Paul Industries is a US process equipment contractor for Morocco that designs, fabricates and commissions pump and dosing skids, pressure vessels, heat exchangers, WFI and purified water systems, CIP sets, process tanks and piping for phosphate and fertilizer, automotive, food and pharmaceutical plants, engineered for the Moroccan supply of 380 V at 50 Hz. Equipment is built and factory tested in the United States, shipped to Tanger Med or Casablanca, then set, started and commissioned by Paul or set under Paul’s supervision, with manuals and records in French or English as the plant specifies.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Medicines regulator AMMPS, created by Law 10-22
Power 220/380 V, 50 Hz
Trade terms US-Morocco FTA in force since 2006
VAT 20 percent on most imports
Main ports Tanger Med and Casablanca
Reviewed November 2026

What a US process equipment contractor for Morocco takes on for a plant

A US process equipment contractor for Morocco takes on the engineering, the US fabrication and testing, the short Atlantic crossing to Tanger Med or Casablanca, the customs paperwork the importer files through PortNet, and the site work from setting to qualified handover. Paul Industries supplies pump and chemical dosing skids, ASME pressure vessels, heat exchangers, purified water and WFI systems, CIP and SIP systems, fabricated tanks and spooled piping, delivered as single items or as complete tested modules.

Moroccan owners pick the route that suits their site organization. A supply contract with installation supervision has Paul’s engineers directing the setting, alignment, connection and testing of each module. Design-build widens the scope to the process area, utilities and control system. Complete installation, set out on the turnkey process systems page, puts design through executed qualification protocols under a single Paul contract. Morocco is one of the Africa countries on Paul’s international projects page.

Phosphate, automotive, food and pharmaceutical plants across Morocco

Morocco’s process equipment buyers fall into four groups: the phosphate and fertilizer platforms on the Atlantic coast, the vehicle and component plants around Tangier and Kenitra, food and agri-processing plants across the farming regions, and pharmaceutical companies in Morocco, which concentrate around Casablanca. Each group lands its equipment through a different port and works to different documentation, so the plant’s location sets the shipping plan from the first review.

Jorf Lasfar and Safi: phosphoric acid and fertilizer production

Jorf Lasfar, on the Atlantic coast near El Jadida, is the site of OCP’s main chemical complex, the Jorf Lasfar industrial platform, with fertilizer capacity of about 11 million tonnes a year and about 6 million tonnes a year of phosphoric acid, fed with phosphate slurry by pipeline from the Khouribga mines. OCP’s older Safi complex has processed phosphate rock since 1965, and both sites are adding seawater desalination plants. Jorf Lasfar port serves the complex. These named sites are market facts that show what Moroccan industry buys: acid-resistant pressure vessels and tanks, heat exchangers, sulfuric acid and phosphoric acid piping in alloy or lined steel, dosing skids, and cooling and boiler water treatment. Paul’s chemical manufacturing page covers that equipment.

Desalination and water supply at coastal plants

Water supply is a design input at every Moroccan coastal plant, and OCP is adding seawater desalination at Jorf Lasfar and Safi to supply its process needs. Plants that take desalinated, well or municipal water need pretreatment matched to that source before boiler feed, cooling tower makeup or purified water generation. Paul Industries builds multimedia filtration, softening, reverse osmosis and polishing skids sized from the plant’s own water analysis, with chemical dosing and online monitoring, and designs blowdown recovery and reject reuse where the plant’s water balance favors it. The industrial water treatment page describes these trains in more detail.

Vehicle plants at Tangier and Kenitra

Vehicle production in Morocco centers on Renault’s plant at Melloussa near Tangier, which built about 299,000 vehicles in 2025, Renault’s SOMACA plant in Casablanca, and Stellantis’s plant in the Atlantic Free Zone near Kenitra, opened in 2019. Tanger Automotive City, opened in 2013 a short way from the Melloussa plant, gathers component suppliers, and goods sold to companies in the Tanger Automotive City free zone and other free zones are zero-rated for VAT. Paint shops, battery and component lines in these zones buy deionized water systems, process chillers and cooling, compressed air and wastewater pretreatment.

