Paul Industries designs, supplies, installs and maintains data center liquid cooling in Wisconsin: coolant distribution units, technology cooling loops, rack manifolds, facility water piping and the dry coolers and chillers that reject the heat, for halls in Mount Pleasant, Milwaukee, Madison, the Fox Valley and the rest of the state. Wisconsin is where facility-scale liquid cooling stopped being an experiment: the state’s largest campus describes more than 90 percent of its first facility as closed-loop liquid cooled. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, builds the same kind of loops for owners of every size, sized to Wisconsin’s winter design data and filled with water treated for its hard groundwater.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Water loops and SPS 345 Chapter excludes water or air as the primary refrigerant (SPS 345.11)
Refrigerant registration A1 or B1 systems at 50 tons or more (SPS 345.30)
Madison fill water Very hard, 18 to 20 grains per gallon (Madison Water Utility)
Coldest design point -25 F in northern counties (SPS Table 363.0302)
Reviewed November 2026

What does data center liquid cooling in Wisconsin involve?

Data center liquid cooling in Wisconsin involves three loops and the equipment between them: a technology cooling loop that carries coolant through cold plates, rear-door coils or immersion tanks; coolant distribution units that separate that loop from the facility water; and a facility water loop that carries the heat to dry coolers, cooling towers or chillers outdoors. Each loop has its own water chemistry, pressure rating, filtration and test records, and in Wisconsin the outdoor end has to survive winter design temperatures from 10 to 25 degrees below zero.

The technologies themselves, direct-to-chip cold plates, single-phase and two-phase systems, rear-door heat exchangers and immersion, are compared on the national data center liquid cooling page, and immersion has its own page at data center immersion cooling. This page covers what changes when the hall is in Wisconsin: the cold, the water, the state code path and the scale of the closed loops now operating in the state.

Closed loop liquid cooling at facility scale in Mount Pleasant

Closed loop liquid cooling at facility scale is already running in Wisconsin. Microsoft announced in June 2026 that its first Mount Pleasant facility was fully operational, and its own description puts more than nine tenths of that building on a sealed liquid loop charged during construction and recirculated from then on, with outdoor air handling the remaining space and evaporative water reserved for peak heat. Microsoft also says the loop is supported by the second largest water-cooled chiller plant on the planet, with heated water piped to cooling fins where 172 fans, each 20 feet across, chill it before it returns to the racks.

Three lessons from that design apply to far smaller Wisconsin projects. First, liquid cooling in Mount Pleasant and across the state is planned as part of the building, not added to it, with headers, risers and heat rejection sized for the final density. Second, a closed loop turns liquid cooling water consumption into a one-time fill plus small makeup, which matters in a state that registers water systems above 100,000 gallons per day. Third, the outdoor heat rejection is large: when most of the heat leaves through water, the fluid coolers and their fans become the main mechanical equipment on the site. The second Mount Pleasant facility, under construction and scheduled by Microsoft for 2028, keeps that kind of work active in Racine County, and these facts are cited here only as market context.

Which loop temperatures suit Wisconsin weather?

Loop temperatures that suit Wisconsin weather are as warm as the IT equipment allows, because a warmer facility loop can reject its heat through dry coolers for more of the year without running compressors. With Milwaukee’s mean January temperature near 24 degrees Fahrenheit and its July mean near 73, and design summer conditions of 89 degrees dry bulb along the lakeshore, a loop returning above 100 degrees has outdoor air to spare almost every hour of the year, while a loop held near 60 degrees still needs chillers through the summer.

