Paul Industries is a US process equipment contractor for Bulgaria that designs and fabricates pharmaceutical water and clean steam systems, jacketed process vessels, pressure vessels and heat exchangers, alloy and stainless piping, distillation and extraction skids, CIP systems and sanitary tanks for Bulgarian pharmaceutical, chemical, metals, refining, essential oil and food plants, each built to the Pressure Equipment Directive and specified for the Bulgarian 400 V, 50 Hz supply. After testing in the United States the equipment sails to the Port of Varna or the Port of Burgas, where Paul installs and commissions it or supervises its installation. The company’s headquarters stand at 256 Shore Drive in Kilmarnock, Virginia; earlier, Paul Industries was based in northern New Jersey and then Pennsylvania.
Request a quote or call 201-450-8280
What a US process equipment contractor for Bulgaria delivers on site
A US process equipment contractor for Bulgaria delivers a functioning process system with a complete record behind it: engineering calculations, material and weld traceability, factory test results, EU conformity documents, Bulgarian-language instructions and executed commissioning and qualification protocols. Paul Industries takes all of it under one contract, so a Bulgarian owner works with one schedule and one technical file instead of assembling them from separate orders.
Bulgarian buyers choose how far that scope reaches. A supply order with installation supervision delivers a tested vessel, exchanger or liquid process system while Paul oversees placement, connection and start-up. Design-build adds layout, utilities and controls. A turnkey order covers the full system from requirements to qualified handover. Bulgaria appears in the Central and Eastern Europe group on the international projects page, and the Greece page and Turkey page cover the neighboring markets to the south and southeast.
What is manufactured in Bulgaria, and which industries buy process equipment?
Bulgaria manufactures medicines, refined fuels, copper, soda ash and fertilizers, food and dairy products, and essential oils such as rose oil, along with machinery and metal goods, and the plants behind those products account for most process equipment purchases in the country. The main industries in Bulgaria that buy vessels, piping and skids are pharmaceuticals around Sofia and in Dupnitsa and Troyan, chemicals at Devnya and Dimitrovgrad, copper processing at Pirdop, refining at Burgas, rose oil distillation around Kazanlak, and food and dairy production across the country.
The major industries in Bulgaria named here appear as market facts, drawn from company and business press sources, so a reader can see who operates where. Manufacturing companies in Bulgaria in each of these sectors export a large share of what they make, which ties their equipment specifications to EU product law and to the customers’ own quality rules.
| Center | Plants named as market facts | Process duties | Paul Industries equipment |
|---|---|---|---|
| Sofia region | Sopharma manufacturing, Bulgarian Drug Agency | Solid dosage, liquids, purified water, HVAC chilled water | Purified water systems, process tanks, chillers, CIP skids |
| Dupnitsa and Troyan | Teva’s Balkanpharma plants | Generic dosage forms, granulation, coating, cleaning | Water and clean steam systems, vessels, solvent handling |
| Devnya and Varna | Solvay Sodi soda ash works | Brine purification, calcination, carbonation, heat recovery | Pressure vessels, heat exchangers, slurry piping, water treatment |
| Pirdop | Aurubis copper smelter and refinery | Sulfuric acid, electrolyte circulation, cooling water, effluent | Acid and electrolyte tanks, alloy piping, effluent treatment |
| Burgas and Dimitrovgrad | Burgas refinery, Neochim fertilizer plant | Refining turnarounds, ammonia and nitrogen chemistry | Exchanger bundles, separators, alloy spools, pump skids |
| Kazanlak and the Rose Valley | Rose oil distilleries | Steam distillation of petals, separation, extraction | Stainless stills, condensers, Florentine separators, extraction skids |
Pharmaceutical companies in Bulgaria and their GMP utilities
Pharmaceutical companies in Bulgaria produce generic medicines in tablet, capsule, liquid and injectable forms for home and export markets, and the Bulgarian Drug Agency in Sofia, a PIC/S member since July 2023, inspects them for GMP. Sopharma runs a network of manufacturing plants whose output covers more than 200 products, with film-coated tablets among its solid dosage forms. Teva makes medicines in Bulgaria at its Balkanpharma plants in Dupnitsa and Troyan, and the Dupnitsa site took first place for environment and sustainability at the EHS Excellence Awards 2025.
