Paul Industries is a US process equipment contractor for New Zealand that designs, fabricates and commissions CIP skids, sanitary tanks, milk and whey processing modules, purified water and WFI systems, pressure vessels and process piping for dairy, meat, wine and pharmaceutical plants, built to the New Zealand pressure equipment regulations and wired for 400 V at 50 Hz. Each system is fabricated and factory tested in the United States, shipped through the Port of Tauranga, the Ports of Auckland or Lyttelton, and installed, started up and commissioned by Paul, or set under Paul’s supervision. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and was formerly based in northern New Jersey, then Pennsylvania.
Request a quote or call 201-450-8280
What a US process equipment contractor for New Zealand builds and ships
A US process equipment contractor for New Zealand takes a plant system from user requirements to signed handover: process design, mechanical and electrical engineering to New Zealand rules, fabrication and factory acceptance testing in the United States, export packing, the sea voyage across the Pacific, and site work through commissioning. Paul Industries builds CIP and SIP systems, sanitary process tanks, ASME and AS/NZS 1200 pressure vessels, purified water and WFI systems, heat exchanger and holding tube packages, glycol and ammonia refrigeration skids, and the stainless and carbon steel piping that ties them together.
New Zealand owners pick from three routes with Paul. Supply with installation supervision fits a plant that runs its own building contract and wants Paul directing the setting, connection and testing of each module. Design-build adds the room layout, utilities and controls around the equipment. Turnkey delivery, described on the turnkey process systems page, puts everything from the user requirement specification to the executed qualification protocols under one Paul contract. New Zealand sits in the Asia Pacific group on the international projects page, which lists every country where Paul takes work.
Dairy companies in New Zealand and the plants that buy process systems
Dairy companies in New Zealand run plants that buy stainless process equipment for every stage of milk handling: milk reception, separation and standardization, pasteurization, evaporation and spray drying, cheese and butter lines, and the CIP that cleans all of it. Fonterra, the farmer-owned cooperative, collected about 78 percent of New Zealand’s milk in the 2024 season, and independent processors in Waikato, Taranaki, Canterbury and Southland make up the rest, many of them supplying infant formula and nutritional powders that demand pharmaceutical-grade hygiene.
A powder plant runs long seasons with a short winter shutdown, so equipment arrives and is tied in during a fixed window. Paul plans fabrication and the sailing backward from that window, builds CIP sets, silo and balance tanks, plate heat exchanger packages and hot water sets as tested modules, and documents spray coverage and cleaning validation. The dairy processing page explains the utilities a milk powder or cheese plant shares.
Infant formula and nutritional powder lines
Infant formula and nutritional powder lines in New Zealand combine dairy-scale volumes with hygiene rules close to those of a medicines plant: wet mixing and blending under strict allergen and foreign matter control, high-pressure homogenizers, evaporators and dryers, and dry blending and canning in segregated high-care zones. Water for reconstitution and cleaning, CIP returns, and air and steam that touch the product all need documented quality. Paul designs mixing and blending skids, hygienic tanks with sloped bottoms and full drainability, filtered culinary steam sets and treated water systems for those lines, and supplies the material, surface finish and weld records a regulatory or customer audit asks for.
Meat, wine and food manufacturing companies in New Zealand
Food manufacturing companies in New Zealand beyond dairy include meat and venison processors in every region, seafood plants in Nelson and Southland, wineries in Marlborough, Hawke’s Bay and Central Otago, and beverage, juice and ingredient plants around Auckland and Christchurch. Meat plants buy hot water and sterilizer systems, rendering and tallow equipment, refrigeration and wastewater pretreatment; wineries buy jacketed fermentation tanks, glycol chillers and CIP. Paul builds that equipment with hygienic welds and drainable layouts, as set out on its meat and poultry and distilling and brewing pages.
Pharmaceutical companies in New Zealand
Pharmaceutical companies in New Zealand range from manufacturers of generic medicines holding Medsafe licences, such as Douglas Pharmaceuticals in Henderson and Lincoln in west Auckland, which exports to overseas markets, to natural health, animal health and biotechnology producers across Auckland, Hamilton and Christchurch. Pharmaceutical manufacturing companies in New Zealand need purified water, clean steam, formulation vessels, CIP and process piping qualified to the New Zealand Code of GMP, and the pharmaceutical industry page describes the utilities that sit behind those lines.