Facility water supply temperature and how a Wisconsin plant rejects the heat
Facility supply temperatureTypical terminal equipmentHeat rejection in southeast WisconsinHeat rejection in central and northern Wisconsin
About 45 to 55 FAir handlers and fan walls, legacy hallsChillers through summer; waterside economizer in winterEconomizer for more of the year; chillers still needed in summer
About 60 to 70 FRear-door heat exchangers, in-row coolersDry coolers in cool months; trim chillers or adiabatic assist on humid daysDry coolers carry most of the year; small trim capacity
About 75 to 90 FDirect-to-chip cold plates through CDUsDry coolers nearly year-round; adiabatic spray for peak daysDry coolers year-round in most counties
Above 90 FWarm-water cold plates designed for high inlet temperaturesDry coolers year-round; return water warm enough for heat reuseDry coolers year-round; strongest case for heat reuse

The allowable supply temperature belongs to the server and cold plate manufacturer, within the classes ASHRAE TC 9.9 publishes for liquid-cooled equipment. Paul Industries designs the facility loop around the warmest temperature the planned equipment accepts and leaves trim capacity for the hardware the owner expects to install next, since a hall that starts with warm-water cold plates may later host equipment that wants cooler water.

Liquid cooling glycol, water and freeze protection in Wisconsin loops

Liquid cooling glycol belongs in the parts of a Wisconsin system that see outdoor air, and plain treated water belongs everywhere else. A facility loop that runs to dry coolers on a roof in Dane County, designed for 15 below, or in Marathon County, designed for 20 below, needs propylene or ethylene glycol at a strength set for that design temperature, or a plate heat exchanger that keeps the outdoor glycol loop apart from the indoor water loop.

Glycol carries less heat per gallon than water and is more viscous when cold, so pumps, heat exchangers and CDUs sized for water lose capacity on a glycol mix. Most designs keep the technology cooling loop on treated water or the coolant the cold plate manufacturer specifies, keep the facility loop indoors on water, and put glycol only in the outdoor loop beyond a plate exchanger. Where an owner prefers one glycol loop from roof to CDU, Paul Industries sizes every component for the mix and records the concentration at turnover so later top-ups keep it in range.

Fill water and liquid cooling coolants on Wisconsin groundwater

Fill water for a Wisconsin liquid cooling loop has to be treated before it goes in, because much of the state’s supply is hard groundwater. Madison’s water comes from a deep sandstone aquifer through wells 500 to 1,100 feet deep, and the utility describes it as very hard, at 18 to 20 grains of hardness per gallon, with naturally occurring iron and manganese. Water like that will scale a cold plate’s fine channels and foul the strainers that protect them.

Technology cooling loops are filled with deionized or reverse osmosis water, or with a premixed coolant from the cold plate manufacturer, and treated with corrosion inhibitors matched to the metals in the loop. Liquid cooling coolants based on propylene glycol carry their own inhibitor package, and the inhibitor level, pH and conductivity are logged from the first fill. Liquid cooling biocide treatment is part of the program for water-based loops, since warm, still water in a dead leg grows bacteria that foul cold plates and corrode copper. The treated water for filling and topping up can come from a purification skid on site, which ties this work to ultrapure water systems in Wisconsin.

Wisconsin liquid cooling loops: fluid, protection and records
LoopUsual fluidWisconsin-specific protectionRecords at turnover
Technology cooling loop (rack side)Treated deionized or RO water, or a manufacturer-specified glycol coolantFill from treated water, never untreated hard groundwater; fine filtration to the cold plate limitFill water analysis, inhibitor and biocide levels, flush and filtration records
Facility water loop (indoor)Treated waterKept inside the heated envelope; minimum flow at all timesPressure test, flushing, water treatment baseline
Outdoor heat rejection loopPropylene or ethylene glycol mixConcentration set from the county design temperature, minus 10 to minus 25 FGlycol concentration and freeze point, trace heating test
Two-phase or refrigerant-based systemsRefrigerantChecked against SPS 345 registration thresholds early in designLeak test, evacuation and charge records

Which Wisconsin code governs a liquid cooling loop?

