Paul Industries is a US process equipment contractor for Argentina that engineers and fabricates pump and chemical injection skids, pressure vessels, tanks, water treatment plants and complete process systems for Argentina’s 50 Hz, 380/220 V supply, ships them to Buenos Aires, Rosario or Bahia Blanca, and installs and commissions them in the Vaca Muerta oil and gas fields, at lithium plants in the northwest and at food and drug factories, or supervises their installation. Electrical design follows AEA 90364, pressure equipment carries the documents provincial registration asks for, and drug plant systems are qualified to ANMAT’s GMP guide. Paul is headquartered at 256 Shore Drive, Kilmarnock, Virginia, after earlier bases in northern New Jersey and then Pennsylvania.
Request a quote or call 201-450-8280
How Paul Industries works as a US process equipment contractor for Argentina
A US process equipment contractor for Argentina designs for the one change that touches almost every rotating machine: Argentina runs at 50 Hz, so a pump, fan or compressor taken straight from a US 60 Hz catalog turns at five sixths of its speed, delivers about five sixths of its flow and roughly 70 percent of its head. Paul Industries therefore selects every motor and machine on 50 Hz data from the start, then carries the order through fabrication, factory acceptance testing, crating and ocean freight to start-up at the site. The range covers chemical injection and transfer skids, separators, receivers and pressure vessels, process and storage tanks, water treatment plants, purified water systems and turnkey process systems.
Argentine owners buy in three ways. Some take the equipment with Paul supervising their erection contractor; others want design-build, with layout, foundations data, tie-ins and controls drawn by Paul; and the rest hand Paul complete installation through start-up and commissioning. All three end with one Spanish and English turnover file and one party answerable for the system. The international page shows Paul’s full country list, and the Chile page and Brazil page cover the two neighbors Argentina trades with most closely.
Vaca Muerta, lithium and the industries that order process systems in Argentina
Argentina’s process equipment demand comes from four clusters: the Vaca Muerta shale in Neuquen, lithium brine projects in the northwest, the food and oilseed industry along the Parana River, and the pharmaceutical and chemical plants of greater Buenos Aires. The table pairs each region with the systems its plants buy.
| Region | Industries | Equipment in demand |
|---|---|---|
| Neuquen and Rio Negro | Shale oil and gas in Vaca Muerta, gas processing, pipelines | Separators, chemical injection skids, produced water treatment, compressor support systems |
| Salta, Jujuy and Catamarca | Lithium brine extraction and lithium carbonate plants | Brine handling skids, reagent dosing, filtration, evaporator and crystallizer support, water treatment |
| Santa Fe and the Rosario hub | Oilseed crushing, vegetable oil refining, biodiesel | Heat exchangers, process tanks, steam and boiler feed systems, effluent treatment |
| Buenos Aires and its province | Pharmaceuticals, food and beverage, chemicals | Purified water, CIP skids, formulation tanks, pressure vessels |
| Bahia Blanca | Petrochemicals, fertilizer, port industry | Pressure vessels, pipe spools, cooling water treatment |
| Cordoba, Mendoza and San Juan | Food, wine, automotive suppliers, mining | Process cooling, CIP, water treatment, seismic-rated frames |
Argentina Vaca Muerta: the shale formation and what it buys
The Vaca Muerta formation is a shale layer in the Neuquen Basin, and the Vaca Muerta shale play now supplies most of Argentina’s oil: shale output reached a record of about 593,000 barrels per day in December 2025, 69 percent of the country’s crude, while total crude production set its own record of about 861,000 barrels per day. For readers checking the Vaca Muerta meaning, the name is Spanish for “dead cow”; Argentine engineers call the field the yacimiento petrolÃfero Vaca Muerta, and Neuquen province alone produced a record of about 469,000 barrels per day in May 2025. Vaca Muerta shale production is led by YPF, the state-controlled oil company, with international operators in neighboring blocks, so YPF Vaca Muerta tenders set much of the equipment specification in the area.
