Paul Industries serves Jordanian plants as a US process equipment contractor for Jordan, designing and fabricating pharmaceutical water systems, CIP and clean steam skids, pressure vessels and process packages in the United States, shipping them through Aqaba duty free under the US-Jordan Free Trade Agreement, and installing and commissioning them in Amman, Aqaba and the Dead Sea region or supervising their installation. Drug plants receive qualification files written for JFDA and PIC/S inspection. The company keeps its headquarters at 256 Shore Drive, Kilmarnock, Virginia; it was formerly based in northern New Jersey, then Pennsylvania.
Request a quote or call 201-450-8280
Where a US process equipment contractor for Jordan fits a plant project
A US process equipment contractor for Jordan fits a plant project wherever the owner wants engineered equipment built to US codes, documented for a PIC/S inspectorate and delivered with commissioning by the same company that built it. Paul Industries designs and fabricates purified water and WFI systems, clean steam generators, CIP and SIP skids, sanitary process piping, pressure vessels and pump and dosing skids, and takes them through testing, export, site work and service.
Three delivery routes are open to a Jordanian buyer. Supply with installation supervision suits a plant whose building contractor is already on site. Design-build adds process and utility engineering, layout and controls. Complete installation covers placement, tie-ins, wiring, start-up, commissioning and qualification. The Saudi Arabia page and the Israel page describe other markets in the region, and the international page lists every country where Paul takes work.
Major industries in Jordan and the equipment they run
The major industries in Jordan are generic pharmaceuticals, potash and phosphate mining and fertilizers, chemicals, food and beverages, and water desalination and conveyance, with manufacturing concentrated around Amman and heavy industry at the Dead Sea, in the southern desert and at Aqaba. Industries in Jordan such as pharmaceuticals sell heavily abroad, so many plants are built and documented to the standards of their customers’ regulators as well as Jordan’s own. The table pairs each sector with the equipment it buys.
| Sector | Where it operates | Systems Paul builds for it |
|---|---|---|
| Generic pharmaceuticals | Amman and the surrounding governorates | Purified water, WFI, clean steam, CIP, HVAC process cooling, sanitary piping |
| Potash | Arab Potash Company’s operations at the Dead Sea | Brine and slurry pumping, crystallizer support, cooling water treatment, tanks |
| Phosphate and fertilizers | JPMC mines in the south, processing at Shidiya and Aqaba | Acid-resistant vessels and piping, scrubber dosing, effluent treatment |
| Chemicals | Aqaba Special Economic Zone and industrial estates | Reactors, exchangers, storage tanks, chemical injection skids |
| Food and beverage | Industrial areas around Amman | CIP, pasteurizer support, glycol cooling, water treatment |
| Water | Aqaba desalination and the conveyance to Amman | Dosing, pretreatment and remineralization skids, pumping packages |
Pharmaceutical companies in Jordan and their export markets
Pharmaceutical companies in Jordan form one of the country’s largest export industries, shipping about JD642 million, roughly $905 million, of pharmaceutical preparations in 2025 to around 85 markets, with about 10,000 people employed directly. The pharmaceutical industry in Jordan dates back to a factory opened in Salt in 1962, and its annual production capacity is now put at about JD1.5 billion. Because so much of the output is exported, pharmaceutical manufacturing companies in Jordan answer to the inspectors of their customers’ regulators as well as to JFDA, which raises the bar for every utility system that touches product.
That export profile shapes what a Jordanian drug plant asks of a US contractor: water systems designed to USP and Ph. Eur. monographs at the same time, ASME BPE fittings and finishes, orbital weld logs with borescope records, and qualification files that a JFDA, Gulf or US inspector can audit without translation. Paul builds to that standard and covers the detail on the pharmaceutical industry page.
