Paul Industries is a US process equipment contractor for Thailand that engineers, fabricates, tests and commissions pressure vessels, boiler feed and steam packages, purified and ultrapure water systems, process cooling plants, chemical dosing and CIP skids, and process piping for petrochemical plants at Map Ta Phut, electronics and hard disk drive plants, sugar, seafood and food processors, and pharmaceutical manufacturers across Thailand. Every system is designed for the 400/230 V, 50 Hz Thai supply and documented for the Department of Industrial Works and Thai FDA rules that apply to it, then shipped through Laem Chabang and installed and commissioned by Paul or installed under Paul’s supervision. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler oversight Department of Industrial Works, Factory Act
Supply 400/230 V, 50 Hz (PEA and MEA)
GMP regulator Thai FDA, PIC/S member since 2016
Main seaport Laem Chabang, Chonburi
VAT 7 percent to 30 September 2027
Reviewed November 2026

What a US process equipment contractor for Thailand supplies to Thai plants

A US process equipment contractor for Thailand takes one system from process requirement to running plant: process design, mechanical and electrical engineering to the Thai supply and Thai safety rules, fabrication and factory testing in the United States, export packing, the ocean voyage, and installation, start-up and handover at the site. Paul Industries delivers ASME pressure vessels, heat exchanger packages, pump and dosing skids, purified water and WFI systems, ultrapure water trains, chilled water and process cooling modules, and the carbon steel, stainless and alloy piping that ties them into the plant.

Thai owners choose among three contract routes. Equipment supply with Paul supervising the installation fits a plant that already runs a construction contract on site. Design-build widens Paul’s scope to the utility room, interconnecting piping, controls and the documents the plant files with its regulators. Turnkey delivery puts the whole system, from user requirements to executed commissioning records, under one Paul contract with one schedule. Thailand sits in the Asia Pacific group on Paul’s international projects page, which lists every country Paul takes work in.

Map Ta Phut, the Eastern Economic Corridor and Thailand’s process clusters

Map Ta Phut in Rayong province is Thailand’s petrochemical and refining center: the Map Ta Phut Industrial Estate zone opened in 1990, is managed by the Industrial Estate Authority of Thailand, and groups five industrial estates around a deep-sea port. Its plants crack gas and naphtha into olefins and aromatics, make polymers, chlorine and caustic, fertilizer feedstocks and specialty chemicals, and run gas separation and power units that feed the whole estate. Map Ta Phut port, Thailand’s largest industrial port according to the Industrial Estate Authority, handles liquid and bulk cargo for those plants with capacity for about 16 million tonnes a year.

The Eastern Economic Corridor Thailand created around that base covers three provinces, Chachoengsao, Chon Buri and Rayong, and holds most of the country’s newer investment in petrochemicals, automotive and electric vehicle parts, electronics, medical devices and data centers. Petrochemical and chemical plants in the corridor buy pressure vessels, column internals and reboilers, shell and tube exchangers, chemical injection and sampling skids, cooling water treatment and alloy piping spools for expansions and turnarounds. Paul builds that equipment to ASME Section VIII and ASME B31.3, with the material traceability, weld maps and test records an operating company’s integrity group files, as set out on its chemical manufacturing page.

Hard disk drives, electronics and the Thailand semiconductor industry

Thailand is a major center for hard disk drive assembly and test: Seagate has announced more than 16 billion baht of investment in its Nakhon Ratchasima operations, and Western Digital has a Board of Investment approved expansion for high-capacity drive lines. The Thailand semiconductor industry around those plants runs chip assembly, packaging and test along with printed circuit board and electronic component production. Those names are market facts about Thai industry; they describe no Paul project.

Drive head, media and chip packaging lines depend on deionized and ultrapure water for wafer saw, cleaning and plating rinses, tight-tolerance process cooling water for test and burn-in equipment, chilled water for cleanroom air handling, and treatment of metal-bearing rinse water. Paul builds reverse osmosis, electrodeionization and polishing skids, closed loop cooling packages and wastewater modules for those plants, wired for 400 V at 50 Hz, as described on its semiconductor industry page.