Vaca Muerta oil and gas wells feed central processing facilities, oil treatment plants and gas conditioning, and each buys three-phase separators, heater treaters, chemical injection skids for corrosion, scale and paraffin control, produced water treatment and compressor support systems. Across the Vaca Muerta shale basin, frac water supply and flowback handling add tanks, filtration and transfer pumps. The Vaca Muerta Neuquen fields sit in dry steppe with strong wind, hot summers and freezing winters, so Paul designs enclosures, heat tracing and coatings for that range, and its oil and gas industry page lists the systems it builds for upstream and midstream plants. The scale of the Vaca Muerta basin, and of the Vaca Muerta shale formation beneath it, means equipment is ordered in repeating trains, which suits standardized skid designs with site-specific tie-ins.
Produced water, injection and winterization in Neuquen
Produced water returns from Vaca Muerta wells with every barrel of oil, and that stream shapes the treatment train before any water is reused for completions or sent to disposal. Typical trains combine skim tanks, induced gas flotation or walnut shell filtration, cartridge polishing and chemical dosing for scale, corrosion and bacteria, with the dosing rates set from water analyses the operator supplies. Chemical injection skids carry duty and standby pumps, calibration columns, pulsation dampeners and pressure relief, and they are built in stainless steel where the chemistry calls for it. Neuquen winters bring frost and snow to exposed sites, so Paul specifies heat tracing on small-bore lines and instrument tubing, insulated and heated enclosures for pumps and analyzers, and drain points that let operators empty dead sections before a freeze. Every skid is wired for 380 V, 50 Hz and tested on a 50 Hz supply before it ships.
Lithium mining in Argentina
Lithium mining in Argentina takes place in the salt flats of the Puna, the high plateau of Salta, Jujuy and Catamarca, and the country ranks as the world’s fifth-largest lithium producer by the Argentine mining chamber’s count, which expected output of about 130,800 tonnes of lithium carbonate equivalent in 2025. Lithium mining companies in Argentina pump brine to evaporation ponds or direct extraction units and refine it to carbonate, so they buy brine transfer and reagent dosing skids, filtration, heat exchangers, crystallizer support equipment and water treatment, all in materials chosen for concentrated chloride brines. Plants on the Puna work at high altitude, so Paul derates motors, resizes air equipment and checks pump suction for the site elevation.
Brine chemistry sets the materials list for a lithium plant. Concentrated chloride brines attack standard austenitic stainless steels, so wetted parts move to duplex or super duplex grades, titanium for some heat exchanger duties, and lined or fiberglass tanks and piping where temperature allows, while carbonate precipitation steps need agitated tanks and filters that handle fine solids without blinding. Fresh water on the Puna is scarce, which puts reverse osmosis, condensate recovery and water reuse into most process designs. Paul designs these trains as transportable modules that arrive tested, which keeps the work window on the salt flat short and the number of field welds low.
Food, oilseeds and the Argentina pharmaceutical industry
The Rosario hub on the Parana River concentrates about 80 percent of Argentina’s oilseed crushing capacity in some 20 plants, most with their own port, and those plants and the vegetable oil refiners and biodiesel units beside them buy heat exchangers, process tanks, steam systems and effluent treatment, as on the food and beverage page. Pharmaceutical companies in Argentina are concentrated in Buenos Aires and its province, where the Argentina pharmaceutical industry produces medicines for the domestic market and for export, and those plants buy purified water, clean steam, formulation and CIP systems qualified to ANMAT rules, described on the pharmaceutical industry page.
Which Argentine rules apply to boilers and pressure vessels?
Argentine boilers and pressure vessels answer first to Decreto 351/79, the regulation of Ley 19.587 on hygiene and safety at work, which sets general conditions for the construction, installation, maintenance, operation and safety of boilers, and then to provincial registration rules where the equipment is installed. In the Province of Buenos Aires, Resolucion 231/96 covers fired and unfired pressure equipment and equipment under combined stresses, places duties on manufacturers, keeps registries of qualified professionals, and issues a habilitacion certificate for each registered unit; it has been amended several times since. Mendoza and other provinces run their own boiler habilitacion programs.
