Paul Industries designs, builds and services ultrapure water systems in Colorado for biotech and pharmaceutical plants, research laboratories, electronics manufacturers and analytical facilities along the Front Range, from Boulder and Aurora’s medical campus to Fort Collins and Colorado Springs. Most Colorado plants start from snowmelt surface water that is low in dissolved solids but disinfected with chloramine and variable through the year, and they run at an altitude that changes how gases behave in the water. A treatment train designed around those facts holds resistivity, TOC and particle targets in every season.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Denver feedwater 100 percent surface water from snow runoff, chloramine disinfected (Denver Water)
Seasonal hardness Harder in winter, softer late spring through fall (Denver Water)
Bioscience base 3,300 companies; 90 percent of firms along the Front Range (OEDIT, 2022)
Pressure at 5,000 ft About 84 percent of sea level, which lowers dissolved gas saturation
Reviewed November 2026

What do ultrapure water systems in Colorado have to handle?

Ultrapure water systems in Colorado have to turn a soft-to-moderately-hard, chloraminated, seasonally variable surface supply into water at or near 18.2 megohm-centimeters, with organic carbon, silica, particles, bacteria and dissolved gases held to the user’s specification. How pure is ultrapure water? At its best it approaches the theoretical resistivity of water itself at 25 degrees Celsius, with total organic carbon measured in parts per billion and particles counted per milliliter at sizes below a tenth of a micron. Reaching that from a city tap is a matter of removing almost everything, in a sequence where each stage protects the next.

Colorado’s water and geography change three parts of that sequence. Pretreatment must deal with chloramine, which protects the city distribution system but attacks reverse osmosis membranes and releases ammonia that the downstream stages then have to remove. The train must ride through seasonal shifts in hardness and source water. And the plant sits at elevations where air pressure is about 84 percent of sea level, which changes dissolved gas behavior in degassing equipment, storage tanks and vents. The national ultrapure water systems page explains the stages and grades in general; this page covers the Colorado conditions.

Who uses ultrapure water in Colorado?

Ultrapure water users in Colorado are concentrated along the Front Range, where most of the state’s bioscience, electronics, research and advanced manufacturing sit. What is ultrapure water used for in those plants? In biotech and pharmaceutical work it feeds Purified Water and Water for Injection generation, cell culture media preparation, laboratory analysis and cleaning; in electronics, aerospace and materials work it rinses components and wafers, makes up process baths and feeds coating and plating lines; in research and analytical laboratories it supplies instruments, chromatography and trace-metal analysis.

The state’s own economic development office counted 3,300 bioscience companies with 37,190 employees in 2022 and reports that 90 percent of bioscience firms are located along the Front Range, centered on the Fitzsimons Life Science District and the adjacent Anschutz Medical Campus in Aurora. The same office counted 2,198 electronics companies with 32,329 employees in 2022. Federal research adds to the demand, including the National Laboratory of the Rockies, the Department of Energy laboratory renamed from NREL in December 2025, with campuses in Golden and Arvada. These figures are cited as market facts.

Colorado ultrapure water users and what each typically specifies
User typeWhere in ColoradoTypical specification focusCommon standard referenced
Biotech and pharmaceutical manufacturingAurora, Boulder, Longmont and the northern Front RangeFeed to Purified Water and WFI; TOC, conductivity, microbial and endotoxin controlUSP water monographs
Electronics, aerospace and componentsColorado Springs, Denver metro, Boulder and BroomfieldResistivity, TOC, particles, silica and metals at the point of useASTM D5127, SEMI F63
Research and analytical laboratoriesGolden, Boulder, Fort Collins, AuroraType I water at the bench; low TOC for trace analysisASTM D1193
Clinical and diagnostic laboratoriesHospital and medical campuses across the Front RangeWater for analyzers and reagent preparationInstrument manufacturer and laboratory standards
Energy and materials researchGolden, Arvada and research parksElectrolyzer, battery and catalyst work; low metals and dissolved oxygenProject specification

Ultrapure water treatment for Front Range feedwater

Ultrapure water treatment in Colorado starts with a feedwater that is, by national standards, good: Denver Water draws 100 percent of its supply from surface water fed by mountain snow runoff across about 3,100 square miles of watersheds on both sides of the Continental Divide. Low dissolved solids help reverse osmosis recovery and extend resin life. Denver Water also reports that its quarterly PFAS testing since 2017 has found none, and that it monitors source water for cyanobacteria, which it has not detected to date.

