Paul Industries is a US process equipment contractor for Israel that engineers and fabricates skids, pressure vessels, tanks, ultrapure and purified water systems and complete process systems in the United States, builds them for 50 Hz power and Israeli safety rules, ships them to Haifa or Ashdod, and then either installs, starts up and commissions each system in Israel or supervises the installation team on site. Most US-made equipment enters Israel free of customs duty under the 1985 free trade agreement, and Paul quotes every project in US dollars. Paul Industries has its headquarters at 256 Shore Drive, Kilmarnock, Virginia, and was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Trade terms US-Israel Free Trade Agreement, in force since 1985
Power 50 Hz, 230/400 V
Main ports Haifa and Ashdod
Import VAT 18% since January 1, 2025
Drug plant GMP Ministry of Health, PIC/S member since 2009
Reviewed November 2026

Where a US process equipment contractor for Israel fits a plant project

A US process equipment contractor for Israel takes on the engineered, code-built part of a plant project: the skids, vessels, water systems and utility packages that a drug, chip, chemical or food plant would otherwise piece together from several sources. Paul Industries designs the system, fabricates and tests it in the United States, crates it for the Mediterranean crossing, and then installs, starts up and commissions it in Israel, or supervises the installation while running the start-up and the test program itself.

Israeli buyers turn to Paul for ultrapure water systems for semiconductor work, purified water and WFI systems and clean steam generators for drug and biotech plants, pressure vessels and reactors for chemical processing, and industrial water treatment for boilers and cooling towers. Supply with installation supervision, design-build including layout and utilities, and complete installation through commissioning are all offered. The international projects page lists the other countries in Paul’s scope.

Pharmaceutical companies in Israel and the plants around them

Pharmaceutical companies in Israel range from global generics producers to biotech start-ups spun out of universities and research institutes, and the pharmaceutical industry in Israel has a long record with US regulators. Teva’s Kfar Saba plant received FDA approval in 1982, and Teva opened a manufacturing plant in Jerusalem’s Har Hotzvim technology park in 2005. In Rehovot, home of the Weizmann Institute of Science, newer ventures such as AION work on drug discovery with backing that includes the Israel Innovation Authority. Pharmaceutical manufacturing companies in Israel therefore buy everything from pilot-scale bioreactor utilities to full-scale oral solid dose and sterile water systems.

GMP Israel’s Ministry of Health enforces is set by its Institute for Standardization and Control of Pharmaceuticals, which became a participating authority of the Pharmaceutical Inspection Co-operation Scheme on 1 January 2009. Drugs manufactured in Israel are therefore inspected against the PIC/S GMP Guide, the same text European inspectors use, and water systems, clean steam and process equipment are designed, built and qualified to its annexes. Paul designs to that guide, delivers IQ and OQ protocols with the equipment, and describes the work for the sector on the pharmaceutical industry page and the biotech industry page.

WFI and clean steam for Israeli drug plants

Water for injection and clean steam systems are the utilities Israeli drug and biotech plants most often buy as complete packages. Paul builds multiple-effect or vapor compression stills and membrane-based WFI generation where the plant’s registrations allow it, hot storage at 80 degrees Celsius or above with spray balls and vent filters, and distribution loops with point-of-use coolers, zero-dead-leg valves and sanitary instrumentation. Clean steam generators are sized for the plant’s autoclaves, SIP circuits and humidification, with condensate sampling for the conductivity, endotoxin and noncondensable gas tests the plant’s quality unit specifies. Every loop is drawn on an isometric with slopes, weld numbers and low-point drains, and those drawings become the backbone of the IQ.

Semiconductor fabs at Kiryat Gat and Migdal HaEmek

Israel’s chip plants need water and chemical systems at a purity few other industries ask for. At Intel Kiryat Gat, Fab 28 produces chips on the Intel 7 process, and Tower Semiconductor, Israel’s specialty foundry, runs its fabs from Migdal HaEmek in the north. Fabs of this kind buy ultrapure water trains, polishing loops, chemical distribution, process cooling water and wastewater treatment, all built with materials and joining methods that keep metals, particles and organics out of the water. Paul builds UPW systems to the purity targets in the fab’s specification, using SEMI F63 as the reference guide where the owner names it, and the semiconductor industry page covers that work.

