Paul Industries provides data center cooling in Colorado by designing, building, starting up and servicing chilled water plants, dry cooler and evaporative heat rejection, CRAH galleries and the piping between them for halls from Aurora and Denver to Colorado Springs and the northern Front Range. Colorado hands a cooling designer a rare mix: air dry enough for long economizer seasons, air thin enough to cut the capacity of every fan and coil, and water supplies that start as mountain snow and that cities now watch closely. The plant that suits those three conditions looks different from one drawn for a humid, sea-level site.
Request a quote or call 201-450-8280
What shapes data center cooling in Colorado?
Data center cooling in Colorado is shaped by elevation, a semi-arid climate and the politics of water and power, all three of which move the design away from the textbook plant. Most Front Range halls sit between about 5,000 and 6,500 feet, where each cubic foot of air carries less mass and therefore less heat. Summer air is hot by afternoon but dry, so the wet bulb temperature that governs evaporative equipment stays low; the National Laboratory of the Rockies in Golden designs to a 60 degree Fahrenheit wet bulb. Water, meanwhile, arrives from snowmelt reservoirs and is counted carefully by utilities and city councils.
Those conditions reward a cooling strategy built on free cooling hours and penalize one built on catalogue ratings taken at sea level. The national data center cooling systems page covers how chilled water plants, CRAHs, containment and liquid loops work in general. This page stays with what changes once the site is in Colorado, and with the 2026 rules that now decide where a hall goes and how it is cooled.
Sizing fans, coils and condensers for 5,000 feet
Air-side equipment for a Colorado data hall is sized by mass flow, because the heat a fan wall or dry cooler removes depends on the pounds of air it moves, and each pound of air takes up more room at elevation. At 5,000 feet the barometric pressure is about 24.9 inches of mercury, roughly 84 percent of the sea-level value, and a given mass of air occupies about 1.17 times the volume it would at the coast. A CRAH chosen from a sea-level airflow table therefore delivers less cooling than its label suggests unless the fan speed, coil face area or unit count is increased to make up the difference.
The same correction runs through every piece of air-cooled data center cooling equipment. Air-cooled chillers and dry coolers lose rejection capacity because their condenser fans push fewer pounds of air across the coil, and their head pressure climbs on hot afternoons. Generator radiators and electrical room fans follow the same physics. Fan energy rises when fans speed up to restore mass flow, which feeds straight back into PUE. Manufacturers publish altitude correction factors, and Paul Industries applies them to every selection before the equipment schedule is issued, then checks the result against the measured airflow during startup.
| Component | Effect of thinner air | Design response in Colorado |
|---|---|---|
| CRAH units and fan walls | Less mass per cubic foot, so less heat removed at the same airflow | Select on mass flow; add coil face area or units; confirm fan motor margin at higher speed |
| Air-cooled chillers | Condenser capacity falls and head pressure rises on hot days | Apply the published altitude factor; consider an extra module or a larger condenser section |
| Dry coolers and adiabatic coolers | Lower rejection per fan at a given approach | Size for the summer design dry bulb at site elevation; set adiabatic pads to trim peak hours |
| Cooling towers | Fan airflow carries less mass, though the low wet bulb helps | Check tower selections at site barometric pressure; the dry climate usually offsets the loss |
| Pumps on open tower loops | Lower atmospheric pressure reduces suction margin | Recalculate NPSH available at site pressure and water temperature |
| Motors and drives | Thinner air cools motor windings and drive heat sinks less | Apply the manufacturer’s altitude derating to motors, drives and enclosed electrical gear |
Economizer hours in a semi-arid climate
Economizer hours along the Front Range are plentiful because the air is dry for most of the year, which lets a water-side economizer or an evaporative assist carry the load without compressors for long stretches. The low wet bulb means a cooling tower makes cold condenser water even on warm days, so a plate heat exchanger between the tower loop and the chilled water loop takes over at higher outdoor temperatures than it would in Atlanta or Houston. At the Golden laboratory, warm-water computing loops run with no compressor-based cooling at all, using towers and a dry cooler alone.