A water or glycol liquid cooling loop in Wisconsin follows the state commercial building code, whose September 2025 update brought in the 2021 edition of the International Mechanical Code and its hydronic piping chapter, while refrigerant-based systems fall under the separate state chapter for mechanical refrigeration, SPS 345. That chapter states plainly that it does not apply to the use of water or air as the primary refrigerant, so single-phase cold plate loops, rear-door coil loops and dry cooler circuits follow the mechanical code, and the chillers that trim them follow SPS 345.

Two-phase direct-to-chip systems and refrigerant-based CDUs deserve an early look. SPS 345 requires registration of systems using A1 or B1 refrigerants at a rated capacity of 50 tons, 50 horsepower or 50,000 volt-amperes, and 50 tons is only about 176 kilowatts of heat, a few dense racks. Paul Industries reviews the refrigerant, its safety group and the system capacity against the chapter during design, so registration and state inspection, where they apply, fit into the schedule rather than delaying the first rack. The plan review route through the Department of Safety and Professional Services is covered on data center mechanical contractor in Wisconsin.

Liquid cooling vs air cooling in a Wisconsin hall

Liquid cooling vs air cooling in a Wisconsin hall is decided by rack density first and by climate second. Air cooling with economizers is efficient in Wisconsin up to the densities that air can physically carry, and cold winters give air-cooled halls long economizer seasons. Above that density, liquid cooling removes heat at the chip, lets the facility loop run warm, and turns the cold climate into year-round dry cooling rather than seasonal economizing.

Most halls end up with both. Liquid cooling takes the processor and accelerator heat, while air handlers or fan walls carry the residual heat from power supplies, memory, storage and networking. A data center liquid cooling system in Wisconsin therefore still needs an air side, smaller than before but designed for the same winter conditions, and the split between the two decides the size of every pump, coil and fan.

Rear-door heat exchangers on an existing Wisconsin chilled water plant

Rear-door heat exchangers are often the first liquid cooling step in an older Wisconsin hall, because they run on chilled or tempered water the plant already makes and need no change to the servers. Each door is a coil in the rack’s exhaust path, fed through hoses from a secondary loop held above the room dew point so the coil never sweats. In Wisconsin the same secondary loop can later serve CDUs for cold plate racks, so Paul Industries sizes its headers for that next step, and raising its temperature over time lets the plant’s waterside economizer carry more of the winter.

The air-side and heat rejection choices for the whole site are covered on data center cooling in Wisconsin.

Data center heat reuse in Wisconsin’s heating season

Data center heat reuse in Wisconsin has a better case than in most states, because the heating season is long and the return water from warm-water cold plates is warm enough to be useful. Return water above 100 degrees Fahrenheit can preheat ventilation air in the same building, warm office and support spaces, keep snow-melt systems and equipment yards clear, or feed heat pumps that lift the temperature for a neighboring building.

The engineering questions are the same everywhere: how much heat is available at what temperature, how steady it is, and who needs it when. Wisconsin’s cold winters make the demand side easier to find. Paul Industries designs the heat recovery exchanger, the isolation that separates the data hall loop from the heat user, and the controls that send heat outdoors when the user does not need it, so the hall keeps full cooling whatever the heating load next door is doing.

Adding liquid cooling to an operating Wisconsin hall

Adding liquid cooling to an operating Wisconsin hall starts with a survey of floor loading, ceiling space, chilled water capacity and electrical service, then a phased installation in which CDUs, headers and manifolds are installed and tested before any rack is connected. Taps into live facility water headers are made with valves installed during planned low-load windows, and new piping is pressure tested, flushed and filled with treated water before it ever sees a cold plate.

Liquid cooling quick disconnects at the rack let servers be added and removed without draining the loop, and they are specified for the coolant, pressure and flow the cold plate manufacturer requires. Leak detection runs under manifolds and along pipe routes, with alarms tied to the building management system. Paul Industries prefabricates manifolds and pipe spools off site, which keeps hot work and open piping inside the hall to a minimum, and documents each step so the operator knows which loop, valve and sensor serves which row. The proving tests are set out on data center commissioning in Wisconsin.

How often does liquid cooling need maintenance?