Potash, phosphate and the chemical industries in Jordan
Jordan’s minerals sector set records in 2025: Arab Potash Company produced about 2.9 million tonnes of potash and inaugurated a $1.1 billion southern expansion, while Jordan Phosphate Mines Company raised raw phosphate output by 52 percent to 12.14 million tonnes and produced 1.36 million tonnes of phosphoric acid and about 1 million tonnes of fertilizers. JPMC’s washing and flotation plant at Shidiya has started production, and the two companies plan an integrated phosphoric acid complex in the Aqaba Special Economic Zone and at Shidiya with output expected in late 2029. Chemical industries in Jordan built on those minerals run on corrosive slurries, acids and brines, which calls for rubber-lined or alloy vessels, acid-resistant piping, scrubbers and effluent treatment of the kind on the chemical manufacturing page.
Water: desalination at Aqaba and the National Water Carrier
The Aqaba-Amman Water Desalination and Conveyance Project, also called the National Water Carrier, combines a seawater desalination plant and marine works at Aqaba with a 438 kilometer pipeline north and a solar plant to power it. Financing approvals came through during 2026, including a $1.8 billion package from the US International Development Finance Corporation, with construction expected to start in the fourth quarter of 2026. Plants that draw on groundwater or conveyed water treat it before it reaches a boiler or cooling tower, and Paul designs that treatment as described on the industrial water treatment page.
Desalinated water brings its own design points. Reverse osmosis permeate is soft, low in alkalinity and aggressive toward carbon steel and copper, so it is usually remineralized and pH-adjusted before distribution, and a plant receiving it may still polish it further for boiler feed or a pharmaceutical pretreatment train. Paul sizes remineralization, pH and chlorine dosing, cartridge filtration and polishing steps from the analysis of the water the plant will actually receive, and chooses the downstream metallurgy so that treated water and pipework stay compatible over the life of the system.
JFDA and the rules that apply to plant equipment in Jordan
JFDA, the Jordan Food and Drug Administration, regulates medicines, food and the plants that make them, and on 1 January 2026 it became the 57th participating authority of the Pharmaceutical Inspection Co-operation Scheme, PIC/S. JFDA applied in January 2021, passed an on-site assessment in April 2025 and was accepted at the PIC/S Committee meeting in November 2025. For a plant equipment buyer, that membership means JFDA inspects against the PIC/S GMP Guide, so the expectations for water systems, clean utilities, qualification and data integrity match those of the other PIC/S inspectorates.
| Requirement | Body | What it asks of the equipment |
|---|---|---|
| GMP for drug manufacturing | JFDA, PIC/S participating authority | Qualified water and clean utilities, documented design, IQ, OQ and PQ |
| Jordanian Standards and technical regulations | Jordan Standards and Metrology Organization, JSMO | Conformity of regulated products, verified by testing in Jordan |
| Customs clearance | Jordan Customs | HS classification, value, origin and the duty and sales tax due |
| Owner engineering specifications | Mining, fertilizer, chemical and utility operators | Design code, materials, inspection and test plan, data book |
| Electrical connection | Distribution companies such as JEPCO | Equipment matched to the 230/415 V 50 Hz network |
JFDA GMP guidelines and what they mean for water systems
JFDA GMP guidelines follow the PIC/S GMP Guide, so a Jordanian drug plant’s purified water and WFI systems are designed, qualified and monitored the way a European or Gulf inspector would expect. In practice that means a user requirement specification, a design qualification that traces each requirement to a drawing, sanitary design with no dead legs and drainable slopes, documented passivation, and installation and operational qualification protocols executed and signed before performance qualification sampling begins. Paul writes and executes those protocols with the plant’s quality unit through its validation and commissioning work, and the JFDA guidelines on product registration and site inspection then draw on the same records.
JSMO standards for imported products
The Jordan Standards and Metrology Organization, JSMO, prepares and publishes Jordanian standards and technical regulations, and imported goods covered by mandatory standards are verified through testing in Jordan before release; JSMO handled about 199,000 customs declarations in 2024. Engineered process equipment usually falls outside the consumer product categories JSMO polices most heavily, but electrical accessories and some components supplied with a skid can fall inside them. Paul reviews the bill of materials against the applicable Jordanian standards and supplies the test reports and declarations with the shipment.
