Paul Industries is a US process equipment contractor for France that engineers pressure vessels, process skids, WFI and clean steam systems, tanks and process piping in the United States for biologics, vaccine, aseptic fill and chemical plants from Vitry-sur-Seine and Chartres to the Lyon region. Every system is built to the Pressure Equipment Directive as France applies it through the Code de l’environnement, wired for the 230/400 V, 50 Hz supply and delivered with French-language manuals. Paul proves it at a factory acceptance test, ships it through Le Havre or Marseille-Fos, and installs, starts up and commissions it at the French site or supervises the installation, with the in-service and GMP records in the turnover file.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
French pressure law Code de l'environnement R557, transposing PED 2014/68/EU
In-service rule Arrete of 20 November 2017: inspection up to 4 years, requalification up to 10
Power 230/400 V three phase, 50 Hz
GMP regulator ANSM, in the PIC Scheme since 1997
Main ports Le Havre (Atlantic) and Marseille-Fos (Mediterranean)
Reviewed November 2026

What a US process equipment contractor for France delivers to a French plant

A US process equipment contractor for France delivers equipment that a French operator can register, put into service and keep in service under French law: CE-marked pressure equipment with its conformity file, machinery with its risk assessment and declaration, electrical work that matches the plant’s French standards, and a document set written in French. Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, and takes projects at plants in France as well as in all 50 US states and the other countries listed on the international projects page.

French plants order the core of a process building from Paul: pressure vessels and receivers, pump, dosing and transfer skids, purified water and WFI systems, clean steam generators and distribution, and CIP and SIP skids for biologics and sterile production. Chemical and specialty plants add reactors, receivers, solvent tanks and alloy piping. The buyer chooses the route that fits the project: supply with installation supervision, design-build from a user requirement specification, or complete installation through start-up, commissioning and qualification.

The appeal of a US source for a French project is a second, fully documented route to capacity. When the large French engineering and fabrication houses are booked by a wave of biologics and decarbonisation investment, a US builder that already works to ASME, ASME BPE and FDA documentation norms, and adds the French conformity and language layer on top, gives a project team schedule options without changing its specification.

Which pharmaceutical companies in France are investing in new production?

Pharmaceutical companies in France are investing heavily in biologics, vaccines and aseptic production in the Ile-de-France region, the Centre-Val de Loire and the Lyon area, and those projects drive demand for WFI, clean steam, CIP and bioprocess equipment. The sites below are named as market facts about French industry; they show where process equipment is being bought and say nothing about any Paul project.

Sanofi announced in 2024 an investment of about one billion euros at Vitry-sur-Seine, south of Paris, to double the site’s monoclonal antibody capacity, alongside smaller projects at Le Trait in Normandy and Lyon Gerland. Its 2020 vaccine plan of about 610 million euros created a modular production site at Neuville-sur-Saône and a research centre at Marcy-l’Étoile, both near Lyon. Novo Nordisk is spending more than 16 billion Danish kroner, about 2.1 billion euros, to more than double the footprint of its Chartres site, opened in 1961, with new aseptic and finished production and a larger quality control laboratory finished in stages from 2026 to 2028. Readers searching for the top 10 pharmaceutical companies in France or the top pharmaceutical companies in France will find these groups on any ranking; for an equipment buyer, the more useful fact is where each is building.

French pharmaceutical and chemical sites investing in process capacity (market facts)
SiteRegionInvestment or profileProcess systems Paul Industries builds for plants of this type
Sanofi, Vitry-sur-SeineIle-de-FranceAbout 1 billion euros to double monoclonal antibody capacity (2024)WFI and clean steam, buffer and media preparation skids, CIP and SIP, bioprocess piping
Sanofi, Neuville-sur-Saône and Marcy-l’ÉtoileAuvergne-Rhône-Alpes, near LyonModular vaccine production site and vaccine research centre (2020 plan of about 610 million euros)Purified water and WFI, process tanks, transfer panels, sanitary piping
Novo Nordisk, ChartresCentre-Val de LoireAbout 2.1 billion euros for aseptic and finished production, stages from 2026 to 2028WFI loops, clean utilities, formulation vessels, CIP skids
Vallée de la ChimieSouth of LyonAbout 2,000 hectares and some 14,000 direct jobs in chemistry, energy and environmentReactors, receivers, solvent tanks, alloy piping modules, dosing skids
Lower Seine and Fos-sur-Mer port zonesNormandy and ProvenceRefining, petrochemicals and energy transition projects beside the two main portsPressure vessels, heat exchanger skids, utility and process piping