The same supply changes with the calendar. By the utility’s account, its water ranges from soft to moderately hard: frozen reservoirs in winter let it take up more minerals, while runoff from late spring into fall dilutes them, and harder from its southern collection system than from its northern one. A plant that blends or switches sources sees those differences directly. Scale-forming tendency, silica and organics can all shift with source and season, so the RO antiscalant dose, recovery setpoint and pretreatment capacity are set for the worst season, not the average day. Paul Industries designs pretreatment from a year of feedwater data where the plant has it, and from the utility’s published quality reports where it does not.

Chloramine and the reverse osmosis train

Chloramine is the pretreatment problem that shapes most Colorado ultrapure water plants, because Front Range utilities such as Denver Water use it as their distribution disinfectant. Chloramine damages polyamide RO membranes over time and is slower to remove than free chlorine. Standard activated carbon removes it poorly at practical contact times, so Colorado plants use catalytic carbon sized for chloramine, or sodium bisulfite injection with oxidation-reduction potential control, or both. Breaking chloramine releases ammonia, which RO rejects only partly and which then loads the electrodeionization or ion exchange stages downstream.

Plants that ignore this see falling RO rejection, rising conductivity after the RO and shorter EDI or resin life, often within the first year. The fix is designed in: chloramine-rated carbon or bisulfite with monitoring, a second RO pass where the ammonia load warrants it, and EDI or mixed-bed polishing sized for what passes. The same chemistry matters for any Colorado plant fed from a chloraminated supply, not only Denver’s.

How is ultra pure water made in a Colorado plant?

Ultra pure water in a Colorado plant is made by a sequence of stages, each removing a different class of impurity and protecting the stage after it. The table follows a typical train for a chloraminated Front Range supply, from the city connection to the point of use.

Treatment stages for a Front Range ultrapure water plant
StagePurposeColorado design point
Multimedia or ultrafiltration pretreatmentRemove particles and colloidsSize for spring runoff conditions and source switches
Chloramine removalProtect RO membranesCatalytic carbon or bisulfite with ORP control; plan for released ammonia
Softening or antiscalantPrevent scale on RO membranesDose and recovery set for winter hardness
Reverse osmosis, one or two passesRemove most dissolved ions and organicsHigh recovery to conserve water; second pass where ammonia or silica requires
DegassingRemove carbon dioxide and oxygenMembrane contactor or vacuum sizing at site barometric pressure
ElectrodeionizationContinuous ion removal to high resistivityFeed limits on hardness, carbon dioxide and ammonia respected
Storage under nitrogenHold water without picking up gasesVents and blanket set for lower ambient pressure
Polishing loop: UV, mixed bed, final filtrationReach resistivity, TOC and particle targets at the point of use185 nm UV for low TOC; ultrafilters or 0.05 micron filters at the end

Cold snowmelt feed and winter RO performance

Cold feedwater in winter lowers reverse osmosis output in Colorado plants, because membrane permeability falls as water temperature drops and snowmelt-fed supplies arrive cold through the coldest months. A train sized on summer feed temperature can fall short of its permeate flow in January, just as winter hardness peaks. The design response is to size membrane area for the coldest expected feed temperature, add a feed heat exchanger using waste heat from the building or a process, or both, and to raise feed pressure within membrane limits as the water cools.