The pharmaceutical industry in Bulgaria is built on solid dosage, which shapes its equipment list: purified water generation and storage, granulation and coating suites with dust extraction, solvent handling where coatings use organic solvents, clean compressed air, and large HVAC chilled water plants. Sterile lines add WFI, clean steam and autoclave utilities under Annex 1 of EU GMP as revised with effect from 25 August 2023. Pharmaceutical manufacturers in Bulgaria buy that equipment against qualification evidence, so Paul supplies design qualification, factory and site test results, and installation and operational qualification protocols with each system, as described on its pharmaceutical industry page.
Purified water for a growing Bulgaria pharmaceutical market
Purified water is the utility every plant in the Bulgaria pharmaceutical market runs, and its design decides how much time the quality unit spends on deviations. Paul builds generation skids with pretreatment, reverse osmosis and electrodeionization, stainless storage with sanitary vent filters, and distribution loops held at velocity and sanitized with heat or ozone on a validated schedule, all to the European Pharmacopoeia and ASME BPE. Each loop arrives with orbital weld logs, slope checks, passivation records and a sampling plan, and Paul’s high-purity water systems page explains the choices in more detail.
The chemical industry in Bulgaria and its heavy process plants
The chemical industry in Bulgaria centers on soda ash and inorganic chemicals at Devnya near Varna, fertilizers at Dimitrovgrad, sulfuric acid produced alongside copper at Pirdop, and refining and petrochemicals at Burgas. Solvay Sodi at Devnya produces soda ash and was the most profitable chemical company in Bulgaria in 2024 according to the business weekly Capital; Neochim in Dimitrovgrad lifted its revenue by 63 percent in the first half of 2026; and Aurubis Bulgaria at Pirdop, which describes itself as the country’s biggest industrial taxpayer, refines cathode copper and recovers sulfuric acid from its smelter gases.
Chemical companies in Bulgaria run corrosive, abrasive and high-temperature services, so their maintenance and expansion budgets go to pressure vessels, heat exchanger bundles, acid-resistant tanks and piping, slurry lines, pump skids and effluent treatment. Paul fabricates pressure vessels and exchangers in carbon steel, stainless and higher alloys to EN 13445 or ASME Section VIII, builds piping to EN 13480 or ASME B31.3, and supplies process wastewater and effluent systems that meet discharge permits. The refinery at Burgas, with a crude capacity of about 9.5 million tonnes a year, buys the same classes of equipment around its turnarounds, and Paul plans shutdown and turnaround deliveries to land before the outage starts.
Rose oil distillation in the Kazanlak valley
Rose oil distillation in the Rose Valley around Kazanlak is a short, intense campaign: petals are picked in late spring and distilled while still fresh, so a distillery has to process its whole season’s harvest in a few weeks. Distilleries such as Lema, in Kazanlak’s southern industrial zone, steam-distill petals in batches, separate the oil from the rose water, and in many cases extract concrete and absolute with solvents, and most of the oil goes abroad to perfume and cosmetics makers. Paul builds stainless stills, condensers, Florentine separators, rose water handling and solvent extraction skids for that work, sized for campaign throughput and cleaned between batches, with the documentation cosmetics customers expect, as covered on the cosmetic industry page.
Food manufacturing companies in Bulgaria
Food manufacturing companies in Bulgaria are known for dairy products such as yogurt and white brined cheese, and also process meat, fruit and vegetables, wine and spirits. Yogurt and cheese lines need milk reception, standardization, pasteurization, fermentation tanks with tight temperature control, brining, chilling and CIP on every circuit, and wineries and distilleries need fermentation tanks, heat exchangers and stills. Paul builds sanitary tanks, plate heat exchangers, fermentation vessels and CIP skids for those plants with hygienic welds and drainable layouts.
Which Bulgarian rules apply to pressure equipment from a US fabricator?
Pressure equipment from a US fabricator enters Bulgaria under the Ordinance on the essential requirements and conformity assessment of pressure equipment, which transposes the Pressure Equipment Directive 2014/68/EU under the Technical Requirements to Products Act, and once installed it falls under the technical inspection regime for high-risk equipment. The State Agency for Metrological and Technical Surveillance, DAMTN, oversees both: its market surveillance directorate checks products placed on the market, and its Directorate General Technical Inspection supervises high-risk equipment in service.