Sugar mills, seafood and the food processing industry in Thailand

Sugar milling is a core process industry in the Thai countryside: about 57 mills crushed cane in the 2023 to 2024 crop year, according to the Office of the Cane and Sugar Board, and Thailand ranked as the world’s second-largest sugar exporter in 2025 reports. A mill runs high-pressure bagasse boilers, juice heaters, evaporator trains, vacuum pans and crystallizers, and many mills feed molasses to ethanol distilleries next door. The wider food processing industry in Thailand adds tuna and seafood canning, poultry, rice and starch, fruit, beverages and dairy, each with retorts, blanchers, hot and chilled water, CIP and refrigeration. Paul designs and builds evaporator and heater exchangers, sanitary process tanks, CIP skids and hot water systems for those plants, covered on the food and beverage page.

Thai industrial regions, the plants in them and the systems Paul Industries ships there
RegionPlants (market facts)Sea entrySystems Paul Industries supplies
Rayong (Map Ta Phut)Refining, olefins, aromatics, polymers, chlor-alkali, gas separationMap Ta Phut or Laem ChabangPressure vessels, exchangers, chemical injection skids, alloy spools
Chon Buri and ChachoengsaoAutomotive, electronics, medical devices, food plantsLaem ChabangProcess cooling, DI water, compressed air, CIP skids
Bangkok, Pathum Thani and AyutthayaPharmaceutical, food and electronics plantsLaem Chabang or Bangkok PortPurified water, WFI, clean steam, sanitary piping
Northeast and central cane beltSugar mills, ethanol distilleries, starch plantsLaem ChabangHeaters, evaporator exchangers, boiler feed and water treatment

Pharmaceutical companies in Thailand and Thai FDA GMP

Pharmaceutical companies in Thailand manufacture under the Thai FDA GMP framework, and the Thai Food and Drug Administration became the 49th participating authority of PIC/S, the Pharmaceutical Inspection Co-operation Scheme, on 1 August 2016. As a PIC/S authority the Thai FDA inspects against the PIC/S GMP Guide, so the Thai FDA GMP guidelines for water, steam and process equipment follow the same annexes on sterile manufacture and on qualification and validation used by the other PIC/S inspectorates in Asia and Europe.

Plants in the Bangkok region and the central provinces make generic tablets and liquids, injectables, vaccines, herbal and traditional medicines, and supplements, and they buy purified water and WFI generation, distribution loops, clean steam generators, formulation vessels and CIP and SIP skids. Paul builds those systems to ASME BPE with orbital weld logs, borescope records, passivation reports and surface finish data, writes IQ and OQ protocols on the plant’s own templates, and executes them through its validation and commissioning work. The pharmaceutical industry page lists the clean utilities Paul builds for oral and sterile plants.

Which Thai rules apply to boilers and pressure vessels?

Boilers and pressure equipment in a Thai factory fall under two sets of rules: the Factory Act notifications and regulations administered by the Department of Industrial Works under the Ministry of Industry, and the Ministry of Labour’s occupational safety regulation for machines, cranes and boilers. A buyer asking about Thailand pressure vessel regulations meets both, because the first governs design evidence, inspection and registration of people, and the second governs safe operation in the workplace.

Department of Industrial Works rules for a boiler in Thailand

A boiler in Thailand needs evidence that its design, calculations, construction and testing follow a recognized standard, and the Department of Industrial Works names ASME, JIS, EN and ISO along with other standards it accepts. Once in service, the boiler receives a safety inspection at least once a year by a professional or senior professional mechanical engineer, or a special boiler inspector, qualified under the Engineering Professions Act B.E. 2505, who files the safety endorsement with the department within 30 days; a later notification allows intervals beyond one year, up to three, with the department’s approval. Boiler operators need a high vocational certificate in industrial mechanics or a department-endorsed operator course, and inspecting engineers, operators and supervisors are registered with the department. The factory keeps every inspection and safety test report on file.

Ministry of Labour regulation for machines, cranes and boilers

The Ministry of Labour’s Ministerial Regulation on occupational safety standards for machines, cranes and boilers, B.E. 2564 (2021), issued under the Occupational Safety, Health and Environment Act B.E. 2554, replaced the 2009 version and took effect 90 days after its August 2021 publication. Its third chapter covers boilers, thermal fluid heaters, pressure vessels and compressed gas cylinders, and the employer prepares written operating instructions and keeps safety devices working. For any pressure vessel Thailand plants receive from Paul, the design file, ASME data report, nameplate details, relief valve sizing and hydrostatic test record are assembled before shipment, so the plant’s engineer has the evidence the inspection calls for. The Paul boiler water treatment page covers the feedwater side of the same boiler house.