Biotech companies in France and the Lyon cluster

Biotech companies in France concentrate around Paris-Saclay, Lyon, Strasbourg and Marseille, and many pass from clinical supply to commercial production inside a few years. For those teams the equipment question changes from a single-use pilot train to stainless WFI, clean steam and CIP infrastructure sized for commercial batches. Pharmaceutical companies in Lyon, France, form the densest vaccine and immunology community in the country, with Sanofi’s vaccine operations at Marcy-l’Étoile and Neuville-sur-Saône at its centre. Paul Industries carries biotech manufacturers from pilot to commercial scale by designing the utilities and process skids for the commercial plant and qualifying them against EU GMP.

Chemical industry in France: Lyon’s chemical valley and the port zones

The chemical industry in France clusters in three places that matter for equipment logistics: the Vallée de la Chimie south of Lyon, the lower Seine corridor between Rouen and Le Havre, and the Fos-sur-Mer and Étang de Berre zone near Marseille. All three sit on water, so a heavy reactor or a tall column module can reach the site by river or coastal barge instead of an oversize road convoy. Paul Industries builds chemical plant equipment to the material, weld and testing rules the operator’s own engineering standards set, and designs each module around the barge or road envelope agreed for its route.

Which French rules apply to pressure equipment, and how does the Pressure Equipment Directive in France work?

Under the Pressure Equipment Directive, France applies the conformity rules through the Code de l’environnement, whose articles L557 and R557 took over that role when decree 2015-799 came into effect on July 19, 2016. A vessel, steam generator or piping assembly above 0.5 bar is sorted into a hazard category from its fluid group, pressure and volume, put through the conformity module that category calls for, given the CE marking, and placed on the French market with its declaration of conformity and instructions.

France then adds a second layer that the directive leaves to member states: in-service monitoring. The ministerial order of November 20, 2017, in force since January 1, 2018, sets three checkpoints. A controle de mise en service is required before first use for larger items, including gas vessels above 4 bar with a pressure-volume product above 10,000 bar-litres, steam generators above 32 bar or 2,400 litres, and quick-opening closures. Periodic inspection follows at intervals of up to four years for most vessels, with the first inside three years and two years for steam generators, while piping follows an inspection programme the operator writes. Periodic requalification, carried out under the responsibility of an approved body, comes at least every ten years, or every six for toxic or corrosive fluids.

French and EU rules a US-built system meets at a plant in France
RuleWhat it coversWhat the equipment arrives with
PED 2014/68/EU through Code de l’environnement R557Design, manufacture and conformity of equipment above 0.5 barCategory assessment, CE marking, declaration of conformity, technical file, French instructions
Order of November 20, 2017Commissioning check, periodic inspection and requalification in serviceData needed for the controle de mise en service, inspection access, documented safe operating limits
Machinery Directive 2006/42/EC, then Regulation 2023/1230 from January 20, 2027Skids and packages with pumps, agitators or other moving partsMachinery risk assessment, technical file, EU declaration and CE marking
ATEX Directive 2014/34/EUEquipment in classified zones at solvent and chemical sitesZone-rated instruments and motors with their ATEX marking and certificates of conformity
NF C 15-100 and NF EN 60204-1Low-voltage installation rules and machine electrical equipmentPanel and wiring design to the French and harmonised EN standards, test records
EU GMP Guide and Annex 1Medicine and vaccine manufacture inspected by the ANSMQualified design, traceable product-contact materials, validated cleaning and sterilisation, data integrity
Loi 94-665Language of the instructions for use of goods sold in FranceOperating and maintenance manuals in French

For a vessel designed to ASME Section VIII, the PED route keeps the ASME calculations and adds what the directive asks for: European material certification, qualified weld procedures and welders, a hazard analysis against the essential safety requirements, the conformity assessment for the category, and the CE marking. Where the operator specifies the French CODAP code or EN 13445, Paul Industries designs to that code instead. The technical file is organised so the approved body that later requalifies the vessel finds the original design data, test pressure and material records in the first binder it opens.

What is the voltage in France for industrial equipment?

