Paul Industries designs, installs, starts up and services data center cooling in Wisconsin: chiller plants, dry coolers, cooling towers, economizers and the piping that carries heat out of the white space, for hyperscale campuses, colocation halls and enterprise server rooms from Mount Pleasant and Milwaukee to Madison, the Fox Valley and Eau Claire. Wisconsin hands a cooling designer an unusual combination: humid summer design conditions along Lake Michigan, winter design temperatures down to 25 below zero in the north, and a statute that counts every gallon a campus draws from its own wells. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, builds plants around all three.
Request a quote or call 201-450-8280
What shapes data center cooling in Wisconsin?
Data center cooling in Wisconsin is shaped by four facts that differ from the East Coast states: a long cold season that makes economizing the default mode for most of the year, state-published design temperatures that vary by county by as much as 15 degrees in winter, a water law built around the Great Lakes Compact, and an electricity price for industrial customers that sat above the national average in 2024. A cooling plant that ignores any one of them either wastes energy for eight months, freezes in January, or runs into a permit question late in design.
The engineering of cooling halls, containment and heat rejection in general is laid out on the data center cooling systems page. This page stays with what is particular to Wisconsin: the design data the state requires designers to use, the water thresholds the Department of Natural Resources applies, how the large campuses now rising in the state have chosen to reject heat, and what those choices mean for an owner planning a new hall or upgrading an operating one.
Design temperatures from Kenosha to Bayfield
Wisconsin publishes its own exterior design conditions, county by county, in Table 363.0302 of the state energy code, and designers size heating and cooling equipment from that table or from ASHRAE 90.1-2019. For a data center the summer columns set the size of the heat rejection plant and the winter column sets the freeze protection, so the county a hall sits in changes both ends of the design.
| Region | Example counties | Winter design | Summer dry bulb / wet bulb | What it means for the cooling plant |
|---|---|---|---|---|
| Lake Michigan shore and the southeast | Milwaukee, Racine, Kenosha, Ozaukee, Waukesha, Rock | -10 F | 89 F / 77 F | Highest wet bulb in the state; towers and adiabatic coolers sized for humid peaks |
| Madison, Fox Valley and the east-central counties | Dane, Dodge, Brown, Outagamie, Winnebago, Sheboygan | -15 F | 87 F / 75 F | Two degrees of relief on wet bulb; dry coolers carry more of the year |
| Central and western Wisconsin | Marathon, Wood, Portage, Eau Claire, La Crosse | -20 F | 87 F / 75 F | Freeze protection becomes a primary design input |
| Northwest and north woods | Chippewa, Barron, St. Croix, Lincoln, Oneida | -25 F | 86 F / 75 F | Glycol strength, heat tracing and winter access drive the layout |
| Lake Superior counties | Douglas, Bayfield, Ashland, Iron | -25 F | 86 F / 70 F | Lowest wet bulb in the state; evaporative cooling rarely needed |
The table explains why a hall in Racine and a hall in Eau Claire with the same IT load end up with different plants. The southeast carries a 77 degree wet bulb, so an evaporative tower there has to be sized for muggy August afternoons. Move 250 miles northwest and the summer wet bulb drops while the winter design temperature falls by 10 to 15 degrees, which shifts the design effort from summer capacity to keeping water and glycol moving at 20 or 25 below.
Data center cooling without water in a Wisconsin winter
Data center cooling without water is practical in Wisconsin for most of the year, because outdoor air is cold enough to reject server heat through dry coolers or air-side economizers from autumn through spring. Milwaukee’s mean January temperature is about 24 degrees Fahrenheit and its July mean about 73 degrees, so a plant with a warm enough supply water setpoint spends long stretches with its compressors idle.
The colder the climate, the more that design choice rests on the water temperature the IT equipment accepts. A hall supplying 65 degree water to rear-door coils or 85 degree water to cold plates can reject its heat through dry coolers on all but the warmest days, and on those days a small trim chiller or an adiabatic spray carries the peak. A hall still built around 45 degree chilled water and air handlers gets far fewer hours of free cooling in Wisconsin, because the outdoor air has to fall well below that setpoint before the economizer carries the full load. Raising supply temperatures, within the limits ASHRAE TC 9.9 publishes for IT equipment, is usually an inexpensive way to add economizer hours to an existing Wisconsin plant.
