Paul Industries is a data center mechanical contractor in Minnesota for central chilled water plants, dry cooler and tower yards, liquid cooling loops, campus and riser piping, generator fuel systems and plumbing, from enterprise halls in the Twin Cities to hyperscale campuses in the south metro and greater Minnesota. Minnesota’s data center market changed in 2025, when the Legislature wrote a state definition of a data center, a fee, a utility tariff class, water permit conditions and a broader sales tax exemption into law, and each of those pieces lands in the mechanical scope. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania, takes data center mechanical work across Minnesota and in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
State definition Data center = 100 MW or more, cooling included (Minn. Stat. 216B.02)
Annual fee $2 million to $5 million for qualified large-scale data centers
Tax exemption scope Covers cooling systems and cooling towers as listed equipment
Tariff deadline PUC very large customer class due December 15, 2026
Reviewed November 2026

What does a data center mechanical contractor in Minnesota build?

A data center mechanical contractor in Minnesota builds everything that moves heat, water and fuel through the facility: the central plant of chillers, dry coolers or towers, pumps and heat exchangers; the facility water headers and risers; CRAH units, fan walls and the coolant distribution units and manifolds of liquid-cooled rows; glycol and water treatment systems; generator fuel storage and piping; domestic water, drainage and fire pump connections where they sit in the mechanical scope; and the controls points that tie it all to the building management system.

Data center mechanical systems in Minnesota carry two extra loads beyond the national pattern described on the data center mechanical contractors page. Every outdoor element is built for a climate where Minneapolis averages a January low of 9°F, and every large project now passes through state water and utility rules written specifically for data centers.

The mechanical scope of a Minnesota data center and what the state adds to each part
ScopeWhat it includesMinnesota factor
Central plantChillers, dry coolers or towers, pumps, plate heat exchangers, buffer tanksLong economizer season; glycol and freeze protection for zone 6A or zone 7 lows
Facility water distributionYard piping, headers, risers, valves, branch connections to hallsBuried and exposed piping depths and heat tracing set for frost and wind
White space coolingCRAH units, fan walls, containment, CDUs, rack manifoldsDry winter air drives humidification; liquid rows run warm water for free cooling
Water and treatmentMakeup, blowdown, filtration, chemical feed, meteringDNR permit terms; closed-loop and reuse conditions above 100 million gallons a year
Generator fuelDay tanks, bulk storage, fuel piping, polishingCold-weather fuel handling and tank heating for diesel stored outdoors
Plumbing and drainageDomestic water, sanitary, storm and condensate drainage2020 Minnesota Plumbing Code; frost protection on roof and yard drains

Proposed data centers in Minnesota and the review they pass through

Proposed data centers in Minnesota at the 100-megawatt scale now pass through a defined path of state reviews, and the mechanical design has to be far enough along to answer them. The 2025 law directs the Department of Natural Resources, the Pollution Control Agency, the Board of Water and Soil Resources and the Department of Health to refer data center permitting inquiries to Minnesota Business First Stop, the coordination program run by the Department of Employment and Economic Development.

For water, a data center expecting more than 100,000,000 gallons a year of consumptive use can ask the DNR for a preapplication evaluation, giving its peak-day and peak-month demand, typical annual use, the water it plans to draw from and the quality the plant needs; the DNR answers in writing about water availability at each candidate site. Those figures come straight from the heat rejection design, which is why Paul Industries prepares water balances for dry, adiabatic and evaporative options early, while the owner still has sites to compare. Planned data centers in Minnesota that settle the heat rejection strategy before the preapplication request avoid redesign later.

New data centers in Minnesota: what the mechanical plant looks like

New data centers in Minnesota fall into three broad types, and each one puts a different plant behind the white space. Enterprise halls inside corporate, hospital and university campuses usually draw on an existing central plant and add dedicated redundancy. Colocation halls in the Twin Cities suburbs build their own plants, sized for tenants whose densities change over the life of the lease. Hyperscale campuses build plant by plant as power arrives, increasingly around warm-water liquid cooling with dry coolers carrying most of the year.