Owner specifications on pressure equipment and piping
Jordanian mining, fertilizer, chemical and utility owners set their pressure equipment rules in the purchase specification, which states the governing code with its edition, typically the ASME pressure vessel code’s Section VIII and the B31.3 piping code, and adds corrosion allowances, linings, materials and the inspection and test plan. For the acid and brine duties of the potash and phosphate industries, the specification often adds rubber lining, alloy cladding or nonmetallic piping. Paul engineers each item to that package, and the owner’s data book receives the design calculations, mill certificates, welding and examination records and hydrotest charts.
What is the voltage in Jordan for industrial equipment?
Jordan’s electricity runs at 50 Hz, with 230 V on single-phase circuits, and the distribution company JEPCO specifies its low-voltage network equipment at 415 V three phase with a solidly earthed neutral. Engineers checking the Jordan voltage and frequency for a US-built skid therefore design motors, heaters and control transformers for a 400 to 415 V three-phase supply and 230 V auxiliaries rather than 480 V and 120 V. JEPCO serves users with either 6.6 kV or 415 V receiving facilities, and for a plant fed at 6.6 kV the transformer and switchgear that step the supply down can sit inside Paul’s scope.
The 50 Hz frequency is what moves a pump or fan off its duty. A 60 Hz motor runs at five sixths of its speed in Jordan, and a centrifugal pump’s head drops with the square of the speed, so Paul selects rotating equipment on 50 Hz performance data or on variable frequency drives configured for the site, and proves the duty point at the factory acceptance test. Panels are built to IEC 60204-1 or the owner’s specification with IEC components.
| Item | Jordan | Common US basis | Paul’s approach |
|---|---|---|---|
| Frequency | 50 Hz | 60 Hz | 50 Hz pump and fan selections or drives |
| Three-phase supply | 415 V network equipment, 400 V class loads | 480 V | Motors and heaters rated for 400 to 415 V |
| Single phase | 230 V | 120 V | 230 V lighting, outlets and instrument power |
| Wiring practice | IEC components | NEC and UL | IEC 60204-1 panels and terminations |
| Pharmaceutical water | PIC/S GMP via JFDA, export to USP and Ph. Eur. | USP and FDA | Dual-compendial design and qualification |
| Site conditions | Hot, dry summers inland; heat and salt air at Aqaba; Dead Sea basin below sea level | Temperate | Derated drives, sealed enclosures, coatings and alloys for brine and chlorides |
Aqaba port and shipping to Jordan from USA ports
Aqaba port is Jordan’s only seaport and the gateway for shipping to Jordan from USA ports, and its Aqaba Container Terminal is the country’s only container terminal. Buyers asking where is Aqaba port will find it at the head of the Gulf of Aqaba on the Red Sea, at the southern tip of Jordan, with the Desert Highway running north to Amman. The Aqaba port code is JOAQJ under the UN/LOCODE system, although some carrier booking systems list Aqaba under a variant code, so Paul checks the code on every booking.
For anyone asking how long does it take to ship from USA to Jordan, published transit times run about 35 days from Wilmington and about 37 days from Baltimore to Aqaba port, Jordan. Paul plans each shipping container from USA to Jordan, or a flat rack for an oversized frame, from the Aqaba port vessel schedule, fixes crate dimensions during design, and arranges the road haul from the Gulf of Aqaba port to Amman, the Dead Sea or the southern mines.
Handling and road haul from Aqaba
Equipment landed at Aqaba still has a long road leg ahead of it, north to the industrial estates around Amman or across to the Dead Sea plants, and the frame has to survive both the crane at the quay and the truck. Paul designs base frames with lifting lugs rated for the full lifted weight, marks the center of gravity and sling points on every crate, and keeps skid widths and heights inside the limits the haulier can move without special escorts wherever the process layout allows. Sanitary systems ship with every port capped and the stainless surfaces wrapped, so a passivated finish arrives as it left the factory. On arrival, Paul’s installation or supervision team checks shock and tilt indicators and the crate condition before the equipment is accepted at the plant.
