Paul Industries is a US process equipment contractor for Turkey, engineering pressure vessels, process skids, WFI and clean steam generators, tanks and pipework that are fabricated in America and delivered to drug producers in Istanbul, Kocaeli and Tekirdag, refineries and petrochemical sites at Izmit and Aliaga, and food and automotive producers from Bursa to the Aegean. Each system ships CE marked under Turkey’s pressure equipment regulation, with Turkish-language instructions and the records the yearly periodic checks of the 2013 work equipment regulation rely on, wired for 400 V, 50 Hz. At the Turkish plant Paul then sets the equipment to work, either installing and starting it up or supervising its installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pressure equipment regulation Basincli Ekipmanlar Yonetmeligi (2014/68/AB), 2018
Periodic checks Work equipment regulation 2013, Annex III: yearly unless a standard sets otherwise
Power 230/400 V, 50 Hz
GMP regulator TITCK, in the PIC Scheme since January 2018
Import VAT 20 percent standard KDV rate
Reviewed November 2026

What a US process equipment contractor for Turkey builds

A US process equipment contractor for Turkey builds equipment that passes Turkish import control as a CE-marked product, satisfies a Turkish plant’s GMP or process safety reviewers, and then stands up to an unusually frequent inspection cycle once it is in service. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, builds and documents each system for all three from the first specification review.

Turkish plants order pressure vessels and reactors, pump and dosing skids, shell and tube heat exchangers, purified water and WFI systems, clean steam generators and alloy or stainless piping through Paul’s process piping work. Plants choose supply with installation supervision, design-build against their user requirements, or complete installation through start-up and qualification.

Turkish manufacturers export widely to Europe, the Middle East and North Africa, and a growing number register products in the United States. Equipment built to ASME, ASME BPE and FDA documentation norms and then carried through Turkey’s EU-aligned product rules lets one system serve every market the plant sells into.

The pharmaceutical industry in Turkey and the Marmara production belt

The pharmaceutical industry in Turkey is concentrated in the Marmara region, mainly in Istanbul, Kocaeli and Tekirdag, where infrastructure, packaging supply and technical staff are easiest to find. Pharmaceutical companies in Turkey range from family-founded national groups to plants owned by multinational producers, and together they make finished doses, sterile products, antibiotics and a rising share of biologics.

Pharmaceutical companies in Istanbul run headquarters, research centres and older production sites inside the city, while newer plants sit in the organised industrial zones to the east and west. Cerkezkoy in Tekirdag hosts high-potency and sterile production buildings and one of the country’s significant penicillin facilities; Kocaeli, around Gebze and Kartepe, holds large solid-dose and sterile plants. Pharmaceutical manufacturers in Turkey also include veterinary pharmaceutical companies in Turkey that produce injectables and premixes for the region’s livestock sector. The provinces and towns above are listed as facts about Turkish industry, to show where pharmaceutical equipment is bought.

Turkey pharmaceutical manufacturing of this kind relies on purified water and WFI, clean steam, CIP and SIP, solvent recovery, and sterile filling utilities. Paul Industries builds those systems for pharmaceutical plants to the GMP guide Turkey applies as a PIC/S member, and to FDA expectations for plants that sell into the United States.

Penicillin and high-potency production, both prominent in the Tekirdag and Kocaeli plants, raise a further requirement: segregation. Beta-lactam products are made in dedicated facilities with their own air handling and utilities, and high-potency suites need closed transfer and wash-in-place design. Paul builds dedicated purified water and CIP skids for segregated buildings, specifies closed sampling and drain connections, and designs vessels with contained charging ports, so one plant’s utilities never cross between product areas.

