Paul Industries designs, builds and retrofits data center cooling in California: chilled water plants, economizers, heat rejection yards, air handling and the controls that tie them together, for colocation halls, enterprise rooms and research computing sites from Santa Clara to San Diego. California’s own energy code writes the economizer, the fan power budget and the airflow containment rule for a computer room into the building permit, and where 2026 law added water and energy disclosure for new halls. Paul Industries plans each plant around those rules, the region’s weather and the owner’s utility allocation.
Request a quote or call 201-450-8280
What does data center cooling in California have to satisfy?
Data center cooling in California has to satisfy four sets of conditions that a plant in most other states never meets together: the computer room section of the state Energy Code, a disclosure regime for energy and water use enacted in September 2026, utilities that ration new capacity in the busiest data center districts, and the highest industrial electricity price in the continental United States. A design that would pass inspection in Texas or Ohio often fails a California plan check on the first item alone.
The Energy Code part is specific. Section 140.9(a) of the 2025 California Energy Code, Title 24, Part 6, in force for permits from January 1, 2026, treats a computer room as a covered process and sets prescriptive rules for its cooling: an integrated economizer, a fan power ceiling, hot or cold aisle containment, and minimum efficiency for alternating current output UPS units. Paul Industries reads those requirements as the starting brief for the mechanical design, because every choice about air handlers, chillers and aisle layout has to fit them before the permit is issued.
The national overview of plant types, redundancy and efficiency sits on the data center cooling systems page. This page covers what is particular to California halls: where they sit, what the code demands, what the climate and water supply allow, and how the 2026 laws change the paperwork a new cooling plant carries.
Where are data centers in California, and what does each climate ask of the cooling plant?
The data centers in California cluster in Santa Clara and the rest of Silicon Valley, the East Bay, greater Los Angeles, the Inland Empire, San Diego and the Sacramento region, and those places span almost the whole range of the state’s weather. A hall in Santa Clara and a hall in Riverside built from the same drawings would spend very different numbers of hours on the economizer.
| Region and reference station | July normal high and low | Cooling character | Design emphasis |
|---|---|---|---|
| Silicon Valley (San Jose) | 81 F and 58 F | Mild days, cool nights, long economizer season | Economizer capacity and controls sized to carry the hall most of the year |
| East Bay (Oakland) | 72 F and 57 F | Marine air, few hot hours | Air-side or water-side free cooling for most hours; corrosion-resistant coils near the water |
| Sacramento region | 94 F and 61 F | Hot, dry afternoons with a wide daily swing | Evaporative assist and night economizer hours; condenser sizing for the afternoon peak |
| Los Angeles basin | 82 F and 65 F | Warm nights, coastal humidity | Water-side economizers and efficient chillers for the hours air cannot cover |
| Inland Empire (Riverside) | 93 F and 64 F | Hot summers, dry air, wildfire smoke seasons | Indirect evaporative or water-cooled plants; filtration for smoke events |
| San Diego | 75 F and 66 F | Narrow daily swing, humid marine layer | Water-side free cooling and dew point control at the air handler |
| Imperial Valley (El Centro) | 107 F and 78 F | Extreme heat, very few cool hours in summer | Mechanical cooling at full duty; heat rejection derated for ambient |
Cooling data centers: Santa Clara and Silicon Valley
Santa Clara is the densest data center city in the state: a May 2025 city council presentation counted 57 data centers active or under construction there, as reported by Fortune, and Silicon Valley Power, the city’s own electric utility, told a January 2026 legislative hearing that data centers account for about 55 percent of its power use. The climate is generous to cooling designers, with San Jose’s July nights averaging 58 degrees Fahrenheit, so the data centers in Silicon Valley that run economizers well spend most of the year with their compressors idle or off. The constraint there is electricity, not weather, and that changes what an efficient cooling plant is worth, as the power section below explains.
