Paul Industries is a US process equipment contractor for Greece that designs, fabricates and commissions pressure vessels, purified water and WFI systems, clean steam, CIP and SIP skids, sanitary tanks and process piping for pharmaceutical plants in Attica and the Peloponnese, dairies and food plants, and refineries and chemical sites, delivered to the EU Pressure Equipment Directive and wired for 230/400 V at 50 Hz. Each system arrives through the port of Piraeus or Thessaloniki with its CE documentation and Greek-language instructions, and Paul installs, starts up and commissions it or supervises the installation. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and was formerly based in northern New Jersey and then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pressure equipment PED 2014/68/EU, Greek MD 74124/2016
Power 230/400 V, 50 Hz; 20 kV medium voltage
Medicines regulator EOF, PIC/S member since 2002
Main ports Piraeus and Thessaloniki
VAT 24 percent standard rate
Reviewed November 2026

The work a US process equipment contractor for Greece carries out

A US process equipment contractor for Greece carries a plant system from process design through fabrication in the United States, factory acceptance testing, export and site commissioning, and hands the Greek owner one file that satisfies both EU market rules and the plant’s own quality system. Paul Industries builds purified water and WFI systems, clean steam generators, CIP and SIP skids, pressure vessels, process tanks and sanitary process piping, and qualifies them under its validation and commissioning service.

Greek owners choose from three routes. Supply with installation supervision suits a plant building its own new hall under a Greek construction contract, with Paul directing setting, connection and testing. Design-build adds the room layout, utilities and controls around the equipment. Turnkey delivery puts the whole system, from user requirements to executed qualification protocols, under Paul. Greece is one of the European markets on Paul’s international projects page, which names every country where the company takes work.

Pharmaceutical companies in Greece and the plants they are building

Pharmaceutical companies in Greece run one of the country’s most export-minded industries: pharmaceutical exports reached about 2.8 billion euros in 2024, some 5.7 percent of all Greek goods exports, with Germany, Austria and Cyprus as the main markets, according to IOBE figures published by Enterprise Greece. The Panhellenic Union of Pharmaceutical Industries has described an investment plan of about 1.5 billion euros through 2026 covering 10 new factories, 56 production lines and 14 research facilities.

The pharmaceutical industry in Greece is centered in Attica, where DEMO runs its main plant at Kryoneri north of Athens and ELPEN has invested about 80 million euros in its Athens LifeTech Park, and it is spreading to the Peloponnese, where DEMO, Win Medica of the ELPEN group and FARAN have projects in Tripoli worth more than 400 million euros. These names are market facts that show what Greek plants are buying; they describe no Paul project. Pharmaceutical manufacturing companies in Greece making generics, sterile injectables and biologics need purified water and WFI, clean steam, formulation and buffer vessels, CIP and SIP, and cleanroom utilities, all qualified to EU GMP.

Greek regions, their plants and the systems Paul Industries supplies
RegionPlants (market facts)Receiving portSystems Paul Industries supplies
Attica (Athens, Kryoneri, Thriasio)Pharmaceutical plants and research parks, refineries at Aspropyrgos and ElefsinaPiraeusWFI and purified water, clean steam, vessels, exchangers
Peloponnese (Tripoli, Corinth)New pharmaceutical complexes in Tripoli, the Corinth refineryPiraeusFormulation skids, CIP and SIP, pressure vessels, piping modules
Central Macedonia (Thessaloniki)Food and dairy plants, the Thessaloniki refineryThessalonikiSanitary tanks, pasteurizer support, CIP, process cooling
Thessaly and EpirusDairy and feta production, food processingThessaloniki or PiraeusMilk reception, brine systems, glycol chillers, wastewater treatment

Greek pharmaceutical industry utilities under EOF and EU GMP

The Greek pharmaceutical industry is supervised by EOF, the National Organization for Medicines, set up in 1983 under the Ministry of Health, which inspects plants against EU GMP and issues GMP certificates, and which has been a PIC/S participating authority since January 2002. Water and steam systems for those plants follow the European Pharmacopoeia monographs for purified water and water for injections, and sterile plants work to the revised Annex 1, in force since August 2023, with its contamination control strategy. Paul designs WFI loops, distillation or membrane-based WFI generation, clean steam and their sampling and sanitization regimes to Annex 1 and ASME BPE, with documents structured for an EOF inspection.

