Paul Industries designs, supplies, installs and upgrades data center cooling in New York, building chilled water plants, cooling towers, dry coolers and the piping that ties them to computer rooms in Manhattan carrier hotels, suburban colocation halls and Upstate campuses. New York pairs electricity priced ninth highest in the nation with some of the longest free cooling seasons on the East Coast, and since July 2026 a statewide pause on large new facilities has pushed owners toward upgrading what they already run. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes cooling work across every region of the state.
Request a quote or call 201-450-8280
How is data center cooling in New York different from the rest of the East Coast?
Data center cooling in New York is shaped by three conditions that rarely meet elsewhere on the East Coast: very high electricity prices, a climate that runs from humid coastal summers to Lake Erie winters, and dense urban buildings where the cooling plant shares a roof and a riser with offices or telecom tenants. Each one changes what a good cooling design looks like. A Brooklyn colocation floor and a hall in Niagara County can carry the same IT load and still need very different plants.
Power price drives the economics. New York’s 2024 average retail electricity price was 19.66 cents per kilowatt-hour, ninth highest in the country (EIA), so every kilowatt the cooling plant draws costs more here than in most states that compete for the same tenants. Climate drives the opportunity: Upstate sites can run on outdoor air or dry coolers for most of the year. Density drives the constraints: in New York City the question is often where the equipment can physically go, not which equipment is best.
The national methods for chillers, economizers, containment and heat rejection are set out on the data center cooling systems page. This page covers what is particular to New York: where the halls are, what the 2026 moratorium changes, the weather record, city emissions limits, state cooling tower rules and the price of running a plant here.
Where are data centers in New York concentrated?
New York data centers fall into four groups: Manhattan carrier hotels and the buildings around them, colocation and enterprise halls in the outer boroughs, Westchester, Rockland and Long Island, corporate and university computer rooms across the Capital Region, Central New York and Rochester, and large campuses in Western and Northern New York where hydropower and cold weather draw high-load computing. The data centers in New York City are mostly floors inside multi-story buildings. The data centers in upstate New York are more often purpose-built or converted industrial sites with room for yards of heat rejection equipment.
In Manhattan, 60 Hudson Street in Tribeca, 32 Avenue of the Americas and 111 Eighth Avenue serve as the main carrier hotels, where networks meet and colocation tenants pay a premium to sit close to them. Western New York shows the other end of the range. The Lake Mariner campus in Barker, on the site of the former Somerset coal plant, lists 600 MW of total critical IT capacity, and Yahoo’s Lockport building, opened in 2010, was designed to cool with outside air for most of the year on Niagara hydropower. An Upstate New York data center and a Manhattan one can share a tenant and still have nothing in common mechanically.
| Region | Typical facility | Cooling constraint | Work Paul Industries delivers there |
|---|---|---|---|
| Manhattan | Carrier hotel floors and colocation suites in high-rise buildings | Roof space, riser capacity, structural loads, noise, city emissions limits | Rooftop tower and chiller replacement, riser and condenser water piping, plant efficiency upgrades |
| Brooklyn, Queens, the Bronx, Staten Island | Converted industrial and warehouse buildings | Older structure and electrical service, flood exposure near the waterfront | New chilled water plants, raised equipment pads, air-cooled and water-cooled chiller installations |
| Westchester, Rockland, the Hudson Valley | Enterprise and financial-services halls, suburban colocation | Aging plants built in the 1990s and 2000s, campus noise limits | Chiller and tower replacement, economizer retrofits, controls upgrades |
| Long Island | Enterprise, hospital and research computer rooms | Salt air on coils and towers, coastal humidity | Coated coils, tower rebuilds, closed-loop fluid coolers, dehumidification |
| Capital Region, Central New York, Rochester | Corporate, state, university and manufacturing computer rooms | Cold winters, snow on rooftop equipment, mixed-use central plants | Glycol dry coolers, waterside economizers, freeze protection |
| Western and Northern New York | Large campuses and converted power or industrial sites | Scale, heavy snow loads, water supply and discharge permits | Large chilled water and dry cooler plants, outside-air systems, pump and piping galleries |
What does the New York data center moratorium mean for cooling projects?