How many desalination plants in Israel feed industrial sites?

Israel desalination plants supply a large part of the water industry uses. The State Comptroller lists five major seawater desalination plants, at Palmachim, Hadera, Ashdod, Ashkelon and Sorek, and water research group Fanack reports that desalination supplies about half of Israel’s drinking water. Industrial sites fed from the national system therefore see water whose hardness, alkalinity and chloride content differ from a US municipal supply. Paul sizes softening, reverse osmosis pretreatment and corrosion control for boilers and cooling towers to the water analysis the plant supplies, so the treatment matches the feed rather than an assumed one.

Israeli industrial regions and the systems their plants buy
RegionIndustry presentSystems Paul builds for it
Jerusalem and Har HotzvimPharmaceutical manufacturing and technology firmsPurified water, WFI, clean steam, CIP skids, qualification packages
Rehovot and the coastal plainBiotech research and pilot productionBioreactor utilities, buffer and media preparation, high-purity water
Kiryat Gat and the southSemiconductor fabricationUltrapure water, chemical distribution, process cooling water
Haifa Bay and the GalileeChemicals, refining and specialty foundriesPressure vessels, heat exchangers, injection skids, wastewater treatment
Coastal desalination corridorSeawater desalination and water utilitiesChemical dosing skids, pump skids, membrane cleaning systems

Which Israeli rules apply to imported pressure and electrical equipment?

Imported pressure and electrical equipment in Israel answers to three sets of rules: the Work Safety Ordinance for pressure installations in the workplace, Israeli Standards and the import routes the Standards Authority enforces, and the electrical installation rules for a 230/400 volt, 50 hertz supply. Each one asks for different records, so Paul maps them item by item before design starts.

Pressure installations under the Work Safety Ordinance

The Work Safety Ordinance (New Version) of 1970 treats steam boilers, steam receivers and air receivers as pressure installations and requires each to be examined by an authorized inspector, known in Hebrew as a bodek mosmach, who issues a written examination report. The Work Safety Regulations on the examination of pressure installations, from 1967, set out how those examinations are made, and separate regulations from 2000 require an authorized operator for steam boilers of at least 500 kilowatts or 20 square metres of heating surface. A vessel built to ASME Section VIII or EN 13445 enters that system with its design calculations, material certificates, weld records, nondestructive examination results and pressure test report, which are the documents an inspector reviews. Paul delivers that file, in English with Hebrew summaries where the plant asks, with every vessel and boiler it supplies.

The Standards Institution of Israel and the import routes

The Standards Institution of Israel, often searched for as the Israel Standards Institute, writes the Israeli Standards, known as SI, and its pressure equipment department tests pressure equipment manufactured in Israel and overseas against both Israeli and foreign standards. Products covered by an official standard enter through a defined import route, and since January 1, 2025 the reform known as What is good for Europe is good for Israel has added an optional European route, under which products meeting the relevant European directives or regulations may be imported and sold. The existing routes stay in place, including those that recognize US and other international standards, and items under official fire safety standards are excluded from the European route except for some portable firefighting equipment. Paul identifies during design which items on a skid fall under an official standard and assembles the test reports and declarations for the route the plant’s importer uses, whether that is a US-standard route or the European one also used for shipments to Germany.

Electrical supply, units and documentation

Israel’s grid supplies 230 volts single phase and 400 volts three phase at 50 hertz, so US-designed equipment is engineered for the lower frequency from the start: motors are wound for 50 hertz at the plant voltage, pumps and fans are selected at their 50 hertz curves, and variable frequency drives are set to a 50 hertz base. Control panels follow IEC 60204-1 unless the owner’s electrical standard says otherwise. Israeli plants work in metric units, so drawings, data sheets and instrument ranges are issued in SI units, with dual dimensions only where the plant wants them, and documentation is supplied in English with Hebrew operator labels where the plant asks.