The US Jordan free trade agreement and Jordan import duty
The US Jordan free trade agreement entered into force on 17 December 2001 and eliminated duties on qualifying trade by 1 January 2010, so a US-built skid that meets the agreement’s rules of origin enters Jordan without import duty. Goods outside the agreement pay duty at rates set by the Jordan Customs Tariff according to product and origin, which is why each Jordan customs HS code on the invoice matters: a Jordan customs duty calculator gives a reliable figure only once classification and origin are fixed. Jordan customs regulations also expect the invoice, packing list and origin evidence to agree line by line, and Paul prepares them that way.
General sales tax on imported equipment
Is there VAT in Jordan? Jordan levies a general sales tax that works much like a VAT, and the standard Jordan sales tax rate is 16 percent on goods and services, including goods imported from abroad. Importers pay the tax at customs clearance, and registered businesses recover it under the sales tax law’s rules. Sales tax still applies to goods that enter duty free under the agreement, so Paul shows duty and sales tax as separate lines and includes both in a DDP price.
How a Jordanian project with Paul Industries proceeds
Paul Industries carries a Jordanian project through nine stages, and the first two fix the GMP and owner requirements, the 415 V 50 Hz design basis, the origin plan for the free trade agreement and the route through Aqaba. The table lists what each stage produces for a Jordanian plant.
| Stage | Scope | Output for the Jordanian plant |
|---|---|---|
| 1. Requirements review | User requirements, JFDA and PIC/S expectations, owner specification, JSMO items, HS codes and origin | Traceability matrix and compliance list |
| 2. Engineering and design qualification | P&IDs, isometrics, 415/230 V design, material and finish specifications | DQ report and approved drawings |
| 3. Fabrication in the United States | Orbital welding, assembly, panel build, instrument calibration | Weld logs, borescope records, calibration certificates |
| 4. Factory acceptance test | Pressure, functional and software tests, attended or by video | Executed FAT with deviations closed |
| 5. Crating and shipping | Passivation and preservation, ISPM 15 crates, sailing to Aqaba | Commercial invoice, packing list, origin file |
| 6. Installation or supervision | Placement, tie-ins, sanitary welds in place | Field weld logs and installation checks |
| 7. Commissioning | Flushing, sanitization, start-up, setpoint tuning | Commissioning report |
| 8. Qualification | IQ and OQ execution, PQ support with the quality unit | Signed protocols and summary reports |
| 9. Handover and service | Training, spares, maintenance and requalification plan | Turnover package and as-builts |
Jordan stays on UTC+3 throughout the year, so the Jordanian afternoon overlaps the US Eastern morning for design reviews and video-witnessed tests. Paul keeps drawings, programs and qualification records on file for troubleshooting and annual requalification, and sizes spare parts holdings at the plant for the sailing time from the United States.
Requalification and change control after handover
A Jordanian drug plant’s water and clean steam systems stay qualified through periodic review, trending of microbial and chemical results, and change control whenever a component or setpoint changes. Paul keeps the design basis, as-built drawings and executed protocols on file, so a replacement pump, a new point of use or a membrane change can be assessed against the original qualification and documented in the same format. Paul also performs annual requalification work, including temperature mapping, instrument calibration and sanitization verification, timed to the plant’s shutdown calendar.
Who builds process systems for plants in Jordan?
Paul Industries builds process systems for plants in Jordan, from a single CIP skid or dosing package to complete purified water, WFI and clean steam systems, acid-duty vessels and turnkey process packages, and carries each through factory testing, export, installation, commissioning and qualification. Paul designs to JFDA and PIC/S expectations or the owner’s specification, wires for the 50 Hz network, prepares the origin and conformity records each shipment needs, and stays responsible for the equipment after handover. Drug makers around Amman, minerals producers at the Dead Sea and in the south, and chemical and water plants at Aqaba work with one contractor and one documentation set.