A new data center Minnesota communities approve today is also likely to be denser than anything the same operator built five years ago, which pushes the mechanical scope toward larger headers, more pumping redundancy and coolant distribution units in the white space. Paul Industries designs those plants to carry the future liquid load from the first phase, because adding pipe capacity to a running hall later costs far more than sizing it once.

Typical mechanical plants for the three kinds of new Minnesota data center
Data center typeTypical plantMechanical priorities
Enterprise hall on a campusBranch from the campus chilled water plant, with a dedicated pump set and backup coolingTie-in without disturbing other buildings; redundancy the campus plant alone lacks
Suburban colocation hallAir-cooled or water-cooled chillers with economizers, CRAH or fan walls, space for CDUsFlexibility for changing tenant densities; phased plant additions
Hyperscale campusWarm-water plants on dry coolers or hybrids, CDU rows, campus yard loopsWater position under the 2025 law, power phasing, prefabrication at scale
Edge or modular site in greater MinnesotaPackaged air-cooled units or small dry cooler loopsZone 7 cold, remote monitoring, freeze-safe restart after outages

Data center plans for Minnesota that start with the plant type in mind reach permit faster, because the water balance, the electrical load of the cooling plant and the yard layout are known when the state and the utility ask for them. Minnesota data center construction schedules also turn on the season the site work starts, so Paul Industries maps prefabrication and yard piping against the frost calendar during design, well before award. Data center construction Minnesota owners plan for the spring thaw can have spools, skids and plant modules ready to set as soon as the ground opens.

The Minnesota data center law and the mechanical scope

The Minnesota data center law signed June 14, 2025 is the main piece of data center legislation Minnesota has passed, and its definition puts the mechanical plant inside the facility: a data center is a facility designed for a load of 100 megawatts or more, including its backup generation, power distribution, environmental control and cooling. Four parts of the law touch the mechanical contractor’s work.

  • Water. Permits for data centers above 100,000,000 gallons a year must reasonably consider conservation measures, naming closed-loop systems, reclaimed water and recycling water before discharge.
  • Tariffs. The Public Utilities Commission must set, for every public utility, a separate class for very large customers no later than December 15, 2026, with costs assigned to that class and protection for other customers against stranded costs.
  • Clean energy. Each public utility must offer a clean energy and capacity tariff that lets commercial and industrial customers pay for new clean resources serving their load.
  • Fee. A qualified large-scale data center pays an annual fee by peak demand: $2 million for 100 to 250 megawatts, $3 million above 250 and below 500, $4 million from 500 to below 750, and $5 million at 750 megawatts or more.

Minnesota data center regulation therefore shapes the plant indirectly: lower water use eases the permit, lower peak demand moves a campus between fee bands, and a lower cooling overhead reduces the share of the tariff spent on fans, pumps and compressors.

The Minnesota data center sales tax exemption and cooling equipment

The Minnesota data center sales tax exemption, in Minnesota Statutes section 297A.68, subdivision 42, covers enterprise information technology equipment, and the statute defines that term to include cooling systems, cooling towers and other temperature control infrastructure, along with power infrastructure, backup generation and racking. A qualified data center needs at least 25,000 square feet and $30 million of construction and equipment investment within 48 months; the 2025 law added a qualified large-scale data center at 25,000 square feet and $250 million within 60 months beginning after June 30, 2025.

The exemption works by certification and refund: the Department of Employment and Economic Development certifies the facility to the Department of Revenue, tax is paid on qualifying purchases and then refunded. The 2025 amendments kept the electricity exemption for qualified and refurbished data centers and left it out for the new large-scale category. For the mechanical contractor, the practical point is documentation: equipment lists, invoices and installation records that tie each chiller, tower, dry cooler and cooling component to the facility DEED has approved. Paul Industries organizes its procurement and turnover records so the owner’s tax team can match purchases to the Minnesota data center tax exemption claim without reconstructing them.