The New York data center moratorium is Executive Order No. 62, signed by Governor Hochul on July 14, 2026, which directs the Department of Environmental Conservation to hold discretionary permit applications for the construction or expansion of data centers that meet a 50 megawatt energy-consumption threshold. The pause lasts until the Department of Public Service completes a Generic Environmental Impact Statement under the State Environmental Quality Review Act, covering energy demand, water use and quality, air quality and noise. Applications deemed complete before the order, permits issued by city and town governments, and facilities used mainly for manufacturing, research, education or medical care fall outside it.
The data centers New York State regulators are now studying are the large ones, and the order itself cites nearly 12 gigawatts of data center load in the NYISO interconnection queue as of May 2026, more than 8 gigawatts of it added in 2025. For many of the proposed data centers in New York, the practical effect of the New York data center pause is time: design continues while the statewide study runs, and the study’s findings on water and noise are likely to shape the cooling choices that follow. Halls below 50 MW, and upgrades to existing plants that need no new DEC discretionary permit, are outside the pause, so cooling work there continues.
Cooling is central to two of the topics the study covers. Water use depends heavily on whether a plant rejects heat through evaporative towers or dry coolers, and noise comes mostly from tower fans, condenser fans and chillers. An owner planning a large New York campus can use the study period to compare a water-intensive plant with a dry or hybrid plant on cost, energy and community impact, so the design is ready when permitting resumes. Paul Industries prices both routes on the same load and site so the comparison is like for like.
Design weather from LaGuardia to Buffalo
New York’s design weather spans a wide range, and NOAA’s engineering weather data shows a 0.4 percent dry bulb of 92 degrees Fahrenheit at LaGuardia against 86 degrees at Buffalo, with design wet bulbs of 77 and 74 degrees. Wet bulb sets what a cooling tower can deliver, so a tower on a Queens roof must be sized for condenser water several degrees warmer than the same tower near Lake Erie. Winter flips the problem: Buffalo’s 99.6 percent heating design temperature is 2 degrees, against 11 at LaGuardia, and its 50-year ground snow load is more than twice the city’s.
| Design value | New York City (LaGuardia) | Buffalo | Cooling decision it drives |
|---|---|---|---|
| 0.4% dry bulb, mean coincident wet bulb | 92 F / 75 F | 86 F / 70 F | Air-cooled chiller and dry cooler capacity on the hottest hours |
| 0.4% wet bulb | 77 F | 74 F | Cooling tower approach and condenser water temperature |
| Hours above 80 F dry bulb | 649 | 290 | How often mechanical cooling must carry the full load |
| Hours above 67 F wet bulb | 1,351 | 713 | Humid hours that limit evaporative cooling |
| 99.6% heating dry bulb | 11 F | 2 F | Glycol concentration, basin heaters, freeze protection |
| 50-year ground snow load | 16 psf | 39 psf | Structural support and clearances for rooftop and yard equipment |
| 50-year frost depth | 38 in | 59 in | Burial depth for buried cooling water mains |
NOAA’s 1991 to 2020 July normals show the same gradient in everyday terms: Central Park averages an 85 degree high and 70 degree low, Islip 83 and 67, Albany 84 and 62, Buffalo 80 and 63, and Massena 81 and 58. Cool nights matter for a data center because the load never stops; a plant that can drop to economizer mode overnight in July saves energy that a coastal plant cannot.
Free cooling hours Upstate and in the city
Free cooling hours in New York differ sharply between the coast and the Great Lakes, and NOAA’s average-year temperature bins show Buffalo at or below 49 degrees for about 4,490 hours a year, against about 3,510 at LaGuardia. Counting everything at or below 64 degrees, Buffalo reaches about 6,590 hours, roughly three quarters of the year, and LaGuardia about 5,770. A dry cooler serving warm-water liquid cooling, or a waterside economizer feeding 60 degree chilled water, can carry most or all of the load through those hours with the chillers off or idling.