Thai rules a US-built system meets, and the records Paul Industries supplies with it
RequirementRule or authorityRecords from Paul Industries
Boiler design evidenceDepartment of Industrial Works: ASME, JIS, EN, ISO or an accepted standardDesign calculations, drawings, material traceability, ASME data report
Boiler safety inspectionFactory Act notifications; yearly inspection by a qualified mechanical engineerInspection access, test procedures, relief valve data, as-built drawings
Operation of boilers, heaters and vesselsMinisterial Regulation B.E. 2564 (2021), Ministry of LabourWritten operating instructions in English, Thai translation on request
Electrical installationPEA or MEA connection rules, 400/230 V, 50 HzSingle-line diagrams, panel drawings, IEC component data, test sheets
GMP equipmentPIC/S GMP Guide applied by the Thai FDAURS trace matrix, IQ and OQ protocols, weld and passivation records

Thailand voltage and frequency for process skids

Thailand voltage and frequency for industrial equipment are 400/230 V at 50 Hz: the Provincial Electricity Authority distributes at 22 kV and 33 kV and steps down to 400/230 V, and the Metropolitan Electricity Authority supplies Bangkok and its surrounding provinces, with EGAT generating and transmitting bulk power. Larger plants take supply at 22 kV or 33 kV through their own transformers and switchgear, so Paul sizes panels for the fault level at the plant bus rather than a residential service.

Thailand voltage vs US practice changes both the voltage and the motor speed: 400 V at 50 Hz in place of 480 V at 60 Hz, so a centrifugal pump selected for 60 Hz turns about one sixth slower and develops roughly 30 percent less head on the Thai grid. Paul selects impellers, fans and gearboxes for the 50 Hz duty point at design, uses IEC motors and drives, and builds control circuits for 230 V. The questions people search about Thailand voltage and plug type matter for a laptop; for a hardwired skid the point is the supply voltage, earthing arrangement and short-circuit rating at the connection, all of which Paul confirms with the plant before panel design. The PLC programming page covers the controls that ship with each skid.

Heat, humidity and the monsoon in panel and skid design

Thai plants run in heat and high humidity all year, with heavy rain through the monsoon season, so Paul specifies enclosures with anti-condensation heaters and filtered or air-conditioned cooling, stainless fasteners and coated frames near chemical and seafood areas, and motor ratings that allow for high ambient temperature. Skids that sit outdoors at Map Ta Phut get drainage, UV-resistant cable and sealed junction boxes, and cooling plants are sized for the plant’s design wet bulb rather than a temperate default.

Shipping to Laem Chabang Port, Thailand and clearing customs

Laem Chabang Port, Thailand’s largest port, sits on the Gulf of Thailand in Chonburi province, mostly in Si Racha district, and is run by the Port Authority of Thailand; for buyers asking where is Laem Chabang port relative to their plant, it is the sea gate for the Eastern Economic Corridor and the Bangkok region. The Laem Chabang port code is THLCH, which appears on booking and bill of lading documents. Sea freight from USA to Thailand runs about 42 to 50 days from New York to Laem Chabang on transshipment services, based on forwarder transit data, with longer times for flat racks and breakbulk.

Paul keeps each module inside a shipping container from USA to Thailand standard sizes where the process layout allows, using 40-foot high cube boxes for skids and flat racks or breakbulk for columns, tanks and large vessels, with ISPM 15 treated crating and corrosion protection for the humid voyage. The road leg from Laem Chabang port to Bangkok area sites and to Rayong runs on the eastern motorway network, and Paul checks bridge, gate and crane limits on the route for every oversize piece. Plants at Map Ta Phut that receive project cargo directly at the industrial port are planned with the port operator when the booking is made.

Receiving, storage and preservation at a Thai site

Receiving a US-built system at a Thai site goes smoothly when storage is planned before the crates leave the factory. Paul sends a receiving checklist that names every crate, its weight and center of gravity, the lifting points and the inspection points, and it sets preservation rules for the wait between delivery and installation: covered storage off the ground, desiccant replacement intervals for panels, nitrogen pressure checks on sealed stainless spools and vessels, and rotation of large pump and fan shafts each month. For brownfield plants in Rayong or the Bangkok region with crowded pipe racks, Paul confirms crane positions, access roads and laydown space during engineering, so module sizes match the gaps they must pass through and no piece arrives too large for its final route into the building.