Sterile injectables, biologics and clean utilities

Sterile injectables and biologics plants in Greece, including the biotechnology production DEMO has announced, put the heaviest demands on utilities: hot WFI loops held above 65 degrees Celsius or ozonated cold loops, clean steam meeting the European Pharmacopoeia quality for sterilizers and SIP, and process vessels with sanitary finishes, zero-dead-leg valves and validated cleaning. Paul builds those systems with orbital welds documented by weld log and borescope records, electropolished surfaces where the user requirements call for them, and passivation records, and its sterile injectables page shows how the utilities connect to fill and finish lines.

Manufacturing companies in Greece outside pharmaceuticals

Manufacturing companies in Greece outside pharmaceuticals buy process equipment in three main areas: food and dairy, refining and fuels, and chemicals. The Greek manufacturing sector has its heaviest industry around Thriasio near Athens, Corinth and Thessaloniki, and its food industry across Thessaly, Macedonia, Epirus and the Peloponnese.

Feta, dairy and food plants

Feta has been an EU protected designation of origin since Commission Regulation 1829/2002, made from sheep’s milk or a blend with at most 30 percent goat’s milk, and Greek dairies that make it, together with yogurt and fluid milk plants, run milk reception, pasteurization, cheese vat feed, brine and CIP systems where drainability and cleaning records decide product safety. Paul Industries builds sanitary tanks, CIP skids, plate heat exchanger and holding tube packages and glycol chillers for dairies and food plants, covered on its dairy processing page.

Beyond dairy, Greek food and beverage plants such as juice and soft drink bottlers, wineries, breweries and olive processors buy stainless storage and blending tanks, heat exchangers for pasteurizing and chilling, CIP, process water treatment and wastewater pretreatment. Paul builds that equipment with hygienic welds and drainable layouts, wired for the Greek supply and documented in Greek, and its food and beverage page explains the utilities those plants share.

Refineries in Greece and chemical producers

Refineries in Greece number four: Hellenic Energy runs refineries at Aspropyrgos, Elefsina and Thessaloniki, and Motor Oil Hellas runs the refinery at Corinth. For anyone asking how many refineries in Greece buy pressure equipment, all four do, along with tank farms, terminals and petrochemical units around them. Oil refineries in Greece buy pressure vessels, heat exchanger bundles, pump skids and alloy piping for turnarounds and upgrades, and chemical manufacturing companies in Greece buy reactors, receivers, dosing skids and solvent handling. Paul builds that equipment to the PED, EN 13445 or ASME Section VIII as the owner’s specification requires, as described on its oil and gas page.

Which EU and Greek rules apply to a US-built vessel or skid?

A US-built vessel or skid placed in service in Greece meets two layers of rules: EU product legislation for placing it on the market, and Greek rules for putting it into service and inspecting it. The Pressure Equipment Directive 2014/68/EU covers stationary equipment with a maximum allowable pressure above 0.5 bar and has fully replaced the earlier 97/23/EC since 20 July 2016; Greece aligned its law with it through Ministerial Decision 74124/ΔΤΒΝ 1431/2016, published in Government Gazette 2278/B/2016, and Greek legislation adds initial and periodic inspection of pressure equipment once it is installed.

A process skid usually falls under several directives at once. The PED governs its vessels, piping and safety accessories by hazard category; the Machinery Directive 2006/42/EC governs assemblies with moving parts until the Machinery Regulation 2023/1230 takes over on 20 January 2027; the Low Voltage and EMC directives govern the electrical equipment. Paul assesses each item’s category and conformity module, prepares the technical file and the declaration of conformity, applies CE marking where the module calls for it, and supplies instructions and safety information in Greek, so the owner meets Greek inspection requirements with complete records.