Winter also brings freeze risk to feed piping in unheated spaces and to any outdoor tanks or reject lines, and building heat loss can push equipment rooms near freezing during a power outage. Paul Industries routes ultrapure water piping inside conditioned space where possible, heat traces and insulates the rest, and sets restart procedures so a plant that lost power during a cold snap is flushed and brought back to specification before the loop serves users again.

Degassing and storage a mile above sea level

Degassing and storage in a Colorado ultrapure water plant work at a lower atmospheric pressure, which changes both the starting gas load and the equipment settings. The solubility of oxygen and other gases in water depends on pressure as well as temperature, as the USGS dissolved oxygen tables reflect, so water saturated with air in Denver carries less dissolved oxygen than the same water at sea level. That modestly reduces the load on membrane contactors or vacuum degassers, but it does not change the target, which for electronics and some laboratory uses is in the low parts per billion.

Equipment settings are where altitude matters most. Vacuum pumps, sweep gas flows and vent paths on membrane contactors and degassing towers are specified at site barometric pressure. Storage tanks are blanketed with nitrogen to keep carbon dioxide and oxygen out, and the blanket regulator, vent and rupture disc settings take the lower ambient pressure into account. Hot water sanitization also needs care, because water boils at a lower temperature here, so loop temperatures and vents are set to avoid flashing at high points.

Ultrapure water system design for Colorado plants

Ultrapure water system design in Colorado begins with the user’s specification at the point of use and works back to the feedwater, with Colorado’s water, power and climate shaping each choice. The main decisions are central plant versus point-of-use units, single or double pass RO, EDI or ion exchange polishing, loop material and sanitization method, and the redundancy needed to keep the loop running during maintenance.

For a single laboratory, an ultrapure water system for laboratory benches fed from a building purified water loop is often enough. A biotech plant, a large research building or an electronics line needs a central plant and a recirculating loop with continuous monitoring. Loops for electronics use PVDF or other high-purity polymers meeting SEMI F57; loops feeding pharmaceutical water systems use electropolished stainless or PVDF depending on sanitization. Is ultrapure water corrosive? Very pure water is aggressive toward many metals and leaches additives from ordinary plastics because it holds almost no dissolved ions, which is why the loop materials, joints and valves are chosen from high-purity families.

Redundancy and maintenance windows

Redundancy decides whether an ultrapure water plant can be serviced without interrupting its users. Plants that feed production or validated pharmaceutical systems usually split RO and EDI into two trains, each able to carry the base load, and size storage to cover the hours a train is down for membrane cleaning or module replacement. Polishing loops use duplex UV units and parallel filter housings so lamps and cartridges change with the loop running. Laboratory buildings with smaller demands often accept a single train and rely on storage for short outages. Paul Industries sets the redundancy with the owner from the consequences of an outage, then designs the valving and bypasses so each component can be isolated, serviced and returned to service without contaminating the loop.

Water conservation in a semi-arid state

Water conservation matters more in a Colorado ultrapure water production plant than in many states, because the supply is snowmelt that cities and water boards count closely. A typical train discards water at several points: RO concentrate, EDI reject, backwash and rinse-up. High-recovery RO designs, a second-stage RO on the concentrate, reuse of RO reject as cooling tower makeup, and recovery of EDI reject to the front of the train all reduce the plant’s draw. Where a reclaimed water line reaches the site, Denver Water’s recycled supply, produced to the top Category 3 class of the state’s Regulation 84, can take over non-potable demands such as tower makeup, leaving potable water for the ultrapure train.

Which stage controls each ultrapure water quality parameter?

Each ultrapure water quality parameter is controlled by a particular stage, which is why a drifting value points straight to the equipment that needs attention. The table maps the common parameters to the stages that set them and to the Colorado conditions that most often move them.

