Paul Industries designs, builds and services data center cooling in North Carolina, from chilled water plants and heat rejection yards to the piping that carries coolant into liquid-cooled racks, for hyperscale campuses in the western Piedmont, colocation halls in Charlotte and the Research Triangle, and enterprise rooms across the state. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries is an East Coast contractor whose North Carolina cooling work reaches from the mountains to the coast. The work runs from early plant sizing through installation, testing and long-term service.
Request a quote or call 201-450-8280
What does data center cooling in North Carolina cover?
Data center cooling in North Carolina covers the full chain that moves heat out of a server hall: the air handlers, fan walls or coolant distribution units inside the hall, the chilled water or condenser water loops that serve them, the chillers, cooling towers, fluid coolers or dry coolers that reject the heat, and the controls that keep all of it stable through a Piedmont summer. A North Carolina data center also has to answer three state-specific questions early: how many hours a year the weather allows economizer cooling, how much water the site can draw or buy, and how the Duke Energy service agreement shapes the size and timing of the electrical load that the cooling plant adds.
The national view of cooling methods, equipment types and design rules sits on the data center cooling systems page. This page goes into the North Carolina side: where the campuses are, what the weather at Charlotte, Raleigh, Hickory and Wilmington means for a plant, how water and power decisions are made here, and what an owner should expect from a cooling contractor working in the state.
Where are data centers in North Carolina, and why the western Piedmont?
Data centers in North Carolina cluster in two belts: the western Piedmont, where Catawba, Caldwell and Rutherford counties host some of the oldest hyperscale campuses in the Southeast, and the Charlotte and Research Triangle metros, where colocation and enterprise halls sit close to the banks, universities and life science companies that use them. Newer campuses are spreading east and south into counties such as Richmond and Lee, wherever land, transmission capacity and water line up.
The western Piedmont cluster is what people mean by the North Carolina data center corridor. Google’s campus at Lenoir dates to about 2007, and Google announced a further $1 billion for it in March 2026. Apple announced its Maiden campus in 2009, and Meta announced Forest City in 2010. Microsoft announced a minimum $1 billion program for four data centers in Conover, Hickory and Maiden in November 2022, and the county says the City of Hickory supplies water to every data center site there. These campuses are named here only as market facts; they show why a data center in Hickory, North Carolina or a data center in Lenoir, North Carolina sits inside an established power and fiber corridor rather than on raw land.
| Area | Market facts | Cooling questions that come first |
|---|---|---|
| Catawba Valley (Hickory, Conover, Maiden) | Apple campus announced 2009; Microsoft four-site program announced 2022; City of Hickory water supply | Water budget against a municipal system; cooler nights favor economizers; phased plant growth |
| Caldwell County (Lenoir) | Google campus since about 2007; $1 billion expansion announced March 2026 | Expansion beside operating halls; tie-ins to existing loops |
| Rutherford County (Forest City) | Meta campus announced 2010 | Foothill weather with more cold hours; freeze protection on outdoor equipment |
| Charlotte metro | Liquid-to-chip colocation at up to 50 kW per rack; Digital Realty Moores Chapel campus with its first building due in 2027 | High-density halls, urban sound limits, retrofits in older enterprise rooms |
| Research Triangle (Raleigh, Durham, RTP) | Enterprise, university and life science computing; colocation near Raleigh and Durham | Campus chilled water tie-ins, research clusters with dense racks |
| Richmond County (Rockingham) | Amazon $10 billion campus on nearly 800 acres, announced June 2025 | Plant standardization across many buildings; water strategy at scale |
| Lee County (Sanford) | CyrusOne campus with closed-loop cooling, about 1,250 gallons a day per building | Waterless heat rejection and the extra power it draws on hot days |
| The Triad and Rockingham County | Conversions of former industrial plants, such as the Madison campus in a former Unifi facility | Retained structure and utilities, roof and yard space for new heat rejection |
North Carolina data center development is moving faster than any single list can track, and the North Carolina data center market now spans hyperscale, colocation and converted industrial sites, which is why the cooling questions in the right-hand column matter more to an owner than the count. Paul Industries works with each owner on the specific site: the utility service, the water source, the soil and yard space for heat rejection, and how many phases the plant has to grow through.