Winter brings the other half of the design problem. Subfreezing nights are routine, sudden cold fronts drop the temperature sharply, and outdoor coils, tower basins and exposed piping must survive them. Plants here use glycol on outdoor dry cooler loops, basin heaters and freeze-protection sequences on towers, and mixing controls on air economizers so that very cold, very dry outside air does not reach the server inlets unconditioned. Paul Industries writes those sequences into the controls narrative and tests them as part of startup, including a simulated loss of the economizer during a cold snap.
An efficient data center cooling plant in Colorado therefore uses more than one mode. A typical arrangement runs full economizer through most of the cold season, partial economizer with chillers trimming the load in spring and autumn, and full mechanical cooling only during the hottest summer hours. The chiller plant is still sized for the design day, but its annual run hours are a fraction of what the same plant would log at a humid site.
How much data center cooling water does a Colorado campus draw?
Data center cooling water consumption in Colorado ranges from tens of thousands of gallons a day to almost nothing, depending on whether heat leaves through evaporation or through dry coils. Two Denver-area projects show the spread. CoreSite says its DE3 building in Elyria-Swansea, an 18 MW facility planned to open in late 2026, will use about 115,000 gallons a day on average from Denver Water, and that about 75 percent of that evaporates. Aurora Water has put the use at the QTS campus near Gun Club Road at roughly 2,400 gallons a day. Both are market facts drawn from the owners and utilities, and they illustrate the choice every new Colorado hall makes.
Evaporative heat rejection buys lower electricity use with water; closed loop data center cooling with dry coolers or air-cooled chillers buys lower water use with fan and compressor energy. In a semi-arid state the trade is sharper than usual, because evaporation is efficient in dry air and because each gallon evaporated is a gallon removed from a basin that city councils and water boards watch. Hybrid plants that run dry when the air is cool and wet only during peak hours sit between the two, and the Golden laboratory reports that adding a thermosyphon dry cooler upstream of its towers cut its cooling water use by more than half.
| Approach | Water use | Energy use | Where it fits in Colorado |
|---|---|---|---|
| Open cooling towers with water-side economizer | Highest; evaporation plus blowdown | Lowest annual chiller energy | Sites with secure supply or reclaimed water and an owner focused on PUE |
| Hybrid dry cooler plus tower | Moderate; towers run on hot hours only | Low to moderate | Front Range campuses balancing water scrutiny against power cost |
| Adiabatic dry coolers | Low; water sprayed only at peak | Moderate | Halls where city approval depends on a small, predictable water figure |
| Air-cooled chillers with free-cooling coils | Near zero after fill | Higher on summer afternoons | Sites with no reliable makeup water or with a water-use condition in the approval |
| Warm-water liquid loops to dry coolers | Near zero after fill | Low, since compressors seldom run | High-density racks that accept warm facility water |
Tower water on snowmelt supplies
A data center cooling tower on the Denver Water system runs on surface water that starts as mountain snowmelt and is disinfected with chloramines. Denver Water describes its supply as soft to moderately hard, slightly harder in winter when reservoirs freeze and softer from late spring through fall when runoff dilutes the minerals, with the southern collection system harder than the northern one. Those seasonal swings change how many cycles of concentration a tower holds before scale forms, so the treatment program and blowdown setpoints should follow the water, not a fixed calendar. Paul Industries sets conductivity-based blowdown and, through cooling tower water treatment, adjusts the chemistry as the source shifts.
Reclaimed water is another source where it reaches the site. Denver Water produces recycled water to the Category 3 standard of the state’s Regulation 84, the class approved for commercial and industrial uses, and some campuses can pipe it to tower makeup. Reclaimed water carries more dissolved solids and nutrients than potable water, so it needs its own treatment plan, side-stream filtration and corrosion monitoring.
Protecting outdoor coils and fans from Front Range hail
Hail is a design load for outdoor data center cooling infrastructure in Colorado, because dry coolers, air-cooled chillers and condenser coils sit exposed on roofs and in yards across one of the most hail-prone parts of the country. The Colorado Climate Center counted 176 reports of hail two inches or larger in 2023, against a previous record of 91 in 2018. Large stones fold the aluminum fins of a coil, cutting airflow and capacity on the next hot day, and they crack fan blades, guards and the thin cabinets of adiabatic units.