Turkish process clusters and the systems Paul Industries supplies
ClusterProvinceProcess profile (market facts)What Paul Industries supplies
IstanbulIstanbulPharmaceutical headquarters, research and city production sitesPurified water, pilot and production skids, sanitary piping
Gebze and KartepeKocaeliSolid dose and sterile pharma, chemicals, Tupras refinery at IzmitWFI, clean steam, pressure vessels, alloy process piping
CerkezkoyTekirdagPenicillin, high-potency and sterile productionContainment-ready skids, CIP and SIP, process tanks
Aliaga peninsulaIzmirSTAR refinery and Petkim petrochemical complexHeat exchangers, dosing skids, pressure vessels
BursaBursaAutomotive assembly and supplier plants, food processingProcess cooling, pretreatment and wastewater skids, compressed air receivers
MersinMersin, Mediterranean coastSouthern gateway for food and industrial plantsSanitary tanks, transfer skids, glycol and chilled water

Chemical companies in Turkey and the petrochemical industry in Turkey

Chemical companies in Turkey cluster around the Gulf of Izmit in Kocaeli and on the Aliaga peninsula north of Izmir, where the country’s refining and petrochemical capacity sits beside deep-water berths. The petrochemical industry in Turkey is built around a few large integrated sites rather than many small ones, which makes each investment cycle a significant equipment market.

Tupras operates a refinery at Izmit in Kocaeli as well as its Aegean refinery at Aliaga. On the Aliaga peninsula, SOCAR’s STAR refinery stands next to the Petkim petrochemical complex and supplies Petkim’s naphtha feedstock; SOCAR is raising STAR’s gross capacity to 12 million tonnes a year. Petrochemical plants in Turkey of this scale, and the oil and gas companies in Turkey that run them, use pressure vessels, heat exchangers, chemical injection skids and alloy piping in large numbers. The chemical industry in Turkey also includes paint, detergent, fertiliser and specialty producers in the Kocaeli, Istanbul and Izmir industrial zones. Paul Industries supplies oil and gas and chemical manufacturing plants with equipment documented to the PED-aligned Turkish regulation and the plant’s inspection programme.

Bursa adds the country’s main automotive cluster: its plants built about 434,000 cars in 2024, and the Oyak Renault factory there has an annual capacity of 390,000 vehicles alongside the Tofas plant that has run since 1968. Car plants of that size consume process cooling, pretreatment chemistry, compressed air and wastewater treatment, all built from the same vessels, skids and piping Paul delivers to process plants.

Which rules govern pressure equipment in Turkey?

Pressure equipment in Turkey is governed by the Basincli Ekipmanlar Yonetmeligi, the Turkish regulation that mirrors the EU Pressure Equipment Directive 2014/68/EU, for design, conformity assessment and CE marking, and by the 2013 regulation on health and safety in the use of work equipment for periodic checks once the equipment runs. Turkey adopted EU product legislation, CE marking and the notified body system under the 1995 Customs Union with the EU, so a CE-marked vessel follows a familiar route. Paul Industries documents every Turkish order against both regulations.

Basincli Ekipmanlar Yonetmeligi: CE marking and Turkish instructions

The Basincli Ekipmanlar Yonetmeligi was published in the Official Gazette on 3 March 2018, issue 30349, and covers pressure equipment with a maximum allowable pressure above 0.5 bar. Like the directive it follows, it classifies equipment into Categories I to IV by fluid group and pressure combined with volume or nominal size, and requires the conformity assessment module the category sets, with notified body involvement above Category I. Its Article 9 requires manufacturers to supply instructions and safety information in Turkish or another language the Ministry accepts and users readily understand, and importers and distributors carry the same duty. Paul Industries delivers Turkish instructions, safety information and nameplate texts, with English versions for the engineering team.

Periodic checks under the 2013 work equipment regulation

The regulation on health and safety conditions in the use of work equipment, published on 25 April 2013 in issue 28628, sets the in-service regime, and Turkey’s is demanding. Annex III, Table 1 puts steam and hot water boilers, thermal oil boilers and compressed air and gas tanks on a maximum one-year periodic check where the applicable standard sets no shorter period. Each check includes a hydrostatic test at operating pressure, and at most every three years, or after any major repair, a hydrostatic test at the test pressure of the production standard, or 1.5 times the maximum pressure where the standard gives none. Non-destructive tests are performed by personnel qualified to at least level 2 under TS EN ISO 9712.

For a buyer that cycle shapes the design. Paul Industries fits test connections, high-point vents and low-point drains so a vessel or skid is filled, pressurised and drained for its periodic test without dismantling, records the maximum and operating pressures on the nameplate as the regulation expects when the two differ, and supplies the design and test records the authorised inspector compares against each year.