Rules a US-built skid meets for a Greek plant, and the records Paul Industries delivers
RequirementLegal basisWhat Paul Industries delivers
Pressure equipment on the marketPED 2014/68/EU, Greek Ministerial Decision 74124/2016Category assessment, conformity module records, CE marking, declaration of conformity
Machinery and assembliesDirective 2006/42/EC, then Regulation 2023/1230 from 20 January 2027Risk assessment, technical file, instructions
Electrical equipmentLow Voltage Directive 2014/35/EU, EMC Directive 2014/30/EU, ELOT HD 60364EN 60204-1 panel design, test records, Greek labels
Putting into service and periodic inspectionGreek pressure equipment inspection rulesInstallation drawings, relief valve data, inspection access, maintenance plan
GMP equipmentEU GMP, Annex 1, Annex 15, PIC/SDesign, installation and operational qualification protocols and reports

Seismic design for skids, tanks and supports in Greece

Seismic design in Greece follows Eurocode 8 with its Greek National Annex, which still uses the national seismic hazard zone map issued in 2003, and a revised annex with five hazard zones is being prepared for the new edition of Eurocode 8. Tall tanks, vessel skirts, skid frames, pipe supports and rooftop equipment need anchorage and bracing designed for the zone and ground class of the site. Paul designs those elements to the seismic actions the owner’s structural engineer specifies, supplies anchor loads for the foundation design, and adds flexible connections where piping crosses between separately supported items.

How is a purified water or WFI system qualified for a Greek plant?

A purified water or WFI system for a Greek plant is qualified in stages that EU GMP Annex 15 and the plant’s validation master plan define: design qualification against the user requirements, factory acceptance testing, installation and operational qualification on site, and a performance qualification of sampling phases that shows the system delivers water to the European Pharmacopoeia monograph every day. Paul Industries writes the protocols in the plant’s format, executes the factory and site tests, and hands over traceable records for every component, weld and instrument.

Performance qualification for a water system usually runs in three phases over about a year, with intensive daily sampling at first and routine sampling once the system proves stable, so the start of qualification sets the date the plant can release product made with that water. Paul plans fabrication and shipping backward from that date, flushes, passivates and sanitizes the system before sampling starts, and stays with the plant’s quality unit through the first phase so deviations are closed quickly.

Greece voltage and frequency for process equipment

Greece voltage and frequency follow European practice: HEDNO, the distribution network operator, supplies low voltage at 230/400 V, single or three-phase, within plus or minus 10 percent, at 50 Hz, and larger plants take medium voltage at 20 kV, with medium voltage customers ranging from about 250 kVA to 10 MVA. Athens Greece voltage is the same as in the rest of the mainland network. Because the frequency differs from the US 60 Hz grid, a centrifugal pump on 50 Hz turns about 17 percent slower, so Paul selects motors, impellers and fans for the duty point at 50 Hz speed.

Greece voltage vs US practice is the key engineering difference on any skid: 400 V, 50 Hz three-phase in place of 480 V, 60 Hz, and 230 V control circuits in place of 120 V. Greece power voltage at the plant also sets component choices: IEC-rated motors, drives and contactors carrying CE marking, panels to EN 60204-1, and cable to European standards. A Greece voltage converter is fine for a laptop, while process equipment needs to be designed for the Greek supply from the start.

Greece electrical power connections and ELOT HD 60364

Greece electrical power installations are designed, built and inspected to ELOT HD 60364, which Ministerial Decision 101195 of October 2021 made the governing standard in place of ELOT HD 384. HEDNO connects or upgrades a supply against an application and the installer’s solemn declaration for the installation. Paul delivers panel drawings, single-line diagrams, cable schedules and test records that fit that process, with Greek labels on panels and field devices.

Shipping to Greece through the port of Piraeus and Thessaloniki

Shipping to Greece from the US East Coast takes about 16 to 20 days from New York to Piraeus on direct Mediterranean services, and up to about 25 days on routings with more transshipment, based on forwarder transit data. The port of Piraeus, Greece, is the main entry for equipment bound for Attica and the Peloponnese, and Thessaloniki serves northern Greece, with transit from New York of around 26 days.