Israeli requirements for an imported process system and the records that answer them
RequirementBasisRecords Paul supplies
Examination of pressure installationsWork Safety Ordinance 1970 and the 1967 examination regulationsDesign calculations, material certificates, weld and NDE records, pressure test report
Boiler operationOperator regulations of 2000 for boilers of 500 kW or 20 square metres and aboveOperating manual, control narrative, safety valve and trip settings
Products under an official standardIsraeli Standards, enforced by the Standards AuthorityTest reports and declarations for the chosen import route
European import routeImport reform in force since January 1, 2025Evidence of conformity with the relevant European directive or regulation
Electrical installation230/400 V, 50 Hz supplyPanel drawings, IEC 60204-1 test records, 50 Hz FAT results
GMP qualificationMinistry of Health, PIC/S GMP GuideIQ and OQ protocols, surface finish and passivation records

Shipping to Israel from USA ports

Shipping to Israel from USA ports crosses the Atlantic and the Mediterranean to Haifa Port in the north or Ashdod Port in the south. One forwarder quotes 15 to 22 days from the US East Coast to either port on direct services, while another gives an average of 30 to 38 days from New York to Haifa, a spread that reflects transshipment and the service a booking lands on. Haifa suits plants in Haifa Bay and the Galilee, and Ashdod suits the Jerusalem corridor, the coastal plain and the south, including Kiryat Gat. Paul fixes crate dimensions during layout, keeping skids within the roughly 2.34 metre door width of a high cube container wherever the process allows, and books the sailing before the FAT date is set.

Equipment leaves in ISPM 15 crates with the lines drained and dried, openings sealed and desiccant sized to the voyage. Instruments, analyzers and drives that are sensitive to vibration are removed and packed in their own cartons inside the crate. A shorter crossing than Gulf or Asian routes reduces preservation cost, and the shipping plan names the port, the inland route and any escort an oversize load needs.

US Israel free trade agreement, duty and VAT

The US Israel free trade agreement, signed in April 1985 and in force since September of that year, phased out duties on manufactured goods by January 1, 1995. On April 1, 2025, Israel canceled the remaining tariffs on US products, which by then applied mainly to food and agricultural goods. The US Israel free trade agreement rules of origin still apply to claim the treatment, and goods move directly from the United States to Israel. The US Israel free trade agreement certificate of origin, the old green form, was phased out on June 30, 2018 and replaced by a signed US origin declaration on the commercial invoice, which Paul prints and signs on every Israeli shipment.

Israel import duties on US process equipment are therefore usually zero, but the Israel import tax that remains is value added tax, raised to 18 percent on January 1, 2025 and charged on the customs value plus any duty. Israel Customs, part of the Israel Tax Authority, collects it from the importer of record, and VAT-registered plants generally recover it. Under DDP terms Paul handles importing to Israel, clearance and VAT inside its price; buyers with a forwarder usually take FCA at a US port or DAP at the plant.

What does a factory acceptance test cover for an Israeli plant?

A factory acceptance test for an Israeli plant proves the system against its approved specification in the United States, on a 50 hertz supply, before anything is crated. Paul runs the hydrostatic or pneumatic pressure tests, verifies every instrument loop from field device to screen, steps the control program through normal sequences, alarms and interlocks, and records flows, pressures and temperatures at the duty points the plant will see. For ultrapure and pharmaceutical water systems the test adds resistivity, TOC and temperature trending on the recirculation loop, sanitization or passivation records and a borescope review of selected orbital welds.

Israeli engineers usually witness by video, with the camera following the test procedure step by step and the signed sheets shared at the end of each test session, and many plants send a quality engineer for the final run on larger systems. Deviations go on a punch list with an owner, a fix and a retest, and the skid ships only when the list is closed or each open item has an agreed site action. The executed FAT then becomes the starting point for the site acceptance test and qualification in Israel, so site testing builds on results already proven in the shop.