Paint shop water and wastewater at vehicle plants

Paint shops at Moroccan vehicle and component plants run on deionized water for pretreatment rinses and electrocoat, chilled water for paint booth air handling, and wastewater treatment that removes metals, phosphates and paint solids before discharge. Paul Industries designs reverse osmosis and mixed bed DI skids sized for the rinse stages, chillers and pump packages for the booth air handlers, and physical-chemical wastewater treatment with dosing, clarification and sludge handling, all wired for 380 V at 50 Hz and built as tested modules. Because vehicle lines run to tight production calendars, Paul schedules tie-ins for planned stops such as the summer shutdown, prefabricates the connecting piping in the United States, and commissions each module against the line’s restart date, with the operating and maintenance manuals in French.

Food, beverage and agri-processing

Food and beverage processing in Morocco covers dairies, olive oil mills, sugar, fruit and vegetable packing and juice, fish processing on the Atlantic coast, and beverages, spread from the Souss and Gharb farming regions to Casablanca and Fes. Those plants buy CIP sets, sanitary tanks, pasteurizer and heat exchanger skids, glycol cooling and wastewater treatment, and Paul’s food and beverage page describes the hygienic design behind them.

Pharmaceutical companies in Morocco and AMMPS

Pharmaceutical companies in Morocco include Sothema in Bouskoura, south of Casablanca, whose 85,000 square meter plant has separate units for penicillins, serums and injectables, along with Moroccan producers and multinational subsidiaries across the Casablanca region. Medicines regulation now sits with AMMPS, the Moroccan agency for medicines and health products created by Law 10-22, which took over from the former Directorate of Medicines and Pharmacy and has received new pharmaceutical authorization requests since June 2025. Law 17-04, the medicines and pharmacy code, ties manufacturing to good manufacturing practice, and a 2026 bill amending it addresses GMP, distribution and vigilance inspections. Paul builds water, steam and process systems with the design qualification, orbital weld logs, passivation records and executed IQ and OQ protocols an inspector reviews, as described on the validation and commissioning page.

Segregated utilities for penicillin and injectable units

Penicillin and injectable units in Moroccan medicines plants need utilities planned around segregation, because GMP guides treat penicillins as highly sensitizing products that call for dedicated or strictly separated facilities and air handling. Paul Industries designs purified water and WFI distribution, clean steam and CIP so that each segregated unit has its own loop, points of use or isolation, with no return path from a penicillin area into a shared system. Room pressure regimes, drain routing and the location of skids and tanks are settled in the design review with the plant’s quality team, and the qualification protocols test the segregation features as well as water quality. The same approach applies to cytotoxic or hormone lines when a plant adds them later.

Moroccan regions, their process industries and the ports that serve them
RegionProcess industries (market facts)Port serving the regionSystems Paul Industries builds
Tangier and TetouanVehicle assembly, components, free zone manufacturingTanger Med portDI water, chillers, compressed air, wastewater pretreatment
Kenitra and RabatVehicle assembly, components, foodTanger Med or Port of CasablancaCooling systems, pump skids, process water
Casablanca-SettatMedicines, food and beverage, chemicals, vehicle assemblyPort of CasablancaWFI, purified water, CIP and SIP, process tanks
El Jadida and Safi (Jorf Lasfar)Phosphoric acid, fertilizers, chemicalsJorf Lasfar port or CasablancaAcid-service vessels, heat exchangers, alloy piping, dosing skids
Souss, Gharb, Fes and MeknesDairy, olive oil, sugar, fruit and vegetablesCasablanca or AgadirCIP, sanitary tanks, glycol cooling, effluent treatment

Which Moroccan rules apply to pressure equipment, power and GMP systems?

Moroccan rules for pressure equipment come under the regulation on land-based steam and gas pressure equipment, administered by the Ministry of Energy Transition and Sustainable Development, which approves inspection bodies to carry out the regulatory inspections and tests of boilers and pressure vessels in service. The owner’s purchase specification names the construction code, and for US-built equipment that is ASME Section VIII Division 1 for vessels, ASME Section I for power boilers and ASME B31.3 for process piping, with the construction record handed to the plant for its regulatory file.