The voltage in France is 230 V single phase and 400 V three phase at 50 Hz, the European standard set out in IEC 60038, and process equipment for a French plant is designed for that supply from the first electrical drawing. The France voltage frequency of 50 Hz is the figure that changes the mechanical design of a US-built skid more than the voltage itself.

The 3 phase voltage in France, 400 V between phases with a neutral at 230 V, feeds motors, heaters and control transformers on almost every process skid. Larger sites take their supply at medium voltage through an HTA delivery substation built to NF C 13-100 and distribute it through their own transformers, so a big package sometimes connects at the plant’s own switchboard voltage. On the installation side, NF C 15-100, republished in August 2024 as a series of 21 parts, governs low-voltage wiring in buildings, and NF EN 60204-1 governs the electrical equipment of the machine itself. Paul Industries designs the control panel, cable selection, protective devices and earthing to those rules and to the plant’s own electrical specification, so the French site’s electrical inspector reviews a familiar design.

Voltage in France vs USA: what changes on a skid

The voltage in France vs USA gap matters less than the frequency. A four-pole motor that turns at about 1,800 rpm on 60 Hz turns at about 1,500 rpm on 50 Hz, and by the pump affinity laws a centrifugal pump at that speed delivers roughly 83 percent of its flow and about 69 percent of its head. Paul Industries therefore selects pumps, fans, compressors and motors for the 50 Hz curve, or adds variable frequency drives where the duty calls for them, and runs the factory acceptance test on a 50 Hz supply where the test plan requires proof of performance at French conditions. Instruments, solenoids and control power supplies are chosen with 230 V, 50 Hz ratings. Since electrical voltage in France is the same as in neighbouring EU states, a design approved for one French site transfers cleanly to a sister plant in Belgium or Germany.

How does the ANSM inspect GMP process systems?

The ANSM, France’s national agency for medicines and health products safety, inspects pharmaceutical manufacturing against the EU GMP Guide, and France has belonged to the PIC Scheme since February 1997, after joining the original convention in December 1992. For sterile medicines, the revised Annex 1, in force since August 25, 2023, asks each site to run a documented contamination control strategy, and that strategy reaches back into how WFI loops, clean steam systems and process vessels are designed.

An ANSM inspector reviewing a new process system looks for evidence that it was designed and built to a controlled specification: traceable product-contact materials, surface finish records, weld logs with borescope evidence, slope and drainability checks, validated cleaning and sterilisation cycles, and controls with audit trails. Paul Industries builds that evidence as it builds the equipment, then executes the installation and operational qualification at the French site and supplies the data the plant uses for performance qualification. For pharmaceutical plants that also export to the United States, the same file is organised to answer an FDA pre-approval inspection, so one system serves both regulators.

Documents in French, units in metric

French law makes the French language compulsory in the instructions for use of goods supplied in France under article 2 of law 94-665, and a French-language manual in digital form satisfies it. Paul Industries supplies operating and maintenance manuals, safety information, nameplate text and alarm messages on the HMI in French, with English kept alongside for the engineering record. Drawings are metric with DN pipe sizes, and P&IDs follow the symbols and tag structure in the plant’s own standard, so French maintenance teams work from documents that look like the rest of their site.

Shipping to France from USA: Le Havre, Marseille-Fos and the river legs

Shipping to France from USA ports for process equipment runs through Le Havre for plants in the north, Paris and the Centre-Val de Loire, and through Marseille-Fos for plants in the Rhône valley and the south. Direct transatlantic container sailings between New York and Le Havre take roughly 8 to 14 days port to port, while Mediterranean routings to Fos generally take longer and vary with the service.

The inland leg decides the design envelope. A crated skid for Vitry-sur-Seine or Chartres moves from Le Havre by truck or by Seine barge; equipment for the Lyon chemical valley can come up the Rhône by barge from Fos, which suits heavy vessels and tall modules that would need escorts on the road. Paul Industries fixes skid widths and heights during design so that a container load ships through the 2.34 metre door of a high cube box, and larger systems split into flanged modules for flat racks. Crates are built from ISPM 15 heat-treated wood, and polished stainless internals are dried, capped and kept under nitrogen or desiccant for the crossing and any wait at the terminal.

