Paul Industries is a US process equipment contractor for Spain that designs and fabricates process skids, pressure vessels, water-for-injection and clean steam units, storage tanks and pipework in the United States, for pharmaceutical and plasma plants in Catalonia and Madrid, the Tarragona chemical complex and food producers across the country. Equipment ships with its CE marking under Royal Decree 709/2015, instructions in Spanish and the documentation its installation and periodic inspections need under Royal Decree 809/2021, and with an electrical design for the 400 V, 50 Hz supply and the REBT. After a witnessed factory acceptance test and a crossing to Valencia, Barcelona, Tarragona or Algeciras, Paul installs, starts up and commissions it at the Spanish plant, or supervises the installation, and closes with qualification and handover.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Placing on the market Real Decreto 709/2015, transposing PED 2014/68/EU
Installation and inspection Real Decreto 809/2021 and its ITCs
Power 230/400 V three phase, 50 Hz; REBT wiring rules
GMP regulator AEMPS, in the PIC Scheme since 1998
Main ports Valencia, Barcelona, Algeciras, Tarragona
Reviewed November 2026

Why Spanish plants work with a US process equipment contractor for Spain

Spanish plants work with a US process equipment contractor for Spain when they want equipment designed, fabricated, tested, delivered and commissioned under one contract by a builder that already speaks the documentation language of the US market. Many Spanish pharmaceutical and plasma producers sell into the United States, and a system built to ASME BPE and FDA expectations, then adapted to the European directives and Spanish regulations, serves both regulators from one design.

From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries delivers to Spanish sites as part of an international practice that also covers every US state; the international projects page lists the other countries. Spanish buyers order pump and dosing skids, pressure vessels and receivers, clean steam generators, WFI and purified water systems, process tanks and process piping in stainless and alloy grades. Plasma and biologics plants add process filtration skids for clarification, depth filtration and ultrafiltration steps. Each project follows the route that suits the plant: supply with installation supervision, design-build from a process specification, or complete installation taken through start-up and qualification.

Which pharmaceutical companies in Spain buy process systems, and where are their plants?

Pharmaceutical companies in Spain are concentrated in Catalonia, around Barcelona and the Vallès, and in the Madrid region, with a growing number of biologics and plasma-derived medicine plants among them. Catalonia counts more than 28,000 direct pharmaceutical jobs, the most of any Spanish region, and regional investment agencies rank it second in the European Union for pharmaceutical employment, behind Lombardy.

Pharmaceutical companies in Barcelona’s industrial belt include Grifols, which opened its first plant at Parets del Vallès in 1972 and in 2014 added a fractionation plant there that doubled its Spanish plasma fractionation capacity to 4.2 million litres a year. Plasma fractionation is a demanding user of process equipment: jacketed tanks held at low temperature, cold ethanol precipitation, filtration and ultrafiltration skids, WFI for every wash, and clean-in-place systems validated to EU GMP. Biotech companies in Spain, many in the Barcelona, Madrid and Valencia science parks, follow a similar path at smaller scale until a product reaches commercial supply and needs stainless utilities sized for it. These companies and sites are named as market facts that show what Spanish plants buy; they say nothing about any Paul project.

Spanish industrial regions and the systems their plants buy
RegionIndustry profile (market facts)Usual port of entryWhat Paul Industries builds for it
Catalonia: Barcelona and the VallèsMore than 28,000 direct pharmaceutical jobs; plasma fractionation at Parets del VallèsBarcelonaWFI and clean steam, cold process tanks, filtration and CIP skids
Catalonia: TarragonaAbout a quarter of Spanish chemical productionTarragona or BarcelonaPressure vessels, reactors, heat exchanger skids, alloy piping
Madrid regionPharmaceutical production and corporate engineering centresValencia, then roadFormulation vessels, purified water, process piping, utility skids
Valencia regionFood, beverage and ceramics manufacturing beside Spain’s main container portValenciaSanitary tanks, CIP systems, heat treatment skids
AndalusiaFood processing, refining and chemicals around Huelva and the Bay of AlgecirasAlgecirasProcess vessels, transfer skids, piping modules

Chemical companies in Spain and the Tarragona complex

Chemical companies in Spain cluster most heavily in Tarragona, where the complex north and south of the city produces about a quarter of Spanish chemical output and half of Catalonia’s, and where operators including BASF and Dow describe it as southern Europe’s biggest chemical complex. The AEQT association represents the companies there, and since 2014 the ChemMed cluster has linked them with the Port of Tarragona.

