Paul Industries is a US process equipment contractor for Portugal, engineering and fabricating process skids, pressure vessels, purified water and WFI systems, tanks and process piping in the United States for pharmaceutical plants around Lisbon and Porto, the Sines industrial complex and food and beverage producers across the country. Each system leaves the factory acceptance test with its PED conformity file, Portuguese-language instructions and the records the IPQ approval of operation draws on under Decreto-Lei 131/2019, wired for 400 V, 50 Hz. Paul then installs and commissions it on site or supervises the installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Placing on the market Decreto-Lei 111-D/2017, transposing PED 2014/68/EU
Installation and operation Decreto-Lei 131/2019; approval of operation through IPQ
Power 230/400 V three phase, 50 Hz; RTIEBT wiring rules
GMP regulator INFARMED, in the PIC Scheme since January 1999
VAT 23 percent mainland, 22 Madeira, 16 Azores
Reviewed November 2026

What a US process equipment contractor for Portugal delivers

A US process equipment contractor for Portugal delivers equipment that clears two separate Portuguese gates: the European rules for placing pressure equipment and machinery on the market, and the national licensing regime that governs how that equipment is installed and operated afterwards. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, plans for both gates from the first drawing, so the equipment that reaches a Portuguese plant is ready for its approval of operation as well as for production.

Portuguese plants order the full range of process equipment from Paul: pump, dosing and transfer skids, pressure vessels and reactors, purified water, WFI and clean steam systems and stainless process piping fabricated as spools. Larger scopes arrive as turnkey process systems, with skids, modules and controls engineered together. The delivery route is the plant’s choice: supply with installation supervision, design-build from a user requirement specification, or complete installation through start-up and qualification.

Portuguese manufacturers increasingly export to the United States, and that is often the reason they look across the Atlantic for equipment. A system designed to ASME BPE and FDA documentation norms, then documented to the Pressure Equipment Directive and Portuguese operating law, satisfies the US customer’s auditors and the Portuguese inspector from one design file.

Pharmaceutical companies in Portugal and the plants they operate

Pharmaceutical companies in Portugal concentrate in two corridors: Greater Lisbon, where active ingredient, formulation and contract manufacturing plants sit in Loures and the surrounding municipalities, and the Porto district in the north, home to Portuguese pharmaceutical companies with their own research and production campuses. Coimbra, between the two, adds a university-linked cluster of generic and biotech producers.

The pharmaceutical industry in Portugal has grown into an exporter, and the investment record shows it. Hovione’s Sete Casas site in Loures employs about 1,250 people, brought a continuous tableting facility online in September 2022 and has since completed a tablet expansion of more than 40 million euros that added about a quarter more commercial-scale batch tableting capacity. In Trofa, in the Porto district, Bial runs its headquarters and industrial campus at São Mamede do Coronado and committed about 30 million euros to expand the factory and add an antibiotic production unit. These sites are named as market facts that show where demand for process systems sits.

Pharmaceutical manufacturing companies in Portugal of this kind run synthesis reactors, solvent recovery, spray drying, granulation and coating suites, and the clean utilities behind them. Biotech companies in Portugal, many of them spun out of university research in Lisbon, Porto and Coimbra, add bioreactors, buffer preparation and single-use process skids as they move toward clinical and commercial supply.

Portuguese process clusters and the equipment they buy
ClusterRegionProcess profile (market facts)What Paul Industries supplies
Loures and Greater LisbonLisbon metropolitan areaAPI synthesis, spray drying, oral solid dose, contract manufacturingPressure vessels, solvent and utility piping, purified water, WFI
Trofa and the Porto districtNorthResearch-based medicines, antibiotics, formulationClean steam, CIP skids, sanitary piping, process tanks
CoimbraCentreGenerics, biotech and university spin-outsBioprocess skids, buffer and media vessels, water systems
Sines industrial and logistics zoneAlentejo coastRefining, polyethylene and polypropylene, energy projectsAlloy process piping, heat exchanger skids, dosing systems
Setubal, Cacia and FigueiraSetubal, CentrePulp and paper mills of The Navigator CompanyChemical dosing skids, tanks, steam and condensate piping
Douro, Alentejo and the food beltNorth and SouthWine, dairy, olive oil, fruit and vegetable processingSanitary tanks, CIP, glycol cooling, transfer skids

The chemical industry in Portugal: Sines and the pulp mills

The chemical industry in Portugal centres on the Sines industrial and logistics zone on the Alentejo coast, where Galp operates the country’s refinery and Repsol runs a petrochemical complex, and on the pulp and paper mills that dominate the centre of the country. Chemical plants in Portugal outside those two groups are smaller specialty and fertiliser producers spread between Lisbon, Aveiro and the north.