Thailand import duties and taxes on process equipment

Thailand import duties and taxes on machinery are assessed by the Thai Customs Department at entry, with import VAT charged on the CIF value plus any duty. The Thailand VAT rate is 7 percent, a reduction from the 10 percent statutory rate that Royal Decree No. 807 extended to 30 September 2027, so the Thailand VAT rate 2026 buyers budget for is the same 7 percent. Projects promoted by the Board of Investment receive import duty exemption on qualifying machinery, and the promotion certificate sets the terms. Thailand import requirements for a skid include the commercial invoice, packing list, bill of lading, certificate of origin and any permit the goods need, and Paul prepares them with tariff classifications and separate lines for machinery, spares and consumables. Entries for Eastern Economic Corridor plants are handled at the Laem Chabang port customs office.

Trade terms follow Incoterms 2020. A request for FOB Laem Chabang port pricing usually means delivered pricing, because FOB names the port of loading; Thai buyers usually choose FCA or FOB at a US port, CIF Laem Chabang, or DAP or DDP to the plant. Paul states every freight, insurance and handling line in US dollars so the buyer sees the delivered cost under the term it picks.

How does a Thai project with Paul Industries run?

A Thai project with Paul Industries runs through nine stages, with the boiler and vessel design evidence assembled during engineering so inspection never waits on paperwork. Each row below pairs Paul’s work with the record the Thai plant keeps from it.

Stages of a process equipment project for a plant in Thailand
StageWork by Paul IndustriesWhat the Thai plant receives
1. RequirementsProcess duty, site supply at 400/230 V and 50 Hz, ambient design data, code basis, GMP scopeAgreed specification in English
2. EngineeringProcess and mechanical design to ASME and IEC practice, 50 Hz equipment selectionDrawings, calculations, data sheets for review
3. Design evidenceBoiler and vessel calculation package, material and weld plansFile ready for the plant’s inspecting engineer
4. FabricationWelding, examination, passivation and panel assembly in the United StatesMill test reports, weld maps, NDE records
5. Factory acceptanceHydrostatic test, functional run, water quality check, witnessed by the buyerSigned FAT report and punch list
6. ExportISPM 15 crating, booking to Laem Chabang or Map Ta Phut, export filingsInvoice, packing list, bill of lading, certificate of origin
7. InstallationPaul sets, pipes and wires the system, or supervises that workInstallation records and redlines
8. Start-upCommissioning, first inspection, IQ and OQ executionCommissioning sheets and executed protocols
9. HandoverOperator training, spares, maintenance and inspection planManuals and as-built dossier, Thai translations where requested

After handover, Paul keeps the system running with scheduled service visits, spare parts, membrane and resin changes, relief valve testing, requalification and repairs, and it updates the equipment file before each yearly boiler inspection.

Who builds process systems for plants in Thailand?

Paul Industries builds process systems for plants in Thailand: pressure vessels, exchangers and chemical skids for Map Ta Phut refiners and petrochemical producers; ultrapure and DI water, cooling and wastewater modules for drive, chip packaging and electronics plants; heaters, evaporator exchangers and boiler feed systems for sugar mills; hot water, CIP and effluent systems for seafood and food processors; and purified water, WFI and clean steam systems for pharmaceutical plants under the Thai FDA. Each system is engineered for 400/230 V at 50 Hz, documented for the Department of Industrial Works and the Ministry of Labour, and installed and commissioned by Paul or installed under Paul’s supervision. Other Asia Pacific country pages on Paul’s site include Vietnam and Singapore.

What drives the delivered cost of a process system for a Thai plant?

Six cost drivers beyond the equipment itself set the delivered price of a system for a Thai plant, and Paul shows each one as its own line in a US dollar proposal.

  • 50 Hz design. Reselected pumps and fans, IEC motors, 400 V drives and tropical enclosures.
  • Code documentation. Boiler and vessel design evidence, data reports and GMP qualification documents.
  • Materials and finish. Alloy steels for Map Ta Phut services, electropolished stainless for pharmaceutical and electronics utilities.
  • Freight. Six to seven weeks of ocean transit, flat racks or breakbulk for oversize pieces, port handling at Laem Chabang or Map Ta Phut.
  • Entry costs. Duty by tariff line, import VAT at 7 percent on CIF plus duty, less any Board of Investment exemption.
  • Site route. Full installation and commissioning inside an operating plant compared with installation under Paul’s supervision; Paul prices both.