The port of Piraeus container terminal on the transatlantic services is Piraeus Container Terminal, and the Piraeus container terminal handles boxes and flat racks, while port of Piraeus cargo that is too large for a box moves as breakbulk. Shipping to Greece from USA ports starts with module size: the inside of a 40-foot high cube container measures roughly 12.0 by 2.35 by 2.69 meters, so Paul lays out skids to fit those limits whenever the process permits. Pallet shipping to Greece suits spare parts and instruments, packed and listed separately from the main equipment. The port of Piraeus also sits close to the Thriasio plain and the motorways to Corinth and Tripoli, which keeps the road leg for Attica and Peloponnese plants short. All crates use ISPM 15 heat-treated wood, and terms follow Incoterms 2020, typically FCA at a US port, CIF Piraeus or DAP at the plant.

From the quay to the plant floor in Greece

The road leg from a Greek port to the plant decides how large each module can be. Plants on the Thriasio plain reach Piraeus in a short drive, Tripoli and Corinth sit on the motorway network into the Peloponnese, and northern plants receive through Thessaloniki, but a wide load still needs a permit, an escort and a route survey for bridges, tolls and town centers. Paul sizes modules against the narrowest point of that route, marks centers of gravity and lifting points on each one, and sends rigging drawings with the shipment so the crane plan at the plant is settled before the equipment lands. Inside existing GMP buildings, door openings, corridor turns and floor loading set a second limit, and Paul splits skids into sections with flanged and plug-in connections where a single frame is too large for the route.

Import duties from USA to Greece and the Greece VAT rate

Import duties from USA to Greece follow the EU Common Customs Tariff, applied by heading under the Combined Nomenclature and charged on the customs value, so a pump skid, a tank and a control panel each carry their own rate. Greece import regulations require an EORI-registered importer, a commercial invoice, a packing list and transport documents, and goods are declared in Greek customs systems on arrival. The standard VAT rate in Greece is 24 percent, with reduced rates of 13 and 6 percent; the Greece VAT rate 2026 changes cut all three rates by 30 percent for businesses on qualifying small islands, which leaves mainland plants at 24 percent. Paul lists each item by heading, weight and value so the importer’s customs agent clears the shipment cleanly.

How a Greek project with Paul Industries runs

Paul Industries runs a Greek project in nine stages, and the first two fix the PED categories, the 50 Hz equipment selection, the qualification strategy and the language of every document. The table lists each stage and its output.

Stages of a process equipment project for a plant in Greece
StageActivityOutput for the Greek plant
1. RequirementsUser requirements, PED categories, 400 V, 50 Hz supply, GMP impactApproved requirements and code basis
2. DesignProcess and mechanical design to PED, EN 13445 or ASME VIII, ASME BPE, EN 60204-1Approved drawings, calculations, design qualification
3. FabricationOrbital welding, examination, passivation, panel build in the United StatesMaterial certificates, weld logs, borescope records
4. Factory testHydrostatic and functional tests, 50 Hz test power where neededSigned FAT report, deviation list
5. ConformityTechnical file, declaration of conformity, CE marking, Greek instructionsConformity package
6. ExportCrating, sailing to Piraeus or Thessaloniki, customs entryInvoice, packing list, bill of lading
7. Site workSetting, hook-up and wiring by Paul, or under Paul’s supervisionInstallation records, redlined drawings
8. QualificationCommissioning, IQ, OQ and PQ support, water system sampling phasesExecuted protocols and reports
9. HandoverOperator training, spares, inspection and maintenance planGreek and English manuals, as-built package

After handover Paul services the systems it supplied with planned maintenance, periodic requalification, spare parts and repairs, and keeps the equipment file in step with the Greek periodic inspection schedule.

Who builds process systems for plants in Greece?

Paul Industries builds process systems for plants in Greece: purified water, WFI, clean steam, CIP and SIP and formulation vessels for pharmaceutical plants in Attica and Tripoli, sanitary tanks, CIP and cooling for dairies and food plants in Thessaly and Macedonia, and pressure vessels, exchangers, pump skids and piping for refineries and chemical sites at Aspropyrgos, Elefsina, Corinth and Thessaloniki. Paul engineers every system for 400 V at 50 Hz, delivers it to the PED and EU GMP with Greek-language instructions, and installs and commissions it or supervises the installation, under one contract with one file. The Italy page covers a neighboring EU market with its own national inspection layer.