Seismic design for Turkish plants

Turkey lies across active fault zones, and the Turkish Building Earthquake Code, published in the Official Gazette of 18 March 2018 as issue 30364 and in force since 1 January 2019, sets a site-specific seismic hazard definition for new and altered buildings. Process equipment sits inside those buildings and on their foundations, so the plant’s structural engineers pass the design accelerations for each location to the equipment builder. Paul Industries designs skid frames, vessel legs and skirts, anchor bolt patterns and pipe supports for those loads, adds flexible connections where piping crosses between structures, and records the anchorage design in the equipment file so the plant’s engineers check it against their building model.

Import control, machinery and electrical rules

Imports of CE-marked pressure equipment are checked through TAREKS, the Ministry of Trade’s risk-based control system, which compares the product and its documents against the Turkish regulations before release into free circulation. Machinery follows the Makina Emniyeti Yonetmeligi, published on 3 March 2009 to align with the EU Machinery Directive 2006/42/EC. Paul prepares the declaration of conformity, technical file references and Turkish documents so an inspection under TAREKS finds a complete set.

Turkish requirements for US-built process equipment
TopicTurkish ruleWhat it requires of the equipmentPaul Industries’ response
Pressure equipmentBasincli Ekipmanlar Yonetmeligi (2014/68/AB), 2018Category, conformity module, CE marking, Turkish instructionsCategory schedule, declaration, Turkish manuals
Periodic checksWork equipment regulation 2013, Annex IIIYearly check with hydrostatic test; full test pressure at most every 3 yearsTest connections, vents and drains, test records
Import controlTAREKS, Ministry of TradeRisk-based document and product checks at importComplete conformity file in the shipment
MachineryMakina Emniyeti Yonetmeligi (2006/42/AT)Risk assessment and CE marking of skids with moving partsGuarding, interlocks, machinery file
ElectricalElektrik Ic Tesisleri Yonetmeligi; grounding regulation 2001; EN 60204-1Installation, earthing and machine electrical safetyIEC panels proven on a 50 Hz, 400 V test bench
GMPTITCK, PIC/S GMP GuideEquipment that supports qualification and sterile assuranceURS-traced design, BPE welds, IQ and OQ

Voltage in Turkey: what is the standard voltage in Turkey for industrial equipment?

Voltage in Turkey matches continental Europe: the grid runs at 50 Hz and delivers 400 V between phases and 230 V from phase to neutral. The electricity voltage in Turkey that matters for process equipment is the 3 phase voltage in Turkey of 400 V between phases for motors, heaters and panels, with 230 V for controls; large plants take medium-voltage service and step it down on site, so industrial voltage in Turkey at the skid terminals is 400 V.

Building installations follow the Elektrik Ic Tesisleri Yonetmeligi, the internal installations regulation in force since 1984, and earthing follows the 2001 regulation on grounding in electrical installations; machine wiring on a skid follows EN 60204-1. Each Turkish panel is laid out with IEC-rated breakers and contactors, conductors sized in square millimetres and the harmonised European wire colours, and is energised at 400 V, 50 Hz during the factory acceptance test.

Voltage in Turkey vs USA: why the frequency matters

Voltage in Turkey vs USA practice differs in frequency as well as level. American plants run 480 V or 208 V at 60 Hz; Turkish plants run 400 V at 50 Hz, which slows an induction motor by about one sixth. By the affinity laws a centrifugal pump then gives about 17 percent less flow and about 30 percent less head than its 60 Hz curve, so Paul selects pumps, fans and compressors on their 50 Hz performance or sizes variable frequency drives for the duty.

TITCK GMP and Turkish pharmaceutical plants

TITCK, the Turkish Medicines and Medical Devices Agency, licenses and inspects pharmaceutical manufacturers and joined the Pharmaceutical Inspection Co-operation Scheme in January 2018, bringing Turkish GMP inspection into the PIC/S network. For a Turkish plant, equipment has to support qualification, cleaning validation and sterility assurance to the PIC/S GMP Guide, and water systems have to meet the pharmacopoeia monographs the plant’s products are released against.

For Turkish sterile and antibiotic plants Paul Industries slopes every sanitary line to drain, records each orbital weld with borescope images, runs WFI distribution hot or ambient as the plant’s sanitisation plan dictates, and proves CIP spray coverage with riboflavin tests. Commissioning and qualification are executed on site with protocols written for the plant’s quality unit.