North Carolina weather and the size of a cooling plant
North Carolina weather sizes a cooling plant through two numbers, the hottest dry bulb the heat rejection equipment must handle and the highest wet bulb a cooling tower must work against, and both differ more across the state than buyers often expect. Hourly airport observations from 2021 through 2024 show Hickory running noticeably cooler than Charlotte, Raleigh running the hottest of the four sites below, and Wilmington carrying the most humid air.
| Station | Hours at 50 F or below | Hours a year at 90 F or above | Dry bulb exceeded 0.4% of hours | Wet bulb exceeded 0.4% of hours | Hours a year at 32 F or below |
|---|---|---|---|---|---|
| Charlotte (CLT) | 24% | 214 | 94 F | 78 F | 234 |
| Raleigh-Durham (RDU) | 25% | 276 | 96 F | 80 F | 306 |
| Hickory (HKY) | 29% | 78 | 91 F | 77 F | 367 |
| Wilmington (ILM) | 18% | 176 | 93 F | 81 F | 161 |
When a hyperscale operator builds a data center, North Carolina’s humid summers set the size of the heat rejection plant more than the peak temperature does. A wet bulb near 80 F at Raleigh and Wilmington pushes cooling tower leaving water into the mid 80s on the worst afternoons, so chillers have to be selected for higher condenser water temperatures than a dry inland climate would ask for. Air-cooled equipment sees the dry bulb instead, and the mid 90s at Charlotte and Raleigh set the rating point for air-cooled chillers and dry coolers.
The four-year record is a practical check rather than a replacement for the design data an engineer of record selects. Paul Industries uses figures like these to test a selection: whether a chiller still makes capacity at the hottest hour, how much headroom a dry cooler has at 96 F, and how many hours a year a free-cooling coil actually carries the load.
How many economizer hours does a Charlotte or Raleigh plant get?
A water-side economizer in Charlotte or Raleigh carries the full load for roughly a third to almost half of the year, depending on how warm the hall’s chilled water is allowed to run. For a plant supplying 65 F water, a cooling tower and plate heat exchanger can carry the load alone when the wet bulb is near 55 F or lower, which happened in 45% of hours at Charlotte, 44% at Raleigh, 49% at Hickory and 36% at Wilmington over 2021 to 2024. A dry cooler with a 10 F approach needs air at 55 F or cooler for the same job, which was true in 32% of hours at Charlotte, 33% at Raleigh, 38% at Hickory and 26% at Wilmington.
Partial economizer hours add to those figures, because a free-cooling coil or plate exchanger can precool the return water and let the chillers run lighter for many more hours each spring and autumn. Raising the hall supply temperature is the strongest lever: every degree the IT equipment can accept moves hundreds of hours a year from mechanical cooling to economizer cooling, which is why Paul Industries reviews the server inlet limits before the plant is sized.
Duke Energy territory and the large-load tariff
Duke Energy serves most large data center sites in North Carolina through two utilities: Duke Energy Carolinas, which covers central and western North Carolina including Charlotte, Durham and the Triad, and Duke Energy Progress, which covers central and eastern North Carolina and the Asheville region. The utility’s 2035 forecast of demand from large customers rose to 8 gigawatts across the Carolinas, and data centers are a large part of that growth.
In October 2026 Duke reached a settlement with data center operators on a large-load tariff that would make an existing high-load-factor rate mandatory for new customers of this kind. Under the settlement, a new data center pays up front for dedicated facilities such as a new substation, while other transmission costs are recovered over the life of its contract; projects that signed with Duke on or before June 1, 2026 fall outside it. The settlement needs approval from the North Carolina Utilities Commission before it takes effect, so owners should treat its terms as pending.
