show equipment, freight and services as separate US dollar lines so the plant’s tax team applies the right treatment.

How a Hungarian project with Paul Industries is sequenced

Paul Industries sequences a Hungarian project in nine stages, and the first two lock in the PED categories, the 50 Hz equipment selection, the qualification strategy and the Hungarian documentation list. The table shows each stage and what the plant receives from it.

Project stages for process equipment supplied to a plant in Hungary
StageWork by Paul IndustriesWhat the Hungarian plant receives
1. RequirementsUser requirements, PED categories, 400 V, 50 Hz supply data, GMP impactAgreed code basis and document list
2. DesignProcess, mechanical and electrical design to PED, EN 13445 or ASME VIII, ASME BPE, EN 60204-1Approved drawings, calculations, design qualification
3. FabricationOrbital and manual welding, examination, passivation, panel build in the United StatesMaterial certificates, weld maps and logs, inspection records
4. Factory acceptance testHydrostatic and functional tests, 50 Hz test power where neededSigned FAT report and punch list
5. ConformityTechnical file, declaration of conformity, CE marking, Hungarian instructionsConformity package for the importer
6. ExportISPM 15 crating, ocean booking, rail or road leg, customs dataInvoice, packing list, bill of lading
7. Site installationSetting, tie-ins and wiring by Paul, or under Paul’s supervisionInstallation records, redlined drawings
8. QualificationCommissioning, IQ and OQ, PQ sampling supportExecuted protocols and summary reports
9. Handover and serviceTraining, spares, inspection plan under NGM Decree 2/2016Hungarian and English manuals, as-built file

After handover, Paul services the systems it delivered with planned maintenance, periodic requalification, spare parts and repairs, and its preventive maintenance plans follow the inspection intervals that Hungarian operating rules set for each pressure item.

Who builds process systems for plants in Hungary?

Paul Industries builds process systems for plants in Hungary: WFI, purified water, clean steam and media and buffer vessels for pharmaceutical and biotech plants in Budapest and Debrecen, chilled water, coolant and deionized water systems for vehicle and battery plants in GyÅ‘r, Kecskemét, Debrecen and Göd, pressure vessels and piping for refining and petrochemical sites at Százhalombatta and Tiszaújváros, and sanitary tanks and CIP for food plants. Paul engineers each system for 400 V at 50 Hz, documents it to the PED and EU GMP in Hungarian and English, and installs and commissions it or supervises the installation, under one contract. The Austria page covers the neighboring market that shares Hungary’s rail gateways.

How is the delivered price of a Hungarian project built up?

The delivered price of a Hungarian project builds up from the equipment itself plus five items that appear as separate US dollar lines in a Paul proposal: European electrical engineering, conformity and qualification documents, freight, customs and VAT, and the site route.

  • European electrical engineering. 50 Hz motors and pumps, 400 V drives, IEC components and EN 60204-1 panels.
  • Conformity and qualification. PED category work, Hungarian translations and GMP protocols, priced as defined deliverables.
  • Freight. Ocean booking, transshipment, the rail or road leg, flat racks and crane plans for oversize modules.
  • Customs and VAT. Duty by Combined Nomenclature heading under the buyer’s Incoterm, and 27 percent VAT on the duty-paid value.
  • Site route. Full installation inside an operating plant, or supervision of setting and hook-up.

Incoterms 2020 decide who pays each leg: FCA at a US port leaves freight and import to the buyer, CIF Rotterdam or CIF Koper adds the ocean leg and insurance, and DAP at the plant moves the whole route to Paul with import duty and VAT left with the buyer.

Paul Industries for Hungarian pharmaceutical, battery and process plants

Paul Industries designs, fabricates and tests PED-compliant vessels, water and steam systems, skids, cooling packages and piping for Hungarian plants, ships them through Bremerhaven, Rotterdam or Koper with the rail or road leg to site, and installs and commissions them or supervises installation, with conformity, electrical and qualification records in Hungarian and English. Send the user requirements, the site and its supply, and the target start-up, and the proposal comes back with the route, the schedule and a price in US dollars. Request a quote for your plant in Hungary.

Standards referenced: Pressure Equipment Directive 2014/68/EU · 44/2016. (XI. 28.) NGM rendelet · 2/2016. (I. 5.) NGM rendelet · Machinery Directive 2006/42/EC and Machinery Regulation (EU) 2023/1230 · Low Voltage Directive 2014/35/EU · EMC Directive 2014/30/EU · MSZ HD 60364 · EN 60204-1 · EN 13445 · EN 13480 · EU GMP, Annex 1 and Annex 15 · PIC/S GMP Guide · European Pharmacopoeia · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Incoterms 2020 · ISPM 15

Frequently asked questions

What is the Hungary VAT rate on process equipment imported from the US?

Process equipment imported into Hungary carries the standard VAT rate of 27 percent, charged on the customs value plus any duty, and VAT-registered plants recover it through their Hungarian VAT returns. Paul Industries itemizes equipment, freight and services on its invoices so the importer applies the correct treatment, and quotes every line in US dollars.

Does a skid for a Hungarian plant need Hungarian-language instructions?

Pressure equipment placed on the Hungarian market comes with instructions and safety information in Hungarian under NGM Decree 44/2016, and a Hungarian version of the EU declaration of conformity belongs in the file. Paul Industries supplies Hungarian manuals, labels and declarations alongside English engineering documents, so the importer and the plant’s safety officer receive a complete set.

Who builds WFI and clean steam systems for pharmaceutical plants in Budapest?