Data centers in Southern California: Los Angeles, the Inland Empire and San Diego
The data centers in Southern California split into two types: carrier and colocation buildings in central Los Angeles and San Diego, many of them converted office or industrial buildings with rooftop or yard space for heat rejection, and newer purpose-built halls in the Inland Empire. Warm, humid nights along the coast shorten air-side economizer hours, so water-side economizers and high-efficiency chillers do more of the work. Inland sites are hotter and drier, which favors evaporative heat rejection but puts the cooling plant in the path of wildfire smoke and summer heat waves.
Data center cooling regulations in California’s Energy Code
The data center cooling regulations in California’s Energy Code sit in Section 140.9(a) of Title 24, Part 6, and they apply to computer rooms, which the code defines by their information technology equipment load rather than by the building’s name. The table summarizes the four prescriptive requirements in the 2025 edition; a performance compliance path also exists for designs that meet the energy budget another way.
| Requirement | What the code asks | Main exceptions | How it shapes the cooling design |
|---|---|---|---|
| Economizer | Integrated air economizer carrying the full expected load at outdoor air of 65 F dry bulb or 50 F wet bulb and below, or integrated water economizer doing the same at 50 F dry bulb or 45 F wet bulb and below, with supply air between 65 F and 80.6 F | Rooms under 5 tons (18 kW) in a building with no economizers; rooms under 20 tons (70 kW) on a second fan system when the main economizer system meets set conditions | Sets the free cooling capacity, heat exchanger sizing and changeover controls from the first schematic |
| Fan power | Total fan power at design no more than 27 watts per thousand Btu per hour of net sensible cooling | None listed for the general limit | Pushes toward larger, slower fans, low-pressure filters and short air paths |
| Air containment | Rooms with air-cooled racks above 10 kW of design load need barriers that stop rack discharge air reaching inlets without passing through cooling | Expansions of existing computer rooms; racks under 1 kW; equal performance shown by computational fluid dynamics | Hot or cold aisle enclosures, blanking and sealed cable openings are part of the mechanical scope |
| UPS efficiency | Alternating current output UPS units meet the minimum average efficiencies in Table 140.9-B | Units with standard NEMA 1-15P or 5-15P plugs | Less UPS loss means less heat for the cooling plant to remove |
An air-side economizer that qualifies under the code also needs the fault detection and diagnostics required by Section 120.2(i), so damper and sensor faults are flagged instead of quietly costing energy. These are the data center cooling requirements that a plan checker in Santa Clara, Los Angeles or Sacramento compares with the mechanical drawings; Paul Industries prepares the compliance forms with the design so the permit set and the cooling plant tell the same story.
Air or water economizer in a California hall?
An air-side economizer suits a California hall where outdoor air is cool, clean and dry for most hours, and a water-side economizer suits halls where the outdoor air brings humidity, salt, smoke or security concerns into the white space. The code accepts either, so the choice turns on the site.
In Silicon Valley and the East Bay, outdoor air sits below 65 degrees Fahrenheit for a large share of the year, so air-side systems carry the room for long stretches. Their weak points are filtration and humidity: smoke from wildfires anywhere in Northern California loads filters fast, and the marine layer brings damp air that must be blended or treated before it reaches servers. Water-side economizers keep outside air out of the room altogether, using cooling towers or dry coolers and a plate heat exchanger to make chilled water directly when the wet bulb is low enough. In Los Angeles and San Diego, where summer nights stay in the mid-60s, water-side systems usually earn more hours than air-side ones, because the wet bulb drops further than the dry bulb.
Paul Industries models economizer hours with hourly weather data for the actual site, sets the changeover points to the server inlet range the owner has chosen, and builds the controls so that partial economizing runs alongside the chillers rather than switching the whole plant at once. Owners raising supply air toward the upper end of the code’s 65 to 80.6 degree range gain more economizer hours with no change to the equipment.
Cooling water and California’s 2026 disclosure laws
The cooling water a California data center consumes depends mainly on its heat rejection: a plant built on evaporative cooling towers or evaporative air handlers consumes water to reject heat, while a plant built on dry coolers and air-cooled chillers uses very little but spends more electricity on hot days. California added public scrutiny to that tradeoff on September 21, 2026, when Governor Newsom signed seven data center bills on energy, water, rates and environmental review, so the old question of how much water does a data center use for cooling now has an official audience.