The tariff matters to cooling because the cooling plant is the largest non-IT load on the bill and the part the owner can shape. A plant that relies on mechanical cooling for more hours raises the peak demand the utility has to serve and the energy the site pays for every year. The table below shows how much the cooling overhead alone is worth at North Carolina’s 2025 average industrial price of 7.79 cents per kilowatt-hour (EIA), against a US average of 8.51.
| Cooling overhead (kW of cooling per kW of IT) | Typical plant | Cooling energy per year | Cost per year |
|---|---|---|---|
| 0.40 | Older air-cooled plant, low supply temperature, little economizer use | 70,080,000 kWh | About $5.46 million |
| 0.25 | Water-cooled chillers with a partial water-side economizer | 43,800,000 kWh | About $3.41 million |
| 0.15 | Warm chilled water, full economizer for a large share of the year | 26,280,000 kWh | About $2.05 million |
| 0.10 | Liquid-cooled racks on warm facility water with dry coolers carrying most hours | 17,520,000 kWh | About $1.36 million |
The table is arithmetic on stated assumptions, not a quote, and an actual site’s rate depends on its service agreement. It shows the order of magnitude: on a 20 MW hall, moving from an older plant design to a warm-water design is worth millions of dollars a year in North Carolina, and that figure grows with every phase of a campus.
Water for cooling: what North Carolina sites are choosing
North Carolina data center water use depends almost entirely on the heat rejection method, and recent campuses in the state show the full range from evaporative towers to almost waterless closed loops. CyrusOne says each building on its Lee County campus is expected to use about 1,250 gallons of water a day on average with closed-loop cooling, mostly for restrooms, basic operations and limited humidification. Catawba County says the Microsoft sites there, once fully running, are projected to use about 1% of the City of Hickory’s daily water production capacity, relying mainly on less water-intensive cooling methods.
Evaporative cooling towers remain the most energy-efficient way to reject heat in a humid climate, but they consume water through evaporation, drift and blowdown, and they need a water treatment program to control scale, corrosion and Legionella. Dry coolers and air-cooled chillers use almost no water but draw more fan and compressor power on hot afternoons, which is exactly when Duke’s system peaks. Hybrid and adiabatic units sit between the two, spraying or wetting their coils only in the hottest hours.
Sites that draw their own water face a state rule as well. Under North Carolina General Statute 143-215.22H, anyone withdrawing 100,000 gallons a day or more of surface or ground water must register the withdrawal with the Department of Environmental Quality. Sites buying water from a municipal system work within the utility’s allocation and its pretreatment rules for blowdown discharged to the sewer. Paul Industries prices each option on the same basis, water, power and maintenance together, so the owner can compare a tower plant, a dry cooler plant and a hybrid on lifetime cost rather than first cost.
Chilled water plant choices for North Carolina halls
Chilled water plant choices for North Carolina halls come down to where the heat leaves the building and how warm the water can run, and most new plants in the state now pair higher supply temperatures with some form of free cooling. Water-cooled centrifugal or magnetic-bearing chillers with cooling towers use the least energy per ton where water is available. Air-cooled chillers with integrated free-cooling coils suit sites that have chosen to limit water use, and they keep the plant compact on a single roof or yard. Liquid-cooled racks change the picture again, since warm facility water at 80 F or more can often be cooled by dry coolers alone for most of the year; that work is covered on the data center liquid cooling in North Carolina page.
| Plant type | Water use | Where it fits in North Carolina | What to watch |
|---|---|---|---|
| Water-cooled chillers with towers and a plate exchanger economizer | Highest; evaporation and blowdown | Large campuses with an assured water supply | Tower water treatment, Legionella program, winter basin heating |
| Air-cooled chillers with free-cooling coils | Near zero | Water-limited sites, phased colocation buildings | Capacity at 94 to 96 F, sound at the property line, glycol in the coils |
| Dry coolers on a warm-water loop | Near zero | Liquid-cooled halls, cooler western Piedmont sites | Hot-hour trim cooling, coil fouling from pollen and dust |
| Adiabatic or hybrid fluid coolers | Low; water only in hot hours | Sites balancing water against peak power | Water quality on the pads or sprays, seasonal startup |
| Rear-door or in-row coolers on chilled water | Depends on the plant behind them | Older Charlotte and Triangle enterprise rooms gaining density | Leak detection under racks, condensation at low supply temperatures |
Redundancy follows the owner’s uptime target. Paul Industries designs and installs N+1, N+2 and 2N chiller and pump arrangements, dual-path piping where a single main would be a single point of failure, and thermal storage tanks that carry the hall through a chiller restart after a utility outage. Chillers for these plants are covered on the data center chillers page.