Paul Industries for Thai petrochemical, electronics, food and pharmaceutical plants

Paul Industries engineers, fabricates and factory tests pressure vessels, water and cooling systems, process skids and piping for plants across Thailand, ships them through Laem Chabang or Map Ta Phut, and installs and commissions them or supervises their installation, with Department of Industrial Works, electrical and GMP records in English. Send the process duty, plant location, supply details and target start-up, and Paul returns a US dollar price, a document plan and a fabrication and shipping schedule. Request a quote for a Thai plant.

Standards referenced: Factory Act B.E. 2535 notifications on boilers (Department of Industrial Works) · Ministerial Regulation on OSH standards for machines, cranes and boilers B.E. 2564 (2021) · Engineering Professions Act B.E. 2505 · PIC/S GMP Guide (Thai FDA) · ASME Boiler and Pressure Vessel Code Section I and Section VIII · ASME B31.3 · ASME BPE · IEC 60038 · Incoterms 2020 · ISPM 15

Frequently asked questions

Is Thailand 50 Hz or 60 Hz for industrial equipment?

Thailand runs at 50 Hz on a 400/230 V low-voltage system, with medium-voltage plant supply at 22 kV or 33 kV. Equipment built for the US 60 Hz grid turns about one sixth slower in Thailand, which cuts pump head and fan airflow. Paul Industries selects every pump, fan and motor for the 50 Hz duty point during design and proves the performance at the factory acceptance test.

How does Thailand voltage and frequency affect a control panel built in the United States?

A panel for a Thai plant takes a 400 V three-phase feed at 50 Hz and usually runs its controls at 230 V, so transformers, motor starters, drives and power supplies are chosen for those values and for IEC ratings. Paul Industries also sets the short-circuit rating for the plant bus, labels the panel in English with Thai labels on request, and adds anti-condensation heaters for the humid climate.

Where is Laem Chabang port, and which plants does it serve?

Laem Chabang is on the Gulf of Thailand in Chonburi province, southeast of Bangkok, and it serves the Eastern Economic Corridor provinces of Chon Buri, Chachoengsao and Rayong as well as the greater Bangkok region and the central provinces. Paul Industries books equipment for Thai plants into Laem Chabang and plans the road delivery to each site, including heavy-lift and oversize permits where a module needs them.

How long does sea freight take from the US East Coast to Laem Chabang?

Forwarder transit data puts ocean freight from New York to Laem Chabang at about 42 to 50 days on transshipment services, and breakbulk or flat rack cargo for oversize vessels often takes longer. Paul Industries builds the voyage, customs entry and road delivery into the project schedule from the start, and books the sailing once the factory acceptance test date is fixed.

Who builds pressure vessels for petrochemical plants at Map Ta Phut?

Paul Industries designs and fabricates ASME Section VIII pressure vessels, heat exchangers and chemical skids for refining and petrochemical plants at Map Ta Phut in Rayong, with design calculations, material traceability, weld maps and hydrostatic test records in the shipping file. Paul ships them through Laem Chabang or the Map Ta Phut industrial port and installs them or supervises installation during the plant’s turnaround window.

What does the Department of Industrial Works require before a new boiler goes into service?

The Department of Industrial Works expects evidence that the boiler’s design, calculations, construction and testing follow a recognized standard such as ASME, JIS, EN or ISO, and the boiler then receives safety inspections by a qualified mechanical engineer at least once a year. Paul Industries supplies the full design file, ASME data report, relief valve data and test records with the boiler so the first inspection proceeds on complete paperwork.

Does an ASME boiler built in the United States meet Thai rules?

ASME is one of the standards the Department of Industrial Works names for boiler design and construction evidence, along with JIS, EN and ISO. Paul Industries builds boilers and fired heater packages to ASME Section I or the applicable section, documents materials, welding and testing to that code, and delivers the calculation package and data report the plant’s inspecting engineer reviews before start-up.

What do the Thai FDA GMP guidelines mean for a new purified water system?

The Thai FDA applies the PIC/S GMP Guide, so a new purified water or WFI system for a Thai plant is designed, built and qualified to the same expectations as in other PIC/S countries: sanitary design, documented materials and welds, and qualification from design through operation. Paul Industries builds those systems to ASME BPE, writes the IQ and OQ protocols and executes them at the plant.