Repsol’s Alba expansion at Sines represents an investment of 657 million euros in two new plants, one for linear polyethylene and one for polypropylene, with start-up scheduled by Repsol for 2025. Galp’s refinery alongside it is pursuing decarbonisation projects, including hydrogen and renewable fuel units. The Navigator Company produces pulp and paper at Setubal, at Cacia near Aveiro and at Figueira on the Mondego estuary, each mill running chemical preparation, bleaching, recovery boiler and effluent systems. For these plants Paul Industries supplies chemical process equipment: alloy and stainless piping, dosing and transfer skids, storage tanks and heat exchanger modules, delivered with the category schedule and inspection documentation that the Portuguese licensing process asks for.

Which rules govern pressure equipment in Portugal?

Pressure equipment in Portugal is governed by Decreto-Lei 111-D/2017, which transposes the Pressure Equipment Directive and controls how equipment is designed, assessed and CE marked before it is placed on the market, and by Decreto-Lei 131/2019, which controls how that equipment is installed, approved for operation, inspected, repaired and altered at the plant. Both apply to a US-built skid, and Paul Industries documents each item against both from the specification stage.

Decreto-Lei 111-D/2017: CE marking and the conformity file

Decreto-Lei 111-D/2017 was published on 31 August 2017 and entered into force the next day, bringing Directive 2014/68/EU into Portuguese law. Every vessel, line and safety accessory above the directive’s thresholds is classified into Category I to IV by fluid group, pressure and volume or nominal size, and the category fixes the conformity assessment module. Category I relies on the manufacturer’s internal production control; Categories II to IV bring a notified body into design examination, production quality or final assessment as the module requires. Paul produces a category schedule for each skid, followed by the EU declaration of conformity and the technical file.

Pressure Equipment Directive vs ASME: designing for a Portuguese plant

The Pressure Equipment Directive vs ASME question decides how a vessel’s conformity is shown, and an ASME design remains a usable basis. The directive sets essential safety requirements and leaves the design method open. EN 13445 is the harmonised standard that gives a presumption of conformity, while an ASME Section VIII design is accepted when the conformity route shows that the essential safety requirements, including material properties and test pressure, are met. Paul Industries designs to EN 13445 or to ASME Section VIII with a PED route, buys material with EN 10204 3.1 certificates and records how each essential safety requirement is satisfied.

Decreto-Lei 131/2019: approval of operation through IPQ

Decreto-Lei 131/2019 approved the Portuguese regulation on the installation and operation of simple pressure vessels and pressure equipment, revoking Decreto-Lei 90/2010 and moving licensing onto the ePortugal portal, where IPQ, the Portuguese Quality Institute, decides the requests. Equipment within its scope needs an approval of operation (aprovação de funcionamento): an inspection body (organismo de inspeção) inspects the installation and the equipment against the regulation and the applicable technical instruction, known as an ITC, and the operator applies to IPQ within 60 days of a favourable inspection. Approvals are renewed through the same route, with the request made up to 60 days before the current approval expires.

The ITCs add rules for particular equipment types: steam generators, compressed air receivers, process assemblies and cryogenic equipment each have their own instruction. Decreto-Lei 131/2019 also accepts a pressure test made at manufacture less than two years before the equipment enters service, which makes the US factory hydrostatic test record directly useful in Portugal. Paul Industries delivers that test certificate, the design data, material and weld records and safety valve sheets the inspection body checks, and plans each shipment so the test record is still current on arrival.

Instructions in Portuguese

Portuguese law has required since Decreto-Lei 62/88 that the information and instructions accompanying machines and industrial or laboratory equipment, covering installation, operation, assembly, maintenance, storage and transport, be written in Portuguese. Paul Industries delivers the operating and maintenance manuals, safety information and nameplate texts in Portuguese, with an English set for the engineering and quality teams.