Aluminium, wood processing and heavy industry
Manufacturing companies in New Zealand outside food and medicines include the Tiwai Point aluminium smelter in Southland, which secured 20-year electricity agreements running to the end of 2044, and timber, pulp and wood products plants on the central North Island. Those sites buy pressure vessels, heat exchangers, cooling water and process water treatment, pump skids and alloy piping for shutdowns and upgrades. These named sites are market facts that show what New Zealand plants buy; they describe no Paul project.
| Region | Process industries (market facts) | Usual receiving port | Systems Paul Industries supplies |
|---|---|---|---|
| Auckland and Northland | Generic medicines, food and beverage, ingredients | Ports of Auckland | Purified water, formulation vessels, CIP, sanitary piping |
| Waikato and Bay of Plenty | Milk powder, cheese, infant formula, kiwifruit packing, timber | Port of Tauranga | CIP sets, silo and balance tanks, heat exchanger packages |
| Taranaki and Manawatu | Dairy processing, meat, energy | Port of Tauranga or New Plymouth | Evaporator support skids, hot water sets, pump skids |
| Hawke’s Bay and Marlborough | Wineries, fruit and vegetable processing, meat | Napier or Nelson | Jacketed tanks, glycol chillers, wastewater pretreatment |
| Canterbury, Otago and Southland | Dairy, meat, seafood, aluminium smelting | Lyttelton or Port Chalmers | Pressure vessels, process cooling, CIP, alloy piping |
Which New Zealand pressure equipment regulations apply to a vessel built in the United States?
New Zealand pressure equipment regulations are set by the Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999, known as the PECPR, which remain in force under the Health and Safety at Work Act 2015 and are administered by WorkSafe New Zealand. The PECPR require pressure equipment to have its design verified and to be inspected during fabrication and before it is put into service, and WorkSafe’s Approved Code of Practice for Pressure Equipment (Excluding Boilers) sets out how equipment other than boilers meets those duties.
Design verification is carried out by a recognised inspection body, which issues a certificate of design verification, unless the approved code of practice waives it for a class of equipment, and the design verifiers who sign that work hold practising certificates from Engineering New Zealand. The code of practice calls up AS/NZS 1200 as the framework standard for pressure equipment, and its schedules list equipment that needs no certificate of inspection. Once a vessel is in service, periodic inspection follows AS/NZS 3788 and the certificate of inspection is renewed on the interval the inspection body sets. Paul Industries delivers each vessel with the drawings, calculations, material certificates, weld maps, examination records and pressure test report that the design verification and fabrication inspection steps call for.
Pressure vessel design NZ: code choice and seismic loads
Pressure vessel design NZ practice starts from the owner’s specification and AS/NZS 1200, and the NZ pressure vessel code named in the purchase order sets the design rules, joint efficiencies, examination extent and test pressures the vessel carries. Paul designs to the code the owner and the design verifier accept, including ASME Section VIII Division 1 where the purchase order names it under that framework, and prepares the calculation package for review before fabrication starts. New Zealand pressure vessel standards also expect seismic actions to be considered: NZS 1170.5 Section 8 sets earthquake demands on parts and components, and Engineering New Zealand’s Practice Note 19 on seismic resistance of pressure equipment, revised in 2024, guides how vessel supports, skirts, legs and anchors are checked.
Plant engineers comparing pressure vessel manufacturers in New Zealand with a US fabricator look at three points: whether the design package is ready for verification, whether seismic anchorage is designed with the vessel, and whether the inspection records follow the vessel. Paul answers all three in the first design submittal, with anchor bolt loads, support calculations and an inspection and test plan for the fabrication inspector.
| Requirement | Rule or standard | What Paul Industries delivers |
|---|---|---|
| Design verification | PECPR 1999; certificate of design verification from a recognised inspection body | Drawings, design calculations, material specifications, design basis |
| Framework standard | AS/NZS 1200 called up by the WorkSafe code of practice | Code compliance statement naming the design code used |
| Fabrication inspection | PECPR inspection during manufacture | Inspection and test plan, weld maps, NDE reports, hydrostatic test report |
| Seismic restraint | NZS 1170.5 Section 8, Engineering NZ Practice Note 19 | Support and anchorage calculations, anchor loads for foundations |
| Into service and in service | Certificate of inspection; AS/NZS 3788 periodic inspection | Relief valve data, nameplate data, inspection access, maintenance plan |
What are the Medsafe GMP requirements for water, steam and process equipment?