Which pharmaceutical plants in the Bangkok region buy WFI and clean steam systems?

Plants making sterile injectables, vaccines and ophthalmic products around Bangkok, Pathum Thani and the central provinces buy WFI generation, hot loop distribution and clean steam, while oral solid and liquid plants buy purified water systems. Paul Industries designs, fabricates and qualifies those systems for Thai plants, built for the 50 Hz supply and documented to PIC/S practice.

What does the Thailand semiconductor industry need from water and cooling systems?

Chip packaging, test and drive component plants in Thailand need ultrapure or deionized water for cleaning and plating rinses, stable process cooling water for test and burn-in equipment, chilled water for cleanroom air, and treatment for metal-bearing rinse water. Paul Industries builds reverse osmosis, EDI and polishing skids, closed loop cooling packages and wastewater modules for those plants, wired for 400 V at 50 Hz.

Does Paul Industries supply equipment to sugar mills in the northeast of Thailand?

Paul Industries designs and builds juice heaters, evaporator exchangers, condensers, boiler feed systems and water treatment packages for sugar mills and ethanol distilleries in the northeast and central cane belt of Thailand. Equipment ships through Laem Chabang and is installed and commissioned by Paul or under Paul’s supervision, timed to the off-season maintenance window before crushing begins.

What is the Thailand VAT rate on imported machinery?

Imported machinery pays VAT at 7 percent, the reduced rate that Royal Decree No. 807 extended to 30 September 2027, assessed on the CIF value plus any import duty. Projects promoted by the Board of Investment receive import duty exemption on qualifying machinery under their promotion certificate. Paul Industries lists values, weights and tariff classifications on every invoice so the importer’s entry goes through cleanly.

Which Incoterm suits a first order from a Thai plant to a US builder?

Many Thai buyers choose CIF Laem Chabang, where the seller pays ocean freight and insurance to the port and the buyer clears customs, or DAP to the plant, where the seller delivers to site and the buyer pays duty and VAT. Paul Industries quotes the buyer’s chosen Incoterms 2020 term in US dollars, with freight, insurance and handling shown as separate lines.

How is equipment protected on the voyage to the Gulf of Thailand?

Paul Industries seals and nitrogen blankets polished stainless piping and vessels, fits desiccant and vapor corrosion inhibitors inside panels and crates, coats carbon steel surfaces, and uses ISPM 15 treated wood for every crate. Humidity indicators go inside each enclosure, and the receiving inspection checklist tells the plant what to check when the crates reach the site.

Does Paul Industries install equipment at plants in Chonburi and Rayong?

Paul Industries installs, starts up and commissions equipment at plants in Chonburi, Rayong, Chachoengsao and across Thailand, or supervises the installation, depending on the contract route the plant chooses. Commissioning covers pressure and leak tests, instrument loop checks, controls tuning, operator training and the inspection records the plant keeps on file.

What documents arrive with a US-built skid for a Thai factory?

A skid for a Thai factory ships with general arrangement and P&ID drawings, design calculations, ASME data reports for any pressure vessel, mill test reports, weld maps and NDE records, the factory acceptance test report, panel drawings and IEC component data, and operating and maintenance manuals in English. Paul Industries adds Thai translations of operating instructions where the plant asks for them.

How does the monsoon season change skid design and delivery in Thailand?

The monsoon season brings heavy rain on top of year-round humidity, so Paul Industries designs outdoor skids with drainage, sealed junction boxes, corrosion-resistant fittings and heated enclosures, and plans the site delivery so crates stay covered from port to installation. Large lifts are scheduled around weather and the plant’s own shutdown calendar.

What should a Thai plant send Paul Industries to get a price in US dollars?

Send the process duty or flow sheet, the plant location in Thailand, the supply voltage and fault level, the code and GMP requirements, the preferred Incoterm and the target start-up date. Paul Industries returns a US dollar proposal with equipment, documentation, freight and site lines, plus a schedule for engineering, fabrication, shipping and commissioning.

Planning a process system for a plant in Thailand?

Send Paul Industries the process duty, the site and the target start-up, and the reply sets out the code documents, the sailing to Laem Chabang and a US dollar budget. Call 201-450-8280 or request a quote.