Protection starts at selection. Hail guards or louvers in front of vertical coils, coil coatings and heavier fin stock, and coil arrangements shielded by the unit frame all reduce damage. Yard layout matters too: placing equipment where screens and buildings break the storm’s angle, and leaving room to reach every coil for straightening or replacement. After a storm, Paul Industries inspects outdoor equipment, combs or replaces damaged coil sections, confirms fan balance, and records the condition so owners and insurers have a dated baseline.
Data center cooling methods that suit the Colorado climate
The data center cooling methods that perform best in Colorado lean on outside air or outside water for most of the year and keep compressors for the peaks. Water-side economizers through plate heat exchangers, indirect evaporative air handlers, dry coolers with glycol, and warm-water liquid loops all exploit the dry climate. Direct outside-air economizers also work, but very dry winter air and wildfire smoke in some summers call for filtration and humidity controls that let the system fall back to recirculation when air quality drops.
Colorado data center legislation and the 2026 moratoria
Colorado data center legislation stalled in 2026, and cities and counties stepped in with pauses of their own. Two bills, HB26-1030 on incentives and SB26-102 on large-load data centers, both failed before the session ended in May. Denver then stopped accepting applications for new primary-use data centers and expansions of existing ones from May 21, 2026 to May 21, 2027, while letting existing facilities and projects already permitted or under construction continue. The city counts five buildings used entirely as data centers and more than 40 buildings with smaller data center operations inside.
For data center cooling regulations, the practical result is that work inside existing, permitted buildings continues while new campuses face longer approvals and conditions on water and power. That makes retrofits, capacity upgrades within approved envelopes and efficiency projects the near-term work for data centers in Denver area buildings, and it puts water figures and heat rejection choices into public hearings for new sites.
| Jurisdiction | Action reported in 2026 | What it means for cooling projects |
|---|---|---|
| Denver | One-year pause on new data center applications and expansions, May 21, 2026 to May 21, 2027 | Upgrades inside existing permitted buildings continue; new halls wait for the city’s framework |
| Longmont | Cap on data center energy use at 5 percent of the regional grid or 100 MW | Cooling efficiency directly affects how much IT load fits under the cap |
| Broomfield | 18-month moratorium on data centers using 10 MW or more | Smaller edge rooms below the threshold remain possible |
| Boulder, Jefferson and Larimer counties | Moratoria adopted or extended | Unincorporated sites on hold while rules are written |
| Weld County | Zoning allows data centers under 50 MW in certain industrial areas after a hearing | Water source and heat rejection likely to be reviewed at the hearing |
| Aurora | QTS campus expansion under construction in August 2026 | Low-water cooling already part of the public record for the site |
Power supply, the large-load tariff and cooling energy
Power for Front Range data centers comes mostly from Xcel Energy in the Denver metro area, from Colorado Springs Utilities in that city, and from Platte River Power Authority for Fort Collins, Loveland, Longmont and Estes Park. Xcel filed a large-load tariff with the Colorado Public Utilities Commission on April 2, 2026 (Proceeding 26AL-0137E) for new or expanded loads of 50 MW or more, with customers between 20 and 50 MW potentially included, and the Commission has the filing under review. Colorado Springs Utilities and Platte River joined the Southwest Power Pool’s regional transmission organization when it expanded into the Western Interconnection on April 1, 2026.
Every kilowatt the cooling plant saves is a kilowatt available for IT load under a fixed service capacity, and that matters more when new service is slow and expensive to obtain. Colorado’s average industrial electricity price was 9.02 cents per kilowatt-hour in 2025, against a national 8.51 (EIA), so the cost of cooling inefficiency is slightly higher here than the US average.