Two of those laws bear directly on cooling. AB 1577 sets up reporting to the California Energy Commission that covers facility size, electrical capacity, energy and water use, and power and water usage effectiveness, and AB 2469 requires developers of certain new or expanded projects to give city and county governments and water suppliers their projected water demand, supply and efficiency measures, with drought planning information following in 2028. Most provisions generally take effect January 1, 2027. A new hall’s cooling basis of design now needs a water figure that will be compared, in public, with what the plant actually uses.
Recycled water and data center cooling without water
Owners have two ways to cut potable water: run cooling towers on recycled water, or design data center cooling without water by relying on dry coolers and air-cooled machines. Recycled water is a real option in parts of the Bay Area; Valley Water’s Silicon Valley Advanced Water Purification Center in San Jose, opened in 2014, treats wastewater by microfiltration, reverse osmosis and ultraviolet light, and its output serves non-potable uses that include industrial cooling towers. Recycled supply changes the tower’s chemistry program, the materials in the condenser loop and the backflow arrangement, and Paul Industries designs those details with the water supplier’s requirements in hand. Waterless plants trade water for power and yard space, and in California’s inland heat they need more chiller capacity for the hottest afternoons.
Why does cooling efficiency weigh so heavily in Santa Clara?
Cooling efficiency weighs heavily in Santa Clara because power, not floor space, limits how much computing a building can host. Silicon Valley Power reported a peak of roughly 740 megawatts in early 2026 and expects around 1,300 megawatts within five to ten years, and in November 2025 Fortune reported two finished 48-megawatt buildings in the city standing empty while the utility worked through a $450 million system upgrade scheduled to finish in 2028.
Under a fixed utility allocation, every kilowatt the cooling plant draws is a kilowatt the owner cannot sell to a tenant. A plant that cuts its annual average cooling power by a tenth of a megawatt frees that much capacity for servers, and at California’s 2024 average industrial price of 21.53 cents per kilowatt-hour (EIA), 100 kilowatts running all year costs about $188,600, compared with about $71,200 at the national average of 8.13 cents. The example uses stated assumptions; actual savings depend on the tariff and the hours. Paul Industries evaluates chiller efficiency, pump and fan speed control, economizer hours and supply temperature on that basis, so the owner sees cooling efficiency in megawatts of sellable capacity as well as dollars.
Which cooling plant arrangement suits a California data hall?
The cooling plant arrangement that suits a California data hall comes down to how heat leaves the site and how many hours the compressors run, and the code’s economizer rule means every option includes a free cooling path. The table compares the common arrangements.
| Arrangement | Where it fits in California | Water use | Points to settle early |
|---|---|---|---|
| Water-cooled chillers, cooling towers and a plate heat exchanger economizer | Large halls in Southern California and the Sacramento region | Evaporative; highest of the options | Water source and recycled water availability; tower chemistry; disclosure figures under the 2026 laws |
| Air-cooled chillers with integral free cooling coils | Bay Area and coastal sites with limited water or yard height | Very low | Glycol and coil sizing for the free cooling hours; sound at the property line; seismic anchorage of rooftop units |
| Dry coolers with trim chillers on a warm-water loop | Liquid-cooled racks and halls running high supply temperatures | Very low, with optional adiabatic assist on hot days | Loop temperature set by the rack cooling; trim capacity for inland heat waves |
| Direct or indirect evaporative air handlers | Dry inland sites such as the Inland Empire and the Central Valley | Moderate, concentrated in hot months | Smoke filtration, water treatment for the wetted media, and the backup mechanical cooling |
| Air-side economizer with chilled water backup | Silicon Valley and East Bay halls with clean outdoor air | Depends on the backup plant | Filtration and smoke response, humidity control, fault detection under Section 120.2(i) |
Refrigerant choice is fixed by the California Air Resources Board for new equipment: its HFC regulation has barred new chillers using refrigerants with a global warming potential of 750 or more since January 1, 2024, which narrows the field to lower-GWP machines. Paul Industries supplies chillers that meet that limit, or installs owner-furnished machines, and the plant’s piping, pumps and controls are the same under either route. Chiller service and refrigerant rules for existing machines are covered on chiller repair in California.