Utilities and the mechanical schedule: Xcel Energy, Minnesota Power and Otter Tail

Utilities set the pace of a Minnesota data center build more than any single trade, because a campus is energized in steps as substations, transmission and service agreements come online. Xcel Energy serves the Twin Cities and much of the state, Minnesota Power serves the northeast, Otter Tail Power the west, and cooperatives serve many rural sites; each brings its own large-load process, and the PUC’s very large customer class decision due by December 15, 2026 will shape the terms for new campuses.

An Xcel data center Minnesota campus in the south metro, a Minnesota Power data center site near Duluth and a cooperative-served site in the southwest all phase their mechanical work to the power schedule: the first hall’s plant and the shared yard piping arrive with the first service, and later halls follow each new increment. Paul Industries sizes headers, plant pads and yard corridors for the campus build-out on day one, so each phase connects without reworking what is already running.

Who is building data centers in Minnesota?

The companies building data centers in Minnesota include hyperscale operators, colocation developers and enterprises expanding their own halls, and the clearest public example is Meta’s Rosemount campus. Meta lists Rosemount as an investment of more than $800 million that broke ground in 2024, with about 1,000 skilled trade workers on site at peak construction and about 100 operating jobs once it is complete. Other hyperscale data centers in Minnesota have been proposed in metro and greater Minnesota communities, and the 2025 law was written with campuses of that size in view.

Whoever owns the campus, the mechanical work follows the same pattern: the plant concept is set early, then the shell, the power system and the mechanical system rise in parallel on one schedule, and data center construction contractors carrying the mechanical scope have to keep pace with both. Data center companies in Minnesota choosing a mechanical contractor look for a firm that designs, prefabricates, installs, tests and services the whole mechanical scope under one contract, so the plant arrives coordinated with the shell and the electrical schedule.

Minnesota codes on the data center mechanical scope

Minnesota codes on the data center mechanical scope come from the 2020 Minnesota State Building Code, administered by the Department of Labor and Industry: the 2020 Minnesota Mechanical and Fuel Gas Code for HVAC, refrigeration, hydronics and fuel gas, the 2020 Minnesota Plumbing Code for domestic water, drainage and fixtures, and the 2024 Minnesota Commercial Energy Code, an amended version of ASHRAE 90.1-2019, for efficiency, controls and verification. The energy code splits the state into climate zone 6A and a northern climate zone 7 that includes St. Louis, Lake, Cook and Itasca counties, so plant equipment and insulation are specified to the zone of the site.

Two state laws reach further. Minnesota Statutes section 326B.92 requires a permit application with the Department of Labor and Industry, or a municipality under agreement with it, before high pressure piping systems are constructed or installed, and Paul Industries confirms at design which plant systems the statute covers. Section 177.43 requires contracts for state projects to pay prevailing wage rates, which applies on university and agency data centers. Data center mechanical design packages from Paul Industries carry the calculations and schedules the plan reviewer needs under each of these.

Building a Minnesota data center through winter

Building a Minnesota data center through winter is a planning problem before it is a construction problem. Minneapolis averages 22 nights a year at or below 0°F, and northern sites run colder. Underground piping is laid to frost depth or insulated, yard work is sequenced before freeze-up where possible, and above-ground piping is tested with temporary heat or glycol rather than water left standing in an unheated shell.

  • Prefabricated pipe spools, pump skids and plant modules built indoors through the winter and set when the site is ready.
  • Temporary enclosures and heat for welding, testing and equipment setting.
  • Glycol-filled test loops where water would freeze during a pressure hold.
  • Snow management plans that keep equipment pads, crane paths and yard corridors clear.
  • Equipment protected on delivery, with outdoor units stored to the maker’s cold-weather instructions.

Paul Industries fabricates spools and skids off site under controlled conditions, so welding quality and schedule hold steady while the site is frozen; the methods are on the pipe fabrication page.