Energy code limits for data center cooling design in climate zone 5B
Data center cooling design in Colorado jurisdictions that use the 2021 International Energy Conservation Code must meet ASHRAE Standard 90.4, with the code’s own mechanical load component limits. In climate zone 5B, which covers Denver, Adams, Arapahoe, Jefferson, Boulder, Larimer, Weld and El Paso counties, the design mechanical load component may not exceed 0.23 and the annualized value 0.16; Pueblo County, in zone 4B, is held to 0.23 and 0.18. State law (HB22-1362) required cities and counties that updated their codes between July 2023 and July 2026 to adopt energy provisions at least equal to the 2021 IECC, and updates from July 1, 2026 to adopt the state’s model low energy and carbon code.
The low annualized limit in zone 5B reflects how many free cooling hours the climate provides; a plant that leans on chillers through spring and autumn will struggle to show compliance. Codes are adopted by each home-rule city and county, so the edition and amendments differ by site; Denver, for example, enforces the 2022 Denver Building and Fire Code. Paul Industries confirms the governing edition with the building department at the start of design and documents the mechanical load calculation for the permit set.
Where Colorado data halls cluster, and what each area asks of the plant
Denver, Aurora and the airport corridor
Data center cooling in Denver and Aurora serves colocation buildings in the core, enterprise rooms inside office and hospital buildings, and new campuses east toward Denver International Airport. Urban sites face tight roof and yard space, sound limits near homes and the Denver pause on new applications, so much of the work is replacing aging CRAC units, adding containment and converting plants to economizer operation. The airport corridor has land for yards of dry coolers and chillers, and the Aurora campus shows how a closed loop plant answers the water question.
Boulder, Longmont, Fort Collins and the northern Front Range
The northern Front Range combines university and federal laboratory computing with enterprise data rooms, under the Platte River and Xcel systems and under several of the 2026 moratoria. Research computing pushes toward liquid cooling, which pairs well with dry coolers in this climate; the data center liquid cooling in Colorado page covers that route.
Colorado Springs, Pueblo and the south
Data center cooling in Colorado Springs serves defense, aerospace and enterprise operators, with power from Colorado Springs Utilities. Colorado Springs sits higher than Denver, so altitude corrections grow further, and the southern plains around Pueblo are a climate zone warmer, with longer summer chiller hours.
Running cost of a Colorado cooling plant: a worked example
The running cost of data center cooling in Colorado is set mainly by how far the plant’s PUE sits above 1.0 and by the electricity rate, with water and treatment adding a smaller share. As a worked example at the 2025 state industrial average of 9.02 cents per kilowatt-hour, a 10 MW IT load whose cooling plant runs at a PUE 0.10 higher than it could means 1 MW of extra demand all year: 8,760,000 kilowatt-hours and about $790,152. That figure is a basis for comparison only; actual tariffs, demand charges and the large-load terms under review at the PUC change it.
Capital cost depends on heat rejection type, redundancy level, equipment altitude corrections, yard and roof structure, and whether the work is a new build or a live retrofit. Paul Industries prices a plant from the IT load profile, the redundancy target, the site water source and the utility service, and shows equipment, piping, controls and commissioning as separate lines so owners can compare options.
Who handles data center cooling installation for Colorado halls?
Paul Industries installs data center cooling in Colorado. The company keeps its headquarters in Kilmarnock, Virginia (256 Shore Drive), was formerly based in northern New Jersey, then Pennsylvania, and takes work across Colorado and in all 50 states. As a data center cooling company it designs chilled water and economizer plants, selects equipment at site elevation, fabricates piping spools and skids off site, installs and pipes chillers, towers, dry coolers and CRAHs, and starts up and services the finished plant. Owners choose supply-only delivery of corrected and documented equipment, design-build from a capacity and water target, or complete installation through turnover.
Buyers comparing data center cooling contractors for a Colorado site should look for altitude-corrected selections in the submittals, a water figure the owner can defend at a hearing, freeze-protection sequences tested at startup and a single contract that carries the plant from design to service. Paul Industries works with the commissioning plan described on the data center commissioning in Colorado page and with the mechanical scope on the data center mechanical contractor in Colorado page, and services the plant’s machines through chiller repair in Colorado.
