Paul Industries delivers ultrapure water systems in Texas from first design to ongoing service, covering pretreatment, reverse osmosis, electrodeionization, polishing and distribution loops for semiconductor fabs, wafer plants, research labs and power and process plants from Sherman and Richardson to Austin, Taylor and the Gulf Coast. Texas is in the middle of a chip-plant build-out, and its source waters range from salty Lake Texoma supply in North Texas to hard limestone groundwater in Central Texas. Paul Industries supplies skids, delivers design-build systems and completes full installations, then starts up, tests and maintains them.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
North Texas fab TI Sherman SM1 in production since December 17, 2025 (TI)
Wafer supply GlobalWafers 300 mm plant in Sherman, opened May 2025
Central Texas fab Samsung Taylor Fab 1 targeting operation in 2026 or early 2027
Feedwater note Lake Texoma water carries elevated dissolved solids (NTMWD)
Reviewed November 2026

What do ultrapure water systems in Texas supply?

Ultrapure water systems in Texas supply water purified close to its theoretical limit, around 18.2 megohm-centimeters of resistivity at 25 degrees Celsius with trace organics, particles, silica and dissolved gases held to parts-per-billion levels or lower, to the wafer rinse and wet process tools of semiconductor fabs, the polishing and cleaning lines of wafer plants, and laboratories, power plants and specialty chemical plants that need water far cleaner than drinking water. Semiconductor manufacturing in Texas is a major driver, with new fabs and expansions in North and Central Texas.

The treatment train itself, from multimedia filtration through reverse osmosis, electrodeionization, ultraviolet oxidation and final filtration, is explained on the national ultrapure water systems page. This page takes up what changes in Texas: the plants that create the demand, the very different source waters across the state, how plants protect loops through grid outages and freezes, discharge permits for the concentrate, and what drives cost.

Semiconductor companies in Texas and the water their fabs need

The semiconductor companies in Texas building and running fabs and wafer plants are grouped in two main clusters: North Texas, where Texas Instruments operates 300-millimeter fabs in Richardson and began production at its first Sherman fab, SM1, on December 17, 2025, and where GlobalWafers opened a 300-millimeter silicon wafer plant in Sherman in May 2025; and Central Texas, where Samsung has long operated a fab in Austin and is bringing its Taylor Fab 1 into operation, which Samsung said in 2026 remained on track for 2026 or early 2027.

Texas semiconductor and wafer plants that create ultrapure water demand (market facts, status as published)
LocationPlantStatusUltrapure water implication
ShermanTexas Instruments SM1 and SM2, 300 mmSM1 in production since December 17, 2025; SM2 construction complete (TI)Large-scale UPW generation fed from a salty surface water region
ShermanGlobalWafers 300 mm silicon wafer plantOpened May 2025, with further phases plannedWafer polishing and cleaning water with very low metals and particles
RichardsonTexas Instruments RFAB1 and RFAB2, 300 mmRFAB1 opened 2009; RFAB2 in production since 2022 (TI)Expansion and replacement work in operating plants
AustinSamsung fabOperatingUpgrades and capacity additions in a running fab
TaylorSamsung Fab 1Being brought into operation; Samsung targeted 2026 or early 2027New UPW plant scale on hard Central Texas feedwater

New semiconductor fabs in Texas at Sherman and Taylor

Sherman and Taylor host new semiconductor fabs in Texas at a scale the state has never had before, and each one needs an ultrapure water plant sized for thousands of gallons per minute of product water, plus the reclaim, wastewater and chemical systems around it. The semiconductor fabs in Dallas suburbs such as Richardson have run for years as well, so Texas also has a large base of existing UPW systems that need expansion, rebuilding and service.

How is water used in semiconductor manufacturing?

Water is used in semiconductor manufacturing above all for rinsing wafers between process steps, because every etch, clean, chemical-mechanical polish and photolithography step leaves chemicals and particles that must be removed with water clean enough to leave nothing behind. The same ultra pure water for semiconductor rinsing also feeds wet benches, scrubbers and chemical dilution, while separate, less pure water serves cooling towers, scrubbers and facility systems.