A Tarragona project brings its own technical requirements: ATEX zoning around hydrocarbon and solvent service, corporate engineering standards from multinational owners, and heavy pressure equipment that arrives over the port’s own quays. Paul Industries designs and fabricates vessels, reactors and alloy piping for chemical plants to EN 13445, ASME Section VIII with a PED route, or the owner’s standard, proves every pressure part by hydrostatic testing before it ships, and documents the work for the Spanish installation and inspection regime described below.

The food industry in Spain, from olive oil and wine to dairy, juices and prepared foods, runs on hygienic process equipment with its own priorities: cleanability, drainage, validated CIP and gentle product handling. Paul Industries builds sanitary tanks, transfer and heat treatment skids and CIP stations for food and beverage plants, wired for Spanish power and documented in Spanish.

RD 809/2021 and RD 709/2015: how Spain regulates pressure equipment

Spain regulates pressure equipment in two layers: Royal Decree 709/2015 transposes the Pressure Equipment Directive and governs placing equipment on the market, while RD 809/2021, the Reglamento de Equipos a Presión with its complementary technical instructions, governs installation, commissioning, periodic inspection, repair and modification of equipment above 0.5 bar once it is in Spain.

Royal Decree 709/2015 is explicit about language. Its articles 5.3 and 6.7 require the instructions and safety information described in Annex I, points 3.3 and 3.4, to be supplied at least in Spanish, and the same duty passes to importers and distributors. Royal Decree 809/2021 then takes over at the plant. The installation is closed out with an installation certificate and a communication filed with the industry department of the autonomous community after the works and on-site tests and before the equipment operates. Each item carries a plate for installation and periodic inspection data, and periodic inspections follow the intervals in Annex III of the regulation, carried out by an authorised inspection agent such as an Organismo de Control. A negative result stops the equipment until it is corrected. Complementary technical instructions add specific rules for boilers and other equipment types, starting with ITC EP-1.

Spanish and EU rules for a US-built process system, and the documents each one needs
RuleStage it governsDocuments Paul Industries supplies
Royal Decree 709/2015 (PED)Design, manufacture and conformity before the equipment is placed on the Spanish marketCategory assessment, CE marking, declaration of conformity, Spanish instructions
RD 809/2021 and its ITCsInstallation, communication to the autonomous community, periodic inspection, repairDesign and test data for the installation certificate, plate data, inspection plan
REBT, Royal Decree 842/2002Low-voltage wiring connecting the equipment inside the plantField wiring design and cable schedules to the ITC-BT instructions
UNE-EN 60204-1Electrical equipment of the machine itselfPanel drawings, protective bonding and test records
Machinery Directive, then Regulation 2023/1230 from January 20, 2027Skids with pumps, agitators or moving partsMachinery risk assessment, technical file, declaration
ATEX Directive 2014/34/EUEquipment in classified zones, common at TarragonaZone-rated components with their conformity documents
EU GMP Guide and Annex 1Medicine manufacture inspected by AEMPS and the regionsQualification protocols, material traceability, cleaning and sterilisation validation

For a plant manager the practical effect is that a vessel’s journey from CE marking to its first periodic inspection depends on records created during design and fabrication. Paul Industries assembles them in one file per item: the PED category and conformity route, design calculations, material certificates, weld and NDT records, test pressures, safety accessory settings and the data the inspection plate and the autonomous community communication call for, all in Spanish with English kept for engineering use.

RD 809/2021 also governs repairs and modifications made years after start-up, which is why the original records matter long after handover. A repair to a pressure-retaining weld or a change to a vessel’s operating conditions is assessed against the design data, material certificates and test history in the first file. Paul Industries keeps a complete copy of every Spanish dossier and returns to the plant for repairs, rerates and modifications on the same equipment, so the engineer who reviews the change works from the same calculations that sized the vessel.