Customs and import VAT for equipment entering France

US-origin industrial goods enter France at zero customs duty under Regulation (EU) 2026/1455, which applies from July 1, 2026 to December 31, 2029. French import VAT, at the standard rate of 20 percent, has been self-assessed on the importer’s VAT return rather than paid at the border since January 1, 2022, for every business identified for VAT in France; a non-EU importer of record needs a French VAT number and a fiscal representative. Many French plants choose to act as importer of record for that reason, and Paul Industries quotes the Incoterm that fits the plant’s choice.

Who handles each leg of a delivery to a French plant, by Incoterm
Incoterm 2020Ocean freight and riskFrench import clearance and VATWhen French plants pick it
FCA US portPlant’s forwarder from the US portPlant, self-assessing VATGroups with a contracted freight forwarder and a Le Havre customs agent
CIF Le Havre or FosPaul Industries to the port, risk passes at loadingPlantBuyers who want sea freight in the price and handle the inland leg
DAP plantPaul Industries to the sitePlant, as importer of recordFirst orders where one firm carries the equipment to the door
DDP plantPaul Industries to the sitePaul Industries, through a French VAT number and fiscal representativeBuyers who want a single landed price including clearance

How does a French project run with Paul Industries?

A French project with Paul Industries runs in nine stages under one contract, and the first two settle the French specifics: PED category and in-service checkpoints, ATEX zones, the electrical standard, the language of every document and the delivery route. The table lists each stage and what the plant receives at its close.

Project stages for a process system delivered to France
StageFrench points settledWhat the plant receives
1. Basis of designPED category, design code (ASME, EN 13445 or CODAP), controle de mise en service need, ATEX zonesCode basis note and document list in French and English
2. EngineeringMetric drawings, 400 V 50 Hz electrical design, Ph. Eur. water quality, French tag and HMI textP&IDs, layouts, calculations, functional specification
3. FabricationPED-route materials with mill certificates, qualified welding, sanitary finishesMaterial certificates, weld maps, NDT and surface finish records
4. Factory acceptance testWitnessed by the French team in person or by video, 50 Hz proof where requiredFAT report signed by both sides, punch items closed
5. Crating and sea freightHeat-treated ISPM 15 crates, booking to Le Havre or Fos, barge or road legCommercial invoice, packing list, bill of lading, certificate of origin
6. Installation or supervisionPlant permit-to-work and French method statementsInstallation and tie-in records
7. Commissioning check and start-upControle de mise en service where required, energisation, flushing, first runsCommissioning check file, start-up report
8. Site qualificationSite acceptance test, IQ and OQ under EU GMP and Annex 1, PQ input dataSigned IQ and OQ protocols with any deviations closed
9. Turnover and aftercareFrench-language operator training, spares, inspection schedule under the 2017 orderAs-builts, manuals, inspection and requalification file

Plants that want complete accountability use Paul for design through qualification; plants with a strong engineering department often start with Paul’s process engineering and design plus fabrication and choose installation supervision for the site phase. Either way, the controls arrive programmed, with PLC programming on the plant’s chosen platform, and the validation and commissioning package goes with the equipment.

Who builds process systems for plants in France?

Paul Industries builds process systems for plants in France, from a single pressure vessel or dosing skid to a complete WFI, clean steam, CIP and process piping package, and carries each one from the design review through the Le Havre or Fos delivery, start-up, commissioning and qualification at the French site. One firm answers for the design, the welds, the tests and the settings, which keeps every question about the equipment with the people who built it. Paul applies the same model in the neighbouring markets described on the Belgium and Switzerland pages, where French-language documentation is equally part of the delivery.

What drives the cost of a process system delivered to France?

The delivered cost of a process system for a French plant depends on six items beyond the equipment itself: freight and the inland leg, crating and preservation, PED and in-service documentation, the electrical and ATEX scope, French-language documentation, and the installation route. Each one appears as its own line in a Paul Industries offer, so the plant sees where its money goes.

  • Freight and inland leg. A skid that fits a high cube container costs far less to move than a flat rack load, and a barge leg up the Seine or the Rhône changes the handling plan at both ends.
  • Crating and preservation. Heat-treated crates, desiccant and nitrogen blanketing protect polished internals across the Atlantic.
  • Conformity work. Higher PED categories need more assessment effort, and items that need a controle de mise en service carry extra documentation.
  • Electrical and ATEX scope. Zone-rated motors and instruments, and panels designed to NF EN 60204-1, change component cost.
  • Language. French manuals, labels and HMI text are prepared for every system.
  • Installation route. An installation supervision scope uses fewer Paul field hours than complete installation, while start-up and qualification stay with the builder in both cases.