Semiconductor plant water usage is high because the purification itself rejects water: reverse osmosis sends a concentrate stream to drain or to recovery, and the plant draws far more city water than it delivers as ultrapure water. Modern fabs recover much of their used rinse water, sorting it by contamination level and returning the cleanest streams to the front of the UPW train and others to cooling towers or scrubbers. Paul Industries designs reclaim systems with the segregation, monitoring and diversion valves that keep a contaminated stream out of the main loop.

Lake Texoma’s salt and the North Texas feedwater problem

Lake Texoma’s salt is the North Texas feedwater problem for ultrapure water plants around Sherman, because the lake carries elevated total dissolved solids, enough that the North Texas Municipal Water District blends Texoma water with Lavon Lake water at its Wylie plant, typically about four parts Lavon to one part Texoma. Sherman itself has treated Texoma water with membrane desalination for decades, first electrodialysis reversal and later microfiltration with reverse osmosis.

For a UPW plant, high and variable dissolved solids raise the load on reverse osmosis and the risk of scaling, change the concentrate volume and chemistry, and make feed quality swing with lake levels and blending. Paul Industries designs North Texas pretreatment for the worst-case feed rather than the average, often with a first-pass reverse osmosis or two-pass design ahead of electrodeionization, antiscalant and pH control chosen from the water analysis, and online conductivity monitoring at the inlet so operators see feed changes before the RO membranes do.

Hard limestone groundwater and river supplies in Central Texas

Central Texas feedwater for ultrapure water plants is hard, because the region’s limestone aquifers and the rivers that cross them carry dissolved calcium and bicarbonate, and federal geological surveys of the San Antonio area rate Edwards water good in quality yet hard. Semiconductor fabs in Austin have treated this kind of water for decades. Hardness and alkalinity scale reverse osmosis membranes and load electrodeionization stacks, so the pretreatment ahead of them has to remove or control both.

Softening or antiscalant dosing, degasification to strip carbon dioxide after pH adjustment, and careful RO recovery limits are the usual tools. Taylor, Austin and San Antonio plants also see seasonal swings in organics and turbidity when rivers and lakes respond to rain after drought, which matters for total organic carbon at the end of the train. Paul Industries specifies pretreatment from at least a year of utility water quality data where it exists, and adds online organic carbon and silica monitoring where the feed varies.

Brackish groundwater and reclaimed water as ultrapure water feed

Brackish groundwater and reclaimed water are increasingly part of Texas ultrapure water planning, because the state’s large brackish aquifers and its experience with desalination offer supply that does not compete with drinking water, and the Texas Water Development Board notes that reverse osmosis and electrodialysis reversal are the most common desalination technologies in Texas. A fab or wafer plant drawing on brackish or reclaimed supply adds treatment steps ahead of the UPW train but secures water in drought.

Texas feedwater types and how the ultrapure water treatment train responds
FeedwaterTypical Texas settingMain challengeFront-end treatment
Lake Texoma-influenced surface waterSherman and North TexasElevated and variable dissolved solidsTwo-pass RO, robust antiscalant program, inlet conductivity monitoring
Limestone aquifer groundwaterSan Antonio and the Hill CountryHardness and alkalinitySoftening or antiscalant, degasification, conservative RO recovery
River and reservoir supplyAustin, Taylor and Central TexasHardness plus seasonal organics and turbidityCoagulation and filtration, ultrafiltration, organic carbon reduction
Brackish groundwaterMany inland and coastal sitesHigh dissolved solids, silica, sometimes ironIron removal, brackish RO, concentrate management
Municipal reclaimed waterLarge cities with reuse systemsOrganics, microbes, variable qualityUltrafiltration, RO, advanced oxidation before the UPW train

Whatever the source, the back end of the train looks similar: electrodeionization, a polishing loop with ultraviolet oxidation and mixed-bed polishers, degasification for dissolved oxygen, and final ultrafiltration at the loop. The front end is where Texas plants differ, and where most early problems appear.

Keeping an ultrapure loop clean through ERCOT outages and freezes

Keeping an ultrapure loop clean through a grid outage or freeze matters in Texas because an ultrapure loop is designed to circulate continuously, and the February 2021 storm showed that power can be lost for days while temperatures sit below freezing: ERCOT shed up to 20,000 megawatts of load while North Texas thermometers read below zero. A loop that stops flowing grows biofilm, leaches from stagnant plastic and loses resistivity, and a loop that freezes can crack.