Free cooling in Wisconsin also has a winter edge to it. Air-side economizers bringing in subzero air need mixing and humidification control so the hall does not fall below its dew point limits, and waterside economizers need the heat exchanger and tower protected against ice. Paul Industries designs the changeover sequence between economizer, partial economizer and mechanical cooling so the plant moves between modes on outdoor wet bulb readings without hunting.
Wisconsin data center water use and the 100,000 gallon threshold
Wisconsin data center water use is measured against a statutory threshold of 100,000 gallons per day: a well system with capacity above that figure is a high capacity well that needs Department of Natural Resources approval under section 281.34, and any water supply system able to withdraw an average of 100,000 gallons per day in a 30-day period must be registered under section 281.346. In the Great Lakes basin, which covers Milwaukee, Racine, Kenosha, Ozaukee and the Lake Michigan shore up to Green Bay, withdrawals at that level need water use permit coverage, and a withdrawal of 1,000,000 gallons per day for 30 consecutive days needs an individual permit.
Those numbers decide how a campus rejects heat. An evaporative plant for a large hall can pass the 100,000 gallon line on a hot day, while a closed loop with dry coolers draws water mainly for its initial fill and makeup. Water bought from a municipal utility falls under the utility’s own withdrawal, but the utility still has to plan for the demand, and large draws in summer arrive exactly when the system is busiest.
| Water level or source | Statutory trigger | What it means in practice |
|---|---|---|
| Own wells, capacity over 100,000 gallons per day | High capacity well approval, Wis. Stat. 281.34 | Well approval before drilling; pump capacity counts, not average use |
| System able to withdraw an average of 100,000 gallons per day in any 30-day period | Statewide registration, Wis. Stat. 281.346 (3) | Registration and annual reporting of monthly withdrawal |
| Great Lakes basin withdrawal of 100,000 to under 1,000,000 gallons per day | General water use permit, Wis. Stat. 281.346 (4s) | Coverage under a general permit with monitoring and reporting |
| Great Lakes basin withdrawal of 1,000,000 gallons per day for 30 consecutive days | Individual water use permit, Wis. Stat. 281.346 (5) | Individual permit with a set withdrawal amount |
| Municipal water service | Utility’s own withdrawal and permits | Demand letter and peak summer flows agreed with the utility early in design |
The largest campuses in the state show where design is heading. Microsoft describes its Mount Pleasant campus, whose first facility it reported fully operational in June 2026, as relying on closed-loop liquid cooling for more than 90 percent of the facility, filled once during construction, with outside air cooling the remainder and water used only on the hottest days. Meta, which broke ground in Beaver Dam in November 2025, has said that campus will use dry cooling with no water demand for cooling once it operates. Both are market facts about how owners in Wisconsin are choosing to answer the water question, and both point to closed loops and dry heat rejection as the default for large new halls.
Which cooling methods fit a Wisconsin data hall?
The cooling methods that fit a Wisconsin data hall are the ones that turn the cold season into economizer hours while keeping water draw and freeze risk under control: dry coolers serving warm-water liquid cooling, air-cooled chillers with integral free cooling coils, water-cooled chillers with waterside economizers, and hybrid adiabatic coolers that add water only at the summer peak. The right mix depends on rack density, the supply temperature the IT equipment accepts and the county design data.
| Option | Water draw | Winter behavior | Where it fits in Wisconsin |
|---|---|---|---|
| Dry coolers on a warm-water loop | Fill and makeup only | Full free cooling most of the year; glycol or drain-down protection required | Liquid-cooled halls statewide; strongest case in the north and west |
| Air-cooled chillers with free cooling coils | Fill and makeup only | Coils carry the load in cold weather; compressors trim in shoulder seasons | Enterprise rooms and mid-size colocation halls on 45 to 60 F water |
| Water-cooled chillers, towers and plate exchanger economizer | Highest; evaporation, drift and blowdown | Waterside economizer carries winter load; basins and lines need heat | Large plants with municipal water and room for a tower yard |
| Hybrid adiabatic coolers | Seasonal; water only above a dry bulb setpoint | Run dry and drained through winter | Southeast Wisconsin, where the 77 F wet bulb design limits dry-only plants |
| Air-side economizer with evaporative assist | Low to moderate | Subzero air needs mixing, filtration and humidity control | Air-cooled halls with clean outdoor air and space for large dampers |
Many Wisconsin plants combine two of these. A new campus might reject liquid-cooled rack heat through dry coolers and keep a smaller air-cooled chiller plant for the air handlers that serve networking rooms and support spaces. An older enterprise hall in Madison might add free cooling coils to its existing air-cooled chillers and raise its chilled water setpoint before considering a new plant. The data center liquid cooling in Wisconsin page goes into the rack-side loops, and the chiller choices are expanded on the data center chillers page.