Heat rejection yards through North Carolina seasons
Heat rejection yards in North Carolina have to work through humid summers, occasional hard freezes and coastal storms, and the equipment details that look minor on a drawing decide how a plant behaves in those conditions. Raleigh averaged about 306 hours a year at or below freezing over 2021 to 2024 and Hickory about 367, so cooling tower basins, outdoor piping and idle coils need heat, drain-down or glycol. Wilmington froze far less often but faces salt air and hurricane-season winds, which call for coated coils, corrosion-resistant fasteners and equipment anchored to the wind loads the building code sets.
Sound is the other yard constraint. Dry cooler and air-cooled chiller fans run hardest on hot nights, when neighbors have windows open, and data center proposals have drawn organized opposition in several North Carolina communities; Durham adopted a two-month moratorium on new data center projects in 2026. Paul Industries lays out yards with low-speed fans, sound attenuation and equipment spacing that keeps recirculation of hot discharge air from cutting capacity on the hottest days.
Adding cooling to an operating North Carolina data center
Adding cooling to an operating North Carolina data center means installing new chillers, pumps or distribution while the existing plant carries the live load, and the plan is built around keeping redundancy intact at every step. Many enterprise and financial-services rooms in Charlotte and the Triangle were built for air-cooled racks at a fraction of today’s densities, and owners there are adding chilled water capacity, rear-door coolers or coolant distribution units without moving out.
Paul Industries surveys the existing plant first: actual loads from trend data, spare capacity in chillers, pumps and towers, the condition of the piping, and the valves that will be needed to isolate tie-in points. New mains are prefabricated off site where possible, connected during planned windows under a written method of procedure, flushed and pressure tested before they see the live system, and started up with the commissioning team watching the existing plant as closely as the new equipment. Testing and turnover for these jobs are covered on the data center commissioning in North Carolina page.
What does data center cooling cost in North Carolina?
Data center cooling cost in North Carolina is set by the IT load and its density, the redundancy level, the heat rejection method chosen for water and power, the number of phases the plant must grow through, and whether the work is a new campus building or a retrofit inside an operating hall. Equipment pricing for chillers, dry coolers and switchgear has moved with demand, so a figure from another project rarely transfers cleanly.
Paul Industries prices cooling work as supply-only for owners who install with a general contractor, as design-build where Paul Industries carries the mechanical design and installation under one contract, or as complete installation to an engineer’s drawings. Owners receive a budget figure built from similar plants early, and a fixed price follows when load, redundancy, site and schedule are settled. The operating cost in the table above often outweighs the difference between two first-cost bids within a few years, so both are shown side by side.
Who designs and builds data center cooling in North Carolina?
Paul Industries designs, fabricates, installs, tests, starts up and services data center cooling in North Carolina, working at hyperscale campuses, colocation buildings, enterprise rooms and university computing centers in every region of the state. Among data center cooling contractors working in the Carolinas, Paul Industries carries the whole mechanical chain under one contract: chillers, towers and dry coolers, pumps and piping, air handlers and fan walls, coolant distribution, controls integration, flushing, testing and records.
Paul Industries is headquartered in Kilmarnock, Virginia; it was formerly based in northern New Jersey and then Pennsylvania, and it takes work across North Carolina, in all 50 states and at plants outside the United States through its international work. Owners comparing state practice can read the data center cooling page for Virginia, the headquarters state, or the Pennsylvania data center cooling page. The full mechanical scope for North Carolina halls is set out on data center mechanical contractors in North Carolina, chiller service on chiller repair in North Carolina, and the rest of Paul’s work in the state on the North Carolina page.