Provincial registration depends on the documents the equipment arrives with. Paul designs vessels and boiler packages to ASME Section VIII and the owner’s specifications, and ships each unit with design calculations, material certificates, weld and NDT records, the hydrostatic test chart and nameplate data, translated into Spanish, so the professional handling the habilitacion file has the full design and test history.
| Rule | Issued by | Effect on the equipment |
|---|---|---|
| Ley 19.587 and Decreto 351/79 | National government | General safety conditions for boilers and pressure equipment at work |
| Resolucion 231/96 | Province of Buenos Aires | Registration and habilitacion of fired and unfired pressure equipment |
| AEA 90364 | Asociacion Electrotecnica Argentina | Design and execution of electrical installations in buildings |
| SRT Resolucion 900/2015 | Workplace risk superintendency | Mandatory grounding resistance and continuity measurements at workplaces |
| INPRES-CIRSOC 103 | INPRES and CIRSOC | Seismic design by zone, highest in San Juan and Mendoza |
| ANMAT Disposicion 4159/2023 | ANMAT | GMP guide for medicines, aligned with PIC/S |
Is Argentina 220V, and how does 50 Hz change a skid?
Argentina’s electricity is 380/220 V at 50 Hz: 380 V between phases for motors and heaters and 220 V from phase to neutral for lighting, sockets and small loads. Is Argentina 220V for controls? Yes for single-phase circuits, and the Argentina voltage 3 phase supply for motors is 380 V, with larger plants and oil field facilities taking medium voltage and transforming down. The Argentina industrial voltage at each motor control center is confirmed during design, since Vaca Muerta facilities, Rosario crushing plants and Buenos Aires drug plants each set their own distribution.
The Argentina voltage and frequency both differ from US practice, which is why an Argentina voltage converter, the kind sold for laptops and phone chargers, has no role on industrial equipment, and even a transformer fixes only voltage. Electricity in Argentina voltage terms means motors wound for 380 V at 50 Hz, pumps re-selected on 50 Hz curves, and drives, contactors and overloads rated for the supply. Paul builds panels to IEC 60204-1 and to the Argentina electrical standards set by AEA 90364, provides grounding and continuity test records of the kind SRT Resolucion 900/2015 requires at workplaces, and reviews components against Resolucion 169/2018, the safety certification regime for low-voltage electrical products.
| Condition | Where it applies | Design response |
|---|---|---|
| 50 Hz, 380/220 V supply | Every Argentine site | 50 Hz motor and pump selections, 380 V windings, 220 V control circuits |
| Wind, heat and freezing winters | Neuquen and Rio Negro oil fields | Heat tracing, insulated enclosures, wind-rated structures |
| High altitude and corrosive brine | Lithium salt flats of the Puna | Motor derating, resized blowers, duplex and alloy materials, lined tanks |
| Seismic loads | San Juan, Mendoza and the Andean foothills | Frames and anchors to the INPRES-CIRSOC 103 zone |
| Humid river climate | Rosario and Buenos Aires | Coatings and sealed enclosures for humidity and condensation |
| Spanish documentation | Provincial registries, ANMAT, operators | Spanish manuals, labels and training, metric drawings |
Seismic design to INPRES-CIRSOC 103
INPRES-CIRSOC 103 is Argentina’s seismic design regulation, adopted by most provinces, and its map divides the country into five zones, with the very high hazard zone in southern San Juan and northern Mendoza. Plants in Cuyo therefore need frames, vessel supports and tank anchorage designed for strong ground motion, while Buenos Aires and the Pampas sit in low-hazard zones. Paul applies the zone the owner’s engineer specifies and files the calculations with the turnover documents.
ANMAT GMP regulations for new drug plant equipment
ANMAT GMP requirements for Argentine drug manufacturing are set by Disposicion 4159/2023, a GMP guide for medicines for human use built on the PIC/S guide PE 009-16, World Health Organization guidance and ICH Q7A, which replaced the 2018 guide. ANMAT has taken part in PIC/S since 2008, and Disposicion 7998/2025 set the rules for GMP verification of manufacturing plants abroad, with a simpler route for products from PIC/S countries.
Under those ANMAT regulations, inspectors look at a new purified water loop, clean steam generator or CIP skid through its documents: user requirements, design specifications, material and finish certificates, weld logs for product-contact lines, and the executed qualification. Paul writes the user and design specifications with the plant, records surface roughness, slope and dead-leg checks and passivation, and runs IQ and OQ in Spanish under its validation and commissioning scope, so the system enters the GMP file with its evidence attached.