Paul Industries and the Colorado cooling plant
Paul Industries builds data center cooling solutions for Colorado sites that hold temperature through a July afternoon at altitude, ride through January cold snaps, and use a water figure that the owner chose on purpose. The same engineering applies to the company’s work in its headquarters state, shown on data center cooling in Virginia, in the humid Gulf and arid west of data center cooling in Texas, and across the region on the Southwest page and the Colorado hub. Where the hall also needs process-grade water for humidification or liquid loops, ultrapure water systems in Colorado covers the treatment side. Send the IT load, redundancy target and site details, and request a quote.
Standards referenced: 2021 International Energy Conservation Code, Section C403.1.2 · ANSI/ASHRAE Standard 90.4 · ASHRAE Thermal Guidelines for Data Processing Environments · Colorado HB22-1362 energy code adoption requirements · CDPHE Regulation 84 (reclaimed water) · 2022 Denver Building and Fire Code
Frequently asked questions
Who installs data center cooling in Aurora and along the Denver airport corridor?
Paul Industries designs and installs chilled water plants, dry cooler yards, CRAH galleries and economizer piping for data halls in Aurora and the corridor east of Denver toward the airport. Selections are corrected for elevation, freeze protection is built into the sequences, and the plant is started up and tested before IT load arrives. Call 201-450-8280 or request a quote with the load and site plan.
Does Paul Industries build cooling plants for data halls in Colorado Springs and Pueblo?
Yes. Paul Industries builds and services cooling plants for data rooms and halls in Colorado Springs, Pueblo and the rest of southern Colorado. Colorado Springs sits higher than Denver, so fans, coils and condensers need a larger altitude correction, while Pueblo County falls in climate zone 4B with longer summer chiller hours. Both are reflected in the equipment schedule from the start.
Who services data center cooling around Fort Collins, Loveland and Longmont?
Paul Industries services chillers, towers, dry coolers, pumps and CRAH units for data rooms in Fort Collins, Loveland, Longmont and Boulder. Service covers seasonal changeover between economizer and mechanical cooling, freeze-protection checks before winter, tower water treatment adjustments as the source water shifts, and records of every reading. In Longmont, efficiency gains also free room under the city’s 100 MW data center energy cap.
How much water do data centers use for cooling on the Denver Water and Aurora Water systems?
The range is wide. CoreSite expects its 18 MW DE3 building in Denver to use about 115,000 gallons a day on average, most of it evaporated, while Aurora Water has put the QTS campus at about 2,400 gallons a day. The difference comes from heat rejection: evaporative towers trade water for lower power, and dry or closed-loop plants trade power for lower water use.
Is closed loop data center cooling practical along the Front Range?
Closed loop data center cooling suits the Front Range well because cool, dry air for much of the year lets dry coolers and free-cooling coils carry the load without compressors. The penalty comes on hot summer afternoons, when air-cooled equipment works harder at altitude. Hybrid plants that add adiabatic spray or a small tower for peak hours keep both water and energy figures moderate.
Which data center cooling tower water treatment suits Denver's snowmelt supply?
Denver Water’s supply is soft to moderately hard and changes with the season, harder in winter and softer through runoff. Treatment for a data center cooling tower on that water uses conductivity-controlled blowdown that tracks the source, scale and corrosion inhibitors matched to the chemistry, biocide control, and regular coupon and tube inspections. Chloramine in the makeup water also affects biocide choice.
How much cooling does a data center need once it sits a mile above sea level?
The heat load is the same as anywhere: nearly every watt of IT power becomes heat to remove, plus losses from power distribution and lighting. What changes at elevation is the equipment needed to remove it. At about 5,000 feet, air-side units must move roughly 17 percent more volume for the same mass of air, so fan walls, CRAHs and air-cooled condensers are selected larger than sea-level tables suggest.
How much does it cost to cool a data center at Colorado's 2025 power prices?