Data center mechanical services after turnover

Data center mechanical services after turnover keep the plant performing through its first winters and summers: preventive maintenance on chillers, pumps, dry coolers and towers; glycol and water treatment testing; CDU fluid sampling; controls tuning as IT load ramps; and seasonal tests deferred at turnover. Paul Industries offers service agreements on the systems it installs and on plants already in operation, with records kept in one place so later expansions start from known conditions.

Mechanical contractor vs HVAC contractor on a data center

The difference in mechanical contractor vs HVAC contractor on a data center is scope. An HVAC contractor typically focuses on air handling, ductwork and packaged equipment; a mechanical contractor on a data center carries the central plant, heavy piping, welding, pressure testing, liquid cooling loops, fuel systems and plumbing as well. Data center HVAC contractors handle part of the cooling chain; a data center mechanical contractor carries the whole chain from the rack manifold to the outdoor heat rejection and the generator fuel tank. Paul Industries takes the full mechanical scope, so the owner has one contract and one set of records.

Questions a Minnesota owner settles with the mechanical contractor before pricing
QuestionWhy it matters in Minnesota
What share of the load is liquid cooled, now and later?Warm facility water lets dry coolers carry most of the year; headers sized for the future save rework
Dry, adiabatic or evaporative heat rejection?Sets the DNR water position, yard area and winter freeze strategy
Which utility, and on what phasing?Xcel Energy, Minnesota Power, Otter Tail or a cooperative; power increments set the build sequence
Will the site use the sales tax exemption?Procurement and installation records have to tie cooling equipment to the approved facility
Is any public money involved?Prevailing wage on state projects; B3 Guidelines on work paid for with state bonds
Which climate zone?Zone 7 in the north means colder design points for glycol, insulation and equipment

How much does it cost to build a data center in Minnesota?

How much it costs to build a data center in Minnesota depends on the IT load and density, the redundancy level, the share of liquid cooling, the heat rejection choice, site conditions and utility work, the building type, and the phasing of the campus; the mechanical package is a major share of that total. For the mechanical scope alone, Paul Industries prices from the plant concept, the length of yard and riser piping, the number of halls and rows, the fuel system, the plumbing and the testing required, with winter construction measures and prevailing wage where they apply.

Owners asking how much does it cost to build a data center usually want a figure per megawatt, but Minnesota projects vary too much in water strategy, climate zone and phasing for a single number to hold. Paul Industries gives a budget range from comparable scope once the load, phasing and plant concept are known, then a firm price on the design. The state fee bands, from $2 million to $5 million a year for qualified large-scale sites, and the very large customer tariff belong in the owner’s operating model alongside the construction budget.

Who builds data centers’ mechanical systems in Minnesota?

Paul Industries builds the mechanical systems of data centers in Minnesota as one of the data center mechanical contractors Minnesota owners and general contractors bring in for the full scope: design-build or design-assist, prefabrication, central plants, piping, liquid cooling, fuel and plumbing, testing, commissioning of the mechanical systems, and service. On the question of who builds data centers, the answer for the mechanical heart of a Minnesota hall is Paul Industries, carrying design, fabrication, installation and service under one contract. Data center contractors Minnesota owners shortlist are judged on exactly that continuity, because the firm that built the plant is the one best placed to tune and expand it.

The same scope in the headquarters state is described on the data center mechanical contractor in Virginia page, and in a state with its own data center pause on the data center mechanical contractor in New York page. Minnesota pages on the parts of the scope include data center cooling in Minnesota, data center liquid cooling in Minnesota, data center commissioning in Minnesota, process piping in Minnesota, industrial welding services in Minnesota and tank fabrication in Minnesota for fuel and water storage. For the region, see the Midwest page.