Technical inspection of pressure vessels and pipelines in Bulgaria is carried out by control bodies that hold a DAMTN licence. They perform initial, periodic and extraordinary inspections and tests, enter the equipment in the register and issue its inspection book, while DAMTN licenses the bodies, keeps oversight of the register and has the power to strike equipment from it. The Technical Requirements to Products Act also requires instructions and directions for use in Bulgarian where a product needs them, so operating manuals and safety information for Bulgarian plants are supplied in Bulgarian.
| Point in the life of the equipment | Bulgarian or EU rule | Paul Industries documentation |
|---|---|---|
| Placed on the market | Pressure equipment ordinance transposing PED 2014/68/EU | Hazard category, conformity module, CE marking, declaration of conformity |
| Registered before use | High-risk equipment regime under the Technical Requirements to Products Act, control body holding a DAMTN licence | Design data, test pressures, material and weld records for the register entry and inspection book |
| Inspected in service | Initial, periodic and extraordinary inspections, DAMTN oversight | Inspection access, relief device data, maintenance and inspection plan |
| Machinery content | Machinery Directive until the Machinery Regulation (EU) 2023/1230 takes over on 20 January 2027 | Hazard review, safety-related controls, machinery declaration |
| Electrical and Ex zones | Low Voltage, EMC and ATEX directives | EN 60204-1 panels, Ex-rated devices for classified areas, test records |
| Medicines manufacture | EU GMP with Annex 1 and Annex 15, PIC/S guide, Bulgarian Drug Agency inspection | Qualification protocols and executed reports |
Design codes for vessels bound for Bulgaria
Vessels bound for Bulgaria are designed to EN 13445 when the owner wants a harmonized standard’s presumption of conformity, or to ASME Section VIII when a licensor package or group standard calls for it. ASME designs meet the directive once the technical file addresses each essential safety requirement, uses European material values and applies the directive’s test pressure, and higher categories bring a notified body into the assessment. Paul works to either route and records the basis in the data book the control body reviews before registration.
Bulgaria voltage and frequency for process skids
Bulgaria voltage and frequency are 230 V single phase and 400 V between phases at 50 Hz, so every motor, heater, drive and panel Paul ships to a Bulgarian plant is selected and built for that supply. Bulgaria 3 phase voltage of 400 V replaces the 480 V common in US plants, and the voltage in Bulgaria for control and convenience circuits is 230 V instead of 120 V.
Bulgaria grid voltage matters less to a skid than the frequency does. At 50 Hz a pump or fan spins about one sixth slower than at 60 Hz, which trims flow by about a sixth and head by close to a third, so Paul chooses impeller diameters, motor sizes and fan drives for the Bulgarian duty point before fabrication starts. Starters, drives and breakers are IEC-rated and CE-marked, panels follow EN 60204-1, and every label and nameplate is in Bulgarian.
Shipping to Bulgaria from USA ports: Varna and Burgas
Shipping to Bulgaria from USA ports means an Atlantic crossing into the Mediterranean, transshipment, and a Black Sea feeder into Varna or Burgas, and published carrier schedules show about 34 days from New York to Burgas with two transfers. Shipping to Bulgaria is therefore planned with float for both transfers, customs release and the road leg to the plant.
Burgas is Bulgaria’s largest port, with about 19 million tonnes of cargo in 2024, and container traffic there runs through the Burgas-West and Burgas-East 2 terminals operated under concession since 2011. The Port of Varna, run by Port of Varna EAD, has two terminals: Varna East, deep in the bay about a kilometer from the city center, and Varna West, recognized as Bulgaria’s container hub. The plant’s location decides which port acts as the major sea port in Bulgaria for a given project. For a shipping container, Bulgaria-bound skids and panels are sized to a 40-foot high cube box with about 12.0 by 2.35 by 2.69 meters of internal space; vessels and bundles beyond that ship on flat racks with a heavy-haul road leg. Crates are built from ISPM 15 treated timber.