Liquid cooling in a data hall needs routine attention on three time scales: continuous monitoring of flow, pressure, temperature and leak sensors; monthly or quarterly checks of strainers, filters and water chemistry; and annual work on pumps, valves, glycol concentration and outdoor heat rejection. The intervals below are a starting point that the owner’s equipment manuals and water treatment results refine.

A maintenance calendar for a Wisconsin liquid cooling system
IntervalTaskWhy it matters in Wisconsin
ContinuousFlow, pressure, supply and return temperature, leak detection alarmsA stopped pump on a subzero night puts the outdoor loop at risk of freezing
MonthlyStrainer differential pressure, makeup water volume, conductivityRising makeup points to a leak; rising conductivity points to contamination
QuarterlyInhibitor, biocide and pH tests on water loops; filter changesWarm, slow sections of loop grow bacteria that foul cold plates
Each autumnGlycol concentration and freeze point, heat trace tests, dry cooler coil cleaningSets the outdoor loop up for design temperatures of minus 10 to minus 25 F
AnnuallyPump and motor checks, valve exercise, quick disconnect inspection, sensor calibrationKeeps the loop serviceable as racks are added and moved

Owners also ask: how often does liquid cooling leak? Leaks in a well-built loop are rare and usually trace to a few causes: a damaged or poorly seated quick disconnect, a fitting disturbed during rack work, corrosion from untreated water, or freeze damage outdoors. The answer is design and practice: rated connectors, pressure testing, treated water, freeze protection and leak sensors where water could collect. Paul Industries offers that program under service contracts.

Riding through a winter power event on a liquid-cooled hall

A liquid-cooled hall riding through a winter power event needs its CDU pumps and facility pumps on uninterruptible power, because cold plates hold very little thermal mass and processors reach their limits within moments of losing flow. The usual design puts CDU pumps and the controls that run them on the same UPS as the IT load, with facility pumps on UPS or on a short ride-through until generators pick up the load.

Wisconsin adds the outdoor side to that plan. If the outdoor loop stops during a subzero night, glycol protects the coils, but a water-filled loop or an untraced makeup line can freeze before power returns. Paul Industries designs the restart sequence so pumps return in a set order, the outdoor loop regains minimum flow first, and dry cooler fans stay off until supply temperature calls for them, which keeps a cold restart from sending near-freezing glycol into an indoor exchanger. The sequence is tested at commissioning with the generators and UPS in the loop, and the owner receives the written procedure and alarm settings with the turnover records.

What does data center liquid cooling cost in Wisconsin?

The cost of data center liquid cooling in Wisconsin depends on the number of racks and their heat load, the cooling technology, CDU redundancy, the length and size of facility piping, the heat rejection plant, freeze protection for the outdoor loop, and how much work happens inside an operating hall. A new hall designed for liquid cooling from the start costs less per rack to equip than a retrofit, because headers, risers and floor loading are planned once.

In Wisconsin the climate also changes the operating side of the comparison. Dry coolers running most of the year on a warm-water loop use far less energy than chillers, and at the 2024 state average industrial price of 8.54 cents per kilowatt-hour the savings in compressor energy are a large part of the case for warmer loops. Paul Industries prepares a budget range from comparable scope once the rack count, density and building are known, and a firm price after a site survey.

Who installs data center liquid cooling in Wisconsin?

Paul Industries installs data center liquid cooling in Wisconsin, designing, supplying, installing, testing and maintaining CDUs, technology cooling loops, manifolds, facility piping and heat rejection, and supplying prefabricated assemblies where an owner wants supply only. Paul Industries takes this work in Mount Pleasant and Racine County, in Milwaukee and Waukesha, in Madison and Dane County, in Green Bay, Appleton and Oshkosh, and in Wausau, Eau Claire and La Crosse, as well as in all 50 states.