Plants protect against both. Loop pumps, UV lamps and monitoring on generator or uninterruptible power keep water moving, storage tanks are blanketed with nitrogen, and any outdoor or unheated section is heat traced and insulated. When a loop does stop, recovery follows a written procedure: drain dead sections, flush, sanitize with hot water or chemicals suited to the loop material, rinse up, and requalify against resistivity, organic carbon, particles and bacteria before tools reconnect. Paul Industries writes that procedure into the design and runs it alongside the plant’s operators after an event, and the related high purity systems are covered on high purity water systems in Texas.

Discharge permits for RO concentrate and fab wastewater

Discharge permits for reverse osmosis concentrate and fab wastewater in Texas come from the Texas Commission on Environmental Quality, which administers the federal discharge permit program in the state as the Texas Pollutant Discharge Elimination System, or from the city sewer authority when the plant discharges to a municipal system under its pretreatment program. RO concentrate carries the salts and scale-formers removed from the feed, so its volume and chemistry depend on the feedwater, and in North Texas the Texoma salt load makes concentrate management a design issue.

Paul Industries designs concentrate handling with the discharge path in mind: recovery limits that keep the concentrate within permit, segregation of high-salinity streams from rinse reclaim, neutralization of regeneration and cleaning wastes, and metering and sampling points the permit requires. Plants exploring higher recovery add concentrate treatment stages, which reduce discharge volume at the cost of more equipment and power.

Ultrapure water beyond the fabs: labs, power, pharmaceutical and hydrogen

Ultrapure water beyond the fabs serves Texas research universities and medical centers, combined-cycle power plants and high-pressure boilers, specialty chemical and pharmaceutical plants, and electrolyzers that make hydrogen, each with its own purity target. Research labs in Austin, College Station, Houston and Dallas need point-of-use ultrapure water for analytical instruments, cell culture and microfabrication; Gulf Coast power and chemical plants need high-purity boiler makeup; and electrolyzers need feed water treated close to ultrapure quality to protect their membranes.

Pharmaceutical plants are a separate case, because compendial waters are defined by USP rather than by electronics standards: purified water and water for injection systems follow USP 645 for conductivity and USP 643 for organic carbon, and the same plant often needs both a pharmaceutical system and an ultrapure system for labs or manufacturing support. Those systems are covered on CIP and SIP systems in Texas and the piping that carries them on sanitary process piping in Texas.

Wafer plants and fabs: two kinds of ultrapure water demand in North Texas

Wafer plants and fabs both need ultrapure water, but they use it differently, and North Texas now has both kinds of plant side by side in Sherman. A silicon wafer plant uses water through crystal processing, slicing, grinding, polishing and final cleaning, where trace metals and particles on the bare wafer surface decide whether a wafer meets its customer’s specification; a fab uses ultrapure water between hundreds of process steps on wafers that already carry circuits.

For the water system, the difference shows up in where purity is critical and how demand swings. Wafer plants need very low metals at the final clean and polishing stations and can carry large, steady flows to slicing and grinding equipment, where somewhat lower grades often serve. Fabs need tight, stable quality at every wet bench and tool, with demand that rises and falls as tools cycle. Paul Industries designs the generation train, loop sizing and point-of-use polishing for the plant actually being served, so a wafer plant is not built like a fab or the other way round, and the monitoring points match the stations where the customer’s specification is enforced.

Monitoring and records Texas fabs expect from an ultrapure water plant

Monitoring in a Texas fab’s ultrapure water plant runs continuously at every stage, because a resistivity dip or an organic carbon spike that reaches the tools can scrap wafers, and Texas feedwater swings with lake levels, drought and rain. Online analyzers report to the plant control system and to the fab’s monitoring system, with alarms that divert or isolate water before it reaches the point of use.