Paul Industries delivers that record with every pressure item: drawings and design calculations, mill certificates for every pressure part, qualified welding procedures with welder records, NDE results, hydrostatic test charts and the nameplate data, organized so the approved inspection body and the plant’s insurer find each document in the order they check it. Drawings and data sheets carry metric units throughout, and the file is issued in French or English as the plant’s procedures require.

Acid service and corrosion at phosphate plants

Acid service at Moroccan phosphate plants sets the material choice before anything else, because phosphoric acid with chlorides and fluorides at process temperature attacks ordinary stainless grades. Paul selects higher alloy stainless steels, nickel alloys or lined carbon steel for each service from the plant’s acid analysis, specifies weld procedures and filler metals to match, and records ferrite, hardness and dye penetrant results with the vessel file. Spare spools and nozzles are fabricated to the same procedures so repairs during a shutdown keep the original corrosion allowance.

Moroccan requirements and what Paul Industries delivers with US-built equipment
AreaRule or practice in MoroccoWhat Paul Industries delivers
Boilers and pressure vesselsLand-based steam and gas pressure equipment regulation; inspections by ministry-approved bodiesASME construction record, NDE, hydrostatic test, nameplate data
Process pipingOwner specification, ASME B31.3 for US spoolsIsometrics, weld maps, examination and test records
Low voltage installationNM 06.1.100:2025 and the owner’s electrical specificationIEC 61439 panels, IEC 60204-1 wiring, cable schedules
Medicines manufacturingLaw 17-04 GMP requirements, inspections under AMMPSDQ, IQ and OQ protocols, weld and passivation records
Documentation languagePlant procedures, usually French, with Arabic for some sitesManuals, labels and drawings in French or English, Arabic labels on request

Morocco voltage and frequency for process skids

Morocco voltage and frequency at an industrial site are 50 Hz, with 380 V between phases and 220 V from phase to neutral, so the answer to what is the voltage in Morocco for a skid is 380/220 V, and the Morocco 3 phase voltage that motors and heaters see is 380 V. Morocco industrial voltage at larger plants arrives at medium voltage from the grid and is stepped down to 380 V at site substations, and Paul confirms the measured site voltage and fault level before motors and drives are ordered.

Morocco voltage vs USA practice changes the core of a skid’s electrical design. Motors are IEC frame machines rated 380 V or 400 V at 50 Hz instead of 460 V or 480 V at 60 Hz, centrifugal pumps and fans turn about one sixth slower so impellers and drives are chosen for the 50 Hz duty point, and controls run on 220 V or 24 V DC instead of 120 V. Morocco voltage tolerance, heater ratings and cable sizing follow the same supply, and panels are built to IEC 61439 with wiring to IEC 60204-1. The PLC programming page covers the automation side.

Shipping to Morocco from USA ports: Tanger Med port and the Port of Casablanca

Shipping to Morocco from USA East Coast ports is one of the shorter export voyages Paul plans: forwarder data puts New York to Tanger Med at about eight days on the quickest direct service, Savannah to Tanger Med at about 11 to 18 days depending on the rotation, and Savannah to Casablanca at about 15 days. Where is Tanger Med port? It sits on the Strait of Gibraltar east of Tangier, and Tanger Med port, Morocco, serves the Tangier and Kenitra automotive zones by road and rail.

The Port of Casablanca, Morocco, on the Atlantic, is the usual entry for plants in Casablanca-Settat and for equipment bound for Fes, Meknes and the south. The Tanger Med Port Authority runs the Tanger Med Port Community System, a paperless platform linked to customs for port calls, freight and gate movements, and the Tanger Med port code is MAPTM on bills of lading and booking documents. Paul lays out skids to suit 40-foot high cube boxes when the process permits, sends oversize tanks and exchangers on flat racks, and packs crates in ISPM 15 heat-treated wood.

Rail and road legs from the port to the plant

Rail and road legs between Tanger Med and the plants inland matter as much as the sailing for a heavy module, because the vehicle plant at Kenitra ships its finished cars by rail to the Tanger Med complex and the same corridor carries inbound freight. Paul Industries checks the route from the quay to the plant gate before modules are sized, with bridge heights, axle loads and turning radii for oversize loads, and plans the crane lifts at the port and at site together. For plants near Casablanca the road leg from the Port of Casablanca is short, and modules are delivered on the day the site is ready to set them.