Paul Industries cooling work across North Carolina
Paul Industries builds and maintains data center cooling plants across North Carolina, from Hickory, Lenoir and Forest City to Charlotte, Raleigh, Durham, Greensboro, Fayetteville and Wilmington: plant design and selection, prefabricated piping, chiller and dry cooler installation, economizer controls, retrofits in live halls and scheduled service afterward. Send the IT load, the planned density, the site and the target dates, and request a quote for the cooling plant.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · ASHRAE 15 · ASME B31.9 · ASME B31.3 · North Carolina State Building Code: Mechanical Code · North Carolina Energy Conservation Code · N.C. Gen. Stat. 143-215.22H (water withdrawal registration)
Frequently asked questions
Who provides data center cooling in Charlotte and the Charlotte metro?
Paul Industries provides data center cooling in Charlotte and across Mecklenburg, Gaston, Cabarrus and Union counties, for colocation halls, bank and enterprise rooms and new campus buildings. Work in data centers in Charlotte often means adding density to rooms built for air-cooled racks, so plant surveys, rear-door or in-row coolers and new chilled water capacity are common scopes there, installed while the hall stays live.
Does Paul Industries build cooling plants in Hickory, Conover and the rest of the Catawba Valley?
Yes. Paul Industries builds and services cooling plants in Hickory, Conover, Maiden, Newton and Lenoir, where the North Carolina data center corridor began. Plants there grow in phases beside operating buildings, so new chillers, towers or dry coolers are tied into existing loops under a written method of procedure. Hickory’s cooler weather gives economizers more hours than Charlotte, which shapes how the plant is selected.
Who handles data center cooling in Raleigh, Durham and Research Triangle Park?
Paul Industries handles data center cooling in Raleigh, Durham, Cary, Morrisville and Research Triangle Park, for enterprise rooms, colocation buildings, university computing and life science companies. Raleigh had the hottest summers of the four airports in the table on this page, with a wet bulb near 80 F in the worst hours, so tower and chiller selections there need more condenser water headroom.
Can Paul Industries cool a data center in Wilmington or elsewhere on the coast?
Yes. Paul Industries designs and installs cooling for data rooms and halls in Wilmington, New Bern, Jacksonville and the rest of the coast. Coastal plants face the most humid air in the state, salt-laden wind and hurricane season, so coils are coated, fasteners and enclosures resist corrosion, and outdoor equipment is anchored to the wind loads in the building code.
Does Paul Industries work on data center cooling in Greensboro, Winston-Salem and the Triad?
Paul Industries works on data center cooling across the Triad, including Greensboro, Winston-Salem, High Point and the converted industrial buildings in Rockingham and Forsyth counties. Conversions often have strong power service and large roofs or yards but piping and structure built for a different use, so the survey checks floor loading, roof capacity and the route for new mains before the plant is laid out.
How many data centers in North Carolina are there?
Counts vary by tracker, because each one decides differently whether to count campuses, individual buildings, enterprise rooms or announced projects. What matters for a cooling plant is the trend: hyperscale campuses in the western Piedmont continue to expand, new campuses have been announced in Richmond and Lee counties, and Charlotte and the Triangle keep adding colocation and enterprise capacity.
Where are data centers in North Carolina concentrated?
The biggest cluster is in the western Piedmont, around Hickory, Maiden, Conover, Lenoir and Forest City, followed by the Charlotte metro and the Research Triangle. Newer campuses are in Richmond County near Rockingham, Lee County near Sanford and the Triad, where former industrial sites already have heavy power service. Each area brings a different mix of weather, water and power constraints.
Are data centers being built in North Carolina right now?
Yes. Data centers being built in North Carolina in 2026 include Microsoft’s Catawba County sites, which were in site preparation and early construction, Google’s $1 billion Lenoir expansion announced in March 2026, and colocation buildings around Charlotte such as Digital Realty’s Moores Chapel campus, whose first building is due in 2027. Amazon’s Richmond County campus was announced in June 2025.