Voltage in Spain and the REBT: the electrical design of a skid

The voltage in Spain for industrial equipment is 400 V three phase with 230 V between phase and neutral, at 50 Hz, the IEC 60038 European values, and a skid for a Spanish plant is designed to that supply from its first one-line diagram. Electrical voltage in Spain is therefore the same as in France or Italy, which lets a multinational owner standardise one design across sister plants.

Two sets of rules apply on the electrical side. The REBT, Royal Decree 842/2002, with its ITC-BT technical instructions and the UNE reference standards listed in ITC-BT-02, governs the low-voltage installation that feeds and connects the equipment in the plant. UNE-EN 60204-1 governs the electrical equipment of the machine: the control panel, emergency stops, protective bonding and conductor identification. Paul Industries designs panels and field wiring to both, and to the plant’s own electrical specification, and hands over schematics and test records in Spanish.

Voltage in Spain vs USA: how the frequency changes rotating equipment

The difference that matters most in voltage in Spain vs USA practice is the frequency. On 50 Hz a four-pole motor runs near 1,500 rpm instead of about 1,800, so a centrifugal pump chosen on its 60 Hz curve loses close to a sixth of its flow and nearly a third of its head. Paul Industries picks every pump, fan, agitator drive and compressor on its 50 Hz performance data, fits variable frequency drives where the process needs turndown, and uses 230 V, 50 Hz instruments and control power, so the skid runs on the Spanish grid exactly as it ran during its factory test.

AEMPS GMP inspection and documents in Spanish

AEMPS GMP inspection, by the Spanish Agency of Medicines and Medical Devices together with the regional health authorities, assesses Spanish pharmaceutical manufacturing against the EU GMP Guide, and AEMPS has belonged to the PIC Scheme since January 1998. For sterile and plasma-derived products, Annex 1 in its revised form, applicable since August 25, 2023, expects a written contamination control strategy, and that strategy shapes the design and cleaning of water systems, clean steam, vessels and transfer lines.

An inspector reviewing new equipment at a Spanish plant asks for evidence of control from design onward: traceable product-contact materials, surface roughness and passivation records, weld logs with internal inspection images, drainability and dead-leg checks, validated cleaning and sterilisation, and an audit trail on every critical control. Paul Industries builds that evidence as it builds the equipment, executes installation and operational qualification at the Spanish site, and supplies the data for performance qualification. For pharmaceutical plants that also face FDA inspections, the same records are indexed for both regulators.

Every manual, label and HMI screen is delivered in Spanish, as Royal Decree 709/2015 requires for pressure equipment and as Spanish operators expect for the rest of the system, with English versions held under the same revision numbers. Drawings are metric with DN sizes, and plants in Catalonia that keep records in Catalan receive the operator documents they specify.

Shipping to Spain from USA: Valencia, Barcelona, Tarragona and Algeciras

Shipping to Spain from USA East Coast ports for process equipment uses direct Mediterranean services that reach Valencia or Barcelona in about 12 to 16 days port to port, with longer times on services that call at other ports first. The Port of Valencia, Spain’s busiest container port with about 5.5 million TEU handled in 2024, suits plants in the Valencia region and Madrid; Barcelona serves Catalonia’s pharmaceutical belt; Tarragona’s quays serve the chemical complex directly; and Algeciras serves Andalusia.

The road leg sets the shipping envelope. A skid for a plant in the Vallès moves a short distance from the Port of Barcelona, while equipment for Madrid covers about 350 kilometres inland from Valencia by road or rail. During design Paul Industries sets each skid’s width, height and lifting lugs to the route: a unit up to 2.34 metres wide loads into a high cube container, and anything bigger is divided at flanged joints into modules that ride on flat racks. Export crates are ISPM 15 heat-treated timber, and electropolished surfaces are drained, sealed and blanketed with nitrogen, or packed with desiccant, until the plant opens them.