The value of those hours is larger in New York than in cheaper power markets. Every 100 kilowatts of chiller power avoided around the clock is 876,000 kilowatt-hours a year, worth about $172,000 at the 2024 statewide average retail price of 19.66 cents. Owners comparing an Upstate site with one closer to the city should weigh that against fiber latency and land cost, and owners of existing city halls should look first at raising chilled water temperature to widen the economizer window.
Cooling plants in Manhattan high-rise buildings
Cooling plants in Manhattan high-rise buildings work within limits that suburban and Upstate halls rarely meet: the roof is shared, riser shafts are full, freight elevators set the size of every piece of equipment, and structural capacity decides whether a larger tower can go where the old one stood. Data center cooling in New York City therefore leans on equipment that breaks down into sections, modular chillers, and condenser water or dry cooler loops that run up existing shafts.
Replacement in an occupied tower is a staged operation. Paul Industries surveys roof framing, dunnage and riser routes before choosing equipment, plans crane picks around street closures and building rules, and keeps a temporary or redundant path for condenser water while each tower cell or chiller is changed. The 2022 New York City Mechanical Code governs the installation and its piping tests, and work in Manhattan carrier hotels is sequenced so that no tenant loses cooling while a component is out of service.
Water is the hidden constraint. Many city halls reject heat through building condenser water loops or open towers on the roof, and both bring the state’s Legionella rules into the cooling program. Converting part of the load to closed-circuit fluid coolers or dry coolers reduces tower dependence but needs roof area and structure the building may not have, so the survey decides what is realistic.
Local Law 97 (LL97) and the cooling plant in a New York City building
LL97, the city’s building emissions law of 2019, caps annual greenhouse gas emissions for most buildings over 25,000 square feet, with a first compliance period from 2024 to 2029 and tighter limits from 2030. Emissions above a building’s limit are charged at $268 per metric ton of carbon dioxide equivalent each year, so a building 1,000 tons over its limit faces about $268,000 a year. Data center floors inside office and telecom buildings carry heavy, continuous electrical loads, which makes them a large share of the building’s emissions total.
The cooling plant is one of the few levers an owner controls. Higher chilled water temperatures, variable speed drives on pumps and tower fans, chiller replacement with higher-efficiency machines, waterside economizers and heat recovery to serve the building’s heating load all cut purchased energy, and every kilowatt-hour avoided lowers both the bill and the emissions count. Paul Industries prices these measures with the owner’s interval data so the savings can be set against the penalty exposure, and schedules the work to fit the building’s compliance filings.
Cooling tower rules New York State enforces
Cooling tower rules in New York State come from 10 NYCRR Subpart 4-1, which requires every tower owner to register in the state Cooling Tower Registry, keep a Maintenance Program and Plan following ASHRAE 188, inspect the tower before seasonal start-up and every 90 days while it runs, and obtain a certification by November 1 each year. The registry must be updated every 90 days while the tower operates, and a Legionella culture result at or above 1,000 CFU per milliliter must be reported to the health department within 24 hours. Towers in New York City are also registered with the City’s own registry.
Data center towers run all year, so the 90-day cycle never pauses for winter as it can on a comfort-cooling tower. The practical effect on design is to favor towers that can be inspected and cleaned one cell at a time without losing capacity, drift eliminators in good condition, access platforms that let an inspector reach the fill and basin, and water treatment with logged chemistry. Paul Industries repairs, rebuilds and replaces towers to meet those rules and connects them to cooling tower water treatment programs that keep the records an inspection asks for. These are the data center cooling regulations that touch the plant every quarter, separate from the building code that governed its installation.
Hydropower, the grid and the price of a kilowatt-hour
Electricity for New York cooling plants comes through a grid run by NYISO, delivered by Con Edison in the city and Westchester, PSEG Long Island, National Grid across much of Upstate, NYSEG and RG&E in the Southern Tier, Finger Lakes and Rochester areas, and Central Hudson in the mid-Hudson Valley. The New York Power Authority’s Niagara project, with a net dependable capacity of 2,675 megawatts, and its St. Lawrence-FDR project at Massena, at 828 megawatts, anchor the hydropower that made Western and Northern New York attractive to high-load computing.