Shipping to Turkey from USA: Ambarli, Izmit, Aliaga and Mersin

Shipping to Turkey from USA East Coast ports uses direct Mediterranean services to four gateways: the Ambarli complex on the European side of Istanbul, the Kocaeli ports on the Gulf of Izmit, Aliaga north of Izmir, and Mersin on the Mediterranean coast. A published direct service schedule shows New York to Aliaga in about 14 days, Istanbul in about 17 and Mersin in about 20, and other listings put Mersin at 20 to 24 days.

The gateway follows the plant: Marmara pharmaceutical and chemical sites receive through Ambarli or Kocaeli, Aegean refining and petrochemical sites through Aliaga, and southern food and industrial plants through Mersin. Plants on the Gulf of Izmit gain a short final leg, since several Kocaeli terminals sit within the industrial belt they serve, while Cerkezkoy and Bursa sites receive through the Marmara ports and a highway run. Container shipping from USA to Turkey suits skids up to the size of a 40-foot high-cube; larger modules move on flat racks or as breakbulk with permitted road transport, and Paul fixes the shipping envelope during design.

Customs, duty and VAT for equipment entering Turkey

Turkey sits in a customs union with the EU for industrial goods but keeps its own customs administration, so equipment from the United States is cleared at the Turkish port under the Turkish tariff and checked through TAREKS where it falls under product safety rules. The additional duties Turkey placed on certain US-origin products in 2018, which covered industrial equipment among other goods, were repealed by Presidential Decree 10435 in the Official Gazette of 22 September 2025. Import VAT, KDV, is charged at the standard 20 percent rate and is deductible for a VAT-registered importer.

How does a Turkish project run with Paul Industries?

A Turkish project with Paul Industries runs in nine stages, and the conformity route, the periodic test design, the Turkish document set and the gateway port are settled before any steel is cut. Each row below lists the Turkish work at that stage and what the plant receives.

A Turkish project with Paul Industries, stage by stage
StageTurkey-specific workOutput for the plant
1. Specification reviewCategories under the 2018 regulation, design code, periodic test regime, GMP needsConformity basis and category list
2. EngineeringMetric design, EN 13445 or ASME with the PED-aligned route, 400 V, 50 Hz electricsP&IDs, calculations, layouts, wiring diagrams
3. FabricationMaterial traced to mill certificates, qualified welding, test vents and drains for yearly checksMaterial and weld dossiers, NDT reports
4. Factory acceptance testHydrostatic and functional tests, witnessed in person or by videoSigned FAT report, test certificates
5. ShippingISPM 15 crates, sailing to Ambarli, Kocaeli, Aliaga or MersinCommercial invoice, packing list, bill of lading
6. ImportConformity file ready for TAREKS checks, Turkish documents in the crateRelease into free circulation
7. InstallationRigging, tie-ins and cabling inside the plant’s work permit system, performed or supervised by PaulSigned installation checklists
8. Commissioning and qualificationWater runs, first operation on product, baseline data for the yearly check, qualification of GMP linesSite test report, approved qualification records
9. HandoverOperator and maintenance training in Turkish, spare parts recommendationsFinal drawings and the complete dossier

Who builds process systems for plants in Turkey?

Paul Industries builds process systems for plants in Turkey, from a single pressure vessel or heat exchanger to complete WFI systems, dosing units and process modules, and takes responsibility for each one from design through fabrication in the United States, factory testing, shipment and import to installation and commissioning at the Turkish site. Paul was formerly based in northern New Jersey, then Pennsylvania, and today directs its international projects from Kilmarnock, Virginia.

Turkish enquiries come from pharmaceutical producers in the Marmara belt, from refining and petrochemical sites at Izmit and Aliaga, and from food, beverage and automotive plants that need process cooling and utilities. The same delivery model serves Paul’s work in the Gulf, described on the Saudi Arabia page, and in the EU, described on the Germany page. Every quote is in US dollars with the Incoterm stated.

What drives the shipping to Turkey from USA cost and the delivered price?

The delivered price of process equipment in Turkey depends on the equipment and on five delivery items: the conformity route, the Turkish documentation, freight and the gateway port, duty and KDV under the chosen Incoterm, and the installation route. Shipping to Turkey from USA cost is one of those lines, and Paul Industries prices each separately.

