Paul Industries designs and builds data center cooling in Idaho, from economizer air handlers and evaporative units to chilled water plants, dry coolers and the piping that feeds liquid-cooled racks in the Treasure Valley, eastern Idaho and the north. Idaho gives a cooling designer dry summer air, long cold nights, sites between 1,400 and 4,700 feet above sea level and a fast-growing utility system. Paul Industries sizes each plant for those conditions and supplies, installs, starts up and maintains it.
Request a quote or call 201-450-8280
What shapes data center cooling in Idaho?
Data center cooling in Idaho is shaped by four state conditions that rarely line up elsewhere: summer air dry enough that a 90 F afternoon carries a wet bulb near 61 F, winters cold enough to freeze an unprotected coil for months, altitude that thins the air every fan and condenser moves, and an electric system adding demand faster than at any point in its planning history. Each changes a line of the design.
The dry air opens evaporative and indirect evaporative cooling to most of the year. The cold opens free cooling for even more of it, but brings freeze protection, low humidity and wildfire smoke into the control sequence. Altitude reduces the mass of air a fan delivers, so air-side equipment selected from sea-level catalog data comes up short. Power availability decides when a campus can grow, which makes the energy a cooling plant draws a scheduling issue as well as a cost. Methods and equipment types for every climate sit on the national data center cooling systems page; the sections below stay with Idaho.
How many hours can an Idaho data hall cool with outside air?
An Idaho data hall can cool with outside air, or with a water-side economizer, for most hours of a normal year: in NOAA’s 1991 to 2020 hourly normals for the Boise airport, 4,939 of the year’s 8,760 hours have a normal temperature at or below 55 F, and 3,486 sit at or below 45 F. Eastern Idaho is colder still, with an annual cooling load at Idaho Falls of 249 cooling degree days against 1,045 at Boise.
Hourly normals smooth out heat waves, so the plant is never sized on them; peak capacity comes from extreme design data and the owner’s chosen return period. What the normals show is the shape of the year. A Boise plant spends long stretches with mechanical cooling off or trimming, and only a summer band of afternoons where compressors carry the full load. That pattern favors equipment that is efficient at part load, controls that move cleanly between modes, and an economizer sized for full IT load rather than a partial one.
| Location | Elevation | July normal high / low | January normal high / low | Days at 90 F or above | Nights below 0 F |
|---|---|---|---|---|---|
| Boise | 2,823 ft | 92.7 F / 61.9 F | 38.8 F / 25.5 F | 54.9 | 0.9 |
| Twin Falls | 4,166 ft | 88.4 F / 57.7 F | 37.0 F / 21.1 F | 42.0 | 1.9 |
| Pocatello | 4,451 ft | 89.3 F / 52.3 F | 34.2 F / 17.1 F | 39.1 | 8.1 |
| Idaho Falls | 4,733 ft | 86.6 F / 49.3 F | 28.7 F / 12.1 F | 26.4 | 14.8 |
| Lewiston | 1,430 ft | 90.8 F / 60.9 F | 42.1 F / 30.3 F | 44.1 | 0.3 |
Why does dry Idaho air favor evaporative cooling?
Dry Idaho air favors evaporative cooling because the gap between dry bulb and wet bulb is wide: at Boise’s July 4 p.m. normal of 90.7 F with a 40.2 F dew point, the wet bulb works out near 61 F at the airport’s pressure. Any device that trades water for temperature, from a direct evaporative media section to an indirect heat exchanger or an adiabatic pad on a dry cooler, has a large spread to work with.
Indirect evaporative units keep outside air out of the hall while using that spread, which protects the room from smoke and dust and holds humidity steady. Direct evaporative cooling adds moisture to supply air, useful in winter when the hall is too dry and something to limit in summer. Adiabatic assist on dry coolers or air-cooled condensers wets the entering air only on the hottest hours, so water use follows the weather instead of running all year. Each option has a water bill and a water source attached, and Paul Industries prices both with the equipment.
Altitude correction for fans, coils and condensers
Altitude correction matters across Idaho because the air at Boise is about 8 percent less dense than at sea level, and at Idaho Falls about 13 percent less, so a fan moving a given volume carries less mass and less heat. Under the standard atmosphere, Boise’s airport elevation of 2,823 feet gives a pressure near 13.3 psia; Pocatello, Twin Falls and Idaho Falls sit between roughly 4,200 and 4,700 feet.