For cooling design, the electric rate decides how far an efficiency measure pays. At the 2024 statewide average of 19.66 cents per kilowatt-hour, a cooling plant that draws a steady 250 kilowatts costs about $430,000 a year to run. A site with a lower negotiated rate shifts the balance toward lower first cost; a Con Edison building at full commercial rates shifts it toward efficiency. Paul Industries uses the facility’s actual tariff, not the average, when it compares options.
| Option | Water use | Best New York fit | Watch for |
|---|---|---|---|
| Open cooling towers with water-cooled chillers | High (evaporation, blowdown) | Large city and suburban plants where roof area is scarce | Legionella program, 90-day inspections, winter basin protection |
| Closed-circuit fluid coolers | Moderate | Long Island and coastal sites, mixed loads | Coil corrosion near salt air, spray water treatment |
| Air-cooled chillers | None at the plant | Outer-borough and suburban sites with yard space | Capacity on 90 degree days, fan noise near homes |
| Glycol dry coolers with trim chillers | None at the plant | Upstate halls and warm-water liquid cooling loops | Glycol concentration, snow clearance, larger footprint |
| Direct or indirect outside-air systems | Low (evaporative assist only) | Purpose-built halls in Western and Northern New York | Humidity control, filtration, freezing air on the coldest days |
Winter, snow and freeze protection Upstate
Winter operation is the defining design problem for Upstate New York cooling plants, because a data center rejects heat every hour while outdoor equipment sits under lake-effect snow and single-digit air. Open towers that run in winter need basin heaters, bypass valves that send water straight to the basin, fan control that prevents icing on the fill and inlet louvers, and a plan for drift that freezes on surrounding roofs and walkways. Dry coolers need glycol mixed for the site’s design low, with margin, and supports high enough to keep coils above drifting snow.
Paul Industries designs freeze protection into the plant rather than leaving it to operators: drain points at every low spot, heat tracing and insulation on exposed piping, glycol testing as part of the service schedule, and controls that stage fans and valves on leaving water temperature rather than on outdoor temperature alone. Buried mains go below the 59 inch frost depth that NOAA lists for Buffalo, and rooftop equipment supports are checked against the ground snow load for the site.
Upgrading an operating New York hall
Upgrading an operating New York hall means changing the cooling plant while the IT load keeps running, which is the normal case now that new large builds are paused. The work usually starts with a survey of what is installed and how close it runs to capacity, then a sequence that adds a new chiller or dry cooler before an old one is removed, uses existing redundancy for each changeover, and keeps temporary cooling ready for the riskiest steps.
Common New York upgrades include replacing R-123 or R-134a chillers with newer machines, adding a waterside economizer heat exchanger, converting constant-speed pumps to variable speed, raising chilled water supply temperature after a containment retrofit, and adding a liquid cooling loop for a dense row. Where higher-density racks are coming, the plant work connects to data center liquid cooling in New York, and every change is proven through data center commissioning in New York before the old equipment comes out. Chillers that need repair rather than replacement are covered by chiller repair in New York.
What does data center cooling cost in New York?
Data center cooling costs in New York depend on the IT load and redundancy target, the heat rejection method, building access and structure, electrical service, how much of the existing plant can be reused, and whether the work happens in an occupied building. Manhattan projects add crane picks, street permits and night work; Upstate projects add freeze protection and snow loads. Operating cost is driven mainly by the electric rate and the hours the chillers run.
Paul Industries prepares a budget range from comparable scope once the load, site and existing equipment are known, then a firm price after a site survey. Owners can buy equipment supply-only, engage Paul Industries for design-build, or have the complete installation, startup and testing delivered under one contract.
Who builds data center cooling in New York?
Paul Industries builds data center cooling in New York, designing, fabricating, supplying, installing, testing, starting up, servicing and maintaining chilled water plants, cooling towers, dry coolers, pumps and piping for data halls across the state. Paul Industries is headquartered in Kilmarnock, Virginia, after earlier years based first in northern New Jersey and then in Pennsylvania, and works as an East Coast contractor across New York City and its boroughs, Long Island, Westchester, the Hudson Valley, the Capital Region, Central New York, Rochester, Buffalo-Niagara and the North Country.