Where US-built process equipment lands in Spain
PortMain catchmentNotes for a process skid
ValenciaValencia region, Madrid, central SpainFrequent transatlantic container calls; road or rail leg to Madrid
BarcelonaCatalonia, including the Vallès pharmaceutical beltShort road haul to Parets del Vallès and the Barcelona science parks
TarragonaThe Tarragona chemical complexQuays beside the complex; suited to heavy vessels and modules
AlgecirasAndalusiaMajor transshipment hub on the Strait of Gibraltar
BilbaoBasque Country and northern SpainAtlantic option for plants in the north

Customs duty and import VAT in Spain

US-origin industrial goods enter Spain at zero customs duty under Regulation (EU) 2026/1455, in force from July 1, 2026 to December 31, 2029. Spanish import VAT at the 21 percent standard rate is normally paid at clearance, but businesses that file monthly VAT returns can elect, through a census declaration made in November, to defer it to their monthly return instead. Paul Industries quotes DAP when the Spanish plant clears the goods itself and DDP when it wants a landed price.

From enquiry to handover: a Spanish project in nine steps

A Spanish project with Paul Industries runs in nine steps under one contract, and the first two lock in the Spanish specifics: PED category, the RD 809/2021 installation and inspection path, ATEX zones, REBT interface, language and port of entry. The table shows each step and the record the plant keeps from it.

Nine steps of a process equipment project for a Spanish plant
StepWhat is settled for SpainRecord the plant keeps
1. Code and scope reviewDesign code, PED category, RD 809/2021 inspection path, ATEX zonesDesign basis and regulatory matrix
2. Engineering400 V 50 Hz design to UNE-EN 60204-1, metric drawings, Ph. Eur. water grades, Spanish HMIP&IDs, layouts, calculations, functional design
3. FabricationPED-route materials, qualified welders and procedures, hygienic finishesMaterial, weld, NDT and finish dossiers
4. Factory testSpanish team on site or connected by videoFAT protocol with results and closed observations
5. ShippingHeat-treated crates, sailing to Valencia, Barcelona, Tarragona or AlgecirasInvoice, packing list, bill of lading
6. InstallationFull installation or supervision under the plant’s safety coordinationErection and tie-in records
7. CommissioningData for the installation certificate and autonomous community communication; start-upStart-up report and plate data
8. QualificationSAT, IQ and OQ under EU GMPSigned protocols and PQ input
9. HandoverSpanish manuals, operator training, Annex III inspection calendarAs-built dossier, spares list, service plan

Spare parts and service follow the same planning. Paul Industries recommends a two-year spares list sized for transatlantic lead times, ships it with the equipment where the plant agrees, and keeps the bill of materials for every skid on file so a seal kit, a sensor or a replacement pump arrives matched to the original. Service visits for periodic checks, upgrades or capacity changes are scheduled with the plant’s maintenance calendar.

Larger Spanish programmes often bring Paul in through project delivery and procurement, so design, long-lead purchasing, fabrication and site work follow one schedule and one change process.

Who builds process systems for plants in Spain?

Paul Industries builds process systems for plants in Spain, from one dosing skid or receiver to a complete WFI, clean steam, filtration, tank and piping package, and stays with each through the Spanish port, installation, start-up and qualification. The plant deals with a single firm that designed, built, tested and commissioned the equipment, so a question about a weld, a test or a control setting goes straight to the people who made it. Paul serves neighbouring Mediterranean markets the same way, as described on the Italy and France pages.

What does delivered process equipment cost in Spain, and why?

Delivered process equipment for a Spanish plant costs the equipment price plus six delivery items: sea freight and the inland leg, crating and preservation, PED and RD 809/2021 documentation, electrical and ATEX scope, Spanish-language documents, and the installation route. Paul Industries shows each item on its own line.

  • Freight. Container loads cost far less than flat racks or project cargo, and the inland distance from Valencia to Madrid adds a leg that a Barcelona or Tarragona delivery avoids.
  • Preservation. Heat-treated crates, desiccant and nitrogen blankets protect polished internals across the Atlantic and the Mediterranean.
  • Regulatory documents. Higher PED categories and items with demanding inspection schedules need more documentation work.
  • Electrical and ATEX. Zone-rated components at chemical sites and panels to UNE-EN 60204-1 change component cost.
  • Language. Each system’s manuals, nameplates and operator screens are written in Spanish.
  • Installation route. A supervision scope books fewer Paul field days than a full installation, and Paul leads start-up and qualification either way.