Customs duty drops out for US-origin industrial goods under the 2026 EU regulation, and import VAT is self-assessed by the French plant. Prices are quoted in US dollars, first as a budget figure from comparable scope and then as a firm price once the design basis, site and Incoterm are settled.

Paul Industries for French pharmaceutical, biotech and chemical plants

Paul Industries, headquartered in Kilmarnock, Virginia, and formerly based in northern New Jersey, then Pennsylvania, delivers complete process systems to plants across France, from Ile-de-France and Normandy to Chartres, Lyon and Provence. It designs and engineers each system, builds its skids, vessels, tanks and pipe spools in the United States, tests them in a witnessed factory acceptance test, ships them to Le Havre or Marseille-Fos, and installs, starts up, commissions and qualifies them at the plant, or supervises the installation, depending on the project. The equipment arrives built and documented to the PED as applied by the Code de l’environnement, the 2017 in-service order, NF C 15-100 and EU GMP, and the turnover file holds French manuals, weld records, as-built drawings and validation documents. Send your user requirements, site and preferred Incoterm to request a quote.

Standards referenced: EU Pressure Equipment Directive 2014/68/EU · Code de l'environnement, articles L557 and R557 (decret 2015-799) · Arrete du 20 novembre 2017 on in-service monitoring of pressure equipment · EU Machinery Directive 2006/42/EC · EU Machinery Regulation 2023/1230 · EU Low Voltage Directive 2014/35/EU · ATEX Directive 2014/34/EU · NF C 15-100 (2024 series) · NF C 13-100 · NF EN 60204-1 · EU GMP Guide (EudraLex Volume 4) and Annex 1 · PIC/S GMP Guide · European Pharmacopoeia · Loi 94-665 on the use of the French language · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Regulation (EU) 2026/1455 · Incoterms 2020 · ISPM 15

Frequently asked questions

How many pharmaceutical companies are in France, and which ones build the most?

France counted 271 medicines production sites in 2022 according to the industry association Leem, about 35 of them for bioproduction, and the biggest current builds include Sanofi’s antibody expansion at Vitry-sur-Seine, its vaccine sites near Lyon and Novo Nordisk’s aseptic expansion at Chartres. Pharmaceutical manufacturing companies in France buy WFI, clean steam, CIP and formulation equipment for projects of this kind, and Paul Industries builds those systems in the United States to the PED and EU GMP and commissions them at the French site.

Can a vessel designed to ASME Section VIII go into service at a French plant?

An ASME Section VIII vessel goes into service in France once it has passed the PED conformity assessment for its category, carries the CE marking and comes with French instructions. Paul Industries keeps the ASME design calculations, adds European material certification, qualified weld procedures and the hazard analysis the directive requires, and supplies the data the plant needs for the commissioning check and later requalification.

What does the controle de mise en service involve for a new skid?

The controle de mise en service is a check before first use, required by the order of November 20, 2017 for larger items such as gas vessels above 4 bar with a pressure-volume product over 10,000 bar-litres and steam generators above 32 bar. It confirms the installation matches the conformity file and that safety accessories are in place. Paul Industries prepares the file and attends the check during start-up.

How often are pressure vessels requalified in France?

Most French pressure vessels and piping are requalified at least every ten years, and every six years when the fluid is toxic or corrosive, under the responsibility of an approved body. Periodic inspections fall in between, at intervals of up to four years, or two years for steam generators. Paul Industries designs inspection openings and supplies records so those visits run on schedule.

Who builds WFI systems for vaccine plants near Lyon?

Paul Industries designs and builds complete WFI systems, from the generator through storage and the distribution loop, for vaccine and biologics plants in the Lyon area, including the Marcy-l’Étoile and Neuville-sur-Saône corridor, designed to the European Pharmacopoeia and EU GMP Annex 1. Each system is fabricated and tested in the United States, shipped through Marseille-Fos or Le Havre, then installed, started up and qualified at the site with French documentation.

Voltage in France vs USA: will a skid built in America run on French power?

A skid built in America runs on French power when it is designed for 400 V three phase at 50 Hz from the start, which is how Paul Industries builds equipment for France. Motors, pumps and fans are selected on their 50 Hz curves, control transformers and instruments carry 230 V ratings, and the factory acceptance test runs on a 50 Hz supply where the test plan asks for performance proof.