Owners comparing approaches across states can read the data center liquid cooling in Pennsylvania page or the headquarters state page, data center liquid cooling in Virginia. Where the chillers that trim a liquid loop need service, chiller repair in Wisconsin covers the state registration and inspection steps. Work across the region is listed on the Midwest page.

Liquid cooling for Wisconsin data halls from Paul Industries

Headquartered in Kilmarnock, Virginia, and once based in northern New Jersey and later Pennsylvania, Paul Industries is an East Coast contractor designing and building liquid cooling for data halls in Wisconsin and every other state. Each loop is sized to the warmest water the equipment accepts, protected for the county’s winter design temperature, filled with treated water and handed over with complete test and water treatment records. Send the rack count and density, the cooling technology, the building or site and the target loop temperatures. The Wisconsin page lists the other process and utility work Paul Industries delivers in the state. Call 201-450-8280 or request a quote.

Standards referenced: Wisconsin Commercial Building Code, chs. SPS 361 to 366 · 2021 International Mechanical Code, hydronic piping (SPS 361.05) · ch. SPS 345 Mechanical Refrigeration and ANSI/ASHRAE 15 · SPS Table 363.0302 exterior design conditions · ASHRAE TC 9.9 liquid cooling guidelines · Open Compute Project cold plate and CDU specifications

Frequently asked questions

Which contractor builds data center liquid cooling in Milwaukee for colocation suites?

Paul Industries builds data center liquid cooling in Milwaukee, Waukesha, Racine and Kenosha, from CDU and manifold installation in colocation suites to facility loops and dry coolers for new halls. Southeast Wisconsin designs to an 89 degree dry bulb and 77 degree wet bulb in summer, so warm-water loops there often add adiabatic assist or small trim chillers for the hottest afternoons.

Does Paul Industries install data center liquid cooling in Madison for research computing?

Paul Industries installs data center liquid cooling in Madison for university research computing, healthcare systems and enterprise halls, often inside existing buildings where floor loading and ceiling space set the layout. Madison’s very hard groundwater, 18 to 20 grains per gallon, means every loop is filled with deionized or RO water or a premixed coolant, never with untreated tap water.

Who builds liquid cooling loops in Green Bay, Appleton and Eau Claire?

Paul Industries builds liquid cooling loops for halls in Green Bay, Appleton, Oshkosh, Wausau, Eau Claire and La Crosse. Design temperatures of 15 to 25 below zero in those counties make freeze protection on the outdoor loop the first design decision, and the same cold makes year-round dry cooling of warm-water loops practical. Paul Industries sizes glycol, heat exchangers and controls for the county’s design data.

Does a water-based liquid cooling loop need registration under Wisconsin's refrigeration code?

Wisconsin’s mechanical refrigeration chapter, SPS 345, states that it does not apply to the use of water or air as the primary refrigerant, so single-phase water or glycol loops follow the Wisconsin Commercial Building Code and the 2021 International Mechanical Code instead. The chillers that trim those loops, and any refrigerant-based two-phase system, are checked against SPS 345’s registration thresholds.

Is a two-phase cold plate system treated differently in Wisconsin?

A two-phase system circulates refrigerant, so it is reviewed against SPS 345, which requires registration of systems using A1 or B1 refrigerants at 50 tons or more and lower thresholds for flammable refrigerant groups. Fifty tons is about 176 kilowatts, so a dense row can reach it. Paul Industries checks the refrigerant, safety group and capacity during design so any registration and state inspection fit the schedule.

Should a Wisconsin liquid cooling loop use glycol or water?

Treated water suits loops that stay inside the heated building, because it carries more heat and needs less pump power. Glycol suits loops that run to outdoor dry coolers, at a concentration set from the county’s winter design temperature, minus 10 on the lakeshore to minus 25 in the north. Many Wisconsin designs separate the two with a plate heat exchanger so glycol stays outdoors.

Can Madison tap water be used to fill a cold plate loop?