Shipping to Argentina from US East Coast ports and clearing customs
A shipping container from USA to Argentina makes a voyage down the Atlantic coast of South America to Buenos Aires, with Rosario reached up the Parana River and Bahia Blanca serving the south; route planners list about 20 days from Savannah and about 21 days from New York on direct services, and multi-port rotations run longer, past 40 days on some services. Paul books the service that fits the delivery date, sizes crates and flat-rack loads during design, and plans the inland haul, which for Neuquen or the Puna means long road legs with permits for oversized loads.
Argentina import regulations, duty and tax
Argentina import regulations changed repeatedly in recent years: the SIRA authorization system was replaced by the SEDI statistical system in December 2023, and SEDI was itself repealed in 2025, which removed the main Argentina import restrictions of the earlier period. Argentina has no free trade agreement with the United States, so US-built equipment pays the Mercosur common external tariff, classified under the Mercosur nomenclature and charged on the CIF value. Argentina import duty rates for capital goods vary by NCM code, and Decreto 513/2025 cut the Argentina customs duty on 27 strategic machines and tools to 12.6 percent.
The Argentina import tax stack adds a 3 percent statistics fee and IVA at 21 percent, or 10.5 percent for goods on the reduced list, plus advance income tax and IVA collections at clearance. The importer registers with ARCA, the tax and customs authority, and files the declaration directly or through a despachante de aduana. Under Incoterms 2020, oil operators with import desks in Buenos Aires usually buy FCA at a US port, plants that want the sea leg arranged choose CFR or DAP, and DDP makes Paul responsible for clearance, duty and IVA.
How an Argentine project with Paul Industries is delivered
Paul Industries delivers an Argentine project in nine stages, with the 50 Hz basis, the provincial registration items and the shipping route fixed in the first two. The table names the document each stage contributes.
| Stage | Work | Document for the Argentine file |
|---|---|---|
| 1. Design basis | Duty, climate and altitude, 380/220 V 50 Hz supply, seismic zone, province, NCM codes | Basis memorandum and applicable rule list |
| 2. Engineering | P&IDs, 50 Hz equipment selection, vessel and piping design, panel design to AEA 90364 | Calculations, metric drawings, single-line diagrams |
| 3. Fabrication | Welding and assembly with traceable materials, panel build | Material certificates, weld and NDT records |
| 4. Factory test | Hydrostatic tests, motor runs on a 50 Hz drive, control checks, owner witness | Test report and cleared punch items |
| 5. Shipping | Export crating, ocean freight to Buenos Aires, Rosario or Bahia Blanca, inland haul | Invoice, packing list, certificate of origin, NCM codes |
| 6. Erection or supervision | Setting, anchoring, piping and cabling | Erection records, as-installed markups |
| 7. Start-up | Flushing, rotation checks, grounding and continuity tests, first fluid | Start-up report, SRT 900/2015 measurement records |
| 8. Commissioning | Performance runs, IQ and OQ for ANMAT-regulated plants | Executed protocols and data |
| 9. Handover | Spanish training, spare parts, service program | Spanish manuals, as-built drawings, habilitacion support file |
Argentina keeps UTC-3 all year, two hours ahead of US Eastern standard time and one hour ahead during US daylight saving, so a factory test that starts in the American morning lands in the Buenos Aires late morning. Argentine engineers follow witness tests and design reviews during office hours, and Paul archives every drawing, calculation and PLC program so later changes start from the as-built record.
Who builds process systems for plants in Argentina?
Paul Industries builds process systems for plants in Argentina, from separators, chemical injection skids and produced water treatment for Vaca Muerta to brine handling and water treatment for lithium plants, and from steam and heat exchange systems for Rosario oilseed plants to purified water and CIP systems for drug makers in Buenos Aires. Every system is selected for 50 Hz, wired for 380/220 V to AEA 90364, documented for provincial registration and ANMAT where they apply, factory tested, shipped, installed or supervised, and commissioned. Plants in Neuquen, Salta, Jujuy, Catamarca, Rosario, Buenos Aires and Bahia Blanca deal with one contractor and one document trail.
What drives the cost of process equipment shipped to Argentina?
The delivered cost of process equipment for an Argentine plant depends on five factors outside the fabricated price: 50 Hz re-selection, the ocean voyage and long inland haul, Spanish and registration documents, the Mercosur duty and tax stack under the chosen Incoterm, and the share of installation Paul carries. Paul’s proposal lists each one in US dollars.