Portuguese requirements for US-built process equipment
TopicPortuguese or EU ruleWhat the rule requiresHow Paul Industries delivers it
Placing on the marketDecreto-Lei 111-D/2017 (PED 2014/68/EU)Category, conformity module, CE marking, EU declaration of conformityCategory schedule, technical file, declaration
Installation and operationDecreto-Lei 131/2019 and its ITCsInspection by an inspection body, approval of operation by IPQ, periodic renewalTest certificates, design data and records for the inspection
LanguageDecreto-Lei 62/88Installation, operation and maintenance information in PortuguesePortuguese manuals, safety texts and labels
MachineryDirective 2006/42/EC, replaced on 20 January 2027 by Regulation (EU) 2023/1230Hazard analysis and a technical file behind the CE markGuarding, interlocks and the machinery file
ElectricalRTIEBT (Portaria 949-A/2006); EN 60204-1Low-voltage installation rules, machine electrical safetyPanels built and tested for 400 V, 50 Hz
GMPEU GMP Guide and Annex 1, supervised by INFARMEDSystems that fit the plant’s contamination control strategy and qualify cleanlyDesign traced to the URS, BPE-grade welds, executed IQ and OQ

Voltage in Portugal and the electrical design of a skid

Voltage in Portugal follows the European standard of 230 V single phase and 400 V three phase at 50 Hz, so the mains voltage in Portugal is the same supply a plant finds across mainland Europe. For a buyer asking what is the voltage in Portugal for industrial equipment, the working answer is 3 phase voltage in Portugal of 400 V between phases for motors and heaters, with 230 V for controls and small loads; larger sites take medium-voltage supply and transform it on site.

Voltage in Portugal and Spain is identical, which lets an Iberian plant group standardise panels across both countries. Low-voltage installations in Portugal follow the RTIEBT, the technical rules approved by Portaria 949-A/2006, and the electrical equipment of machines follows EN 60204-1. Paul Industries designs every skid panel for the plant’s voltage and frequency in Portugal, uses IEC-rated components, metric conductor sizes and European wire colours, and tests the panel at the factory on a 50 Hz supply.

Voltage in Portugal vs USA: what changes on a US-built skid

Voltage in Portugal vs USA practice differs in frequency as well as voltage, and the frequency is what changes mechanical design. A US plant runs 480 V or 208 V at 60 Hz; a Portuguese plant runs 400 V at 50 Hz. An induction motor turns about one sixth slower at 50 Hz, and by the pump affinity laws a centrifugal pump then delivers about 17 percent less flow and roughly 30 percent less head than its 60 Hz curve shows. Paul selects motors, pumps and fans on their 50 Hz curves, or sizes variable frequency drives for the duty, so the skid meets its process duty on the Portuguese supply from the first start.

INFARMED, GMP and Portuguese biotech companies

INFARMED, the Portuguese medicines authority, licenses and inspects pharmaceutical manufacturers against the EU GMP Guide, and has taken part in the Pharmaceutical Inspection Co-operation Scheme since January 1999, following membership of the earlier convention from 1971. For a sterile or biologic plant, that means equipment has to fit a contamination control strategy under the 2022 revision of Annex 1, and water systems have to meet the European Pharmacopoeia monographs.

Paul Industries designs process and utility systems for that environment: drainable sanitary piping with orbital welds and borescope records, WFI loops held hot or cold to the plant’s sanitisation concept, clean steam generators and CIP stations with documented cleaning coverage. Because many Portuguese producers also sell to the United States, Paul builds the same systems to satisfy FDA expectations at the same time. Commissioning and qualification follow the plant’s validation master plan, with IQ and OQ protocols drafted for the quality unit’s review before the factory acceptance test.

Shipping to Portugal from USA: Sines, Lisbon and Leixoes

Shipping to Portugal from USA East Coast ports runs to one of three gateways: the Port of Sines on the Alentejo coast, the Port of Lisbon on the Tagus, and Leixoes, the port serving Porto and the north. Published forwarder estimates put a New York sailing at about two to three weeks port to port, with the fastest listed route to Leixoes at about 14 days and Lisbon services at about 20 days, depending on whether the sailing is direct or transships in the Mediterranean.