Are data centers in western North Carolina cooled differently from those in Charlotte?
Data centers in western North Carolina benefit from cooler weather: Hickory spent 38% of hours at 55 F or below over 2021 to 2024, against 32% at Charlotte, and saw about 78 hours a year at 90 F or above against 214. More hours of dry cooler and economizer operation mean less chiller run time, but the same sites need more freeze protection on outdoor equipment.
How much water does a North Carolina data center use for cooling?
Water use ranges from a few thousand gallons a day for a closed-loop campus to far more for an evaporative tower plant. CyrusOne says each Lee County building is expected to use about 1,250 gallons a day on average. A tower plant evaporates water in proportion to the heat it rejects and adds blowdown, so its use depends on load, weather and the cycles of concentration the treatment program allows.
Does a North Carolina data center have to register its cooling water use?
A site that withdraws 100,000 gallons a day or more of surface or ground water must register the withdrawal with the North Carolina Department of Environmental Quality under General Statute 143-215.22H. Sites on municipal water work within the supplier’s allocation instead, along with its sewer use rules for tower blowdown. Paul Industries sizes the water side of the plant around whichever path applies.
How does the Duke Energy large-load tariff affect a cooling plant decision?
The October 2026 settlement would make new high-load-factor customers pay up front for dedicated facilities such as substations and recover other transmission costs over their contracts, pending approval by the North Carolina Utilities Commission. A cooling plant that runs less mechanical cooling lowers both the peak demand the site commits to and its annual energy, so the plant design and the service agreement should be developed together.
What supply air and water temperatures suit a hall in the North Carolina Piedmont?
Most new halls run server inlet air within the ASHRAE recommended range of about 64 to 81 F, with chilled water supply in the 60s rather than the 40s of older plants. In Piedmont weather, moving chilled water from 55 F to 65 F lifts the share of hours a water-side economizer can carry the full load from about 27% to about 45% at Charlotte and Raleigh. Paul Industries confirms the IT inlet limits before fixing the plant temperatures.
Can an older chilled water plant in a Charlotte bank data room be upgraded without a shutdown?
In most cases, yes. The upgrade is staged so that redundancy is confirmed before each piece of equipment is isolated, new piping is prefabricated, flushed and tested before it is connected, and tie-ins happen in planned windows with valves installed in earlier phases. Where a room has no spare capacity, temporary chillers carry the load while permanent equipment is replaced.
Which delivery routes does Paul Industries offer for North Carolina cooling plants?
Paul Industries offers supply-only equipment and prefabricated piping for owners installing with a general contractor, design-build where Paul Industries carries the mechanical design, installation and testing under one contract, and complete installation to an engineer’s drawings. Service contracts for chillers, towers, dry coolers and water treatment can follow turnover so one firm keeps the whole plant.
How is a North Carolina cooling plant protected through a winter freeze?
Tower basins get heaters or are drained to indoor sumps, outdoor piping is heat traced and insulated, dry coolers and air-cooled chiller coils run on a glycol mixture sized for the site’s coldest hours, and idle equipment is drained or kept circulating. Raleigh and Hickory averaged roughly 300 to 370 hours a year at or below freezing over 2021 to 2024, enough to split an unprotected coil.
How does North Carolina's power price compare for cooling?
North Carolina’s average industrial electricity price was 7.79 cents per kilowatt-hour in 2025, below the US average of 8.51, according to the EIA. A lower price does not make cooling efficiency less valuable on a large campus: at that rate, every 0.05 of cooling overhead on a 20 MW hall running all year is worth about $680,000 annually.
What should a North Carolina data center send for a cooling plant quote?
Send the IT load by phase and the planned rack densities, the redundancy target, the site location and utility, the water source, any existing drawings or trend data for a retrofit, and the dates for each phase. With those, Paul Industries returns a budget range from comparable scope and the steps to a firm price.
Sizing a cooling plant for a North Carolina data hall?
Send the IT load by phase, rack densities, redundancy target, site and water source, plus any drawings or trend data for an existing plant. Call 201-450-8280 or request a quote.