The same accountability carries across the plant: one contract covers the mechanical design, the equipment, the process piping in New York that connects it, the startup and the records. For the mechanical scope of a whole facility, see data center mechanical contractors in New York. Paul Industries also delivers this work for owners in Virginia, its headquarters state, and through data center cooling in New Jersey and data center cooling in Pennsylvania, in all 50 states and at plants outside the United States through its international work.
Paul Industries cooling plants for New York data halls
Paul Industries designs, supplies, installs, upgrades and services data center cooling plants for colocation, enterprise, university and high-load computing sites in every region of New York, including data center chillers, data center cooling towers, dry coolers, pumps, piping and controls. Send the IT load and redundancy target, drawings or a description of the existing plant, the utility and rate, and where the hall is. Call 201-450-8280 or request a quote. The New York page lists the process, water and piping work Paul Industries delivers across the state.
Standards referenced: New York Executive Order No. 62 (2026) · State Environmental Quality Review Act (SEQRA) · 10 NYCRR Subpart 4-1, Protection Against Legionella · ASHRAE 188 · New York City Local Law 97 of 2019 · 2022 New York City Mechanical Code · NYS Uniform Fire Prevention and Building Code · NOAA Engineering Weather Data
Frequently asked questions
Who handles data center cooling for carrier hotels in Manhattan and colocation floors in Brooklyn?
Paul Industries handles data center cooling for carrier hotel floors in Manhattan and colocation buildings in Brooklyn and Queens, including rooftop tower and chiller replacement, condenser water risers and plant efficiency upgrades. City projects are planned around roof structure, riser space, freight elevator dimensions, crane permits and building rules, and each change is staged so tenant cooling stays online throughout.
Does Paul Industries build cooling plants for data centers in Buffalo, Niagara County and Western New York?
Yes. Paul Industries builds and upgrades cooling plants for halls in Buffalo, Niagara County and the rest of Western New York, where cold weather and hydropower favor dry coolers, waterside economizers and outside-air designs. Plants there are designed for lake-effect snow, a 2 degree heating design temperature and deep frost, with glycol, drain points and raised supports built into the installation.
Who installs cooling for data halls in Westchester, Rockland and the Hudson Valley?
Paul Industries installs and replaces cooling for enterprise and colocation halls in Westchester, Rockland and the Hudson Valley, many of them built in the 1990s and 2000s for financial-services and corporate tenants. Typical work there is chiller and tower replacement, economizer retrofits, variable speed pumping and controls upgrades, done in stages so the hall keeps running while each component changes.
Can Paul Industries cool a data center on Long Island or in the Capital Region?
Yes. Paul Industries takes data center cooling work in Nassau and Suffolk counties and across the Capital Region around Albany. Long Island plants face salt air on coils and towers, so coated coils and closed-circuit coolers are common choices there. Capital Region plants face colder winters, so freeze protection and economizer hours carry more weight in the design.
Are there any data centers in New York State outside New York City?
Yes, many. Western New York holds large campuses such as Lake Mariner in Barker, on a former coal plant site, and Yahoo’s Lockport building, which was designed to cool with outside air on Niagara hydropower. Corporate, state and university computer rooms operate around Albany, Syracuse, Rochester and Ithaca, and suburban colocation halls sit in Westchester, Rockland and on Long Island.
Is New York banning data centers?
New York has paused permitting for large new data centers rather than banning them. Executive Order 62, signed July 14, 2026, holds discretionary DEC permit applications for construction or expansion of data centers at or above 50 megawatts until the state finishes a Generic Environmental Impact Statement. Smaller halls, applications completed before the order and facilities used mainly for research, education, medical care or manufacturing fall outside it.
Can an existing New York data center still upgrade its cooling plant during the moratorium?
The order is aimed at DEC discretionary permits for the construction or expansion of covered facilities, so cooling upgrades that need no such permit, such as replacing a chiller inside an existing plant or adding an economizer, are a different category from what it names. Owners confirm their own permit position first. Paul Industries then plans the upgrade so it can proceed on its own schedule.
What is the New York data center bill, and is it law?