Paul Industries designs, fabricates and qualifies WFI generation and distribution, purified water and clean steam systems for pharmaceutical plants in Budapest and Pest county, built to the European Pharmacopoeia, EU GMP Annex 1 and ASME BPE. Each system ships with a 400 V, 50 Hz electrical design and Hungarian documents, and Paul installs and commissions it or supervises installation.

Which equipment does a biotech plant in Debrecen need from a US fabricator?

A biotech plant in Debrecen needs media preparation and buffer hold vessels, bioreactor utilities, WFI at each point of use, clean steam for sterilization in place, CIP skids and process cooling. Paul Industries builds those systems to ASME BPE with orbital welds and passivation records, ships them by sea and rail, and delivers the qualification protocols with them.

What does a vehicle plant in Győr or Kecskemét buy from Paul Industries?

Vehicle plants in GyÅ‘r and Kecskemét buy chilled water systems, machining coolant filtration skids, parts washing and pretreatment tanks, compressed air piping and process water treatment. Paul Industries designs those packages for the Hungarian 400 V, 50 Hz supply, builds and tests them in the United States, and installs them during the plant’s scheduled shutdowns.

Which systems does a battery plant at Göd or Debrecen run?

Battery cell plants such as the Samsung SDI site at Göd run dry room air handling, solvent recovery for electrode coating, closed-loop process cooling, deionized water and dust collection. Paul Industries supplies cooling, water and recovery support packages with CE-marked controls and IEC components, documented for Hungarian operation and built to the plant’s hazardous area classification.

Who fabricates pressure vessels for the refinery at Százhalombatta?

Paul Industries fabricates pressure vessels, heat exchanger bundles, pump skids and alloy piping spools for refining and petrochemical sites such as Százhalombatta and Tiszaújváros, designed to EN 13445, EN 13480 or ASME Section VIII as the owner specifies. Each item carries its PED conformity documents and test records and arrives timed to the turnaround window.

Is Hungary voltage different from US voltage for process skids?

Hungarian plants run 230 V single phase and 400 V three phase at 50 Hz, while US plants use 120 V and 480 V at 60 Hz. Pumps and fans run about one sixth slower at 50 Hz, so Paul Industries sizes impellers and motors for the Hungarian duty point and builds panels with IEC-rated components from the first drawing.

Which authority supervises pressure equipment in operation in Hungary?

Pressure equipment in operation in Hungary falls under NGM Decree 2/2016, with the government offices as the supervising authority and the Metrology and Technical Supervision Department of the Budapest Government Office handling nationwide technical safety tasks. Paul Industries delivers the data sheets, relief valve records and inspection access each vessel needs under that decree.

Do Hungarian plants accept ASME Section VIII vessels?

Hungarian plants accept vessels designed to ASME Section VIII when the PED conformity route shows how each essential safety requirement is met, covering material properties, test pressure and the hazard category of the item. Paul Industries documents that route in the technical file and applies CE marking where the category calls for it, or designs to EN 13445 when the owner prefers.

How long does shipping to Hungary from the US East Coast take?

Forwarder schedules show about 11 days from Wilmington to Bremerhaven and about 15 days from Savannah to Rotterdam on direct services, and about 24 days from Newark to Koper with transshipment. The rail or road leg to Budapest and customs entry follow. Paul Industries books the sailing so equipment reaches the plant before its installation window opens.

How are customs duties calculated on a US skid entering Hungary?

Customs duties on a US skid entering Hungary follow the EU Common Customs Tariff by Combined Nomenclature heading, charged on the customs value, and the importer of record files with an EORI number. Paul Industries lists each component by heading, weight and value on the invoice and packing list and offers FCA, CIF or DAP terms under Incoterms 2020.

What does OGYI's creation in November 2026 mean for equipment qualification?

OGYI, the National Institute of Pharmacy, took over Hungary’s medicines and medical device functions on 1 November 2026, and GMP expectations stay anchored in EU GMP and the PIC/S guide. Paul Industries prepares design, installation and operational qualification records in the plant’s format so its quality unit presents a complete chain of evidence at inspection.

Can Hungarian engineers witness the factory acceptance test?

Engineers and quality staff from Hungarian plants attend Paul Industries factory acceptance tests at the US fabrication site or follow them through a live video link. The test covers hydrostatic checks, functional runs, alarm and interlock tests and a document review, and the signed report and punch list join the qualification package before the equipment ships.

Which sugar, meat and food plants in Hungary buy sanitary process equipment?

Food plants across Hungary, including meat processors in Szeged and the sugar factory at Kaposvár, buy sanitary tanks, heat exchangers, CIP skids, evaporator support and refrigeration packages. Paul Industries builds that equipment with hygienic welds and drainable layouts, wired for 400 V at 50 Hz and documented in Hungarian for the plant’s food safety and pressure equipment files.

What information gives a firm price for a Hungarian project?

A firm price for a Hungarian project comes from the user requirements, the PED categories, the site address and supply data, the qualification scope, the documentation languages and the target start-up. Paul Industries returns a proposal in US dollars with equipment, conformity work, freight, duty assumptions and site work shown as separate lines.

What service follows equipment installed at a Hungarian plant?

Paul Industries services Hungarian installations with planned maintenance, periodic requalification of water and steam systems, derouging and passivation of stainless surfaces, spare parts and repairs. Service visits line up with the periodic inspections that NGM Decree 2/2016 sets for pressure equipment, and every finding is added to the equipment history handed over at commissioning.

Planning a process system for a plant in Hungary?

Send Paul Industries the user requirements, the plant location and supply, and the start-up date, and the reply sets out the gateway port, the build schedule and a budget in US dollars. Call 201-450-8280 or request a quote.