The port follows the plant. Equipment for Loures and the Lisbon region enters through Lisbon; northern sites in Trofa, Maia or Aveiro are served through Leixoes; and loads for the Sines complex arrive at the Port of Sines container terminal, Terminal XXI, operated by PSA Sines, or as breakbulk on the industrial quays. Skids that fit a 40-foot container ship on a regular service; wider or taller modules ship on flat racks, and Paul fixes that shipping envelope during design so road permits and lifting plans are known before fabrication starts.

Customs, duty and VAT for equipment entering Portugal

Portugal is inside the EU customs union, so equipment clears once at the port of entry and then moves freely within the EU. Since July 1, 2026, Regulation (EU) 2026/1455 has set customs duty on US-origin industrial goods at zero, a measure that runs to the end of 2029, and origin is judged under the EU’s non-preferential rules. Value added tax is charged on import at the standard rate of 23 percent on the mainland, 22 percent in Madeira and 16 percent in the Azores, and a VAT-registered importer recovers it through its return. The importer needs an EORI number.

Incoterms 2020 set where Paul’s delivery ends. Portuguese buyers typically choose FCA at the US port with their own forwarder, DAP to the plant gate with Paul carrying freight and risk to site, or DDP when they want import VAT and clearance inside the price. Crates are built from ISPM 15 heat-treated timber with desiccant and vapour barrier for the crossing.

How does a Portuguese project run with Paul Industries?

A Portuguese project with Paul Industries runs in nine stages, and the code, language, licensing and shipping decisions are fixed in the first stage so that fabrication and paperwork follow them. The table shows what is particular to a plant in Portugal.

A Portuguese project with Paul Industries, stage by stage
StagePortugal-specific workOutput for the plant
1. Scope and code reviewPED categories, design code, ITC that applies under Decreto-Lei 131/2019, GMP requirementsConformity basis and category schedule
2. EngineeringMetric design, EN or ASME code, 400 V, 50 Hz electrics, RTIEBT interfaceP&IDs, layouts, calculations, electrical drawings
3. FabricationEN 10204 3.1 material, qualified welding, orbital welds for GMP linesMaterial dossier, weld and NDT records
4. Factory acceptance testHydrostatic test, function test, documentation check, witnessed or by videoSigned FAT report, test certificate for the approval of operation
5. Crating and shippingISPM 15 crates, preservation, sailing to Sines, Lisbon or LeixoesCommercial invoice, packing list, bill of lading
6. InstallationSetting, piping and wiring under the plant’s permit system, by Paul or under Paul’s supervisionInstallation records, redlined drawings
7. Inspection and licensingInspection body visit, documents for the IPQ approval of operationInspection file in Portuguese
8. Commissioning and qualificationStart-up, site acceptance test, IQ and OQ for GMP systemsSAT report, executed protocols
9. Handover and serviceTraining, Portuguese manuals, spare parts lists, service planAs-built drawings, turnover package

Who builds process systems for plants in Portugal?

Paul Industries builds process systems for plants in Portugal, from a single pressure vessel or CIP skid to a complete WFI system or process module, and takes each one from design and fabrication in the United States through factory testing, shipment, installation and commissioning at the Portuguese site. Plants that previously relied on a single regional fabricator gain a second source that works to ASME, ASME BPE and FDA norms and adds the PED, Portuguese licensing and language requirements on top.

Paul Industries was formerly based in northern New Jersey, then Pennsylvania, and today runs its international work from Kilmarnock, Virginia. Portuguese enquiries come from pharmaceutical producers around Lisbon and Porto, from chemical and refining sites at Sines, and from food and beverage producers whose wineries, dairies and olive oil mills run sanitary tanks, transfer skids and glycol cooling. Every quote is in US dollars with the Incoterm stated, so the buyer’s finance team converts on its own terms.

What drives the cost of process equipment delivered to Portugal?

The cost of process equipment delivered to Portugal depends on the equipment itself and on the delivery work around it: PED conformity steps, the Portuguese licensing file, freight and inland routing, import VAT under the agreed Incoterm, and the installation route. A buyer asking how much is shipping from USA to Portugal for a skid will find that freight is one line among several, and Paul Industries prices each one separately.