Monitoring points in a Texas ultrapure water plant and why each matters here
PointMeasuredTexas reason
Raw water inletConductivity, temperature, turbidity, pHTexoma salts and Central Texas hardness change with season and blending
RO permeateConductivity, flow, recovery, differential pressureEarly warning of scaling from hard or salty feed
After electrodeionizationResistivity, silica, boron where specifiedSilica from groundwater and brackish sources
Polishing loop supplyResistivity, total organic carbon, dissolved oxygen, particlesRiver organics after rain; product grade at the tools
Loop returnResistivity, organic carbon, bacteria by samplingConfirms the loop holds quality during low draw and after outages
Reclaim streamsConductivity, organic carbon, pHKeeps contaminated rinse water out of the front of the train

Records matter as much as the readings. Paul Industries delivers analyzer calibration certificates, startup and qualification data, sanitization logs and the alarm and diversion setpoints, so the fab’s quality team can trace any excursion back to its cause and show customers how water quality is controlled.

Expanding ultrapure water capacity inside an operating Texas fab

Expanding ultrapure water capacity inside an operating Texas fab is planned around keeping the existing loop in specification while new equipment is tied in, because a fab cannot stop drawing water for a construction outage. New generation trains are built in parallel, tested and rinsed to grade on their own recirculation before they connect, and loop extensions are made through pre-installed valved branches or under a carefully staged cut-in.

A cut-in into a live PVDF or stainless loop is the riskiest moment. Paul Industries prefabricates and cleans the new section, flushes and rinses it separately, schedules the tie-in for a low-demand window agreed with the fab, and runs a written sanitization and requalification sequence on the affected section before it returns to service. Particle and organic carbon counts are trended for days afterward to confirm the loop has settled, and the results are filed with the change record. Where a fab expects several expansions, Paul Industries designs the first one with spare connections, header capacity and analyzer ports for the next, so later phases become routine tie-ins rather than major cut-ins.

Texas heat and the temperature of ultrapure water

Texas heat affects ultrapure water systems because feedwater from lakes and rivers warms through the summer, and warmer feed changes how reverse osmosis behaves: membranes pass more water at a given pressure but also more salt, and biological growth accelerates in pretreatment. Fabs also specify a tight temperature for ultrapure water at the tools, so a summer-warm loop has to be cooled back to its setpoint.

Plants handle the swing with feedwater heat exchangers that hold RO inlet temperature steady, loop heat exchangers fed from the fab’s process cooling water, and RO controls that adjust pressure and recovery with temperature. In winter the problem reverses on the plains, where cold feed reduces RO output and outdoor piping needs freeze protection. Paul Industries sizes the exchangers and controls for the full Texas range, from August lake temperatures to February freezes, and ties loop cooling into the plant’s chilled water system covered on chiller repair in Texas.

What sets ultrapure water cost in Texas?

Ultrapure water cost in Texas is set by the product flow and purity grade, the feedwater, the redundancy the process requires, the loop length and material, reclaim and concentrate systems, and whether the work happens in an operating fab. Feedwater is the Texas-specific variable: a salty North Texas supply or a hard Central Texas supply adds pretreatment stages, and brackish or reclaimed sources add more.

Operating cost includes power for pumps, RO and UV, chemicals and resin, filter and membrane replacement, and water and discharge charges. With 2024 Texas industrial electricity at 6.12 cents per kilowatt-hour, under the 8.13 cent national mean (EIA), the power share of operating cost stays lower than in many states. Semiconductor water treatment budgets also carry monitoring, which at fab grade means online resistivity, organic carbon, particle, silica, dissolved oxygen and boron analyzers. Paul Industries prices systems from a water analysis and the product specification, giving a budget figure from comparable systems first and a fixed price once the design is set.

Who builds and services ultrapure water plants in Texas?

Paul Industries builds and services ultrapure water plants in Texas, designing treatment trains around Texas feedwater, fabricating and installing skids, building PVDF and high-purity stainless distribution loops, and starting up, testing, sanitizing and maintaining the systems for fabs, wafer plants, labs and process plants. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes ultrapure water work across Texas and in all 50 states, with loop piping, welding and passivation covered on process piping in Texas and passivation services in Texas.

Paul Industries builds the same systems at home in Virginia, described on ultrapure water systems in Virginia, and for Georgia’s biologics and battery plants on ultrapure water systems in Georgia. For a semiconductor fab in Sherman, Texas, a wafer plant in North Texas or a lab in Austin, one contract covers generation, loop, reclaim and service.