New data center Wisconsin projects: the first cooling questions
Every new hall starts with three questions before equipment is chosen: the supply temperature the IT equipment accepts, the water the site may draw, and the county design data. Settling those first keeps a data center Wisconsin utilities and regulators have approved from being redesigned halfway through procurement.
Data center cooling requirements in Wisconsin’s 2021 codes
Data center cooling requirements in Wisconsin come from the Wisconsin Commercial Building Code, which since September 1, 2025 incorporates the 2021 International Building Code, International Mechanical Code and International Energy Conservation Code with state amendments in chapters SPS 361 to 366. Plans go to the Department of Safety and Professional Services through its eSLA system, which has a 15 business day review clock, and construction of a building of 50,000 cubic feet or more is supervised by a Wisconsin registered architect or engineer.
Two state amendments matter most to a cooling designer. SPS 363.0403 requires design loads to be calculated from the state’s county table or ASHRAE 90.1-2019, and it replaces the IECC economizer section with a requirement for supply air economizers on all packaged rooftop units and all other cooling systems of 60,000 Btu per hour or more, with exceptions the designer has to work through for computer rooms and process loads. Chillers fall under a separate chapter, SPS 345, which requires registration of refrigeration systems using common A1 or B1 refrigerants at 50 tons or more and does not apply where water or air is the primary refrigerant, so a chiller plant is registered while the water loop it serves is governed by the mechanical code. The registration and inspection steps are covered on chiller repair in Wisconsin.
Wisconsin data center energy costs and the cooling overhead
Wisconsin data center energy costs start from an average industrial electricity price of 8.54 cents per kilowatt-hour in 2024, against a national industrial average of 8.13, and a commercial average of 12.63 cents (EIA). Every kilowatt the cooling plant draws is paid for at those rates around the clock, so the overhead between IT load and total load is where cooling design shows up on the bill.
As an illustration with stated assumptions, a hall with 30 megawatts of IT load that improves its power usage effectiveness by 0.10, for example by raising supply water temperature and extending dry cooler hours, cuts about 3 megawatts of continuous demand. Over 8,760 hours that is 26.3 million kilowatt-hours, worth about $2.2 million a year at the 2024 Wisconsin industrial average. The actual figure depends on the owner’s tariff, demand charges and load profile, and Paul Industries runs the calculation on the real numbers before recommending a change.
Utility territory also shapes the schedule. We Energies serves more than 2.3 million electric and gas customers in Wisconsin, including Milwaukee and the southeast, and Wisconsin Public Service more than 824,000 in the northeast and center of the state, while Alliant Energy’s Wisconsin Power and Light serves areas that include Beaver Dam and Madison Gas and Electric serves about 170,000 electric customers in Madison and neighboring Dane County communities. The utility’s timeline for new service and substation capacity often sets the date when a cooling plant can run at full load, so the cooling sequence is planned to start in stages as capacity arrives.
Keeping a Wisconsin cooling plant from freezing
Keeping a Wisconsin cooling plant from freezing means designing for the county’s winter design temperature, from 10 below on the lakeshore to 25 below in the north, and for the failure case where a pump stops on the coldest night. Water standing in an outdoor coil, a tower basin or an uninsulated riser freezes quickly at those temperatures, and a split coil or cracked header can take a cooling plant out of service for days.
Paul Industries applies the usual defenses, chosen to suit the site: propylene or ethylene glycol in loops exposed to outdoor air, at a strength set by the county design temperature rather than a rule of thumb; heat tracing and insulation on exposed piping, makeup lines and instrument taps; basin heaters and indoor sumps for towers that run in winter; and controls that keep minimum flow through outdoor coils whenever the loop is filled with water. Glycol lowers heat transfer and raises pump power, so the design often separates an outdoor glycol loop from an indoor water loop through a plate heat exchanger, keeping the penalty on the outdoor side only.
Snow and ice matter as much as temperature. Dry coolers and air-cooled chillers need clearance for drifting snow, intake screens that shed ice, and access paths a technician can use in February. Rooftop equipment in the north woods counties is laid out with that access in mind.