How an import in Morocco clears customs, and the Morocco VAT rate

An import in Morocco clears through the customs administration, ADII: the importer files an import title on PortNet, the national trade single window, domiciles it with its bank, and lodges the customs declaration through ADII’s BADR system. Paul supplies the commercial invoice, packing list, bill of lading and origin documents in the form the importer’s customs agent needs, with each module listed by tariff heading, weight and value.

The Morocco VAT rate on imports is 20 percent, with a 10 percent rate for designated imports, as the 2024 to 2026 reform moves Morocco VAT to rates of zero, 10 and 20 percent. A special import tax of 0.25 percent of the goods’ value also applies, and customs duty is charged ad valorem on the value at entry, reduced where a free trade agreement applies.

The United States Morocco Free Trade Agreement

The United States Morocco Free Trade Agreement entered into force on 1 January 2006, and under the US-Morocco Free Trade Agreement goods that meet its rules of origin enter Morocco at reduced or zero duty when the importer claims the preference. Paul Industries supplies the origin information and supporting documents for each module so the plant’s customs agent files the claim with the entry, and lists any components of other origin separately on the invoice.

How does a Moroccan project run with Paul Industries?

Paul Industries runs a Moroccan project in nine stages, and the first two fix the construction code, the 50 Hz equipment selection, the documentation language and the qualification approach. The table shows each stage and its output.

Stages of a process equipment project for a plant in Morocco
StageWork doneDeliverable for the Moroccan plant
1. Requirements reviewProcess needs, construction code, 380 V, 50 Hz supply, language of documentsAgreed requirement file and code basis
2. EngineeringProcess, mechanical, materials and electrical design, IEC panelsDrawings and calculations for the plant’s approval
3. US fabricationWelding, examination, passivation, assembly and panel buildMaterial traceability, weld logs and NDE reports
4. Factory acceptancePressure and functional testing with the Moroccan team attending or onlineFAT report signed by both parties
5. ExportDrying, capping, ISPM 15 crating, booking to Tanger Med or CasablancaInvoice, packing list, bill of lading, origin documents
6. EntryPortNet import title, BADR declaration, FTA claim by the importerEquipment released at the port
7. Site installationPaul sets, connects and wires the modules, or supervises the installationInstallation checklists and marked drawings
8. Start-up and qualificationCommissioning, SAT, IQ, OQ and PQ data for medicines plantsExecuted protocols and reports
9. HandoverTraining, spare parts, inspection and maintenance planAs-built file in French or English, metric units

The short sailing to Tanger Med changes the schedule more than any other factor on a Moroccan job, because two or three weeks at sea in place of six leave more of the program for fabrication, testing and site work. Paul plans the factory test close to the sailing date, keeps critical spares on the same booking, and sequences module deliveries so each one arrives as the site is ready to set it.

Who builds process systems for plants in Morocco?

Paul Industries builds process systems for plants in Morocco: acid-service vessels, heat exchangers, alloy piping and dosing skids for phosphate and fertilizer plants at Jorf Lasfar and Safi; DI water, chillers, compressed air and wastewater systems for vehicle and component plants at Tangier and Kenitra; CIP, tanks and cooling for food and beverage plants; and WFI, purified water and clean utilities for pharmaceutical plants around Casablanca. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, was formerly based in northern New Jersey, then Pennsylvania, and takes work in all 50 states and at plants in Morocco and other countries. It engineers every system for 380 V at 50 Hz, prepares the construction and qualification file, and installs and commissions the equipment or supervises the installation. The Spain page covers the destination across the Strait of Gibraltar.

What drives the delivered cost of a process system for a Moroccan plant?

The delivered cost of a process system for a Moroccan plant rests on six items besides the equipment, and a Paul proposal prices each of them on its own US dollar line.