Medsafe GMP requirements for a New Zealand medicines plant come from the New Zealand Code of GMP, which Medsafe takes directly from the PIC/S Guide to Good Manufacturing Practice, used with the permission of PIC/S, and Medsafe audits the manufacturers it licenses against it as a PIC/S participating authority. Because the Medsafe code of GMP is the PIC/S guide, the annexes on sterile products, qualification and validation apply to water, steam and process equipment in the same way they do across the other PIC/S member authorities.
A Medsafe GMP certificate belongs to the manufacturer and rests on audit evidence that its systems are designed, qualified and controlled. For purified water and WFI, that evidence starts with a design qualification against the user requirements and runs through installation, operational and performance qualification, with sampling phases that show the system delivers water to the pharmacopoeia monograph the plant has registered against. Paul Industries builds water and steam systems to ASME BPE with orbital welds, borescope and weld log records, passivation records and drainable, sanitizable layouts, writes protocols in the plant’s own format, and executes them under the validation and commissioning service.
What are New Zealand voltage and frequency for industrial equipment?
New Zealand voltage and frequency for industrial equipment are 230 V single phase and 400 V three-phase at 50 Hz, the national standard system, and the Electricity (Safety) Amendment Regulations 2025 set the tolerance on standard low voltage at plus or minus 10 percent. For buyers asking what voltage does New Zealand use, or whether New Zealand voltage 230 or 240 is the right figure, the nominal value in the regulations is 230 V. New Zealand industrial voltage at larger plants arrives as a high voltage supply that a site transformer steps down to 400 V.
New Zealand voltage vs US practice is the main electrical change on any skid: 400 V, 50 Hz in place of 480 V, 60 Hz, and 230 V control circuits in place of 120 V. A centrifugal pump turns about 17 percent slower on 50 Hz, so Paul selects impellers, motors and fan drives for the duty point at 50 Hz speed rather than relabelling a 60 Hz design. New Zealand three phase voltage also sets heater and transformer ratings, and Paul specifies IEC motors, drives rated for 400 V and the New Zealand voltage tolerance, and plug-in control transformers sized for 230 V.
New Zealand wiring standards and the panel file
New Zealand wiring standards are called up by regulation 57 of the Electricity (Safety) Regulations 2010, which requires low voltage installations to comply with AS/NZS 3000, and from 13 November 2026 electrical work must follow the 2018 edition of AS/NZS 3000 with its amendments. For power in New Zealand, voltage and protection design at the panel follow that standard, so Paul builds control panels with AS/NZS 3000 earthing and protection, IP ratings for washdown areas, and labels and drawings in New Zealand terms. A New Zealand voltage 3 phase supply also changes cable sizing, so the panel file includes single-line diagrams, cable schedules, protection settings and test records for the connection and certification steps on site.
Shipping to New Zealand from USA ports through the Port of Tauranga and the Ports of Auckland
Shipping to New Zealand from USA East Coast ports takes about 42 to 45 days port to port from New York to Auckland, and about 42 days from Savannah to Tauranga, based on forwarder transit data, with the voyage running through the Panama Canal and across the Pacific. The Port of Tauranga in the Bay of Plenty is the usual entry for equipment bound for Waikato and Bay of Plenty dairy and wood processing plants, the Ports of Auckland serve Auckland and Northland, and Lyttelton serves Canterbury, with Port Chalmers and Bluff further south.
Module size drives the shipping plan. Paul lays out skids to fit 40-foot high cube containers wherever the process allows, ships larger tanks and frames on flat racks, and marks centers of gravity and lifting points on each module so the crane plan at the quay and at the plant is settled before arrival. Crates use ISPM 15 heat-treated wood, and terms follow Incoterms 2020, usually FCA at a US port, CIF Tauranga or Auckland, or DAP at the plant gate.