With no duty on US-origin industrial goods and import VAT recovered by the plant, the offer, in US dollars, moves from a budget estimate based on similar projects to a firm price when the design basis, site and Incoterm are fixed.

Paul Industries for Spanish pharmaceutical, chemical and food plants

Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, and once based in northern New Jersey, then Pennsylvania, brings complete process systems to Spanish plants in Catalonia, Madrid, Valencia, Tarragona and Andalusia. It engineers each system, fabricates the skids, vessels, tanks and spools in the United States, runs the factory acceptance test with the plant’s engineers, ships through the Spanish port closest to the site, and installs, starts up, commissions and qualifies the equipment there or supervises the installation, depending on the project. Every system arrives built to Royal Decree 709/2015, documented for RD 809/2021 and the REBT, and qualified to EU GMP where medicines are made, with Spanish manuals, weld records and as-built drawings in the dossier. To start, send the specification, site and preferred Incoterm and request a quote.

Standards referenced: EU Pressure Equipment Directive 2014/68/EU · Real Decreto 709/2015 · Real Decreto 809/2021, Reglamento de Equipos a Presion and its ITCs · REBT, Real Decreto 842/2002 and its ITC-BT · EU Machinery Directive 2006/42/EC · EU Machinery Regulation 2023/1230 · ATEX Directive 2014/34/EU · UNE-EN 60204-1 · EU GMP Guide (EudraLex Volume 4) and Annex 1 · PIC/S GMP Guide · European Pharmacopoeia · EN 13445 · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Regulation (EU) 2026/1455 · Incoterms 2020 · ISPM 15

Frequently asked questions

What voltage in Spain should a skid built in America be designed for?

A skid built in America for a Spanish plant is designed for 400 V three phase with 230 V phase to neutral, at 50 Hz, the supply used across Spanish industry. Paul Industries selects motors and pumps on their 50 Hz curves, specifies 230 V control power and instruments, and designs the panel to UNE-EN 60204-1 and the field wiring to the REBT.

Which pharmaceutical companies in Spain make plasma-derived medicines?

Grifols makes plasma-derived medicines at Parets del Vallès near Barcelona, where its 2014 fractionation plant doubled Spanish fractionation capacity to 4.2 million litres a year. Plasma plants of this kind need cold process tanks, filtration and ultrafiltration skids, WFI and validated CIP, and Paul Industries builds those systems in the United States to EU GMP and commissions them in Spain.

What does RD 809/2021 require before a new pressure vessel operates in Spain?

RD 809/2021 requires the installation of a new pressure vessel to be closed out with an installation certificate and a communication filed with the autonomous community’s industry department after on-site tests and before the vessel operates, and each item carries an installation and inspection plate. Paul Industries supplies the design, test and accessory data those documents rely on.

How often are pressure vessels inspected in Spain once they are in service?

Periodic inspection intervals for pressure vessels in Spain are set in Annex III of the Reglamento de Equipos a Presión approved by RD 809/2021, by equipment type and level of inspection, counted from manufacture or the last inspection. An authorised inspection agent such as an Organismo de Control carries them out. Paul Industries designs inspection access and supplies the records the agent reviews.

Are instructions for pressure equipment required in Spanish?

Royal Decree 709/2015 requires the instructions and safety information for pressure equipment placed on the Spanish market to be supplied at least in Spanish, in articles 5.3 and 6.7. Paul Industries delivers manuals, safety information, labels and HMI text in Spanish for every system, with English versions kept under matching revisions, and provides Catalan operator documents where a Catalan plant asks for them.

Who builds WFI and clean steam systems for pharmaceutical companies in Barcelona?

Paul Industries builds WFI generation and distribution systems and clean steam generators for pharmaceutical companies in Barcelona and the Vallès, meeting European Pharmacopoeia water quality and the Annex 1 design expectations. The units are built and put through their factory test in the United States, sail to the Port of Barcelona, and are installed, started up and qualified at the plant with Spanish documentation.

Voltage in Spain vs USA: which components change on a US-designed skid?

Motors, pumps, fans, compressors, control transformers and instruments change on a US-designed skid bound for Spain, because the Spanish grid delivers 400 V at 50 Hz, unlike the 60 Hz supply of American plants. Paul Industries reselects rotating equipment on its 50 Hz data, adds variable frequency drives where turndown is needed, and specifies 230 V control components throughout.