Data centers in Wisconsin, region by region
Data center cooling in Milwaukee and along the Lake Michigan shore is planned around the state’s highest summer design wet bulb and a busy construction market, with the Microsoft campus in Mount Pleasant fully operational on its first facility and building its second, scheduled by Microsoft for 2028, and the Lighthouse campus in Port Washington, Ozaukee County, still developing in late 2026. Data center cooling in Mount Pleasant and Racine County is planned with summer water use held to what the supplying utility has agreed to deliver, since evaporative peaks arrive when municipal systems are busiest.
Data center cooling in Madison and Dane County serves university research computing, healthcare and enterprise rooms as well as colocation, often inside existing buildings where roof space and structure limit what heat rejection equipment can be added. Data center cooling in Green Bay and the Fox Valley tends toward enterprise halls serving manufacturers, insurers and health systems, with the colder design data favoring dry coolers and free cooling coils. Central and western Wisconsin, from Wausau to Eau Claire and La Crosse, sees the deepest winter design temperatures and the strongest case for closed loops with dry heat rejection.
Halls of every size across the state share the same building code, the same water statutes and the same state design table, so the questions above apply whether the project is a 200 kilowatt enterprise room or a multi-building campus.
Upgrading cooling in an operating Wisconsin hall
Upgrading cooling in an operating Wisconsin hall is a staged job that keeps the existing plant carrying the load while new equipment is set, piped and tested beside it, then transfers load one loop or one row at a time. The cold season helps: a cooling upgrade scheduled between October and April can lean on economizer capacity while a chiller is isolated, which a summer outage in the southeast cannot.
The usual sequence is a survey of existing capacity and redundancy against the county design day, valved tie-in points installed during low-load periods, new equipment set and tested on its own loop, then a controlled cutover with the old plant held in reserve. The tests that prove each stage are described on data center commissioning in Wisconsin. Paul Industries prefabricates piping assemblies off site, so the work inside the hall is short and the tie-ins happen at planned moments rather than over days of open piping.
What does data center cooling cost in Wisconsin?
The cost of data center cooling in Wisconsin is set by the heat rejection method, the supply temperature the IT equipment accepts, the redundancy level, the county design data, whether the site draws its own water, and how much of the work happens inside an operating hall. A dry cooler plant on a warm-water loop costs more in heat exchange surface than a tower plant but less in water treatment and permits; a water-cooled plant costs less in equipment per ton but adds towers, chemical treatment and winter protection.
Freeze protection, roof structure and electrical service are the line items that surprise owners most often in Wisconsin. Glycol systems need larger pumps and heat exchangers, cold-climate equipment options add cost, and a roof that was never designed for dry coolers may need new steel. Paul Industries prices a budget range from comparable scope once the IT load, density and site are known, then a firm price after a survey of the building, the utility service and the water source.
Who installs data center cooling in Wisconsin?
Paul Industries installs data center cooling in Wisconsin, designing, supplying, installing, starting up and maintaining chiller plants, dry coolers, towers, economizers and cooling distribution for halls from Kenosha and Milwaukee to Madison, Green Bay, Appleton, Oshkosh, Wausau, Eau Claire and La Crosse, and in all 50 states. Owners choose the route that fits: supply of equipment and prefabricated piping assemblies, design-build of a complete plant, or complete installation of an engineered design.
The same contract covers the related scopes. Heat rejection plants depend on data center mechanical contractor in Wisconsin work for piping, supports and equipment setting; tower yards draw on data center cooling towers; and owners comparing states read the data center cooling in Pennsylvania and data center cooling in New York pages, or the headquarters state page, data center cooling in Virginia. Plants across the region are listed on the Midwest page.
Data center cooling solutions in Wisconsin from Paul Industries
Paul Industries delivers data center cooling solutions in Wisconsin as an East Coast contractor headquartered in Kilmarnock, Virginia, formerly based in northern New Jersey and then Pennsylvania, taking work across Wisconsin and every other state. Every new data center Wisconsin owners plan, and every older hall being densified, gets a plant sized to the county design table, protected for the winter design temperature and matched to the water the site is allowed to draw. Send the IT load and density, the site or building, the target supply temperatures and the utility schedule. Call 201-450-8280 or request a quote, and see the Wisconsin page for the rest of the work Paul Industries does in the state.