The New York data center bill passed by the Legislature in 2026 is the Responsible Data Center Development Act, which would create new rate classes for data center water and electricity use. When the governor issued Executive Order 62 on July 14, 2026, her office described the bill as needing further work and she had not signed it, choosing the executive order as the immediate step.
What is the New York data center market like for cooling work right now?
The New York data center market for cooling work is weighted toward upgrades. Large new campuses face the statewide pause while the environmental study runs, yet nearly 12 gigawatts of data center load sat in the NYISO interconnection queue in May 2026. Existing halls, smaller facilities and research computing keep moving, and high power prices make efficiency projects pay faster here than in most states.
How often must a New York data center cooling tower be inspected?
Every 90 days while it is in use, and before seasonal start-up, under the state’s Legionella rules in 10 NYCRR Subpart 4-1. A data center tower runs all year, so the inspections and registry updates continue through winter. The owner also needs a current Maintenance Program and Plan and a certification by November 1 each year, and New York City towers register with the City as well.
How does LL97 affect a data center floor inside a New York City office building?
LL97 limits the whole building’s annual emissions, so a data center floor’s continuous electrical load counts toward the owner’s total. If the building exceeds its limit, the penalty is $268 per metric ton of carbon dioxide equivalent each year. Cooling plant efficiency is a major lever: higher chilled water temperature, variable speed drives, economizers and newer chillers all reduce purchased power and emissions together.
What does NYPA hydropower mean for cooling design Upstate?
Hydropower from the New York Power Authority’s Niagara and St. Lawrence-FDR projects is one reason high-load computing has looked at Western and Northern New York. Where a site’s power is cheaper, the payback on efficiency measures lengthens, but the cold climate still makes dry coolers and economizers attractive on reliability and water grounds. Paul Industries runs the comparison with the site’s actual rate.
Can a New York data center run without evaporative cooling towers?
Yes, with air-cooled chillers, dry coolers or outside-air systems, and New York’s climate makes that easier Upstate than in the city. Buffalo spends about 6,590 hours a year at or below 64 degrees, so dry coolers can carry warm-water loops most of the year with trim chillers for summer peaks. In Manhattan, roof area usually limits how much dry heat rejection fits.
How much does it cost to run a cooling plant for a New York data center?
At New York’s 2024 average retail price of 19.66 cents per kilowatt-hour, each 100 kilowatts of continuous cooling plant power costs about $172,000 a year, and a plant drawing 250 kilowatts costs about $430,000. The real figure depends on the facility’s tariff, the hours its chillers run and how much free cooling it uses. Paul Industries prices efficiency measures against the owner’s actual bills.
How are cooling towers kept running through a Buffalo or Syracuse winter?
Towers that run in winter need basin heaters, a bypass that returns water straight to the basin on cold days, fan control that prevents ice on the fill and louvers, and insulated, heat-traced makeup and drain lines. Many Upstate plants shift to dry coolers or a waterside economizer in winter and keep the tower as backup, which also reduces icing and drift problems.
Can Paul Industries supply chillers and cooling towers for a New York project without installing them?
Yes. Paul Industries supplies chillers, cooling towers, dry coolers, pumps, heat exchangers and prefabricated piping on a supply-only basis, and offers design-build or complete installation with startup and testing when the owner wants one contract for the whole plant. Equipment is selected for the site’s design weather, power and water, whichever route the owner chooses.
What chilled water temperature suits an older New York City hall after a containment retrofit?
Many older city halls were designed for chilled water in the low to mid 40s Fahrenheit. Once hot or cold aisle containment controls mixing, supply water can often rise into the 50s or higher, which cuts chiller energy and lengthens the economizer season. The right setpoint depends on coil capacity in the existing air handlers, so Paul Industries tests the coils before recommending a change.
What should a New York data center send to price a cooling project?
Send the IT load today and planned, the redundancy target, drawings or photos of the existing plant, chiller and tower nameplates, the utility and rate schedule, roof or yard dimensions and any structural reports. For city buildings, add riser and freight elevator dimensions. Paul Industries uses that package to scope a site survey and returns a budget range, then a firm price.