What is the REBT, and does it apply to imported process equipment?

The REBT is Spain’s low-voltage electrical regulation, Royal Decree 842/2002, with ITC-BT technical instructions and reference UNE standards, and it applies to the wiring that connects any process equipment in a Spanish plant, wherever the equipment was built. Paul Industries designs field cabling, protection and earthing to it, and the skid panel to UNE-EN 60204-1.

Who supplies pressure vessels to chemical companies in Tarragona?

Paul Industries supplies pressure vessels, reactors, heat exchanger skids and alloy piping to chemical companies in Tarragona, designed to EN 13445, ASME Section VIII with a PED route, or the owner’s corporate standard, with ATEX-rated components where the zone requires them. Equipment ships directly to the Port of Tarragona and is installed and commissioned at the complex.

Why does the Port of Valencia matter for plants in Madrid?

The Port of Valencia, which handled about 5.5 million TEU in 2024, more than any other Spanish port, has frequent transatlantic calls, which makes it the usual gateway for plants in the Madrid region, about 350 kilometres inland. Paul Industries plans the road or rail leg from Valencia during design, sizing skids for the route and timing the sailing around the factory acceptance test.

How long is the sea crossing from the US East Coast to Valencia or Barcelona?

Direct Mediterranean services reach Valencia or Barcelona from the US East Coast in about 12 to 16 days port to port, while routings with extra calls or transshipment take longer. Customs clearance and the inland leg add days at the Spanish end. Paul Industries books the sailing once crate sizes are fixed and preserves the equipment for the full voyage.

Shipping to Spain from USA cost: which items move the number most?

The items that move shipping to Spain from USA cost most are the equipment envelope, since a flat rack or project cargo costs far more than a container, the choice of port, the inland distance to the plant and the Incoterm. Preservation and crating add smaller amounts. Paul Industries quotes freight as a separate line in US dollars once crate dimensions are known.

Can a Spanish plant defer import VAT on equipment from the United States?

A Spanish plant that files monthly VAT returns can elect, by a census declaration made in November, to defer import VAT to its monthly return instead of paying it at clearance. Regulation (EU) 2026/1455 sets duty on US-origin industrial goods at zero. Paul Industries quotes DAP for plants that clear the goods themselves and DDP for a landed price.

What do biotech companies in Spain need when they move to commercial manufacturing?

Biotech companies in Spain moving to commercial manufacturing usually add WFI and clean steam utilities, buffer and media vessels, CIP stations and qualified bioprocess piping around their production trains. Paul Industries designs those systems for commercial scale, fabricates and tests them in the United States, and qualifies them at sites in Barcelona, Madrid or Valencia to EU GMP.

Does Paul Industries build sanitary equipment for the food industry in Spain?

Paul Industries builds sanitary tanks, transfer and heat treatment skids, CIP stations and hygienic process piping for the food industry in Spain, including juice, dairy, oil and prepared food plants. Each system has documented surface finishes, drainable layouts and validated cleaning, a 400 V, 50 Hz electrical design and Spanish documentation, and is installed and commissioned at the plant.

Who installs process equipment at plants in Andalusia and around Seville?

Paul Industries installs, starts up and commissions process equipment at plants in Andalusia, including the Seville, Huelva and Bay of Algeciras areas, or supervises the installation, depending on the project. Equipment usually enters through Algeciras, and site work follows the plant’s safety coordination before closing with site acceptance testing, qualification where needed and handover.

Can engineers from a Spanish plant join the factory acceptance test?

Engineers from a Spanish plant join the factory acceptance test in the United States in person or follow it live by video, with results and observations recorded as the test runs. Paul Industries agrees the protocol during design, tests pressure, function, alarms and controls against it, and closes each observation before the equipment is crated and shipped.

Planning process equipment for a plant in Spain?

Tell Paul Industries the process, the design code, the site and the Incoterm you prefer, and you will receive the RD 709/2015 and RD 809/2021 route, the Spanish document list and an offer in US dollars. Call 201-450-8280 or request a quote.