Standards referenced: Wisconsin Commercial Building Code, chs. SPS 361 to 366 · 2021 International Mechanical Code (SPS 361.05) · 2021 International Energy Conservation Code as amended by ch. SPS 363 · SPS Table 363.0302 exterior design conditions · ch. SPS 345 Mechanical Refrigeration · Wis. Stat. 281.34 and 281.346 (high capacity wells, water use registration and permits) · ASHRAE 90.1-2019 · ASHRAE TC 9.9 thermal guidelines
Frequently asked questions
Who handles data center cooling in Milwaukee, Waukesha and the southeast counties?
Paul Industries designs, installs and services data center cooling in Milwaukee, Waukesha, Racine, Kenosha and Ozaukee counties. The southeast carries Wisconsin’s highest summer design wet bulb, 77 degrees Fahrenheit with a 89 degree dry bulb, so evaporative and hybrid plants there are sized for humid peaks while dry coolers and free cooling coils carry the rest of the year. Send the IT load, density and building details to start a design or upgrade.
Does Paul Industries handle data center cooling in Madison and Dane County?
Paul Industries designs and installs data center cooling for enterprise, university and colocation halls in Madison, Middleton, Fitchburg, Sun Prairie and the rest of Dane County. Dane County designs to 15 below zero in winter and an 87 degree dry bulb, 75 degree wet bulb in summer, which favors dry coolers and air-cooled chillers with free cooling coils for enterprise and university halls. Projects inside existing buildings start with a check of roof structure and electrical service.
Who provides data center cooling in Green Bay and the Fox Valley?
Paul Industries provides data center cooling in Green Bay, Appleton, Oshkosh, Neenah and the rest of the Fox Valley, where halls serving manufacturers, insurers and health systems design to 15 below zero and an 87 degree dry bulb. That climate suits air-cooled chillers with free cooling coils and dry coolers on warm-water loops. Brown County sits in the Great Lakes basin, so any site drawing its own water at high rates plans for DNR water use coverage.
Who builds cooling for server rooms in Wausau, Eau Claire and La Crosse?
Paul Industries builds cooling for server rooms and data halls in Wausau, Eau Claire, La Crosse and the rest of central and western Wisconsin. Design temperatures of 20 to 25 below zero make freeze protection the first design input: glycol loops separated from indoor water by plate exchangers, traced and insulated outdoor piping, and controls that hold flow through outdoor coils. Long economizer seasons make the operating cost low once the plant is protected.
Which design temperatures must a Wisconsin data center cooling plant use?
Wisconsin’s energy code requires heating and cooling loads to be calculated from SPS Table 363.0302 or from ASHRAE 90.1-2019. The table lists each county: Milwaukee and the southeast at minus 10 in winter and 89 over 77 in summer, Dane and Brown at minus 15 and 87 over 75, and the far north at minus 25. Paul Industries sizes heat rejection and freeze protection from the figures for the county where the hall sits.
Does a Wisconsin data center need a DNR permit for cooling water?
A permit question arises when the site draws its own water at high rates. Wells with combined capacity over 100,000 gallons per day need high capacity well approval, systems able to withdraw an average of 100,000 gallons per day in a 30-day period must be registered, and Great Lakes basin withdrawals at that level need water use permit coverage. Municipal water falls under the utility’s withdrawal, though large summer demand still needs the utility’s agreement.
Is a closed loop or an evaporative plant better for a new Wisconsin campus?
For most new Wisconsin campuses a closed loop with dry heat rejection is the starting point, because the cold season gives long free cooling hours and the loop draws water only for fill and makeup. Evaporative towers still suit plants with ample municipal water and 45 degree chilled water needs, and hybrid adiabatic coolers cover the southeast’s humid peaks. Paul Industries compares the options on energy, water, freeze risk and cost for the specific site.
Can an existing Wisconsin hall add free cooling without replacing its chillers?
Free cooling can usually be added to an existing hall in stages. Air-cooled chillers can be fitted or replaced with units carrying free cooling coils, a plate heat exchanger can give a water-cooled plant a waterside economizer, and raising chilled water setpoints within ASHRAE TC 9.9 limits widens the hours either one runs. Paul Industries surveys the plant, models the hours against the county design data and installs the change around live operation.
How much glycol does a Wisconsin outdoor cooling loop need?