What shapes the delivered cost of a system for a Jordanian plant?
The delivered cost of a process system for a Jordanian plant is shaped by the sailing and road haul from Aqaba, preservation, qualification and owner documentation, the sales tax and any duty under the chosen Incoterm, and the installation route. Paul prices each line separately so the buyer can weigh the options.
- Freight. Ocean freight to Aqaba, flat racks for wide skids and the road haul inland all add cost.
- Preservation. Passivated stainless systems ship sealed, dry and capped to protect finishes on the voyage.
- Qualification. PIC/S-level documentation, dual-compendial testing and protocol execution add engineering hours.
- Tax and duty. Qualifying US goods carry no duty, while the 16 percent sales tax applies at import; DDP puts both in Paul’s price.
- Installation. Supervision costs less than complete installation, and cleanroom access rules affect field productivity.
Paul Industries for Jordanian plants
Paul Industries designs, fabricates, tests and ships process equipment to Jordan and installs, commissions and qualifies it or supervises its installation, with JFDA-ready qualification records, owner documentation and origin files in one turnover package. Share the process duty, the plant location, the GMP or owner requirements and the start date, and Paul will propose the scope, the route through Aqaba and a US dollar price. Request a quote for a Jordanian project.
Standards referenced: JFDA GMP requirements (PIC/S participating authority from 2026) · PIC/S GMP Guide · Jordanian Standards and technical regulations (JSMO) · US-Jordan Free Trade Agreement · Jordan Customs Tariff (HS-based) · General Sales Tax Law (16 percent standard rate) · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · ASME B31.3 · IEC 60204-1 · Incoterms 2020 · ISPM 15
Frequently asked questions
Which pharmaceutical companies in Jordan buy WFI and purified water systems from abroad?
Jordan’s generic drug makers, many of them around Amman, export to about 85 markets and need water systems that satisfy JFDA and their customers’ regulators at once. Paul Industries designs purified water and WFI systems to USP and Ph. Eur. requirements together, builds them in the United States, and qualifies them on site with the plant’s quality unit.
What does JFDA membership in PIC/S change for a Jordanian drug plant?
Since 1 January 2026, JFDA has been a PIC/S participating authority and inspects against the PIC/S GMP Guide, so Jordanian plants are held to the same water, utility and qualification expectations as other PIC/S markets. Paul Industries builds and documents equipment to that level, with design qualification, IQ and OQ records ready for inspection.
Where is Aqaba port, and how does equipment reach Amman from it?
Aqaba port lies at the head of the Gulf of Aqaba on the Red Sea, at Jordan’s southern tip, and cargo for Amman moves north by truck on the Desert Highway. Paul Industries sizes crates and frames for the road haul, plans permits for oversized loads, and arranges delivery to the plant.
What is the Aqaba port code for a bill of lading?
The UN/LOCODE for the Port of Aqaba is JOAQJ, and that is the code most shipping documents use. Some carrier booking systems list Aqaba under a variant, so Paul Industries confirms the code with the carrier on every booking to keep the bill of lading, invoice and customs entry consistent.
What ocean transit should a Jordanian buyer allow from Wilmington or Baltimore?
Published schedules give about 35 days from Wilmington and about 37 days from Baltimore to Aqaba. Paul Industries confirms the current Aqaba port vessel schedule when fabrication dates are firm and sets the factory acceptance test date from the cargo cutoff.
Does a US-built skid pay Jordan import duty under the free trade agreement?
Qualifying US goods have entered Jordan duty free since the free trade agreement completed its tariff phase-out on 1 January 2010. The goods must meet the agreement’s rules of origin. Paul Industries prepares origin records for each shipment so the claim is ready at clearance.
What is the Jordan sales tax rate on imported process equipment?
The standard general sales tax rate is 16 percent, and it applies to goods imported into Jordan, including equipment that enters duty free under the free trade agreement. Importers pay it at clearance and registered businesses recover it under the tax rules. Paul Industries lists the tax separately and includes it in DDP prices.