Ultrapure water parameters, controlling stages and Colorado influences
ParameterControlling stageColorado influence
ResistivityEDI or ion exchange, then mixed-bed polishingAmmonia released from chloramine adds ionic load
Total organic carbonRO passes, 185 nm UV, polishing resinOrganics can shift with source water and season
SilicaRO and EDI or strong-base resinSource blending changes silica feed
Dissolved oxygen and carbon dioxideMembrane contactors or vacuum degassing, nitrogen blanketLower ambient pressure changes saturation and vent settings
ParticlesUltrafiltration or final filtersNew loops shed particles until rinse-up is complete
BacteriaUV, sanitization, loop velocity and designWarm equipment rooms and dead legs, not the climate
Hardness scaling on ROSoftening or antiscalant and recovery setpointWinter hardness peak

Ultrapure water polishing system and point-of-use design

The ultrapure water polishing system is the part of the plant that turns good water into specification water and keeps it there. A recirculating loop draws from nitrogen-blanketed storage, passes through 185 nanometer UV to break down organics, through mixed-bed polishing resin for the last ions, and through ultrafilters or fine membrane filters before reaching the points of use and returning to the tank. Velocity in the loop is kept high enough to discourage biofilm, and every branch to a point of use is kept short so that water does not stand in dead legs.

Point-of-use design depends on the user. Electronics tools need steady pressure and temperature as well as purity; laboratory benches need dispensers with final filters and sometimes their own small polishers; pharmaceutical users need sample valves and documentation at each use point. Paul Industries lays out the loop with the users, sizes it for current and planned points of use, and leaves capped branches where expansion is expected, so the ultra pure water facility can grow without rebuilding the loop.

Feeding pharmaceutical water systems

Many Colorado biotech plants use ultrapure-quality water as the feed to their Purified Water and Water for Injection systems, where USP limits and validation govern the finished water. The pretreatment and RO described here then become the front end of a validated system, and their records feed the qualification package. The high-purity water systems in Colorado page covers that pharmaceutical side, including distribution and sanitization of compendial water.

Sanitization, monitoring and records

Ultrapure water quality in a Colorado loop is held by continuous monitoring and scheduled sanitization, both documented. Online analyzers measure resistivity at several points, TOC at the loop return, particles, dissolved oxygen where specified, and flow and pressure at each point of use. Sanitization uses hot water, ozone or chemical agents according to the loop material and the user’s requirements, on a frequency set from microbial data.

Paul Industries delivers the records that each user type expects: analyzer calibration certificates, rinse-up curves for new loops, sanitization logs, and the turnover package for validation where the water feeds pharmaceutical processes. For ultrapure water TOC targets below a few parts per billion, the records include the UV lamp replacement schedule and TOC trend data, since lamp aging is a common cause of drifting values.

What does an ultrapure water system cost in Colorado?

Ultrapure water cost in Colorado depends on the flow rate and specification, the redundancy, the loop length and material, the pretreatment needed for chloramine and seasonal hardness, the degree of water recovery, and the monitoring and documentation required. Operating cost is mainly power, membranes, resins, filters, UV lamps, chemicals and water. Power is the most predictable line. EIA reports that Colorado industrial customers paid 9.02 cents a kilowatt-hour on average in 2025, so a 30 kilowatt RO and loop pump load running around the clock costs about $23,705 a year.

Paul Industries prices ultrapure water systems from the point-of-use specification, flow and peak demand, the feedwater analysis, the building layout and the documentation required, and shows pretreatment, RO, polishing, loop, controls and startup separately, so owners can compare options such as single versus double pass RO on equal terms.

Who designs and installs ultrapure water plants across Colorado?

Paul Industries installs ultrapure water systems in Colorado. Run from a Kilmarnock, Virginia head office on Shore Drive (number 256), and formerly based in northern New Jersey, then Pennsylvania, the company takes water system projects in every part of Colorado and in all 50 states. It designs the treatment train from the feedwater up, fabricates skids and loop sections off site, installs pretreatment, RO, degassing, EDI, storage and polishing equipment, builds and passivates or rinses the loop, starts up and qualifies the system, and services it afterward. Owners choose supply-only delivery of skids and loop components, design-build from a point-of-use specification, or complete installation through startup.