  • Materials for the service. Higher alloys or linings for acid service at phosphate plants move the price more than any other choice.
  • 50 Hz design. IEC motors, 380 V drives, IEC 61439 panels and pumps resized for 50 Hz speed.
  • Documentation. Construction records, qualification protocols and French translation of manuals and drawings.
  • Freight. Container and flat-rack count, Tanger Med or Casablanca, and the road or rail leg to the plant.
  • Border charges. VAT at 20 percent, the 0.25 percent special import tax and any duty after the FTA preference, under the Incoterm the plant chooses.
  • Site route. Complete installation inside a running plant is priced above supervision alone, and Paul quotes both.

Paul Industries for Moroccan process plants

Paul Industries designs, fabricates and tests skids, vessels, exchangers, tanks, water systems and piping for plants across Morocco, ships them to Tanger Med or Casablanca, and installs and commissions them or supervises the installation, with construction, electrical and qualification records in French or English. Send the process requirement, the site supply and the target start-up, and request a quote in US dollars.

Standards referenced: Law 17-04 (Moroccan medicines and pharmacy code) · Law 10-22 (AMMPS) · Moroccan regulation on land-based steam and gas pressure equipment · NM 06.1.100:2025 · ASME Boiler and Pressure Vessel Code Section VIII · ASME Section I · ASME B31.3 · ASME BPE · IEC 60204-1 · IEC 61439 · US-Morocco Free Trade Agreement · Incoterms 2020 · ISPM 15

Frequently asked questions

Does Morocco have a free trade agreement with the US that covers process equipment?

Morocco and the United States have had a free trade agreement in force since 1 January 2006, and goods that meet its rules of origin enter Morocco at reduced or zero duty when the importer claims the preference on entry. Paul Industries supplies origin information for each module built in the United States, so the plant’s customs agent has what the claim needs.

What voltage do skids need for a plant in Casablanca or Tangier?

Plants in Casablanca and Tangier take 50 Hz power at 380 V between phases and 220 V phase to neutral. Paul Industries specifies IEC motors for that supply, drives programmed for the plant’s network, control circuits at 220 V AC or 24 V DC, and pump impellers and fan drives sized for 50 Hz speed, then confirms the measured site voltage before ordering.

Who builds acid-service vessels for phosphate plants at Jorf Lasfar and Safi?

Paul Industries designs and fabricates acid-service pressure vessels, tanks, heat exchangers and alloy piping for phosphate and fertilizer plants at Jorf Lasfar and Safi, with materials chosen from the plant’s acid analysis and weld procedures qualified for the alloy. Equipment ships to Jorf Lasfar port or Casablanca and is installed by Paul or under Paul’s supervision during the plant’s shutdown.

Which equipment do vehicle plants in Tanger Automotive City and Kenitra order?

Vehicle and component plants in Tanger Automotive City and the Atlantic Free Zone near Kenitra order deionized water systems for paint shops, process chillers and cooling, compressed air, wastewater pretreatment and process piping. Paul Industries builds those systems in the United States for 380 V at 50 Hz, ships them through Tanger Med, and installs and commissions them around the plant’s production schedule.

Which agency inspects medicines plants in Morocco?

Medicines regulation in Morocco now sits with AMMPS, the agency created by Law 10-22, which replaced the former Directorate of Medicines and Pharmacy, and GMP requirements come from Law 17-04, the medicines and pharmacy code. Paul Industries delivers water and steam systems with the qualification evidence an AMMPS inspection reviews, from design qualification through executed protocols.

Who installs WFI and purified water systems for pharmaceutical plants near Casablanca?

Paul Industries designs, fabricates, installs and qualifies WFI and purified water systems for pharmaceutical plants in Casablanca, Bouskoura and the wider Casablanca-Settat region, built to ASME BPE with orbital welds and borescope records. Systems land at the Port of Casablanca, where Paul installs and commissions them, or directs the installation as supervisor, before running the IQ and OQ protocols with the plant.

How many days does a sailing take from a US East Coast port to Tanger Med?

Forwarder data puts New York to Tanger Med at about eight days on the quickest direct service and Savannah to Tanger Med at about 11 to 18 days, depending on the carrier’s rotation. Paul Industries books the sailing after the factory acceptance test is signed off and plans fabrication backward from the plant’s start-up date.

What is the Tanger Med Port Community System used for?