Seismic bracing, smoke and heat waves: what California adds to plant design
California adds three design loads that a cooling plant elsewhere rarely carries: earthquake forces on every chiller, tower, pump and pipe; wildfire smoke drawn into air handlers and coils; and multi-day heat waves that push inland condensing temperatures past the usual design points. Each one is a reason cooling stops in a California hall if the plant was drawn from a template.
The 2025 California Building Code, effective January 1, 2026, adopts ASCE 7-22, whose Chapter 13 sets seismic forces for mechanical equipment and piping. Paul Industries designs anchorage for chillers, cooling towers, dry coolers and pumps, adds sway bracing and flexible connections to chilled water and condenser piping, and coordinates both with the structural engineer so roof curbs and yard pads carry the loads. For smoke, plants with air-side economizers get a smoke response sequence that switches to recirculation or water-side cooling when outdoor particulate rises, with spare filter sets on site. For heat waves, heat rejection is selected at a design ambient chosen from the site’s own record, with margin for coil fouling.
Expanding cooling capacity in a live California hall
Expanding cooling capacity in a live California hall means expanding a live plant without letting server inlet temperatures drift, and it usually happens because tenants have arrived with denser racks than the building was designed for. The work typically adds chillers or dry coolers, extends chilled water headers, installs new air handlers or coolant distribution units, and tightens containment.
Paul Industries plans each tie-in under a written method of procedure: the redundancy available during the step, the valve sequence, the backout plan and the temperature limits that stop the work. Hot taps and line stops connect new branches to live headers where an isolation would cost redundancy. Because containment retrofits in existing rooms fall under the code’s exception for expansions, owners keep flexibility on aisle layout, but new fans and economizers added to the plant still meet the current Energy Code. Where denser racks need liquid cooling, the design follows the approach on data center liquid cooling in California, and the testing that proves the expanded plant follows data center commissioning in California.
How is the price of a California data center cooling plant built up?
What data center cooling in California costs depends on the plant arrangement, the tonnage, the heat rejection method, seismic anchorage and bracing, the economizer and controls scope, and whether the work is a new building or a retrofit in an operating hall. Operating cost matters as much as first cost at California power prices, so owners usually ask how much does it cost to cool a data center over ten years, and the answer comes from annual energy and water modeling, not from equipment prices alone.
| Cost driver | Why it matters in California | What to send for pricing |
|---|---|---|
| Plant arrangement and capacity | Sets equipment, piping and yard space | IT load in megawatts by phase, redundancy level, rack densities |
| Economizer and controls | Required by Section 140.9(a); controls decide how many hours run free | Target server inlet range, preferred economizer type |
| Seismic design | Anchorage, bracing and flexible connections under ASCE 7-22 | Site address, building drawings, roof or yard layout |
| Water source | Potable, recycled or none; drives tower chemistry and disclosure figures | Water supplier, recycled water availability, discharge limits |
| Retrofit conditions | Live tie-ins, night work and temporary cooling add labor | Plant drawings, redundancy during work, allowed outage windows |
| Energy price | 21.53 cents per kWh industrial average (EIA, 2024) magnifies every efficiency choice | Utility, tariff and expected load growth |
Paul Industries gives a budget range from comparable scope once the load and arrangement are known, and a firm price after the site survey and design review. Delivery routes include supply only of chillers, dry coolers, pumps and air handling equipment, design-build from a load and efficiency target, and complete installation from foundations to commissioning.
Who installs data center cooling in California?
Paul Industries installs data center cooling in California, taking chilled water plants, economizers, heat rejection yards, air handling, containment and controls from design through startup for halls in Santa Clara, San Jose, Fremont, Hayward, Sacramento, Los Angeles, the Inland Empire and San Diego. Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, was formerly based in northern New Jersey, then Pennsylvania, and takes data center work across California and in all 50 states.