Paul Industries on Minnesota data halls and campuses

Paul Industries designs, prefabricates, installs, tests and services the mechanical systems of Minnesota data halls and campuses, from a new computer room in a downtown tower to hyperscale phases in the south metro, Rochester, St. Cloud and the Duluth area. New data centers in Minnesota get one mechanical contract from the rack manifold to the yard, and owners comparing mechanical contractors Minneapolis offers for data hall work get the same single-contract scope. For the state overview see Minnesota. Send the load, phasing, site plan and utility schedule, and request a quote.

Standards referenced: Minnesota Statutes 216B.02, 216B.1622, 216B.1623 and 216B.72 (2025 data center law) · Minnesota Statutes 297A.68, subdivision 42 (data center sales tax exemption) · Minnesota Statutes 103G.265 and 103G.271 (DNR water-use permits) · Minnesota Statutes 326B.90 to 326B.925 (high pressure piping) · Minnesota Statutes 177.41 to 177.44 (prevailing wage) · 2020 Minnesota Mechanical and Fuel Gas Code · 2020 Minnesota Plumbing Code · 2024 Minnesota Commercial Energy Code (ASHRAE 90.1-2019) · ASME B31.9 and B31.3

Frequently asked questions

Who is the data center mechanical contractor for campuses in Rosemount, Farmington and the south metro?

Paul Industries builds central plants, yard piping, liquid cooling loops and fuel systems for campus-scale data centers in Rosemount, Farmington, Lakeville and across Dakota and Scott counties. Projects at that scale pass through DNR water review and Xcel Energy large-load phasing, so Paul Industries sizes headers and plant pads for the full campus on the first phase.

Does Paul Industries take data center mechanical work in Minneapolis, Saint Paul and the northern suburbs?

Yes. Paul Industries takes enterprise and colocation hall work in Minneapolis, Saint Paul, Fridley, Blaine, Plymouth and Maple Grove, including plant upgrades inside operating buildings, new liquid-cooled rows and connections to campus or district chilled water. Urban projects often hinge on roof and yard space, which shapes the heat rejection choice early.

Which contractor builds data center mechanical systems in Rochester, Mankato and southern Minnesota?

Paul Industries builds data center mechanical systems in Rochester, Mankato, Owatonna, Austin and across southern Minnesota, from hospital and research computing plants to new enterprise halls. Open sites there allow larger dry cooler yards, and campus sites often tie into existing central plants, which Paul Industries connects with redundancy confirmed first.

Does Paul Industries build data center mechanical systems in Duluth, the Iron Range and Moorhead?

Yes. Paul Industries builds plants and piping for data centers in Duluth, Hermantown, the Iron Range and the Red River Valley. St. Louis, Itasca and other northern counties fall in energy code climate zone 7, so glycol strength, insulation, heat tracing and snow management are designed for colder conditions than the Twin Cities.

What does the Minnesota data center tax exemption mean for cooling equipment purchases?

Minnesota’s exemption covers enterprise information technology equipment, and the statute’s definition includes cooling systems, cooling towers and other temperature control infrastructure. Tax is paid on qualifying purchases and refunded once DEED certifies the facility. Paul Industries keeps equipment lists, invoices and installation records that tie each cooling component to the approved site.

What is the Minnesota data center law passed in 2025?

Enacted as chapter 12 of the 2025 First Special Session and signed on June 14, 2025, the law set a 100-megawatt threshold for the state definition of a data center, set DNR water permit conditions and a preapplication evaluation for very large water users, created a very large customer tariff class and a clean energy and capacity tariff, added a large-scale category to the sales tax exemption, and set an annual fee of $2 million to $5 million.

How do proposed data centers in Minnesota get a water availability answer?

A data center expecting more than 100 million gallons a year of consumptive use can request a DNR preapplication evaluation, listing expected peak and average water demand, the intended source and any quality limits. The DNR replies in writing about constraints at each proposed site. Paul Industries prepares those water figures from the heat rejection design.

How should planned data centers in Minnesota choose between dry coolers and cooling towers?