The correction reaches every air-side component. Computer room air handlers and fan walls need more airflow to remove the same heat, and fan power at a given volume falls with density but rises with the extra volume. Air-cooled chillers, condensers and dry coolers lose heat rejection per fan, so a selection made from sea-level ratings comes up short on the hottest day. Generator radiators and engine output derate as well. Paul Industries corrects every selection to site elevation and to the extreme design temperature before equipment is ordered.
| Site | Elevation | Density vs sea level | Effect on air-side equipment |
|---|---|---|---|
| Lewiston | 1,430 ft | About 0.96 | Small correction; check condenser ratings on hot days |
| Boise, Meridian, Nampa and Kuna | About 2,800 ft at Boise | About 0.92 | More airflow per kW of heat; derated air-cooled condensers and dry coolers |
| Twin Falls and the Magic Valley | 4,166 ft | About 0.88 | Larger fan selections; generator and radiator derate |
| Pocatello | 4,451 ft | About 0.88 | Same corrections plus deeper freeze protection |
| Idaho Falls | 4,733 ft | About 0.87 | Largest airflow correction in this group; long freeze season |
Running a data center in cold climate conditions across eastern Idaho
A data center in cold climate conditions such as Idaho Falls or Pocatello gains free cooling hours but has to protect water-filled equipment through a long freeze season: NOAA’s normals give Idaho Falls 14.8 nights a year below 0 F and Pocatello 8.1. Any coil, cooling tower basin, dry cooler or exposed pipe that holds water needs a strategy for those nights.
The usual answers are a glycol loop on the outdoor side with a plate heat exchanger to the building water, basin heaters and heat-traced makeup lines on towers, and mixing dampers that temper outside air before it reaches a coil. Glycol strength is chosen for the coldest expected temperature, and the pump and heat exchanger selections account for the heavier, more viscous fluid. Cold air is also dry air. Mixing very cold outside air into a hall can push the room below the lower moisture limit in the ASHRAE recommended envelope, a dew point of -9 C (15.8 F), so many Idaho designs add humidification or limit outside air in deep winter.
Data center cooling regulations: Idaho’s energy code exemption
Data center cooling regulations in Idaho start with the state’s building rules, IDAPA 24.39.30, which adopt the 2018 International Energy Conservation Code with an Idaho amendment, Section C101.5.2, that exempts buildings or portions heated or cooled exclusively to keep industrial, electronic or manufacturing equipment at its operating temperature. A data hall that qualifies must still be separated from conditioned office and support space by an envelope that meets the code.
The exemption does not remove the mechanical code. Idaho’s HVAC rules, IDAPA 24.39.70, adopt the 2018 International Mechanical Code with amendments, and Idaho Code 54-5016 requires a permit from the authority having jurisdiction before an HVAC system is installed, extended or altered. Office, battery and support spaces outside the exempt area follow the energy code in full, including its economizer rules, where the Idaho amendments add an exception for systems facing unusual outdoor contaminants that need special filtration. The Building Code Board has been preparing a move to the 2024 code editions, so Paul Industries confirms the edition in force with the permit office for each project. Owners chasing efficiency targets usually design to ASHRAE 90.4 anyway, exemption or not, because the energy bill follows the plant either way.
Wildfire smoke and the economizer sequence
Wildfire smoke is a design condition for Idaho air-side economizers, because the state’s Department of Environmental Quality notes that large wildfires are becoming more frequent in the western United States and runs a Wildfire Smoke Event Response Protocol when smoke threatens Idaho. A hall that pulls outside air through its filters during a smoke event loads them quickly and can carry particles onto server inlets.
Smoke modes handle it. Outdoor particle or air quality sensors close the economizer dampers above a set point, the hall moves to recirculation with mechanical or indirect cooling, and the sequence returns to outside air only after readings fall. The mechanical plant has to carry full load in recirculation on a hot, smoky August afternoon, which is the condition that sizes it. Filter banks are sized for the higher pressure drop of loaded media, and filter change procedures are written before the first smoke season. Indirect evaporative units and water-side economizers avoid most of the problem, since outside air never reaches the hall.
Idaho data center water and closed-loop cooling
Idaho data center water use depends on whether the heat leaves through evaporation or through dry heat exchange, and the Treasure Valley’s hyperscale example shows how far a dry design can go. Meta, which announced in September 2026 that its Kuna, Idaho data center is online and operational, describes the campus as cooled by a closed-loop, liquid-cooled system that uses zero water for the majority of the year, and says it invested more than $100 million in a new water and wastewater system for the City of Kuna.
For other owners the trade is site by site. Cooling towers reject heat with less fan and compressor energy than dry equipment, and in Idaho’s dry air the evaporation per ton is high while the water supply is a city or water right question. Dry coolers with adiabatic assist on peak hours cut water use sharply at some cost in fan energy and footprint. Closed-loop systems with a dry cooler and a trim chiller keep water off the roof almost entirely. Paul Industries models water and energy for each arrangement against the site’s supply and sewer limits, and treats blowdown and makeup water as part of the design rather than an afterthought.