| Port | Terminals | Ocean leg | Plants it serves |
|---|---|---|---|
| Burgas | Burgas-West and Burgas-East 2 | About 34 days from New York with two transfers | Burgas refinery, southeastern and central Bulgaria, Kazanlak and Dimitrovgrad |
| Varna | Varna West container hub, Varna East general cargo | Mediterranean transshipment and Black Sea feeder, booked per load | Devnya chemical works, northeastern Bulgaria, and onward road delivery to Sofia |
Bulgaria customs duty, import taxes and import restrictions
Bulgaria customs duty follows the EU Common Customs Tariff: each line on the invoice is classified under the Combined Nomenclature and duty is assessed on the customs value. Bulgaria import taxes on process equipment therefore come to that duty plus import VAT, both declared by the importer of record under an EORI number. Bulgaria import restrictions for plant equipment take the form of EU product requirements, so CE marking, the declaration of conformity and Bulgarian instructions accompany the delivery. Paul’s commercial invoice and packing list give each item its code, origin, weight and value.
Bulgaria VAT rate 2026 after the switch to the euro
The Bulgaria VAT rate for 2026 is a Bulgaria standard VAT rate of 20 percent on imported equipment, assessed on the customs value plus duty and reclaimed by VAT-registered plants; the Bulgaria reduced VAT rate of 9 percent covers hotel accommodation, books and some baby products. Bulgaria euro adoption on 1 January 2026 made Bulgaria the 21st member of the euro area at a fixed rate of 1.95583 leva to the euro, and the lev stopped being legal tender after 31 January 2026, so Bulgarian VAT and duty are now declared in euros. With Bulgaria euro adoption 2026 complete, Paul quotes in US dollars and the importer converts at the euro rate on the declaration date.
How Paul Industries delivers a project to a Bulgarian plant
Paul Industries delivers a project to a Bulgarian plant in nine steps, and the first two decide the PED categories, the high-risk equipment registration route, the 50 Hz equipment list, the GMP qualification plan and the Bulgarian documents.
| Step | Paul Industries work | What the Bulgarian plant holds afterward |
|---|---|---|
| 1. Scope | User requirements, PED categories, registration route, 400 V supply data, GMP impact | Approved basis of design |
| 2. Design | Process, vessel, piping and control design to EN or ASME, ASME BPE, EN 60204-1 | Drawings, calculations, design qualification |
| 3. Fabrication | Welding, nondestructive examination, passivation, panel assembly in the United States | Material certificates, weld maps, NDE reports |
| 4. Factory testing | Hydrostatic, functional and interlock tests | Signed FAT record and corrective actions |
| 5. Conformity | Technical file, CE marking, declaration, Bulgarian instructions | Conformity documents for import and registration |
| 6. Freight | ISPM 15 crating, booking to Varna or Burgas, customs data | Shipping documents and a complete customs data set |
| 7. Installation | Paul places, connects and wires the equipment, or supervises the work | Installation records |
| 8. Registration and qualification | Data for the control body’s initial inspection, commissioning, IQ and OQ | Inspection book data, executed protocols |
| 9. Handover | Training, spare parts, periodic inspection plan | Bulgarian and English manuals, as-built drawings |
After handover Paul maintains the systems it delivered with planned maintenance, water and steam system requalification, derouging, spare parts and repairs, timed to the periodic inspections recorded in each inspection book.
Who builds process systems for plants in Bulgaria?
Paul Industries builds process systems for plants in Bulgaria: purified water, WFI, clean steam and process vessels for pharmaceutical plants in Sofia, Dupnitsa and Troyan, pressure vessels, exchangers, acid and slurry piping and effluent systems for chemical and copper plants at Devnya, Dimitrovgrad and Pirdop, exchanger bundles and spools for the Burgas refinery, stills and extraction skids for rose oil distilleries around Kazanlak, and sanitary tanks, fermentation vessels and CIP for dairy, wine and food plants. Paul engineers each one for 400 V at 50 Hz, documents it to the Bulgarian pressure equipment ordinance and EU GMP in Bulgarian and English, and installs and commissions it or supervises its installation, with one contract covering the whole scope.
How much does it cost to ship to Bulgaria, and what drives the full project price?
How much does it cost to ship to Bulgaria depends on cube, weight, the two transfers and the port, and freight is one of six price lines that Paul shows separately, in US dollars, for a Bulgarian project.
- Sea and road freight. Ocean space, Mediterranean transshipment, the Black Sea feeder, port handling at Varna or Burgas and delivery to site.
- Electrical design for 50 Hz. Reselected pumps and fans, 400 V motors and drives, IEC switchgear, EN 60204-1 panels.