Owners comparing data center cooling contractors in California usually check how the firm handles the Energy Code compliance forms, seismic design and live tie-ins, and whether the same contract covers the piping, the chillers and the service afterward. Paul Industries carries all of those under one contract. The mechanical package that surrounds the cooling plant, including generators, fuel and fire water piping, is described on data center mechanical contractor in California, and the process and condenser piping standards on process piping in California. Owners with halls on both coasts can compare this page with data center cooling in Virginia, the headquarters state, and with data center cooling in North Carolina. The West Coast page covers the neighboring Pacific states.
Next steps for a California cooling plant with Paul Industries
Paul Industries designs, supplies, installs, starts up and services data center cooling plants in California, from economizer studies and Title 24 compliance documents to chillers, towers, dry coolers, pumps, piping, air handling, containment and controls. For an estimate, send the IT load by phase, the redundancy level, rack densities, the site location and utility, the water source, and drawings of any existing plant. Call 201-450-8280 or request a quote. The California page lists the process, water and piping work Paul Industries delivers across the state.
Standards referenced: 2025 California Energy Code (Title 24, Part 6), Section 140.9(a) · 2025 California Building Code (Title 24, Part 2) · 2025 California Mechanical Code (Title 24, Part 4) · ASCE 7-22 · ASHRAE TC 9.9 thermal guidelines · CARB HFC Regulation, 17 CCR 95374 · AB 1577 and AB 2469 (2026 data center reporting and water disclosure laws)
Frequently asked questions
Who designs cooling plants for data centers in Santa Clara and San Jose?
Paul Industries designs and builds cooling plants for data centers in Santa Clara, San Jose, Sunnyvale and Milpitas, with economizer capacity sized for Silicon Valley’s mild climate and controls that keep compressors off for long stretches of the year. Because Silicon Valley Power allocates new capacity carefully, Paul Industries treats each kilowatt of cooling power saved as capacity the owner can return to servers.
Does Paul Industries build data center cooling in Los Angeles, Orange County and the Inland Empire?
Yes. Paul Industries builds and retrofits cooling for colocation buildings in central Los Angeles, enterprise rooms in Orange County and new halls in Riverside and San Bernardino counties. Coastal buildings lean on water-side economizers and efficient chillers because summer nights stay warm, while inland halls favor evaporative heat rejection with filtration and a smoke response sequence for fire season.
Who handles data center cooling in Sacramento, Fresno and the Central Valley?
Paul Industries handles data center cooling in Sacramento, Rancho Cordova, Fresno and the wider Central Valley. Sacramento’s July normal high is 94 degrees Fahrenheit and Fresno’s is 98, but nights cool to around 61 and 69, so night economizer hours are real and condensers must still be sized for long, hot afternoons. Evaporative assist and generous heat rejection keep these plants inside their limits.
Does Paul Industries cool data centers in San Diego and along the coast?
Yes. San Diego’s narrow daily temperature swing and humid marine layer make water-side economizers and dew point control at the air handler the usual approach there, and salt air near the coast calls for coated coils on air-cooled equipment and dry coolers. Paul Industries designs, installs and services those plants for San Diego colocation, enterprise and research computing rooms.
How many data centers in California sit in Santa Clara alone?
Directory counts change monthly, but the concentration is clear in Santa Clara, where a May 2025 city council presentation counted 57 data centers active or under construction, and where the city utility reports roughly 60 in its territory. Large clusters also sit in San Jose, the East Bay, Los Angeles and the Sacramento region. From 2027, reporting to the California Energy Commission under AB 1577 will give the state its own record.
Does every California computer room need an economizer?
Most do. Section 140.9(a) of the Energy Code requires an integrated air or water economizer for cooling systems that serve a computer room, with exceptions for rooms under 5 tons (18 kW) in a building with no economizers and rooms under 20 tons (70 kW) served by a second fan system while another economizer system meets set conditions. The required economizer must carry the full expected load at the code’s outdoor test points.
What server inlet temperature range does the California code assume for economizer design?
The economizer must deliver supply air between 65 and 80.6 degrees Fahrenheit while carrying the full expected load at the code’s outdoor test points. The range matches the recommended envelope widely used for servers. Owners who set supply air toward the upper end of the range gain economizer hours and lower chiller energy, which matters at California power prices.