By comparing annual water use against the DNR permit position and the city supply, yard area against the site plan, fan and pump energy against the utility tariff, and winter freeze risk against the site’s climate zone. Warm facility water for liquid-cooled racks tilts most Minnesota comparisons toward dry or adiabatic coolers. Paul Industries runs that comparison with the owner before the plant is fixed.

Who is building data centers in Minnesota, and what do they buy from a mechanical contractor?

Hyperscale operators, colocation developers and enterprises are all building, with Meta’s Rosemount campus the clearest public example. Each buys a central plant, facility water distribution, white space cooling or liquid cooling, water treatment, generator fuel systems and plumbing, plus testing and service. Paul Industries carries that whole mechanical scope under one contract.

How do Xcel Energy and Minnesota Power large-load terms affect a campus build?

Power arrives in increments as substations and service agreements are completed, and the mechanical build follows each step. The PUC has until December 15, 2026 to define that class utility by utility, with the class carrying its own costs. Paul Industries phases plant and yard piping to the power schedule and sizes shared systems for the full build-out.

Which wage rules cover mechanical labor on a state university data hall in Minnesota?

Minnesota Statutes section 177.43 requires prevailing wage rates on contracts for state projects, so it applies to university and agency data centers. Privately funded campuses fall outside that section unless a public funding agreement adds the requirement. Paul Industries keeps the wage records each contract requires.

Do Minnesota data center plants need high pressure piping permits?

Minnesota Statutes section 326B.92 requires a permit application with the Department of Labor and Industry, or a municipality under agreement, before high pressure piping systems are built. Whether a plant’s steam, fuel or process lines fall under the law depends on their conditions as the statute defines them; Paul Industries settles each system’s status at design.

Which mechanical and plumbing codes apply to a data center in Minnesota?

The 2020 Minnesota Mechanical and Fuel Gas Code covers HVAC, refrigeration, hydronics and fuel gas, the 2020 Minnesota Plumbing Code covers water and drainage, and the 2024 Minnesota Commercial Energy Code, based on ASHRAE 90.1-2019, covers efficiency and controls. Paul Industries designs and documents the mechanical package to the editions in force on the permit date.

How are generator fuel systems built for a Minnesota winter?

Diesel stored outdoors thickens in deep cold, so fuel systems use winter-grade fuel management, tank and line heating where needed, insulated and traced piping, and polishing systems that keep fuel clean through long storage. Paul Industries builds day tanks, bulk storage connections and fuel piping and tests them before the first generator run.

Which parts of a Minnesota data center are prefabricated?

Pipe spools, pump skids, CDU and header assemblies, plant modules and sometimes whole mechanical rooms are prefabricated off site and set when the building is ready. In Minnesota, prefabrication also moves welding and testing indoors through the winter. Paul Industries fabricates and tests these assemblies before shipment.

Can an existing Minnesota warehouse or plant become a data hall?

Many can, given enough power, floor loading, ceiling height and yard space for heat rejection. The mechanical survey checks structure for rooftop or yard equipment, routes for new headers, existing water service and drainage, and any legacy once-through well cooling, which Minnesota law requires to convert. Paul Industries surveys the building and returns a mechanical concept with budget.

Are equipment-only packages available for a Minnesota data center mechanical scope?

Yes. Paul Industries supplies chillers, dry coolers, pump skids, CDUs, prefabricated headers and fuel system components on a supply-only basis, alongside design-build and complete installation. Supply packages include submittals, factory test records and startup support for the owner’s team.

What does Paul Industries need to price mechanical work on a Minnesota data center?

Send the IT load by phase, densities and liquid-cooled share, the redundancy target, the site plan, the utility and power schedule, the water source, the drawings available, and whether public funding or the sales tax exemption applies. Paul Industries returns a budget range and plant concept, then a firm price on the design. Call 201-450-8280 or request a quote.

Building a data hall or campus in Minnesota?

Share the campus load plan, site layout, power schedule and water source. Call 201-450-8280 or request a quote.