Annual cooling energy cost depends on IT load, PUE and the tariff. At Colorado’s 2025 industrial average of 9.02 cents per kilowatt-hour, each megawatt of continuous cooling demand costs about $790,152 a year. A plant that uses economizer hours well keeps that megawatt figure small; one that runs chillers through spring and autumn pays for it every month.
Does Denver's data center moratorium stop cooling upgrades in existing buildings?
The pause covers applications for new primary-use data centers and expansions of existing ones from May 21, 2026 to May 21, 2027. Existing facilities and projects already permitted or under construction continue. Cooling replacements, containment and controls work in an existing building go through normal mechanical permit review, and Paul Industries confirms with the city whether a given scope counts as an expansion before design starts.
What is a good data center cooling strategy for a semi-arid climate?
A strong strategy uses free cooling as the base mode and mechanical cooling as the trim. Water-side economizers or dry coolers run through most of the cold season, chillers trim the load in spring and autumn, and full mechanical cooling covers only the hottest hours. Warm supply temperatures within the ASHRAE recommended range extend the free cooling season further.
Can a Colorado data hall run data center cooling without water?
Yes, with air-cooled chillers, dry coolers with free-cooling coils, or warm-water liquid loops rejecting to dry coolers. After the initial fill and occasional makeup, those plants use almost no water. The trade is higher fan and compressor energy on summer afternoons, and larger equipment because of the altitude correction. Many owners pick a hybrid that uses water only on the hottest days.
What do data center cooling requirements in the energy code mean for a Denver project?
Under the 2021 IECC, data center systems follow ASHRAE 90.4 with the code’s mechanical load component limits. In climate zone 5B, which includes Denver, the annualized limit is 0.16, among the tighter values in the table because the climate offers so many free cooling hours. The permit set includes a mechanical load calculation showing compliance at full and half IT load.
How are data centers kept cool during a Colorado cold snap?
Cold weather mostly helps, but very cold air brings freeze and control risks. Glycol on outdoor dry cooler loops, basin heaters and bypass controls on towers, and mixing dampers on air economizers keep coils from freezing and server inlet air within range. The controls sequence should hand over between economizer and chiller modes without a temperature swing, and that handover is tested before turnover.
Do Colorado data centers use reclaimed water for cooling towers?
Some do where a reclaimed line reaches the site. Denver Water produces recycled water to the Category 3 standard under the state’s Regulation 84, approved for commercial and industrial uses. Reclaimed makeup needs its own treatment program because it carries more dissolved solids and nutrients than potable water, and the tower, piping and heat exchangers are inspected more often.
What efficient data center cooling upgrades pay back fastest in Colorado?
The usual leaders are raising chilled water and supply air temperatures, adding or repairing a water-side economizer, containing hot or cold aisles, fitting variable-speed drives on pumps and fans, and retuning controls so free cooling starts as early as the weather allows. Because the climate offers so many economizer hours, a plant that is failing to use them often has big savings waiting.
What details does Paul Industries need to price a Front Range cooling plant?
Send the IT load and its growth schedule, rack densities, redundancy target, the site elevation and address, the water source and any limits on water use, the utility service size, roof and yard space, and drawings of any existing plant. Paul Industries uses that information to compare heat rejection options, corrected for altitude, and prices each with equipment, installation and commissioning shown separately.
Can a Colorado project buy altitude-corrected cooling equipment from Paul Industries as supply only?
Yes. Paul Industries supplies chillers, dry coolers, towers, pumps, CRAH units and prefabricated piping skids with selections corrected for site elevation and documented for the owner’s installer of record. The same equipment is also available under design-build or complete installation contracts, where Paul Industries carries the plant through startup and handover.
How does the large-load tariff Xcel filed affect cooling decisions?
Xcel’s April 2026 filing at the Colorado PUC covers new or expanded loads of 50 MW or more and would require large customers to cover the generation and transmission they need. Under that kind of tariff, every kilowatt saved in cooling lets more IT load fit within the contracted capacity, which strengthens the case for economizers, warm water temperatures and efficient pumping.
Planning a data hall somewhere along the Front Range?
Send the IT load, redundancy target, site elevation and water source. Call 201-450-8280 or request a quote.