Ultrapure water design points for Israeli fabs

Ultrapure water design for a fab starts with the feed. Water from the national system arrives with its own mix of desalinated and natural sources, so Paul sizes multimedia or ultrafiltration pretreatment, double-pass reverse osmosis, electrodeionization, ultraviolet TOC reduction, degasification and mixed-bed polishing to the analysis the fab supplies. Distribution loops are built from high-purity PVDF or electropolished stainless steel as the specification requires, joined by bead-free or orbital welds, and sized to keep return velocity high enough to limit biofilm. Online analyzers for resistivity, TOC, dissolved oxygen, silica and particles are fitted at the points the fab’s specification names and calibrated before FAT.

How an Israeli project with Paul Industries runs

An Israeli project with Paul Industries follows nine steps, with the first two fixing the Israeli rules for each item, the 50 hertz duty points and the crate envelope. The table lists what each step produces for the plant.

Steps in a process equipment project for an Israeli plant
StepActivityOutput for the Israeli plant
1. Requirements reviewProcess duty, site, Work Safety Ordinance items, Israeli Standards, import route, purity or GMP classItem-by-item rules register
2. EngineeringP&IDs, metric layout, 50 Hz motor and pump selection, panel designApproved drawings and data sheets in SI units
3. Fabrication in the United StatesVessel and skid fabrication, orbital welding, panel building, instrument fit-outWeld logs, borescope records, material traceability
4. FATPressure, functional and software testing on a 50 Hz supply with the plant watchingExecuted FAT and closed punch list
5. ExportPreservation, ISPM 15 crating, export filing, sailing to Haifa or AshdodInvoice with FTA origin declaration, packing list, bill of lading
6. Site installation or supervisionSetting, anchoring and tie-ins at the Israeli plantInstallation and tie-in weld records
7. Start-upFlushing, sanitization or passivation, water trialsStart-up log and setpoint list
8. Commissioning and qualificationSAT, IQ and OQ through validation and commissioning, inspector examination of pressure itemsExecuted protocols and examination file
9. HandoverOperator training, spare parts, service scheduleManuals, as-built drawings, full turnover package

Israel runs seven hours ahead of US Eastern time for most of the year, on UTC plus two in winter and plus three in summer, so the Israeli afternoon overlaps the US morning. Paul schedules video-witnessed FAT runs in that window and plans site visits around the Israeli working week, which runs Sunday to Thursday at most plants.

Who builds process systems for plants in Israel?

Paul Industries builds process systems for plants in Israel, from single dosing and transfer skids to ultrapure water trains, WFI and clean steam systems, pressure vessels and turnkey process systems, and carries each one through FAT, export, installation, start-up and commissioning at the site. Paul engineers to the plant’s specification and the Israeli rules that apply, fabricates in the United States, delivers the inspection and qualification records Israeli authorities and owners review, and supports the equipment through handover and service. Plants in Jerusalem, Rehovot, Kiryat Gat, Haifa, Migdal HaEmek, Ashdod and Beersheba work with one contractor for the whole scope.

What sets the cost of a process system delivered to Israel?

The delivered cost of a process system in Israel turns on five items besides the equipment, and Paul prices each one separately so the plant can weigh delivery terms and installation routes.

  • Freight. Direct sailings cost less in days than transshipped ones, and out-of-gauge loads on flat racks cost more than containerized skids.
  • Purity and GMP scope. Ultrapure and WFI systems add orbital welding, borescope inspection, passivation and qualification work to the fabrication scope.
  • Israeli documentation. Examination files for pressure installations, standards test reports and Hebrew labels add engineering hours in proportion to the item count.
  • Duty and VAT. FTA treatment keeps duty at zero for most US-made equipment, and the 18 percent VAT sits with the importer under FCA or DAP or inside Paul’s price under DDP.
  • Installation route. Supervision keeps Paul’s site days low, and complete installation keeps tie-ins, start-up and qualification under one contract.
  • Spares and service. A spare parts set sized for the voyage to Haifa or Ashdod, and any service agreement the plant wants after handover, are priced as their own lines.

Paul gives a budget range from comparable work and converts it to a firm price once drawings, the rules register and the Incoterm are agreed. Plants weighing a Gulf project as well can compare the United Arab Emirates page.