Madison tap water is very hard, 18 to 20 grains per gallon, and carries naturally occurring iron and manganese, which would scale cold plate channels and foul fine strainers. Loops are filled with deionized or reverse osmosis water, or with a manufacturer-specified coolant, then dosed with corrosion inhibitor and biocide. Paul Industries records the fill water analysis and treatment levels at turnover.

What does the Mount Pleasant campus show about liquid cooling in Wisconsin?

Microsoft describes its first Mount Pleasant facility, fully operational since 2026, as more than 90 percent liquid cooled through a sealed loop charged while the building went up, with outdoor air serving the remaining space and water reserved for the hottest days. The design shows that closed loops at very large scale run well in Wisconsin’s climate. It is cited as a market fact about the state.

How much water does a closed liquid cooling loop use in Wisconsin?

A closed loop uses water mainly for its first fill, plus small makeup to replace losses from maintenance and minor leaks, and the heat leaves through dry coolers without evaporation. Water use rises only if the plant adds adiabatic spray or evaporative towers for summer peaks. That keeps most closed-loop sites well below the 100,000 gallon per day level at which Wisconsin requires registration of a water supply system.

What water temperature should a new Wisconsin liquid-cooled hall supply?

The warmest temperature the planned servers and cold plates accept, within ASHRAE TC 9.9 liquid cooling classes and the manufacturer’s limits, because warm supply water lets dry coolers carry the load most or all of the year in Wisconsin. Many cold plate halls supply water in the 75 to 90 degree range. Paul Industries leaves trim capacity so later equipment that wants cooler water can be served.

Can heat from a Wisconsin liquid-cooled hall heat other buildings?

Return water from warm-water cold plates often exceeds 100 degrees Fahrenheit, enough to preheat ventilation air, warm support spaces, melt snow or feed heat pumps serving another building. Wisconsin’s long heating season gives that heat a steady user for much of the year. Paul Industries designs the heat recovery so the hall can always reject its heat outdoors when the heating demand drops.

Where should leak detection go in a Wisconsin liquid-cooled row?

Leak sensors belong under rack manifolds, under CDUs, along overhead and underfloor pipe routes and at low points where water would collect, with alarms tied to the building management system and, where the owner wants it, automatic isolation valves. In Wisconsin, outdoor loops also get low-temperature and low-flow alarms, because a stopped pump in winter is a freeze risk.

What do liquid cooling quick disconnects need to match?

Quick disconnects need to match the coolant chemistry, the loop’s operating and test pressure, the flow rate per server and the cold plate manufacturer’s connector specification, and they are inspected for wear and seating during rack changes. Paul Industries specifies and installs them with the manifolds, pressure tests the assembled row, and records connector types so replacements match.

How long does it take to add liquid cooling to an operating Wisconsin hall?

The schedule depends on how many rows are converted, the lead time for CDUs and heat rejection equipment, the floor and ceiling work needed, and when the operator can allow tie-ins to live facility water. Work is phased so each set of CDUs and manifolds is tested and flushed before racks connect. Paul Industries sets the phases with the operator and prefabricates manifolds and spools to shorten work inside the hall.

Does Paul Industries supply CDUs and manifolds on a supply-only basis in Wisconsin?

Paul Industries supplies CDUs, manifolds, prefabricated pipe spools and dry coolers on a supply-only basis for Wisconsin projects, with submittals, pressure test certificates and fill instructions. The same equipment is also available within design-build or complete installation contracts when the owner wants one company responsible from design through the first rack connection.

What should a Wisconsin operator send to price liquid cooling?

Send the number of racks and their heat load, the cooling technology and cold plate or CDU requirements, the building or site and county, existing facility water capacity and temperatures, roof or yard space for heat rejection, and the electrical service available. For an operating hall add drawings and photos of the floor and ceiling. Paul Industries returns a budget range from comparable scope, then a firm price after a survey.

Bringing liquid-cooled racks into a Wisconsin hall?

Send the rack count and density, cooling technology, building or site and target loop temperatures. Call 201-450-8280 or request a quote.