Among ultrapure water companies, the Colorado questions are how the design handles chloramine and its ammonia, how it rides through seasonal feedwater changes, how degassing and storage are set for altitude and how much water the plant returns to use. Related Colorado pages cover the passivation of stainless loops on passivation services in Colorado, qualification on validation and commissioning in Colorado, and the process piping on sanitary process piping in Colorado.

Paul Industries and Colorado ultrapure water

Paul Industries builds ultrapure water purification systems for Colorado plants that hold their specification in January and in June, treat chloramine as a design input, and conserve water in a state where every acre-foot counts. The same engineering appears in its headquarters state on ultrapure water systems in Virginia and in Texas on ultrapure water systems in Texas. For electronics and data center users, the cooling side connects through data center cooling in Colorado. For the state and regional view, see the Colorado hub and the Southwest page. Send the point-of-use specification, flow and feedwater data, and request a quote.

Standards referenced: ASTM D5127 Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries · ASTM D1193 Standard Specification for Reagent Water · SEMI F63 Guide for Ultrapure Water Used in Semiconductor Processing · SEMI F57 Specification for Polymer Components Used in Ultrapure Water Distribution · USP Water for Pharmaceutical Purposes · Colorado Plumbing Code (2021 International Plumbing Code)

Frequently asked questions

Who builds ultrapure water systems for biotech plants on Aurora's medical campus?

Paul Industries designs and builds ultrapure and purified water systems for biotech, pharmaceutical and clinical users around the Fitzsimons Life Science District and the Anschutz Medical Campus in Aurora. Systems are designed for chloraminated supply, seasonal feedwater changes and the documentation that pharmaceutical users need. Call 201-450-8280 or request a quote.

Does Paul Industries install ultrapure water for labs in Boulder and Golden?

Yes. Paul Industries installs central ultrapure water plants and polishing loops for research and analytical laboratories in Boulder, Golden, Arvada and the rest of the Front Range. Designs range from building purified water loops with point-of-use polishers to central plants with recirculating loops and continuous TOC and resistivity monitoring.

Who installs ultrapure water for electronics and aerospace plants in Colorado Springs?

Paul Industries installs ultrapure water plants and high-purity polymer loops for electronics, aerospace and component manufacturers in Colorado Springs and the Denver metro area. Point-of-use specifications for resistivity, TOC, particles, silica and metals follow guides such as ASTM D5127 and SEMI F63, and loops are built from components meeting SEMI F57.

Why do Colorado RO membranes fail early on chloraminated city water?

Chloramine slowly damages polyamide RO membranes and is harder to remove than free chlorine. Colorado plants use catalytic carbon or sodium bisulfite with ORP control to remove it. Breaking chloramine releases ammonia, which passes RO in part and loads the EDI or resin stages, so those are sized for it and a second RO pass is added where needed.

Why does a Colorado ultrapure plant need to plan for winter feedwater?

Denver Water reports that its supply is harder in winter, when reservoirs freeze and the water absorbs more minerals, and softer from late spring through fall. Higher winter hardness raises the scaling risk on RO membranes, so antiscalant dose, softening and recovery are set for the winter case, with the plant’s own feedwater data checked against the utility’s figures.

Does altitude change how an ultrapure water plant removes oxygen?

Altitude lowers atmospheric pressure, and gas solubility depends on pressure, so air-saturated feedwater in Colorado carries somewhat less dissolved oxygen than at sea level. The target in the finished water is unchanged, and membrane contactor vacuum, sweep gas flow and vent settings are specified at site barometric pressure so the degassing stage performs as designed.

Is ultrapure water deionized water?