What is the voltage in Jordan for a control panel built in the United States?
Jordan’s supply is 50 Hz with 230 V single phase, and JEPCO specifies its low-voltage network equipment at 415 V three phase. A US panel for Jordan is therefore built with 400 to 415 V motor circuits, 230 V control and lighting, and IEC components. Paul Industries designs it that way from the start.
Does Paul Industries build acid-resistant equipment for phosphate plants at Shidiya and Aqaba?
Paul Industries builds lined and alloy vessels, acid-resistant piping, scrubber dosing systems and effluent treatment for phosphate and fertilizer plants at Shidiya and Aqaba, documented to the owner’s specification. Materials are chosen for the acid, slurry and chloride conditions each service sees.
What equipment does potash production at the Dead Sea use?
Potash plants run brine and slurry pumping, crystallization and cooling circuits, tanks and water treatment, all exposed to concentrated brine. Paul Industries designs pumping skids, cooling water treatment and tanks with materials and coatings suited to that brine and to the heat of the Dead Sea basin.
Do electrical parts on a skid need JSMO conformity in Jordan?
Imported goods covered by mandatory Jordanian standards are checked through testing in Jordan before release, and some electrical accessories supplied with a skid can fall within those standards. Paul Industries reviews the bill of materials against them and ships the test reports and declarations with the cargo.
Does Paul Industries install and qualify water systems at drug plants in Amman?
Paul Industries installs, commissions and qualifies purified water, WFI and clean steam systems at drug plants in Amman, or supervises their installation, and executes IQ and OQ with the plant’s quality unit. Field welds are logged and inspected to the same standard as the factory welds.
Which pressure vessel code do Jordanian mining and chemical owners specify?
Each owner’s purchase specification decides it. Vessels are usually designed to the ASME Section VIII rules and piping to the B31.3 code, while acid and brine services add rubber lining, alloy cladding or plastic piping. Paul Industries follows the edition the order names and files its calculations and hydrotest records in the owner’s format.
How are Jordan customs regulations met for a mixed shipment of skids and spares?
Each item carries its own HS code, description, value and origin on the commercial invoice, and the packing list ties every crate to its contents and markings. Spares are listed separately from the skid they serve. Paul Industries prepares the set so classification, duty and sales tax are clear at clearance.
What does a US-built system for the National Water Carrier region involve?
Plants along the Aqaba to Amman corridor treat seawater permeate, groundwater or conveyed water before using it in boilers, cooling and process. Paul Industries builds dosing, remineralization, softening and reverse osmosis polishing skids sized on each site’s water analysis, wired for the 50 Hz network.
Which Incoterm suits a Jordanian buyer importing through Aqaba?
A Jordanian buyer that runs its own logistics takes the goods FCA at the American port. If the buyer wants the cargo brought to the plant but prefers to clear it, DAP fits, and DDP hands over the equipment cleared with the sales tax settled. Paul Industries prices whichever term is chosen in US dollars.
What should a Jordanian plant send Paul Industries for a quotation?
A user requirement specification or a description of the duty, the plant and its address, the GMP or owner standards that govern the work, a feed water analysis and power details, the date production must start and the delivery term wanted. From that, Paul Industries prepares a US dollar proposal with a voyage plan and an installation option, and moves to a fixed price after design review.
Can Paul Industries ship a complete WFI skid to a plant near Amman in one piece?
Paul Industries designs WFI and purified water skids to ship as complete, tested modules wherever the plant’s access route and the road haul from Aqaba allow, which keeps field welding to a minimum. Where a skid is too large, it is split at planned break points with sanitary connections, and the field welds are logged and inspected like the factory welds.
Planning process equipment for a plant in Jordan?
Send the process duty, the plant location in Amman, Aqaba or the Dead Sea region, and your GMP or owner requirements, and Paul Industries will propose the scope, the route through Aqaba and a figure to budget against. Call 201-450-8280 or request a quote.