Data center cooling options for Idaho halls
Data center cooling options for an Idaho hall fall into five arrangements, and the right one depends on rack density, water supply, the site’s elevation and how much outside air the owner is willing to bring into the white space. Many campuses combine two, such as indirect evaporative air handling for air-cooled rows and a dry cooler loop for liquid-cooled racks.
| Arrangement | Where it fits in Idaho | Water use | Idaho watch item |
|---|---|---|---|
| Direct air-side economizer with evaporative assist | Air-cooled halls in the Treasure Valley and Magic Valley | Low to moderate, summer only | Smoke lockout and winter humidity control |
| Indirect evaporative air handlers | Halls that keep outside air out of the white space | Moderate in summer, little in winter | Freeze protection on wet sections; altitude-corrected fans |
| Water-cooled chillers, towers and water-side economizer | Large chilled water plants with high load factor | Highest, all year with towers running | Tower basin heat and makeup supply; water treatment |
| Air-cooled chillers with integral free cooling | Sites with limited water or phased growth | None at the plant | Condenser derate at altitude; glycol strength |
| Dry coolers with trim chillers for liquid loops | Direct-to-chip and rear-door loops at warm water temperatures | None, or adiabatic on peak hours | Glycol on outdoor side; peak-day approach |
Data center cooling equipment and the refrigerant rule
Data center cooling equipment ordered for an Idaho hall has to meet the EPA’s Technology Transitions rule, which sets a global warming potential limit of 700 for data center, computer room air conditioning and IT equipment cooling from January 1, 2027. Equipment schedules written now should name compliant refrigerants, since a long-lead order that slips past the date can arrive under the new limit.
Power growth and the cooling share of the load
Power growth in southern Idaho is the backdrop to every cooling decision: Idaho Power’s 2025 Integrated Resource Plan expects peak demand to grow nearly 45 percent, about 1,700 megawatts, over 20 years, with nearly 1,000 megawatts of that in the first five. The Idaho Public Utilities Commission acknowledged the plan in February 2026.
Large campuses meet that growth through special contracts: the commission’s 2025 annual report notes that Idaho Power customers taking more than 20,000 kilowatts must arrange service under one, and the utility says new large-demand customers pay for their own interconnection. Cooling energy is the part of a facility’s load the mechanical design controls. At the 2025 Idaho industrial average of 7.88 cents per kilowatt-hour reported by the EIA, each 0.1 of power usage effectiveness on a 10 MW IT load is about 8.76 million kilowatt-hours a year, or roughly $690,000. Northern Idaho sites are served by Avista and much of eastern Idaho by Rocky Mountain Power, with their own tariffs and planning.
Data center cooling: Boise, Meridian, Nampa and Kuna
Data center cooling Boise-area campuses use runs hottest in Idaho, with about 55 days a year at 90 F or above, but with the dry air that makes indirect and evaporative cooling efficient. Treasure Valley plants are sized for the hot afternoon in recirculation mode, because smoke season and peak heat often arrive together.
Twin Falls, Pocatello and Idaho Falls
Magic Valley and eastern Idaho sites trade fewer hot days for colder nights and higher elevation. Freeze protection, glycol selection and altitude-corrected heat rejection carry more weight there, and the free cooling season is longer than in Boise.
Coeur d’Alene and Lewiston
North Idaho halls sit lower and, in Lewiston’s case, warmer in summer than eastern Idaho, with Avista as the electric utility. Cooling plants there follow the Treasure Valley pattern with smaller altitude corrections.
What does data center cooling cost in Idaho?
Data center cooling cost in Idaho is set by the data center cooling load, the arrangement chosen, the redundancy level and the site’s elevation, and a firm price follows a defined load, density and phasing plan. Altitude adds fan and coil capacity, freeze protection adds glycol, heat exchangers and heat tracing, and water-based designs add treatment and makeup systems.
- Load and density: total IT load, rack density, the share on liquid cooling and the growth phases.
- Redundancy: N+1, N+2 or 2N on chillers, air handlers and pumps.
- Site corrections: elevation, extreme design temperature, coldest design night.
- Water: tower or adiabatic makeup, blowdown handling and treatment.
- Controls: economizer and smoke sequences, mode changes and monitoring.
- Schedule: phased installs that match utility capacity as it arrives.