Does a containment retrofit in an existing California data hall trigger the Energy Code containment rule?
The containment requirement in Section 140.9(a) applies to rooms with air-cooled racks above 10 kW of design load, but expansions of existing computer rooms are listed as an exception, and racks under 1 kW are also excepted. Containment remains a low-cost efficiency measure in an existing room, so Paul Industries usually recommends it whether or not the code requires it for the specific project.
Can a California data center cooling tower run on recycled water?
In parts of the state it can. The Silicon Valley Advanced Water Purification Center in San Jose treats wastewater by microfiltration, reverse osmosis and ultraviolet light, and its output serves non-potable uses including industrial cooling towers. Recycled supply changes the treatment program, metallurgy and backflow protection, so Paul Industries designs the condenser loop around the supplier’s water quality data and conditions of use.
How does wildfire smoke affect a data center that cools with outside air?
Smoke loads economizer filters quickly and can carry fine particulate toward servers, so an air-side economizer needs a defined response: sensors that detect rising outdoor particulate, a switch to recirculation or water-side cooling, enough mechanical capacity to carry the room without outside air, and spare filters on site. Paul Industries builds that sequence into the controls and tests it during commissioning.
Which refrigerants can a new chiller for a California data hall use?
Since January 1, 2024, the California Air Resources Board’s HFC regulation has prohibited new chillers that use refrigerants with a global warming potential of 750 or more. New machines therefore use lower-GWP refrigerants, which affects safety classification, machine room requirements and available sizes. Existing chillers keep running and are serviced on their current refrigerant.
What water figures will a new California data center have to report?
Under the 2026 laws, developers of certain new or expanded data centers give city and county governments and water suppliers their projected water demand, water supply and efficiency measures, and qualifying operators report water use and water usage effectiveness to the Energy Commission. Most provisions generally take effect January 1, 2027. Paul Industries provides the cooling plant’s expected annual water use from hourly modeling so the figures in the filing match the design.
Is a waterless cooling plant practical for a Southern California data center?
It is practical with the right sizing. Dry coolers and air-cooled chillers use very little water but lose capacity on hot afternoons, so an inland hall needs more chiller capacity, larger coils and sometimes adiabatic assist used only during heat waves. Coastal Southern California sites have fewer extreme hours. Paul Industries compares water use, peak power and yard space for both approaches before the design is fixed.
How do California power prices change a cooling plant decision?
California’s 2024 average industrial electricity price was 21.53 cents per kilowatt-hour against a national average of 8.13 (EIA), so an efficiency measure pays back roughly two and a half times faster than at the national average. High-efficiency chillers, variable speed pumps and fans, warmer supply temperatures and more economizer hours all clear their payback sooner. Paul Industries prices those options against the owner’s actual tariff.
How are chillers and cooling towers anchored for earthquakes in California?
The 2025 California Building Code adopts ASCE 7-22, whose Chapter 13 sets seismic design forces for mechanical equipment and the piping between it. Chillers, towers, dry coolers and pumps receive anchorage designed for those forces, piping receives sway bracing and flexible connections at equipment, and the details go into the permit set. Paul Industries designs anchorage together with the structural engineer’s framing so pads and roofs carry the loads.
Who provides cooling for data centers that are moving to liquid-cooled racks?
Paul Industries provides both the room cooling and the facility water side of liquid cooling: warm-water loops, coolant distribution units, dry coolers and trim chillers, with the air handling sized for the heat that remains in the room. Liquid loops at higher temperatures also earn more economizer hours under the California Energy Code, which helps the plant’s annual energy figure.
What should a California owner send to start a data center cooling estimate?
Send the IT load by phase in megawatts, redundancy level, expected rack densities and any liquid cooling plans, the site address and electric utility, the water source and whether recycled water is available, and drawings of any existing plant. For retrofits, include the outage and redundancy rules for the operating hall. Paul Industries returns a budget range and the main design choices for review.
Planning a cooling plant for a California data hall?
Send the IT load by phase, redundancy level, rack densities, site and utility, and the water source. Call 201-450-8280 or request a quote.