- 50 Hz engineering. Larger pumps or higher-speed drives to recover the flow lost at 50 Hz, and motors wound for 380 V.
- Freight and haul. The voyage to the River Plate, river transit to Rosario, and the long roads to Neuquen or the Puna.
- Documentation. Spanish manuals, calculation packages for provincial habilitacion and GMP protocols.
- Duty and tax. The Mercosur tariff by NCM code, the 3 percent statistics fee, IVA and advance tax collections, paid by the buyer under FCA, CFR or DAP and by Paul under DDP.
- Installation. Oil field access rules, camp logistics and shift patterns, with supervision priced below full erection.
Paul Industries for Argentine oil, lithium, food and pharmaceutical plants
Paul Industries designs, fabricates and tests process equipment for Argentine plants in the United States, ships it to the River Plate or Bahia Blanca, and installs and commissions it or supervises the installation, handing over electrical, pressure equipment, seismic and qualification records in Spanish. Tell Paul the process duty, the site and its province, the owner’s standards and the start-up target, and the answer comes back as a delivery route, a program and a US dollar price. Request a quote for an Argentine project.
Standards referenced: Ley 19.587 and Decreto 351/79 (hygiene and safety at work) · Resolucion 231/96, Province of Buenos Aires (pressure equipment) · AEA 90364 Reglamentacion para la Ejecucion de Instalaciones Electricas en Inmuebles · SRT Resolucion 900/2015 · Resolucion 169/2018 electrical safety regime · INPRES-CIRSOC 103 · ANMAT Disposicion 4159/2023 (GMP) · ANMAT Disposicion 7998/2025 · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · IEC 60204-1 · Incoterms 2020 · ISPM 15
Frequently asked questions
Is an Argentina voltage converter enough to run a US-built pump skid?
An Argentina voltage converter changes voltage for small portable devices, and a hardwired skid also has to cope with 50 Hz, which slows a 60 Hz motor to five sixths of its speed and cuts pump head to roughly 70 percent. Paul Industries builds skids for Argentina with 380 V, 50 Hz motors and pumps selected on 50 Hz curves from the first drawing.
What supply does an Argentine plant give a skid's motors and controls?
Argentine plants run at 50 Hz with 380 V between phases for motors and 220 V phase to neutral for controls and lighting, and larger sites take medium voltage and transform down at each motor control center. Paul Industries confirms the supply at every connection point and builds panels, motors and protection to that basis.
Which equipment do Vaca Muerta operators buy from US builders?
Vaca Muerta operators buy three-phase separators, heater treaters, chemical injection skids, produced water treatment, tanks and compressor support systems for central processing facilities and gas conditioning plants in Neuquen. Paul Industries builds those units to ASME Section VIII vessel rules and B31.3 piping practice, sized for 50 Hz power and the Patagonian climate, and installs and commissions it in the field or supervises the installation.
What is the Vaca Muerta shale, and where is it?
The Vaca Muerta shale is a hydrocarbon-rich rock formation in the Neuquen Basin of west-central Argentina, mostly in Neuquen province, and it is now the source of most of the country’s oil, with a record of about 593,000 barrels per day in December 2025. Paul Industries builds separators, injection skids and water treatment for the facilities that process its output.
Where is lithium found in Argentina, and who builds brine skids for plants in Salta and Jujuy?
Argentine lithium comes from brine under the salt flats of the Puna in Salta, Jujuy and Catamarca. Paul Industries designs and builds brine transfer and reagent dosing skids, filtration units, heat exchangers and water treatment plants for lithium operations in Salta, Jujuy and Catamarca, using alloys and linings suited to concentrated chloride brines and selections derated for altitude. Paul installs and commissions them at the plant or supervises their installation.
How is a US-built boiler registered in the Province of Buenos Aires?
Resolucion 231/96 of the Province of Buenos Aires covers fired and unfired pressure equipment installed in the province, keeps a registry of qualified professionals, and grants a habilitacion certificate to each registered unit. Paul Industries supplies the design calculations, material certificates, weld and test records and nameplate data in Spanish for the registration file.