Tax treatment can change the equipment budget. Idaho Code 63-3622VV, in effect since July 1, 2020, exempts eligible server equipment, which the statute defines to include chillers and generators, and new data center facilities from sales tax for qualifying business entities that commit at least $250 million of investment within five years and 30 new jobs. Paul Industries provides a budget range from comparable scope early in design and a firm price once the plant is defined.
Seasonal service for an Idaho cooling plant
Seasonal service for an Idaho cooling plant follows the state’s two swing points, the spring move from heating-season economizer operation to summer evaporative and mechanical cooling, and the autumn return to freeze protection. Each transition exercises valves, dampers and sequences that have sat in one position for months.
In spring, Paul Industries cleans and inspects evaporative media and dry cooler coils, checks the water treatment program before towers and adiabatic pads start wetting, recalibrates outdoor temperature, humidity and particle sensors, and tests the smoke lockout so it works before the first fire season. In autumn, glycol strength is sampled and topped up, heat tracing and basin heaters are proved, outdoor water sections are drained or protected, and humidifiers are serviced for the dry months ahead. Through the year, filter pressure drop, fan speeds and economizer hours are trended so a damper stuck closed or a sensor drifting high shows up as lost free cooling rather than as a surprise on the power bill. Maintenance agreements can cover the chillers, air handlers, pumps and controls under one schedule.
Who installs data center cooling in Idaho?
Paul Industries installs data center cooling in Idaho, designing, supplying, installing, testing and starting up chilled water plants, indirect evaporative and economizer air handling, dry cooler loops and the piping between them for halls in Boise, Meridian, Nampa, Kuna, Twin Falls, Pocatello, Idaho Falls, Coeur d’Alene and Lewiston. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and was formerly based in northern New Jersey, then Pennsylvania; it is an East Coast contractor that takes work across Idaho and in all 50 states.
Data center cooling contractors are worth comparing on how they handle altitude correction, smoke modes and freeze protection, and on how their submittals show the corrected selections. Paul Industries puts each of those in its proposal. Liquid loops at the rack are covered on data center liquid cooling in Idaho, testing on data center commissioning in Idaho, the full mechanical package on data center mechanical contractors in Idaho, and chiller service on chiller repair in Idaho. For comparison with other climates, see the headquarters-state page, data center cooling in Virginia, and the arid and humid mix on data center cooling in Texas.
Idaho data center cooling plants from Paul Industries
For Idaho data centers, Paul Industries delivers cooling plants by any route the owner prefers: equipment supply, design-build, or complete installation with startup and service. That includes chillers, towers and dry coolers, air handlers and fan walls, closed-loop cooling systems, chilled water and glycol piping fabricated and welded to ASME B31.9, controls and economizer sequences, and maintenance after turnover. More on Idaho plants is on the Idaho page, more on the sector on data centers, and the western states together on the West Coast page. Send the IT load, density, site elevation and water source, and request a quote.
Standards referenced: 2018 International Energy Conservation Code with Idaho amendments (IDAPA 24.39.30) · 2018 International Mechanical Code with Idaho amendments (IDAPA 24.39.70) · Idaho Code 54-5016 (HVAC permits) · Idaho Code 63-3622VV (data center sales tax exemption) · ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · EPA Technology Transitions rule · ASME B31.9
Frequently asked questions
Who designs data center cooling for halls in Boise, Meridian and Nampa?
Paul Industries designs and installs data center cooling for halls in Boise, Meridian, Nampa and Kuna, including indirect evaporative air handlers, economizer sequences, chilled water plants and dry cooler loops. Each selection is corrected to the Treasure Valley’s elevation and sized for a hot August afternoon with the economizer locked out for smoke.
Which contractor builds cooling plants for data centers in Idaho Falls and Pocatello?
Paul Industries builds cooling plants for data centers in Idaho Falls, Pocatello and the rest of eastern Idaho, with glycol outdoor loops, heat-traced makeup lines, tower basin heaters and humidity control for very dry winter air. Equipment is selected for an elevation near 4,500 to 4,700 feet and for nights well below zero.
How are data centers kept cool in Idaho's dry climate?
Most use outside air or a water-side economizer for much of the year, evaporative or indirect evaporative cooling on summer afternoons, and chillers that run fully only during the hottest hours. Liquid-cooled racks add warm water loops rejected through dry coolers. The wide gap between dry bulb and wet bulb in Idaho summer air makes evaporative methods unusually effective.
What does the Meta data center Idaho Power serves in Kuna use for cooling?
Meta states that its Kuna Data Center, online since 2026, uses a water-efficient closed-loop, liquid-cooled system that uses zero water for the majority of the year. The campus is a market example of a dry heat rejection design in the Treasure Valley climate. Paul Industries designs comparable closed-loop arrangements for other owners in Idaho.