Glycol strength is set from the county’s winter design temperature and the plant’s failure case, such as a stopped pump on the coldest night, with burst protection and freeze protection treated as different targets. Northern counties at minus 25 need a stronger mix than the lakeshore at minus 10. Because glycol reduces heat transfer and raises pump energy, Paul Industries often limits it to an outdoor loop separated from indoor water by a plate heat exchanger.
How are Microsoft's and Meta's Wisconsin campuses cooled?
Microsoft describes its Mount Pleasant campus as using closed-loop liquid cooling for more than 90 percent of the facility, filled once during construction, with outside air for the remainder and water only on the hottest days; its first facility was reported fully operational in June 2026. Meta has said its Beaver Dam campus, under construction since November 2025, will use dry cooling. These are market facts about owner choices in the state.
Does the Wisconsin economizer amendment apply to data center cooling systems?
Wisconsin’s SPS 363.0403 replaces the IECC economizer section with a requirement for supply air economizers on all packaged rooftop units and on other cooling systems of 60,000 Btu per hour or more. How it applies to a computer room depends on the system type and the exceptions the designer relies on, and many data center plants meet the intent with waterside or fluid cooler economizers. Paul Industries designs to the approved plans and documents the economizer sequence at turnover.
Do Wisconsin chillers serving a data center need state registration?
Chillers using A1 or B1 refrigerants at 50 tons or more are mechanical refrigeration systems that must be registered with the Department of Safety and Professional Services under SPS 345 before they first operate, and the state inspects them after installation. The chapter excludes systems where water or air is the primary refrigerant, so dry coolers and water loops are governed by the mechanical code instead. Paul Industries prepares the registration information with the chiller installation.
Which utilities serve data center sites in Wisconsin?
We Energies serves Milwaukee and much of southeast Wisconsin, Wisconsin Public Service serves the northeast and central parts of the state, Alliant Energy’s Wisconsin Power and Light serves areas including Beaver Dam, and Madison Gas and Electric serves about 170,000 electric customers in Madison, Middleton, Fitchburg and other Dane County communities. The utility’s schedule for new service and substation capacity usually sets when a cooling plant can run at full load, so Paul Industries plans plant startup in stages that follow the power available.
How does Wisconsin's industrial electricity price affect cooling design?
Wisconsin’s 2024 average industrial price of 8.54 cents per kilowatt-hour, above the national 8.13, makes every point of cooling overhead worth calculating. As an example, a 30 megawatt hall that improves its power usage effectiveness by 0.10 saves about 26 million kilowatt-hours a year, roughly $2.2 million at that average. Paul Industries runs the same estimate on the owner’s actual tariff and load before recommending warmer setpoints, dry coolers or new chillers.
Which months suit a cooling upgrade in a Wisconsin data hall?
October through April suits most cooling upgrades in Wisconsin, because economizer capacity can carry much of the load while a chiller, tower cell or pump is isolated. Summer outages in the southeast have the least margin, given the 77 degree design wet bulb. Paul Industries stages work so redundancy is confirmed before each piece of equipment comes offline, and tests each stage before the next begins.
What winter problems hit data center cooling equipment in northern Wisconsin?
Frozen coils, ice on intake screens, drifting snow around dry coolers and tower basins that freeze during low load are the common winter problems. Each comes back to design and controls: minimum flow through outdoor coils, glycol where water could stand, basin heaters or indoor sumps, heat tracing on makeup and drain lines, and clear access for technicians. Paul Industries checks these during fall service so the plant enters winter protected.
Can Paul Industries supply dry coolers and prefabricated piping without installing them?
Paul Industries offers supply-only scopes for Wisconsin projects, providing dry coolers, chillers, pumps and prefabricated piping assemblies with the submittals and test records an installing team needs. The same equipment can be delivered under a design-build or complete installation contract when the owner wants one company responsible for the plant from design through startup. Send the equipment list or design documents to start a supply quote.
What does Paul Industries need to price data center cooling in Wisconsin?
Send the IT load and rack density, the county and building or site, the supply temperatures the IT equipment accepts, the redundancy level, the water source and any limits on it, roof or yard space for heat rejection, and the utility service schedule. For an operating hall add the existing plant data and recent trend logs. Paul Industries returns a budget range from comparable scope and a firm price after a site survey.
Planning a cooling plant for a Wisconsin data hall?
Send the IT load, rack density, county and site, target supply temperatures and water source. Call 201-450-8280 or request a quote.