Paul Industries for Israeli plants

From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries delivers engineered and tested process equipment to pharmaceutical, biotech, semiconductor, chemical, water and food plants in Israel, and commissions it on site. Every system leaves the US shop designed for 50 hertz power and metric documentation, built and documented for the Work Safety Ordinance, Israeli Standards and the plant’s GMP or purity requirements, and backed by records that stay with it through commissioning and service. Israeli plants begin with process data, the site and the delivery terms sent through request a quote.

Standards referenced: Work Safety Ordinance (New Version) 5730-1970 · Work Safety Regulations (Examination of Pressure Installations) 5727-1967 · Work Safety Regulations (Steam Boiler and Heating Boiler Operator) 5760-2000 · Israeli Standards (SI) · PIC/S GMP Guide · ASME Boiler and Pressure Vessel Code Section VIII · EN 13445 · IEC 60204-1 · SEMI F63 · Incoterms 2020 · ISPM 15

Frequently asked questions

Does a US-built pressure vessel need Israeli Standards Institute approval?

A pressure vessel installed in an Israeli workplace is examined as a pressure installation under the Work Safety Ordinance by an authorized inspector, who reviews its design, material, weld and test records. Products covered by an official Israeli Standard also follow an import route enforced by the Standards Authority, and the SII pressure equipment department tests equipment made overseas. Paul Industries supplies the full record set for both.

How long does it take to ship from USA to Israel for a process skid?

Forwarders quote about 15 to 22 days from the US East Coast to Haifa or Ashdod on direct services, and averages of 30 to 38 days from New York to Haifa where transshipment is involved. Customs clearance and inland trucking to Kiryat Gat, Jerusalem or the Galilee add to that. Paul Industries books the sailing once crate sizes are fixed and plans the FAT around it.

Is US-made process equipment duty free in Israel?

Duties on manufactured goods under the US-Israel Free Trade Agreement were phased out by January 1, 1995, and Israel canceled its remaining tariffs on US products on April 1, 2025. The equipment ships directly from the United States with a signed origin declaration on the invoice. VAT of 18 percent still applies on import, and VAT-registered plants generally recover it.

Which port should equipment for a Kiryat Gat fab use, Haifa or Ashdod?

Ashdod sits closer to Kiryat Gat and the south, so fab equipment usually lands there, while Haifa suits plants around Haifa Bay, Migdal HaEmek and the Galilee. The choice also depends on the sailing schedule and the dimensions of the biggest crate. Paul Industries names the port and the inland route in the shipping plan and checks road clearances for oversize loads.

Does Paul Industries build ultrapure water systems for Israeli semiconductor fabs?

Paul Industries builds ultrapure water trains, polishing loops, chemical distribution and process cooling water systems for semiconductor fabs in Israel, designed to the purity targets in the fab’s specification. Systems are fabricated and tested in the United States, shipped as modules sized for containers or flat racks, and installed and commissioned at the fab with the facility’s controls.

What GMP standard applies to pharmaceutical plants in Jerusalem and Rehovot?

Israel’s Ministry of Health inspects drug plants through its Institute for Standardization and Control of Pharmaceuticals, a PIC/S participating authority since 2009, so plants in Jerusalem, Rehovot and elsewhere follow the PIC/S GMP Guide. Paul Industries designs purified water, WFI, clean steam and CIP systems to that guide and delivers IQ and OQ protocols, weld logs and surface finish records with them.

What did the European import reform change for equipment entering Israel?

Since January 1, 2025, products that meet the relevant European directives or regulations can be imported and sold in Israel through an optional European route, while the earlier routes, including those recognizing US standards, remain open. Items under official fire safety standards stay outside the European route except some portable firefighting equipment. Paul Industries documents each item for whichever route the importer uses.

What are Israel import duties and VAT on a US skid shipped DDP?

Under DDP terms the delivered price includes clearance by Israel Customs, any duty, which is usually zero for US-made equipment under the free trade agreement, and VAT at 18 percent on the customs value plus duty. Paul Industries pays those charges, files the import documents with the US origin declaration on the invoice, and delivers to the plant with the cargo risk carried to the gate.

Who examines steam boilers and air receivers once they are installed in Israel?