  • Conformity route. Notified body steps for Categories II to IV, and EN 13445 or ASME with PED documentation, add engineering and assessment hours that rise with the category.
  • Licensing file. The documents for the inspection body and the IPQ approval of operation, prepared in Portuguese, are scoped from the start.
  • Freight. A container-sized skid on a regular service to Lisbon or Leixoes costs far less than a flat-rack module needing escorted road transport to an inland plant.
  • VAT and clearance. Under FCA or DAP the importer pays the 23 percent import VAT and recovers it; under DDP Paul includes clearance and import charges.
  • Installation route. When Paul supervises the installation, the field line is shorter; when Paul installs, starts up and qualifies the system, one contract covers the work from crate to running plant.

A budget figure follows a short scope note with the process, size and plant location, and a firm price follows once the specification, design code and Incoterm are agreed.

Paul Industries for Portuguese process plants

Paul Industries, at 256 Shore Drive in Kilmarnock, Virginia, delivers Portuguese projects within its international practice, which spans Europe, the Americas, the Middle East and Asia as well as all 50 US states. For a Portuguese plant Paul engineers the system, fabricates the skids, vessels, tanks and piping in the United States, proves them at the factory acceptance test, ships them to Sines, Lisbon or Leixoes, and installs and commissions them or supervises their installation, built and documented to the PED, Decreto-Lei 131/2019 and Portuguese language rules. Iberian groups with sites across the border can compare the Spain page. To start a Portuguese project, describe the process and the site and request a quote.

Standards referenced: Pressure Equipment Directive 2014/68/EU · Decreto-Lei 111-D/2017 · Decreto-Lei 131/2019 and its ITCs · Portaria 398-A/2019 · Decreto-Lei 62/88 · RTIEBT, Portaria 949-A/2006 · Machinery Directive 2006/42/EC · Machinery Regulation (EU) 2023/1230 · EN 60204-1 · EN 13445 · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · EU GMP Guide and Annex 1 · European Pharmacopoeia · Regulation (EU) 2026/1455 · Incoterms 2020 · ISPM 15

Frequently asked questions

What is the voltage in Portugal for a three-phase process skid?

A three-phase process skid in Portugal connects to 400 V between phases at 50 Hz, with 230 V phase to neutral for controls, lighting and small loads. Paul Industries designs the panel, motors and drives for that supply, tests the panel at the factory on 50 Hz and delivers the electrical drawings in the form a Portuguese electrician expects under the RTIEBT installation rules.

Which pharmaceutical companies in Portugal invest in new production capacity?

Recent investment includes Hovione’s tablet and continuous manufacturing expansions at Sete Casas in Loures, where about 1,250 people work, and Bial’s campus expansion in Trofa with a new antibiotic unit. Projects like these need reactors, spray dryers, purified water, WFI and clean steam. Paul Industries builds that equipment in the United States to EU GMP and the PED and commissions it in Portugal.

What does Decreto-Lei 131/2019 require before a new vessel runs in Portugal?

Decreto-Lei 131/2019 requires pressure equipment within its scope to be inspected by an inspection body against the regulation and the applicable ITC, and then to receive an approval of operation from IPQ, requested within 60 days of the favourable inspection. Paul Industries supplies the design data, material and weld records, hydrostatic test certificate and safety valve data that inspection relies on.

Is the factory pressure test accepted when the equipment reaches Portugal?

Decreto-Lei 131/2019 accepts a pressure test carried out at manufacture less than two years before the equipment is put into service. Paul Industries records the hydrostatic test at the factory acceptance test, issues the test certificate with the shipment and plans fabrication, sailing and installation so the record is still within that window when the Portuguese inspection body reviews the equipment.

Who builds WFI systems for pharmaceutical companies in Lisbon, Portugal?

Paul Industries builds WFI generation, storage and distribution systems for pharmaceutical companies in Lisbon, Portugal, and the surrounding municipalities such as Loures. Systems are designed to the European Pharmacopoeia and EU GMP Annex 1, fabricated from ASME BPE components in the United States, wired for 400 V, 50 Hz and qualified on site with the plant’s validation team.

Do pharmaceutical companies in Porto, Portugal buy US-built clean utilities?

Pharmaceutical companies in Porto, Portugal, and the wider district, including the research-based producers in Trofa, run clean steam, CIP, purified water and sanitary transfer systems that Paul Industries designs and builds in the United States. Each system ships through Leixoes with its PED file, Portuguese manuals and IQ and OQ protocols, and Paul installs and commissions it or supervises the installation.