The Tanger Med Port Community System, run by the Tanger Med Port Authority, is a paperless platform for port calls, freight transit, gate movements and payments, linked to customs. The importer and its agents use it for cargo moving through Tanger Med, and Paul Industries sends booking details, packing lists and crate data early so the entries match the shipment.

What VAT and import tax apply to process equipment entering Morocco?

Imports into Morocco carry VAT at 20 percent, with a 10 percent rate for designated imports, plus a special import tax of 0.25 percent of the goods’ value, and customs duty is charged on the value at entry, reduced under a free trade agreement. Supplies to free zone companies are zero-rated. Paul Industries itemizes every module so duties and taxes are calculated correctly.

Does a US-built ASME vessel suit a Moroccan plant's pressure equipment file?

Moroccan plants name the construction code in their purchase specifications, and a US-built vessel is designed and built to ASME Section VIII Division 1 under that specification, then inspected in service by bodies the Ministry of Energy Transition and Sustainable Development approves. Paul Industries supplies the calculations, material certificates, NDE and pressure test records and nameplate data for that file.

Can manuals and drawings be delivered in French for a Moroccan plant?

Paul Industries delivers manuals, drawings, data sheets and qualification documents in French or English as the plant’s procedures require, with metric units throughout and Arabic operator labels on request. Document numbering follows the plant’s own system, so the turnover file goes straight into its document control.

Which equipment do food and olive oil plants in the Souss and Meknes regions buy?

Food plants in the Souss and olive oil mills and dairies around Meknes and Fes buy CIP sets, sanitary tanks, heat exchanger and pasteurizer skids, glycol cooling and wastewater treatment. Paul Industries builds that equipment with hygienic welds and drainable layouts for 380 V at 50 Hz, ships it to Casablanca or Agadir, and installs and commissions it at the plant.

Who files the customs entry for equipment shipped to Morocco?

The Moroccan plant, as importer, files an import title on PortNet, domiciles it with its bank and lodges the customs declaration through ADII’s BADR system. Paul Industries supplies the invoice, packing list, bill of lading and origin documents in the format the importer’s customs agent needs, and quotes FCA, CIF or delivered terms as the plant prefers.

Can the Moroccan team witness the factory acceptance test in the United States?

Moroccan engineers and quality staff are invited to each factory acceptance test Paul Industries runs in the United States, in person or online, covering pressure tests, functional runs, alarms and interlocks, and the document review. With the short sailing to Tanger Med, open items close before shipment and the equipment arrives with a signed test record.

How does Paul Industries protect equipment for the sea voyage to Morocco?

Paul Industries drains, dries and caps stainless systems, fills sensitive vessels with nitrogen or desiccant, wraps panels and instruments, and crates equipment in ISPM 15 heat-treated wood with lifting points and centers of gravity marked. Impact and tilt indicators go on critical crates, and the condition is checked on arrival against the shipping record.

Which port suits a dairy or juice plant near Agadir?

Dairy, juice and fruit packing plants in the Souss region near Agadir usually receive equipment through the port of Agadir or through Casablanca with a road leg south, depending on the sailing available. Paul Industries chooses the routing with the fewest handlings for oversize modules, confirms the road route, and installs and commissions CIP, tanks and cooling equipment at the plant.

What service follows equipment installed at a Moroccan plant?

Paul Industries services equipment it delivered to Moroccan plants with planned maintenance, requalification, spare parts, passivation and derouging of stainless systems, and repairs. Records from every visit are added to the equipment history handed over at commissioning, ready for the plant’s next pressure equipment inspection or GMP audit.

What does a Moroccan plant send Paul Industries to receive a proposal in US dollars?

A Moroccan plant sends the process description or user requirements, the site layout, supply voltage and fault level, the construction code, the documentation language, the target start-up date and the preferred Incoterm. Paul Industries replies with a US dollar proposal listing engineering, equipment, documentation, freight and site work separately.

Planning process equipment for a plant in Morocco?

Send Paul Industries your process requirement, the site supply and the start-up date, and the reply covers the code basis, the sailing to Tanger Med or Casablanca and an estimate priced in dollars. Call 201-450-8280 or request a quote.