What sets the delivered cost of a system for a Greek plant?

The delivered cost of a system for a Greek plant depends on five items beyond the equipment itself: 50 Hz and CE engineering, conformity and qualification documents, freight, customs and VAT, and the installation route. Each appears as its own US dollar line in a Paul proposal.

  • 50 Hz and CE engineering. IEC motors, 400 V drives, EN 60204-1 panels and CE-marked components add engineering hours to a US design.
  • Conformity and qualification. PED category work, Greek translations of instructions and GMP protocols are priced as defined deliverables.
  • Freight. Flat racks, crane plans at Piraeus or Thessaloniki and escorted road moves for wide modules add to ocean freight.
  • Customs and VAT. EU duty by heading and VAT at 24 percent on the duty-paid value, recoverable for VAT-registered plants under Greek rules.
  • Site work. Installation inside a running GMP plant, with gowning and segregation, sets the site figure; supervision lowers it.

Paul Industries for Greek pharmaceutical, dairy and refining plants

Paul Industries designs, fabricates and tests PED-compliant vessels, water and steam systems, skids and piping for plants across Greece, ships them to Piraeus or Thessaloniki, and installs and commissions them or supervises installation, with conformity, electrical and qualification records in Greek and English. Send the user requirements, the site, the supply details and the target start-up, and the proposal comes back with the delivery route, the build and qualification schedule, and a US dollar price. Request a quote for your Greek plant.

Standards referenced: Pressure Equipment Directive 2014/68/EU · Ministerial Decision 74124/DTBN 1431/2016 · Machinery Directive 2006/42/EC and Machinery Regulation (EU) 2023/1230 · Low Voltage Directive 2014/35/EU · EMC Directive 2014/30/EU · ELOT HD 60364 · EN 13445 · EU GMP and Annex 1 · PIC/S GMP Guide · European Pharmacopoeia · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Incoterms 2020 · ISPM 15

Frequently asked questions

What is the Greece VAT rate on equipment imported from the United States?

Imported equipment in Greece carries the standard VAT rate of 24 percent on the customs value plus duty, and VAT-registered plants generally recover it through their returns. Reduced rates of 13 and 6 percent cover listed goods, and since January 2026 qualifying small islands apply rates 30 percent lower. Paul Industries itemizes invoices so the importer’s VAT treatment is clear.

Does a skid for a Greek plant need CE marking under the PED?

Pressure equipment above 0.5 bar placed on the Greek market falls under the Pressure Equipment Directive, and most vessels and assemblies above the Article 4.3 thresholds carry CE marking with a declaration of conformity, while sound engineering practice items carry neither. Paul Industries assesses each item’s category, prepares the technical file and delivers the equipment with the matching conformity documents.

Who builds WFI systems for pharmaceutical plants in Attica?

Paul Industries designs, fabricates and qualifies WFI generation, storage and distribution systems for pharmaceutical plants in Attica, around Athens and Kryoneri, built to the European Pharmacopoeia, EU GMP Annex 1 and ASME BPE. Each system arrives with a 50 Hz electrical design, Greek instructions and qualification protocols, and Paul installs and commissions it or supervises the installation.

Which equipment do the new pharmaceutical plants in Tripoli need?

New pharmaceutical plants in Tripoli, in the Peloponnese, need purified water and WFI, clean steam, formulation and buffer vessels, CIP and SIP skids, HVAC utilities and process piping, all qualified to EU GMP. Paul Industries designs and fabricates those systems in the United States, ships them through Piraeus and commissions them on site.

How does a dairy in Thessaly or Macedonia order a CIP system from the United States?

A dairy in Thessaly or Central Macedonia sends Paul Industries its line layout, cleaning circuits, chemical regime and supply voltage, and Paul designs the CIP skid, tanks and return pumps, wires them for 400 V at 50 Hz, runs a factory test and ships the system through Thessaloniki. Spray coverage tests and cleaning records go into the turnover file.

Who fabricates pressure vessels for refineries at Aspropyrgos, Elefsina and Corinth?