Under the Work Safety Ordinance, steam boilers, steam receivers and air receivers are pressure installations examined by an authorized inspector, a bodek mosmach, who issues a written report, and larger steam boilers also need an authorized operator under the 2000 regulations. Paul Industries supplies the calculations, material certificates, NDE results and test reports the inspector reviews and runs the start-up with the plant’s operators.

How does Israel's 50 Hz supply affect pumps and motors built in the United States?

At 50 hertz a two-pole motor turns about one sixth slower than at 60 hertz, which cuts pump flow and head and changes fan and compressor output. Paul Industries selects motors wound for 50 hertz at the plant’s 400 volt supply, chooses pumps at their 50 hertz curves, sets drive base frequencies to match, and tests the skid on a 50 hertz supply at FAT.

Does Paul Industries install equipment at plants in Haifa and Beersheba?

Plants in Haifa, Beersheba, Ashdod and the rest of Israel rely on Paul Industries to place, connect and commission their equipment, or to oversee the setting crew on site with Paul in charge of every start-up and test run. Each site task is permitted under the plant’s own safety procedures, and the schedule is built around the Sunday to Thursday working week most Israeli plants keep.

Which documents ship with equipment importing to Israel?

An Israeli shipment carries the commercial invoice with the signed US origin declaration, the packing list and the bill of lading, plus the test reports and declarations that items under an official Israeli Standard need for their import route. Paul Industries prepares the set, matches the item descriptions across every document, and sends copies ahead so the importer can lodge the entry before arrival.

Can water from Israel desalination plants feed a boiler or cooling tower directly?

Water from the national system, much of it desalinated, still needs treatment matched to its analysis before it feeds a boiler or cooling tower. Hardness, alkalinity, chlorides and dissolved oxygen set the softening, reverse osmosis, chemical dosing and blowdown design. Paul Industries designs that treatment from the plant’s water analysis and builds the skids with the boiler or tower package.

What metric and language conventions do Israeli plant drawings follow?

Israeli plants work in metric units, so Paul Industries issues drawings, data sheets, instrument ranges and pressure ratings in SI units, with dual dimensions where the plant asks for them. Documentation is supplied in English, which Israeli engineering teams use widely, with Hebrew operator labels and safety signs where the plant or the applicable standard calls for them.

Does Paul Industries build chemical injection and dosing skids for desalination plants in Israel?

Paul Industries designs and builds chemical dosing skids, pump skids and membrane cleaning systems for desalination and water utility plants along Israel’s coast, with materials chosen for seawater chlorides and the chemicals dosed. Each skid is tested at FAT on a 50 hertz supply and shipped with its pressure test records, material certificates and control documentation.

What do Israeli buyers send Paul Industries to get a quote in US dollars?

Israeli buyers send the P&IDs or a process description, the plant location and port preference, the purity or GMP class, any owner standards, the plant voltage, and the chosen Incoterm and installation route. Paul Industries replies with a rules register for each item, a sailing plan and a budget range in US dollars, and fixes the price once drawings are agreed.

What does a FAT witnessed by video from Israel include?

A video-witnessed FAT follows the approved test procedure with a camera on each step: pressure tests, instrument loop checks, control sequences, alarms and interlocks, and performance runs on a 50 hertz supply. Signed sheets, trend data and photographs go to the Israeli plant as each test session closes. Paul Industries closes the punch list before crating, so site testing in Israel starts from a proven system.

Which spare parts should an Israeli plant hold for a US-built water system?

An Israeli plant holds the parts a voyage of several weeks would otherwise leave it waiting for: pump seals, gaskets and diaphragms, filter and membrane elements, UV lamps, instrument sensors, and the critical drive and control spares. Paul Industries sizes that list from the system design and the shipping time to Haifa or Ashdod, delivers it with the equipment, and keeps the drawings and program on file for service.

Planning a process system for a plant in Israel?

Send the process duty, the plant location and the purity or GMP class, and Paul Industries will map the Israeli rules for each item, the sailing to Haifa or Ashdod and a first price estimate. Call 201-450-8280 or request a quote.