  • Conformity route. Notified body involvement above Category I and the choice of EN or ASME design set the assessment and engineering hours.
  • Turkish documentation. Translated instructions, safety texts, nameplates and the file for TAREKS are scoped from the first estimate.
  • Freight. A container-sized skid to Ambarli on a direct service costs far less than a breakbulk module needing permitted road transport inland.
  • Duty and KDV. Duty follows the Turkish tariff classification; KDV at 20 percent is paid by the importer under FCA or DAP and included by Paul under DDP.
  • Installation route. Supervision keeps Paul’s field time short; complete installation, start-up and qualification by Paul keeps one contract from crate to running plant.

Paul gives a Turkish buyer a budget number from comparable past scope as soon as the duty, size and province are known, then converts it to a fixed offer when the specification is frozen and the delivery term chosen.

Paul Industries for Turkish process plants

Turkish projects sit within Paul Industries’ international work, directed from 256 Shore Drive in Kilmarnock, Virginia. Turkish plants receive systems engineered and fabricated in America, accepted at a witnessed factory test, shipped to Ambarli, Kocaeli, Aliaga or Mersin, and installed and commissioned by Paul or under Paul’s supervision, with the CE marking documents, Turkish instructions and periodic test provisions the country’s regulations require. Describe your process and plant to request a quote.

Standards referenced: Basincli Ekipmanlar Yonetmeligi (2014/68/AB) · Pressure Equipment Directive 2014/68/EU · Is Ekipmanlarinin Kullaniminda Saglik ve Guvenlik Sartlari Yonetmeligi (2013) · Makina Emniyeti Yonetmeligi (2006/42/AT) · Elektrik Ic Tesisleri Yonetmeligi · Elektrik Tesislerinde Topraklamalar Yonetmeligi · EN 60204-1 · EN 13445 · TS EN ISO 9712 · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · PIC/S GMP Guide · European Pharmacopoeia · Incoterms 2020 · ISPM 15

Frequently asked questions

What is the electricity voltage in Turkey for an imported process skid?

Turkish plants feed an imported skid at 400 V across three phases and 50 Hz, and its control circuits take 230 V. Paul Industries rates motors, drives and the panel for that supply, builds the panel to EN 60204-1 and tests it at the factory on 400 V, 50 Hz so it connects to the plant’s distribution without modification.

What is the voltage in Turkey compared with a US plant?

Turkish plants run 400 V three phase at 50 Hz, while US plants run 480 V or 208 V at 60 Hz. The lower frequency slows induction motors by about one sixth, so pumps and fans lose flow and head unless they are selected on 50 Hz curves. Paul Industries sizes every rotating machine for the Turkish supply.

Which pharmaceutical companies in Turkey buy WFI and clean steam systems?

Pharmaceutical companies in Turkey that make sterile products, antibiotics and biologics in Istanbul, Kocaeli and Tekirdag run WFI, clean steam and CIP systems, and national groups and multinational plants both invest in them. Paul Industries designs and builds these systems in the United States to the PIC/S GMP Guide and pharmacopoeia requirements, then installs and qualifies them or supervises the installation.

How often are pressure vessels tested in Turkey once in service?

Under Annex III of Turkey’s 2013 work equipment regulation, boilers and compressed air and gas tanks receive a periodic check at least yearly where the standard sets no other period, with a hydrostatic test at operating pressure and, at most every three years or after major repair, a test at full test pressure. Paul Industries designs vents, drains and test connections for that cycle.

Is CE marking recognised for pressure equipment entering Turkey?

Turkey adopted EU product legislation under the 1995 Customs Union and applies its own pressure equipment regulation, published in 2018 to mirror Directive 2014/68/EU, so CE marking with a complete conformity file is the route for pressure equipment. Paul Industries delivers the category schedule, declaration of conformity and Turkish instructions with each system.

Must operating instructions be in Turkish?

Article 9 of the Basincli Ekipmanlar Yonetmeligi requires instructions and safety information in Turkish or another language the Ministry accepts and users readily understand, and importers and distributors carry the same duty. Paul Industries supplies Turkish operating and maintenance manuals, safety information and nameplate texts with every Turkish order.

Who supplies process equipment to pharmaceutical companies in Istanbul?