Importing machinery into New Zealand: biosecurity and customs
Importing machinery into New Zealand brings in the Ministry for Primary Industries as well as Customs: the Import Health Standard for Vehicles, Machinery and Parts covers all forms of machinery, used machinery must be cleaned inside and out, and used outdoor machinery needs a cleaning certificate and expects an on-arrival inspection. New equipment from Paul ships clean, capped and sealed, with no soil, plant matter or water left in pipework after hydrostatic testing, so it moves through the biosecurity check without treatment. For buyers asking how to import into New Zealand, the importer or its customs agent lodges the Customs and MPI declaration through the Trade Single Window before the container arrives.
New Zealand import duty is charged by tariff heading under the Working Tariff Document of New Zealand, so a pump skid, a tank and a control panel each carry their own classification. The New Zealand GST rate is 15 percent and applies to imported goods at the border, and GST-registered plants generally claim it back through their returns. Paul lists each module by tariff heading, weight and value on the commercial invoice and packing list so the customs agent files a clean entry.
Project steps from user requirements to handover in New Zealand
Paul Industries runs a New Zealand project in nine stages, and the first two lock the design code, the 50 Hz equipment selection, the design verification route and the qualification strategy. The table lists each stage and what the plant receives from it.
| Stage | Activity | Output for the New Zealand plant |
|---|---|---|
| 1. Requirements | User requirements, design code, 400 V, 50 Hz supply, GMP or food safety impact | Approved requirements and code basis |
| 2. Design | Process, mechanical, seismic and electrical design to AS/NZS 1200, ASME VIII, ASME BPE, AS/NZS 3000 | Drawings and calculations ready for design verification |
| 3. Fabrication | Orbital welding, examination, passivation and panel build in the United States | Material certificates, weld logs, NDE and borescope records |
| 4. Factory test | Hydrostatic and functional tests, 50 Hz test power where needed, witnessed by the plant | Signed FAT report and deviation list |
| 5. Export | Drying, capping, ISPM 15 crating, sailing to Tauranga, Auckland or Lyttelton | Invoice, packing list, bill of lading, cleanliness declaration |
| 6. Entry | Trade Single Window declaration, MPI clearance, GST and duty under the chosen Incoterm | Cleared equipment at the port |
| 7. Site work | Setting, hook-up and wiring by Paul, or under Paul’s supervision | Installation records and redlined drawings |
| 8. Commissioning | Start-up, IQ, OQ and PQ, cleaning validation for food and dairy lines | Executed protocols and reports |
| 9. Handover | Operator training, spares, in-service inspection and maintenance plan | Manuals and as-built package in New Zealand English |
Working inside a dairy season
A New Zealand dairy season runs from spring calving to late autumn, so tie-ins at milk powder and cheese plants happen in the winter months when milk flow is lowest. Paul schedules the design freeze, fabrication, factory test and sailing so equipment lands with weeks in hand before the shutdown opens, prefabricates piping spools to cut site welding, and plans hot work, isolations and CIP reinstatement around the plant’s shutdown schedule so the site restarts on the first milk of the new season.
After handover Paul services the equipment it supplied with planned maintenance, requalification, spare parts and repairs, and keeps each vessel’s records in step with its certificate of inspection renewals.
Who builds process systems for plants in New Zealand?
Paul Industries builds process systems for plants in New Zealand: CIP sets, sanitary tanks, heat exchanger packages and process cooling for dairy plants in Waikato, Taranaki, Canterbury and Southland; tanks, chillers and wastewater systems for meat plants and wineries; purified water, WFI, clean steam and formulation vessels for pharmaceutical plants in Auckland; and pressure vessels, exchangers and piping for heavy industry. Paul engineers each system for 400 V at 50 Hz, builds its pressure equipment for design verification under the PECPR, and installs and commissions it or supervises the installation, under one contract and one turnover file. The Australia page covers the neighbouring market across the Tasman, where the pressure equipment regime runs on different rules.
What drives the delivered cost of a system for a New Zealand plant?
The delivered cost of a system for a New Zealand plant depends on six items beyond the equipment itself, and each appears as its own US dollar line in a Paul proposal.
- 50 Hz engineering. IEC motors, 400 V drives, AS/NZS 3000 panel design and resized pumps and fans add engineering hours to a US design.
- Design verification and seismic work. Calculation packages for the inspection body and NZS 1170.5 support design are priced as defined deliverables.