What does SRT Resolucion 900/2015 require of a new skid's electrical installation?
SRT Resolucion 900/2015 makes grounding resistance measurements and verification of the continuity of exposed conductive parts mandatory at Argentine workplaces, using AEA 90364 as the technical basis. Paul Industries designs skid grounding and bonding to AEA 90364 and hands over the measurement and continuity records taken at start-up.
What does ANMAT expect of a new water system at a Buenos Aires drug plant?
ANMAT inspects against Disposicion 4159/2023, its GMP guide aligned with PIC/S, so a new water system at a Buenos Aires plant needs approved specifications, traceable materials and finishes, and executed installation and operational qualification before it supports batches. Paul Industries prepares those documents in Spanish and runs the qualification with the plant’s quality unit.
Which pharmaceutical companies in Argentina buy GMP process systems?
National laboratories and multinational plants in Buenos Aires and its province buy purified water and clean steam systems, formulation tanks and CIP skids when they add capacity or upgrade lines for ANMAT inspection. Paul Industries designs and qualifies those systems and installs them inside operating plants with the change control their GMP files require.
Does Paul Industries install heat exchangers at oilseed plants near Rosario?
Paul Industries installs, starts up and commissions heat exchangers, process tanks, steam and boiler feed systems and effluent treatment at oilseed crushing, oil refining and biodiesel plants around Rosario, or supervises the installation, depending on the contract. Equipment reaches the Rosario hub by river from Buenos Aires or directly on vessels calling at its terminals.
How many days does a sailing from Savannah or New York to Buenos Aires take?
Direct services take about 20 days from Savannah and about 21 days from New York to Buenos Aires according to route planners, while multi-port rotations run past 40 days on some services. Barge or feeder transit up the Parana to Rosario and trucking inland come on top. Paul Industries picks the service that meets the site date and books it with the inland legs.
What are Argentina import duty rates on US process equipment?
US-built equipment pays the Mercosur common external tariff for its NCM code on the CIF value, and Decreto 513/2025 lowered the duty on 27 strategic machines and tools to 12.6 percent. Every import also pays the 3 percent statistics fee, IVA at 21 or 10.5 percent and advance tax collections. Paul Industries lists the expected charges in its proposal under the chosen Incoterm.
Are there still Argentina import restrictions on capital equipment?
The SIRA prior authorization system was replaced in December 2023 by the SEDI statistical system, and SEDI was repealed in 2025, so imports of capital equipment now clear through the normal customs declaration once the importer is registered with ARCA. Paul Industries prepares the invoice, packing list and origin documents the declaration needs.
How do seismic rules affect equipment for plants in Mendoza or San Juan?
INPRES-CIRSOC 103 places southern San Juan and northern Mendoza in Argentina’s highest seismic zone, so skid frames, vessel supports and tank anchorage there are designed for strong ground motion. Paul Industries designs supports and anchors to the zone the owner’s engineer specifies and includes the calculations in the turnover file.
Which Incoterm suits a Vaca Muerta operator buying from the United States?
Operators with import desks in Buenos Aires usually buy FCA at a US port and manage freight and clearance themselves, plants that want the sea voyage arranged choose CFR or DAP, and buyers who want one landed figure choose DDP. Paul Industries quotes any Incoterms 2020 term and itemizes freight, insurance, duty, fees and IVA.
Does a skid for Argentina need different pumps or just new motors?
Pumps usually change too: at 50 Hz a pump sized for 60 Hz delivers about five sixths of its flow and roughly 70 percent of its head, so Paul Industries re-selects the pump for the duty point at 50 Hz, or fits a larger impeller or a drive, as well as specifying 380 V motors. The factory test confirms each duty point on a 50 Hz supply.
What information lets Paul Industries price an Argentine project?
Pricing an Argentine job takes the process duty and flow sheet, the site, province and altitude, the electrical supply data, the owner’s standards and seismic zone, any boiler, vessel or GMP items, the start-up target and the preferred Incoterm. Paul Industries returns a US dollar proposal with engineering, fabrication, freight, installation option and program shown separately.
Planning process equipment for a plant in Argentina?
Share the process duty, the site and province, and the owner standards, and Paul Industries will return a 50 Hz design basis, a delivery route and a budget figure. Call 201-450-8280 or request a quote.