Paul Industries supplies purified water and WFI systems, clean steam generators, process skids, tanks and sanitary piping to pharmaceutical companies in Istanbul and the neighbouring industrial zones. Equipment is fabricated in the United States from ASME BPE components, documented to Turkish regulations, shipped through Ambarli and commissioned by Paul or under Paul’s supervision.

Which chemical companies in Turkey operate at Aliaga near Izmir?

The Aliaga peninsula north of Izmir hosts SOCAR’s STAR refinery, the Petkim petrochemical complex that takes its naphtha, and Tupras’s Aegean refinery. Plants of this kind use pressure vessels, heat exchangers, chemical injection skids and alloy piping, which Paul Industries fabricates in the United States and delivers through the Aliaga port with Turkish documentation.

Can Paul Industries supply equipment to the Izmit refinery area in Kocaeli?

Paul Industries supplies pressure vessels, heat exchangers, process skids and alloy piping to refining, chemical and pharmaceutical plants around Izmit and Gebze in Kocaeli. Equipment ships to the Kocaeli ports on the Gulf of Izmit, clears TAREKS with its conformity file, and is installed and commissioned by Paul or under Paul’s supervision.

What does the pharmaceutical industry in Turkey need for GMP inspections?

TITCK inspects Turkish manufacturers to PIC/S GMP standards and joined the PIC Scheme in January 2018. Plants need equipment with traceable materials, documented welds and surface finishes, drainable sanitary design and executed qualification protocols. Paul Industries builds that documentation into every system and writes IQ and OQ protocols for the plant’s quality unit.

How long does container shipping from USA to Turkey take?

A published direct service schedule shows New York to Aliaga in about 14 days, Istanbul in about 17 days and Mersin in about 20 days, and other listings give 20 to 24 days for Mersin, before clearance and the road leg. Paul Industries books the sailing to the gateway nearest the plant and plans it with the factory acceptance test date.

Are US-made machines still subject to Turkey's extra 2018 duties?

Turkey repealed the additional duties it imposed in 2018 on certain US-origin products, a list that included industrial equipment, by Presidential Decree 10435 in the Official Gazette of 22 September 2025. Duty now follows the Turkish tariff classification of each item, and KDV at 20 percent applies at import. Paul Industries states the treatment in every quote.

What does TAREKS check when a skid arrives in Turkey?

TAREKS is the Ministry of Trade’s risk-based system for checking imported products that fall under Turkish product safety rules, including pressure equipment, before release into free circulation. A selected shipment faces document and physical checks. Paul Industries ships every system with its declaration of conformity, technical file references and Turkish documents ready for review.

Do petrochemical plants in Turkey accept ASME-designed vessels?

Petrochemical plants in Turkey accept vessels designed to ASME Section VIII when the conformity route under the Turkish pressure equipment regulation shows the essential safety requirements are met, and many plants also specify EN 13445. Paul Industries works to whichever code the plant’s specification names and issues the calculations and EN 10204 3.1 material papers that route needs.

Can Paul Industries supply process cooling to automotive plants in Bursa?

Paul Industries supplies chillers and glycol loops, pretreatment and wastewater skids, compressed air receivers and process piping to automotive and supplier plants in Bursa, Turkey’s main car production centre. Equipment is wired for 400 V, 50 Hz, documented to Turkish regulations, shipped through the Marmara ports and installed and commissioned by Paul or under Paul’s supervision.

Can Turkish engineers witness the factory acceptance test?

Turkish plant engineers witness the factory acceptance test in the United States or follow it over a live video link, against a protocol agreed during design. Hydrostatic tests, control sequences, loop checks and the Turkish document set are reviewed, and Paul Industries closes every open item before the equipment is crated for the crossing.

Which details let Paul Industries price a Turkish project quickly?

Pricing moves fastest when a Turkish plant shares its URS or datasheets, existing drawings, the vessel code it follows, the province and preferred port, steam and cooling water conditions, the delivery term and whether Paul installs or supervises. Paul Industries answers with a budget figure, then a fixed dollar offer when the scope is frozen.

Planning process equipment for a plant in Turkey?

Share the process, your plant’s design code, its province and the Incoterm you prefer, and Paul Industries will set out the CE route, the Turkish paperwork and a dollar-denominated offer. Call 201-450-8280 or request a quote.