- Materials of construction. Higher alloys and linings for acid, brine and slurry services; ASME BPE finishes for pharmaceutical systems.
- Conformity and registration. PED category work, notified body fees where required, Bulgarian translations and data for the control body.
- Duty and VAT. Common Customs Tariff duty and 20 percent import VAT, declared in euros under the agreed Incoterm.
- Site scope. Paul’s complete installation and commissioning, or Paul’s supervision of placement and connection.
Incoterms 2020 assign those lines: under FCA the buyer takes over at a US East Coast port and pays the voyage and import, CIF Burgas or CIF Varna adds sea freight and insurance to the Bulgarian port, and DAP at the plant keeps the freight risk with Paul up to delivery while duty and import VAT are paid by the importer in euros.
Paul Industries for Bulgarian pharmaceutical, chemical and food plants
For Bulgarian plants, Paul Industries engineers, builds and tests water and steam systems, vessels, exchangers, piping, distillation and CIP packages, ships them to Varna or Burgas, then installs and commissions them or supervises their installation; registration, conformity and qualification files come in Bulgarian and English. Share the process requirements, the plant location and supply, and the start-up target, and Paul replies with a shipping plan, a build schedule and pricing in US dollars for Bulgaria. Request a quote for a Bulgarian plant.
Standards referenced: Pressure Equipment Directive 2014/68/EU · Bulgarian Ordinance on the essential requirements and conformity assessment of pressure equipment · Technical Requirements to Products Act (Bulgaria) · Machinery Directive 2006/42/EC and Machinery Regulation (EU) 2023/1230 · Low Voltage Directive 2014/35/EU · EMC Directive 2014/30/EU · ATEX Directive 2014/34/EU · EN 13445 · EN 13480 · EN 60204-1 · EU GMP, Annex 1 and Annex 15 · PIC/S GMP Guide · European Pharmacopoeia · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · ASME BPE · Incoterms 2020 · ISPM 15
Frequently asked questions
How much is VAT in Bulgaria on imported process equipment?
Bulgaria charges its standard 20 percent VAT on imported process equipment, calculated on the customs value plus duty and declared in euros since the country joined the euro area on 1 January 2026. VAT-registered plants reclaim it through their returns. Paul Industries quotes in US dollars and lists equipment, freight and services separately so each line is taxed correctly.
Is Bulgaria voltage and frequency different from a US plant's supply?
Bulgarian plants run on 400 V three phase and 230 V single phase at 50 Hz. Paul Industries builds skids and panels for that supply with IEC-rated starters and drives and EN 60204-1 panels, and reselects pumps and fans for 50 Hz, because a 60 Hz pump on the Bulgarian supply loses about a sixth of its speed and close to a third of its head.
What did Bulgaria euro adoption change for equipment imports?
Bulgaria euro adoption on 1 January 2026 replaced the lev at 1.95583 leva per euro, and the lev stopped being legal tender after 31 January 2026, so customs duty and import VAT are now declared and paid in euros. Paul Industries continues to quote and invoice in US dollars, and the importer converts at the euro rate on the declaration date.
Who builds purified water systems for pharmaceutical plants in Sofia?
Paul Industries designs, fabricates and qualifies purified water, WFI and clean steam systems for pharmaceutical plants in Sofia and across Bulgaria, built to the European Pharmacopoeia and ASME BPE and documented for EU GMP and Bulgarian Drug Agency inspection. Each system is wired for 400 V at 50 Hz, and Paul installs and commissions it or supervises the installation.
Which equipment do generic drug plants in Dupnitsa and Troyan use?
Generic drug plants in Dupnitsa and Troyan use purified water systems, granulation and coating suites with dust extraction, solvent handling for film coatings, clean compressed air, HVAC chilled water and cleaning systems for shared equipment. Paul Industries builds water systems, process tanks, solvent skids and chilled water packages for that duty, with qualification protocols in the plant’s own format.
Who fabricates pressure vessels and exchangers for chemical plants at Devnya?
Paul Industries fabricates pressure vessels, heat exchanger bundles, brine and slurry piping, acid-resistant tanks and pump skids for chemical plants at Devnya, designed to EN 13445 or ASME Section VIII with piping to EN 13480 or ASME B31.3. Each item carries PED conformity documents and material and weld records, and ships through Varna for the plant’s planned outage.