Are instructions in Portuguese mandatory for imported process equipment?

Decreto-Lei 62/88 requires the information and instructions that accompany machines and industrial or laboratory equipment, covering installation, operation, assembly, maintenance, storage and transport, to be in Portuguese. Paul Industries delivers Portuguese operating and maintenance manuals, safety information and labels with every system, alongside an English set for the engineering team.

Which port should equipment for the Sines industrial complex use?

Equipment for the refinery, petrochemical plants and energy projects at Sines lands at the Port of Sines itself, either in containers at Terminal XXI or as breakbulk and project cargo on the industrial quays, which keeps the road leg to a few kilometres. Paul Industries books the sailing to match the module dimensions and the receiving quay.

How long does shipping from the US East Coast to Portugal take?

Published forwarder estimates put a New York sailing to Portugal at about two to three weeks port to port: around 14 days to Leixoes on the fastest listed route and about 20 days to Lisbon, depending on direct calls or Mediterranean transshipment. Customs clearance and the road leg follow. Paul Industries sets the factory test date and booking together to meet the installation window.

Is there customs duty on US-built equipment entering Portugal?

Process equipment of US origin pays no EU customs duty while Regulation (EU) 2026/1455 is in effect, from July 1, 2026 through 2029. Import VAT still applies at 23 percent on the mainland, and a VAT-registered Portuguese importer recovers it. Paul Industries states the Incoterm and the tax treatment in every quote.

Which ITC applies to a compressed air receiver at a Portuguese plant?

Compressed air receivers in Portugal fall under their own technical instruction, issued as Despacho 2957/2022 under the Decreto-Lei 131/2019 regime, while steam generators, process assemblies and cryogenic equipment have separate ITCs. Paul Industries identifies the ITC for each item during the scope review and builds the documentation the inspection body needs for that instruction.

Can Paul Industries supply sanitary tanks to wineries in the Douro valley?

Paul Industries supplies stainless sanitary tanks, transfer skids, CIP stations and glycol cooling to wineries and port wine producers in the Douro valley and across northern Portugal. Tanks are fabricated in the United States with sanitary finishes and documented welds, shipped through Leixoes, and installed and commissioned by Paul or under Paul’s supervision.

What do biotech companies in Portugal need when scaling to clinical supply?

Biotech companies in Portugal moving from research to clinical supply need bioreactor skids, media and buffer preparation, purified water and clean steam, all designed for qualification under EU GMP. Paul Industries designs and fabricates these systems in the United States, sized for the next production step, and qualifies them on site with IQ and OQ protocols written for the company’s quality unit.

Which chemical plants in Portugal use alloy process piping and skids?

Chemical plants in Portugal using alloy piping and process skids include the refining and polymer units in the Sines industrial zone and the pulp mills at Setubal, Cacia and Figueira on the Mondego, which run bleaching, chemical preparation and recovery systems. Paul Industries fabricates alloy and stainless spools, dosing skids and heat exchanger modules for these processes, documented to the PED and Decreto-Lei 131/2019.

Can engineers from a Portuguese plant witness the factory acceptance test?

Engineers and quality staff from Portuguese plants attend the factory acceptance test in the United States or follow it by live video, working through a protocol agreed during design. The test covers the hydrostatic test, functional sequences, wiring checks and a documentation review, and every open item is closed before the equipment is crated for shipment to Portugal.

In which currency does Paul Industries quote Portuguese projects?

Paul Industries quotes Portuguese projects in US dollars, with the Incoterm stated. Equipment, PED conformity work, the Portuguese licensing file and manuals, crating and freight each appear on their own line, together with VAT and clearance under DDP, so a Portuguese purchasing team lines the offer up against a euro bid item by item.

What should a Portuguese plant send to receive a firm offer?

A firm offer for a Portuguese plant starts from its URS or specification, any existing P&IDs, the code the vessels must follow, the town where the plant stands, its steam, cooling water and electrical data, the Incoterm and whether Paul installs or supervises. Paul Industries answers with a budget range from comparable scope, then fixes the price when the specification is frozen.

Planning process equipment for a plant in Portugal?

Send Paul Industries the process, the design code, the plant location and your preferred Incoterm, and you will receive the PED and Decreto-Lei 131/2019 route, the list of Portuguese documents and a price in US dollars. Call 201-450-8280 or request a quote.