Deionized water has had most ions removed by ion exchange, but it can still carry organics, particles, bacteria and dissolved gases. Ultrapure water goes further: RO, degassing, EDI, UV oxidation, polishing resin and ultrafiltration remove ions, organics, particles and gases together to reach about 18.2 megohm-centimeters with parts-per-billion TOC. Distillation alone does not reach that level either.

What ultrapure water TOC target suits a Colorado research lab?

Many analytical and research applications specify TOC in the low parts per billion at the point of use, with tighter limits for trace organic analysis. A low TOC ultrapure water system uses double pass RO, 185 nanometer UV oxidation in the polishing loop, fresh polishing resin and clean loop materials, with an online TOC analyzer at the loop return to prove the result.

What sets an ultrapure water system price in Colorado?

Flow and peak demand, point-of-use specification, redundancy, loop length and material, pretreatment for chloramine and seasonal hardness, water recovery equipment, monitoring and documentation set the capital price. Paul Industries prices each section separately so owners can compare single and double pass RO, EDI and resin polishing, and recovery options on equal terms.

Can RO reject water be reused at a Colorado plant?

Yes, and it is worth doing in a semi-arid state. RO concentrate from a low-solids snowmelt feed is often clean enough to serve as cooling tower makeup, irrigation or scrubber water, and EDI reject can be returned to the front of the train. A second-stage RO on the concentrate raises overall recovery further. Each option is checked against the receiving use’s limits.

Can a Colorado plant feed ultrapure water from recycled water?

Denver Water’s recycled water is produced to Category 3, the top class in Colorado’s Regulation 84 for reclaimed water, and it is better suited to cooling tower makeup and other non-potable uses than to ultrapure feed. Moving those uses onto recycled water frees potable supply for the ultrapure train, which is the more common arrangement.

How long does a new ultrapure loop take to rinse up in Colorado?

A new loop is flushed and rinsed until resistivity, TOC and particle counts at every point of use reach specification and hold, which can take days to weeks depending on materials, length and the specification. Clean installation practice, factory-cleaned components and a planned rinse-up shorten the time. Paul Industries records the rinse-up curves as part of the turnover package.

What service does a Colorado ultrapure plant need after startup?

Paul Industries services ultrapure water plants after startup: membrane cleaning and replacement, carbon and resin changes, EDI maintenance, UV lamp replacement, filter changes, analyzer calibration, sanitization and loop inspections, with records of every task. Service is scheduled with the seasonal feedwater changes in mind, such as reviewing antiscalant dosing before winter.

Can a Colorado lab's purified water loop be taken to ultrapure grade without a shutdown?

Often, yes. Upgrades typically add a second RO pass or EDI, degassing, a polishing loop with UV and mixed-bed resin, and final filtration, and they may replace loop materials that would leach at higher purity. Paul Industries surveys the existing system, tests its water at several points and designs the upgrade so the plant keeps running during the work.

What makes ultrapure water storage different at altitude?

Storage tanks are blanketed with nitrogen so the water does not reabsorb carbon dioxide and oxygen. At Colorado elevations the ambient pressure is lower, so the blanket regulator, vent and rupture disc are set for site conditions. Hot water sanitization also takes account of the lower boiling point to avoid flashing in tanks and high points.

Which feedwater and use-point data start a Colorado ultrapure design?

Send the point-of-use specification for resistivity, TOC, particles, silica, metals and bacteria, flow and peak demand, the number and location of use points, a year of feedwater data or the utility source, the building layout, the space available and the documentation required. Paul Industries uses them to design the train and loop and to price each part.

Is Colorado water purification for laboratories different from purification for manufacturing?

The stages are similar, but scale and documentation differ. Laboratories often polish building purified water at each bench or floor, while manufacturing plants run central plants with large storage, loops and continuous monitoring. Pharmaceutical users add validation records, and electronics users add particle and metals monitoring at the point of use.

Planning ultrapure water for a Colorado lab or plant?

Send the point-of-use specification, flow, feedwater data and building layout. Call 201-450-8280 or request a quote.