- Freight. A six-week Pacific voyage, flat racks for oversize tanks and the road leg from Tauranga, Auckland or Lyttelton set the shipping figure.
- Border costs. Duty by tariff heading and GST at 15 percent, under the Incoterm the plant chooses.
- Qualification. GMP protocols for medicines plants and cleaning validation for dairy and infant formula plants.
- Site route. Full installation inside an operating plant during a seasonal shutdown costs more than the supervision route; Paul prices both.
Paul Industries for New Zealand dairy, food and pharmaceutical plants
Paul Industries designs, fabricates and tests process skids, tanks, pressure vessels, water and steam systems and piping for plants across New Zealand, ships them through Tauranga, Auckland or Lyttelton, and installs and commissions them or supervises installation, with design verification, electrical and qualification records in one file. Send the user requirements, the site and its supply, the shutdown or start-up date and the code basis, and the proposal returns with the shipping plan, the build and commissioning schedule and a price in US dollars. Request a quote for your New Zealand plant.
Standards referenced: Health and Safety in Employment (Pressure Equipment, Cranes, and Passenger Ropeways) Regulations 1999 · Approved Code of Practice for Pressure Equipment (Excluding Boilers) · AS/NZS 1200 · AS/NZS 3788 · NZS 1170.5 · Electricity (Safety) Regulations 2010 · AS/NZS 3000:2018 · New Zealand Code of GMP (PIC/S Guide PE009) · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · MPI Import Health Standard for Vehicles, Machinery and Parts · Incoterms 2020 · ISPM 15
Frequently asked questions
What voltage does New Zealand use for three-phase plant equipment?
New Zealand uses 400 V three-phase and 230 V single phase at 50 Hz, and since the 2025 amendment to the Electricity (Safety) Regulations the standard low voltage tolerance is plus or minus 10 percent. Paul Industries designs skids for New Zealand around that supply from the first drawing, with IEC motors, 400 V drives and 230 V controls, and sizes pumps and fans for 50 Hz speed.
How does a skid reach a Waikato dairy plant through the Port of Tauranga, New Zealand?
A skid for a Waikato dairy plant sails from a US East Coast port to the Port of Tauranga in about six weeks, clears Customs and MPI biosecurity through the Trade Single Window, and moves by road to the plant on a route checked for width and height. Paul Industries sizes modules for that route, marks lifting points and sends rigging drawings ahead so the crane plan is settled before arrival.
Which equipment do dairy companies in New Zealand order for a seasonal shutdown?
Dairy companies in New Zealand use the winter shutdown to install CIP sets, silo and balance tanks, plate heat exchanger and holding tube packages, evaporator and dryer support skids, hot water sets and replacement sanitary piping. Paul Industries builds those items as tested modules in the United States, ships them to arrive before the shutdown opens, and ties them in and commissions them inside the window.
Does a US-built pressure vessel need design verification before use in New Zealand?
Pressure equipment covered by the PECPR needs its design verified, normally by a recognised inspection body that issues a certificate of design verification, unless the WorkSafe approved code of practice waives it for that class of equipment, and it is inspected during fabrication and before it enters service. Paul Industries prepares the calculation package, drawings and inspection and test plan for that review before fabrication starts.
Is ASME Section VIII accepted for pressure vessels shipped to New Zealand?
New Zealand pressure equipment sits under AS/NZS 1200, the framework standard the WorkSafe code of practice calls up, and the purchase order names the design code the owner and design verifier accept. Where the owner and verifier accept ASME Section VIII Division 1 under that framework, Paul Industries designs to it, and to AS 1210 or another listed code where that is named, and records the choice in the design basis.
How are vessels and skids restrained against earthquakes at plants in Wellington and Canterbury?
Plants in Wellington, Canterbury and other high-seismic regions design equipment restraint to NZS 1170.5 Section 8 for parts and components, and Engineering New Zealand’s Practice Note 19 guides seismic checks on pressure equipment and its supports. Paul Industries designs skid frames, vessel legs and skirts, pipe supports and anchors to the site’s seismic demands and supplies anchor loads for the foundation design.
Who builds purified water and WFI systems for pharmaceutical plants in Auckland?