Which France industrial voltage do large chemical sites use?

Large French chemical sites take medium-voltage supply through an HTA delivery substation built to NF C 13-100 and step it down to 400 V three phase for most process equipment, with some large drives fed at higher voltage. Paul Industries matches each package to the plant’s switchboard voltage, short-circuit rating and earthing system, and documents the panel to NF EN 60204-1.

What is NF C 15-100, and does it apply to equipment from the United States?

NF C 15-100 is the French standard for low-voltage electrical installations, republished in August 2024 as a series of 21 parts, and it applies to the wiring that connects a new skid at a French site, wherever the skid was built. Paul Industries designs field wiring, protection and earthing to it, and the skid’s own panel to NF EN 60204-1.

Are manuals for French plants supplied in French?

Manuals for French plants are supplied in French, because article 2 of law 94-665 makes French compulsory in the instructions for use of goods sold in France. Paul Industries delivers operating and maintenance manuals, safety information, labels and HMI alarm text in French, with English versions kept for engineering reference, and the digital copies go into the plant’s document management system.

What sailing time separates New York and Le Havre for process equipment?

A crated skid crosses from New York to Le Havre in roughly 8 to 14 days on a direct sailing, with longer times on services that call at other ports first. Port handling, customs clearance and the road or Seine barge leg to the plant add days at the French end. Paul Industries books the sailing once the crates are measured and schedules the factory acceptance test around that departure.

What drives the shipping to France from USA cost for process equipment?

The shipping to France from USA cost for process equipment depends on whether the skid fits a high cube container or needs a flat rack, the port of discharge, the inland leg by road or barge, and the Incoterm. Preservation for polished stainless adds a smaller line. Paul Industries quotes freight as its own line in US dollars once crate sizes are fixed.

How is import VAT handled when a French plant imports equipment from America?

A French plant identified for VAT self-assesses import VAT, at the standard 20 percent rate, on its VAT return rather than paying it at the border, a system compulsory since January 1, 2022. Customs duty on US-origin industrial goods is zero under Regulation (EU) 2026/1455. Under DAP the plant acts as importer of record; under DDP Paul Industries handles clearance through a French VAT number and fiscal representative.

Who sets and commissions process equipment at sites around Paris and in Normandy?

Paul Industries installs, starts up and commissions equipment at plants around Paris and in Normandy, or supervises the installation, depending on the project. The work follows the site’s permit-to-work, French method statements and the plant’s safety rules, and closes with site acceptance testing, installation and operational qualification and handover of the French turnover file.

What does a biotech company in Paris-Saclay buy when it moves to commercial production?

A biotech company in Paris-Saclay moving to commercial production typically adds stainless WFI and clean steam utilities, buffer and media preparation vessels, CIP skids and a qualified process piping network around its bioreactors. Paul Industries designs those systems for the commercial scale, builds and tests them in the United States, and qualifies them at the French site to EU GMP.

Does equipment for a Fos-sur-Mer or Le Havre chemical site need ATEX ratings?

Equipment installed in a classified zone at a Fos-sur-Mer or Le Havre chemical site needs ATEX-rated motors, instruments and enclosures chosen for that zone and gas group. Paul Industries reviews the plant’s zone drawings during design, selects the rated components, and includes their ATEX conformity documents in the technical file with the PED and machinery declarations.

Can a French team witness the factory acceptance test?

A French team can witness the factory acceptance test in person in the United States or follow it live by video, with the protocol, deviations and punch list shared in real time. Paul Industries agrees the FAT protocol with the plant during design, runs pressure, function, alarm and control tests against it, and closes each punch item before the equipment is crated for shipment.

In which currency does Paul Industries quote French projects?

Paul Industries quotes French projects in US dollars, first as a budget figure based on comparable scope and then as a firm price once the design basis, site, delivery route and Incoterm are fixed. Freight, crating, conformity documentation, French-language deliverables and the installation route appear as separate lines, so the plant compares the offer against its own budget cleanly.

Planning process equipment for a plant in France?

Send your user requirements, design code, site location and preferred Incoterm, and Paul Industries will return the conformity route, the French documentation plan and a priced offer. Call 201-450-8280 or request a quote.