Which systems does the copper smelter at Pirdop buy for acid and electrolyte service?
A copper smelter and refinery such as the Aurubis site at Pirdop buys acid-resistant tanks and piping for sulfuric acid, electrolyte circulation tanks and heat exchangers, cooling water systems and effluent treatment. Paul Industries fabricates those items in alloys and lined steel suited to each service, and designs effluent systems around the plant’s discharge permit.
What equipment does a rose oil distillery near Kazanlak need?
A rose oil distillery near Kazanlak needs stainless steam stills sized for the harvest campaign, condensers, Florentine separators for oil and rose water, rose water storage and, where it makes concrete and absolute, solvent extraction and recovery skids. Paul Industries builds that equipment in sanitary stainless, wired for 400 V at 50 Hz, with cleaning between batches designed in.
How is a pressure vessel registered and inspected in Bulgaria?
A pressure vessel in Bulgaria is registered and inspected through a control body holding a DAMTN licence, which performs the initial inspection, enters the vessel in the register, issues its inspection book and carries out periodic and extraordinary inspections. Paul Industries provides the design data, test pressures and material and weld records the control body uses for registration.
Is an ASME Section VIII vessel accepted at a Bulgarian refinery or chemical plant?
An ASME Section VIII vessel is accepted at a Bulgarian refinery or chemical plant when it is placed on the EU market under the Bulgarian pressure equipment ordinance, with a technical file that meets each essential safety requirement of the directive and a notified body for higher categories. Paul Industries prepares that file or designs to EN 13445 instead.
Which language do operating manuals for Bulgarian plants use?
Operating manuals and safety information for Bulgarian plants are written in Bulgarian, because the Technical Requirements to Products Act requires instructions and directions for use in Bulgarian where a product needs them. Paul Industries supplies Bulgarian manuals, labels and nameplates together with English drawings, calculations and test records for the engineering file.
How long is the sea voyage from New York to a Bulgarian port?
Published carrier schedules show about 34 days from New York to Burgas with two transfers, through Mediterranean and Black Sea services, followed by customs release and road delivery. Paul Industries books freight once factory acceptance is signed, builds float into the schedule for each transfer and shares the vessel and arrival details with the plant.
Should equipment for northeastern Bulgaria land at the Port of Varna or Burgas?
Equipment for plants in northeastern Bulgaria, including the Devnya chemical works, usually lands at the Port of Varna, where Varna West is the container hub, while southeastern and central plants are closer to the Port of Burgas. Paul Industries picks the port by plant location, module size and road route, and designs transport frames and lifting points to suit.
What does a Bulgarian importer file to clear a US-built skid?
A Bulgarian importer lodges the declaration with its EORI number, attaching the invoice, packing list and bill of lading with a Combined Nomenclature code on each line, while the CE declaration of conformity and Bulgarian instructions stay with the goods for product checks. Paul Industries supplies those documents with code, origin, weight and value already filled in per component.
What does a Bulgarian yogurt or cheese plant buy for fermentation and CIP?
Paul Industries supplies Bulgarian dairy plants with milk reception and pasteurization piping, yogurt fermentation tanks with tight temperature control, brining and chilling systems and CIP skids, and supplies wineries and distilleries with fermentation tanks, heat exchangers and stills. Every package uses hygienic welds, drains completely and carries Bulgarian documentation for food safety files.
How do Bulgarian engineers review equipment at the factory acceptance test?
Bulgarian engineers review equipment at Paul Industries’ factory acceptance test in the United States, in person or by video link, checking the build against approved drawings, witnessing hydrostatic, functional and interlock tests, and reviewing weld, material and calibration records. Corrective actions are closed and signed before crating, and the FAT record joins the qualification file.
What should a Bulgarian plant send to receive a firm proposal?
Pricing a Bulgarian project starts from the process description and user requirements, design conditions and materials, the plant address and electrical supply, the GMP or food safety scope, the manual languages, the Incoterm and the start-up date. Paul Industries replies with a proposal in US dollars that separates equipment, conformity, freight, duty assumptions and site work.
Planning a process system for a plant in Bulgaria?
Send Paul Industries a process outline, the plant’s address and electrical supply, and the target start-up, and the reply covers the port, the fabrication schedule and US dollar pricing for Bulgaria. Call 201-450-8280 or request a quote.