Paul Industries designs, fabricates and qualifies purified water and WFI generation, storage and distribution systems for pharmaceutical plants in Auckland, built to ASME BPE and the New Zealand Code of GMP, which is the PIC/S guide. Each system arrives wired for 400 V at 50 Hz with qualification protocols in the plant’s format, and Paul installs and commissions it or supervises the installation.
What does the Medsafe code of GMP expect from a new water system?
The Medsafe code of GMP is the PIC/S Guide, so a new water system needs design, installation, operational and performance qualification, documented sanitization, and sampling that shows water quality to the pharmacopoeia monograph the plant uses. Paul Industries delivers the system with traceable weld, material and passivation records and executes the qualification protocols with the plant’s quality unit.
What is the New Zealand GST rate on equipment imported from the United States?
Goods imported into New Zealand carry GST at 15 percent, collected at the border, and GST-registered businesses generally claim it back through their returns. Customs duty is charged separately by tariff heading. Paul Industries itemizes every module on its commercial invoice so the importer’s customs agent calculates duty and GST on a clean entry.
How is New Zealand import duty worked out for a process skid?
New Zealand import duty is set by the tariff heading of each item in the Working Tariff Document of New Zealand, so a skid may be classified as a whole or split into pumps, vessels, heat exchangers and panels. Paul Industries lists headings, weights, values and country of origin for every item, and offers delivered terms when the plant prefers a landed price.
Does new equipment shipped to New Zealand need an MPI biosecurity inspection?
MPI’s Import Health Standard for Vehicles, Machinery and Parts covers all machinery, with its strictest cleaning and inspection rules aimed at used and outdoor machinery. Paul Industries ships new equipment clean, drained, dried and capped, with no soil, plant matter or test water left inside, and packs it in ISPM 15 heat-treated crates so the biosecurity check passes quickly.
Which port should equipment for a Canterbury or Southland plant use?
Equipment for Canterbury plants usually lands at Lyttelton, near Christchurch, while Otago and Southland plants receive through Port Chalmers or Bluff. Paul Industries chooses the routing that keeps oversize modules on the fewest handlings, and confirms the road route to the plant before modules are sized.
Is New Zealand voltage the same as Australia for process equipment?
New Zealand and Australia both run 230/400 V supplies at 50 Hz and share AS/NZS 3000 wiring rules, but each country applies its own electrical safety regulations and connection procedures. Paul Industries designs panels and motors for the New Zealand supply and regulations specifically, with test records that fit the New Zealand certification steps on site.
Can a New Zealand plant witness the factory acceptance test in the United States?
Engineers and quality staff from New Zealand plants attend Paul Industries factory acceptance tests at the US fabrication site or join through a live video link, covering hydrostatic tests, functional runs, alarm and interlock checks and document review. The signed FAT report and deviation list go into the turnover file before the equipment sails.
What equipment do wineries and meat plants in Marlborough and Hawke's Bay order?
Wineries in Marlborough and Hawke’s Bay buy jacketed fermentation and storage tanks, glycol chillers, CIP and wastewater pretreatment, and meat plants in those regions buy hot water and sterilizer systems, refrigeration and rendering equipment. Paul Industries designs and builds that equipment in the United States for 400 V, 50 Hz and installs and commissions it at the plant.
Which language and units do manuals for New Zealand plants use?
Paul Industries supplies manuals, labels, drawings and qualification documents for New Zealand plants in English, with metric units throughout and SI pressure units on nameplates and gauges where the plant requests them. Drawings follow the plant’s numbering and symbol conventions, so the files drop straight into its document control system.
What should a New Zealand plant send to get a quote in US dollars?
A New Zealand plant should send the user requirements or process description, the site layout and supply details, the design code it expects, the shutdown or start-up date and the preferred Incoterm. Paul Industries returns a proposal in US dollars with equipment, engineering, freight, border costs and site work as separate lines.
What service follows equipment installed in New Zealand?
Paul Industries services New Zealand installations with planned maintenance, requalification runs, spare parts, passivation and derouging of stainless systems, and repairs. Maintenance plans line up with each vessel’s certificate of inspection renewal, and every visit adds its findings to the equipment history Paul handed over at commissioning.
Planning process equipment for a plant in New Zealand?
Send Paul Industries your user requirements, the site and its supply, and the shutdown or start-up date, and the reply sets out the sailing, the build schedule and a working budget in US dollars. Call 201-450-8280 or request a quote.