Is a Kuna Idaho data center typical of what the state will build?
Meta’s campus shows the scale the Treasure Valley can host, and Idaho Power’s plan expects about 1,000 megawatts of peak growth in five years across all customer types. Smaller enterprise and colocation halls follow the same climate logic at lower density. Paul Industries sizes plants for either, from a few hundred kilowatts to campus scale.
What are the data center cooling requirements for altitude in Idaho?
Air-side equipment must be corrected for lower air density, about 8 percent below sea level at Boise and about 13 percent at Idaho Falls. That means more airflow per kilowatt, derated air-cooled condensers and dry coolers, and generator radiator derates. Paul Industries applies the correction to every selection before equipment is ordered.
Does Idaho's energy code apply to a data hall?
Idaho’s amendment C101.5.2 to the 2018 energy code exempts buildings or portions cooled exclusively for electronic or industrial equipment, provided they are separated from other conditioned space by a complying envelope. Offices and support spaces still follow the code, and the 2018 International Mechanical Code applies to the whole HVAC installation.
Do Idaho data centers need a permit to install cooling equipment?
Idaho Code 54-5016 requires a permit from the authority having jurisdiction before an HVAC system is installed, extended or altered, while repair and maintenance of an existing system needs none. Paul Industries prepares the permit drawings and schedules inspections with the city, county or state office that has jurisdiction over the site.
How do wildfire smoke events affect data center cooling in Idaho?
Smoke loads economizer filters and can reach server inlets, so air-side economizers need a smoke mode that closes outside air dampers above a set point and moves the hall to recirculation. The mechanical plant must then carry full load on its own, often on the hottest days. Indirect evaporative and water-side designs keep smoke out of the hall altogether.
How much water does a data center cooling tower use in Idaho?
Evaporation runs roughly in proportion to heat rejected, and blowdown adds to it depending on makeup water quality and cycles of concentration. In Idaho’s dry air the tower works well, but the supply comes through a city or a water right. Paul Industries models tower, adiabatic and dry cooler options so the owner sees water and energy side by side.
What freeze protection does an eastern Idaho cooling plant need?
Outdoor coils and dry coolers usually run on glycol with a plate heat exchanger to the building loop, towers get basin heaters and heat-traced makeup, and outside air is mixed with return air before it reaches a coil. Idaho Falls averages almost 15 nights a year below 0 F, so the strategy covers long cold spells, not single nights.
Can an Idaho data hall run without mechanical cooling most of the year?
With a full-size economizer and a warm enough supply set point, many Idaho halls run compressor-free for most hours, since about 56 percent of Boise’s normal hours sit at or below 55 F. Chillers or evaporative trim still have to carry the full load on the hottest afternoons and through smoke events, and that condition sizes the plant.
Why do Idaho data halls get too dry in winter?
Very cold outside air holds little moisture, and once it is warmed in the hall its relative humidity falls sharply. Deep economizer use in January can push the room below the ASHRAE recommended lower moisture limit. Paul Industries designs humidification or outside air limits into the sequence so the hall stays inside the owner’s chosen envelope.
Which refrigerants can new Idaho data center cooling units use?
The EPA’s Technology Transitions rule limits data center, computer room air conditioning and IT equipment cooling to refrigerants with a global warming potential of 700 or lower from January 1, 2027. Paul Industries checks every equipment schedule against that date, especially for long-lead units that could ship after it.
How does Idaho's data center tax exemption affect cooling equipment?
Idaho Code 63-3622VV exempts eligible server equipment, defined to include chillers and generators, and new data center facilities from sales tax for qualifying business entities. Qualifying requires at least $250 million of investment within five years and 30 new jobs. Paul Industries structures equipment lists and invoices so the owner can document the exemption.
What does data center cooling cost to run in Idaho?
Energy is the main running cost, and Idaho’s 2025 industrial average was 7.88 cents per kilowatt-hour against 8.51 nationally, per the EIA. Each 0.1 of power usage effectiveness on a 10 MW IT load is about $690,000 a year at that rate. Water, treatment, filters and maintenance follow, varying with the plant type.
What should an owner send to price a data center cooling plant in Idaho?
Total IT load and how it phases in, rack densities and any liquid-cooled share, the site address and elevation, redundancy level, water supply and sewer limits, and the electric service schedule. With those, Paul Industries returns a plant concept, a budget range and a schedule, then a firm price once the design is fixed.
Sizing a cooling plant for an Idaho data hall?
Send the IT load, rack densities, site elevation, water supply and the date power arrives. Call 201-450-8280 or request a quote.