Paul Industries fabricates pressure vessels, heat exchanger bundles, pump skids and alloy piping spools for refineries at Aspropyrgos, Elefsina, Corinth and Thessaloniki, built to the PED, EN 13445 or ASME Section VIII as the owner specifies. Each item ships with its conformity documents and test records, timed to the refinery’s turnaround window.

Is Greece voltage the same as US voltage for process equipment?

Greek supply is 230/400 V at 50 Hz, while US plants run 120/208 or 277/480 V at 60 Hz, so US equipment needs 50 Hz motors, resized pumps and fans, 400 V drives and 230 V controls. Paul Industries designs Greek skids around the HEDNO supply from the first drawing rather than adapting a US design afterward.

Which electrical standard applies to panels installed in Greek plants?

Electrical installations in Greece are designed, built and inspected to ELOT HD 60364 under Ministerial Decision 101195 of 2021, and machine panels follow EN 60204-1 under the Low Voltage and EMC directives. Paul Industries builds panels to those standards with CE-marked components, Greek labels and test records.

What changes for machinery shipped to Greece after January 2027?

From 20 January 2027 the EU Machinery Regulation 2023/1230 replaces the Machinery Directive 2006/42/EC for machinery placed on the market, with updated requirements for safety functions, software and digital instructions. Paul Industries prepares risk assessments and technical files for skids shipping to Greece under the rule in force on the date they are placed on the market.

How long does shipping a skid from New York to Piraeus take?

Forwarder transit data puts New York to Piraeus at about 16 to 20 days on direct Mediterranean services and up to about 25 days on routings with more transshipment, and New York to Thessaloniki at around 26 days. Customs clearance and the road leg to the plant are added to those figures. Paul Industries picks the sailing that lands the equipment ahead of the plant’s installation window.

Does EOF accept equipment qualification documents prepared in the United States?

EOF inspects Greek plants against EU GMP and the PIC/S guide, and it judges whether the plant’s qualification evidence is complete, accurate and controlled, wherever the documents were written. Paul Industries prepares design, installation and operational qualification protocols in the plant’s document format, in English with Greek translations where the plant requires them.

Which language do manuals for Greek plants use?

Paul Industries supplies instructions, safety information and labels for Greek plants in Greek, with English versions for engineering and corporate reviewers. Drawings use metric units and European symbols, and the conformity documents, test records and qualification protocols are organized so a Greek inspector or EOF reviewer finds each item quickly.

Can a Greek plant witness the factory acceptance test in the United States?

Engineers and quality staff from Greek plants attend Paul Industries factory acceptance tests at the US fabrication site or join through a live video link, covering hydrostatic tests, functional runs, alarm checks and documentation review. The signed FAT report and deviation list become part of the qualification package before the equipment sails.

How are customs duties charged on US equipment entering Greece?

Customs duties on US equipment entering Greece follow the EU Common Customs Tariff by Combined Nomenclature heading, charged on the customs value, and the importer needs an EORI number. Paul Industries classifies each component on the invoice and packing list so the customs agent files the declaration accurately, and offers delivered terms on request.

Which project details give a firm price for a Greek plant?

A firm price for a Greek plant comes from the user requirements, the PED categories, the site and its supply, the qualification scope, the language of documents and the target start-up date. Paul Industries returns a proposal in US dollars with equipment, conformity work, freight, duty and site work as separate lines.

What service follows equipment installed in Greece?

Paul Industries services Greek installations with planned maintenance, periodic requalification runs, spare parts, rouge and passivation work on stainless systems, and repairs. Maintenance plans line up with the Greek periodic inspection schedule for pressure equipment, and each visit adds its findings to the equipment history Paul handed over at commissioning.

How are tanks and skids anchored against earthquakes at plants near Athens and Corinth?

Plants near Athens and Corinth design equipment anchorage to Eurocode 8 with the Greek National Annex, using the seismic zone and ground class of the site. Paul Industries designs tank anchorage, skid frames and pipe supports to the seismic actions the owner’s structural engineer sets, supplies anchor loads for the foundations, and documents the calculations in the turnover file.