Ultrapure water from Paul Industries for Texas plants

Paul Industries designs, supplies, installs, starts up and maintains ultrapure water systems for Texas fabs, wafer plants, labs and process plants. Send a recent feedwater analysis and its source, the product flow and purity grade, points of use and loop layout, and any reclaim or discharge limits. Call 201-450-8280 or request a quote. The Texas overview lists the rest of Paul Industries’ work in the state.

Standards referenced: SEMI F63 (ultrapure water for semiconductor processing) · ASTM D5127 (electronics and semiconductor grade water) · ASTM D1193 · USP 645 and USP 643 where pharmaceutical water is also produced · ASME BPE · Texas Pollutant Discharge Elimination System (TCEQ) · ASME B31.3

Frequently asked questions

Who builds ultrapure water for a semiconductor fab in Sherman, Texas, or a North Texas wafer plant?

Paul Industries builds ultrapure water systems for fabs, wafer plants and labs in Sherman, Richardson, Dallas and across North Texas. Lake Texoma-influenced feedwater carries elevated dissolved solids, so North Texas trains are designed for worst-case feed with robust reverse osmosis pretreatment, antiscalant control and inlet monitoring ahead of electrodeionization and polishing.

Does Paul Industries install ultrapure water systems in Austin, Taylor and Round Rock?

Yes. Paul Industries installs and services ultrapure water systems in Austin, Taylor, Round Rock and San Marcos, for fabs, research labs and electronics plants. Central Texas feedwater is hard and its organics swing with river and lake conditions, so pretreatment includes hardness control, degasification and organic carbon reduction sized from the utility’s water quality records.

Who installs ultrapure water for labs and plants in Houston and on the Gulf Coast?

Paul Industries installs ultrapure water systems for research labs at Houston medical and university campuses and for power, chemical and hydrogen plants along the Gulf Coast. Coastal projects add humidity and storm planning: generator coverage for loop pumps and UV, sealed electrical enclosures, and a written restart and sanitization procedure after an outage.

Can Paul Industries supply ultrapure water systems for San Antonio and South Texas plants?

Yes. Paul Industries supplies, installs and maintains ultrapure water systems for plants and labs in San Antonio, New Braunfels and South Texas. Edwards Aquifer water there is a hard calcium bicarbonate water, so softening or antiscalant programs and conservative reverse osmosis recovery protect the membranes and the electrodeionization stack.

What semiconductor fabs are in Texas today?

Texas Instruments runs 300-millimeter fabs in Richardson and started production at Sherman SM1 on December 17, 2025, with SM2’s construction complete. GlobalWafers opened a 300-millimeter wafer plant in Sherman in May 2025. Samsung operates a fab in Austin and is bringing Taylor Fab 1 into operation, targeted for 2026 or early 2027. Each needs large ultrapure water capacity.

Why does Lake Texoma water make ultrapure treatment harder?

Lake Texoma carries elevated dissolved solids, which is why the North Texas Municipal Water District blends it with Lavon Lake water, typically about one part Texoma to four parts Lavon. Higher and more variable salts raise reverse osmosis pressure and scaling risk and enlarge the concentrate stream, so treatment trains near Sherman are designed for the saltiest expected feed.

How much water does a semiconductor plant use for ultrapure water production?

A fab draws considerably more city water than it delivers as ultrapure water, because reverse osmosis and other purification steps reject a concentrate stream. The ratio depends on feedwater quality, RO recovery and how much rinse water the plant reclaims. Texas plants on salty or hard feed see lower recovery, which makes reclaim and concentrate treatment more valuable.

Can a Texas fab reuse its rinse water?

Yes. Fabs segregate used rinse water by contamination level, return the cleanest streams to the front of the ultrapure water train and send others to cooling towers or scrubbers. The keys are reliable online monitoring and diversion valves that send any stream out of specification away from the loop. Paul Industries designs reclaim systems with those safeguards.

What happens to an ultrapure loop when ERCOT power is lost?

If loop pumps and UV stop, the stagnant water begins to lose resistivity and support bacterial growth, and an unheated section can freeze. Plants keep loop pumps, UV and monitoring on backup power, blanket tanks with nitrogen, and follow a written restart: drain dead sections, flush, sanitize, rinse up and requalify the loop before tools reconnect.

Which loop material suits a Texas semiconductor fab?

PVDF is the usual choice for fab ultrapure water loops because it leaches very little, tolerates hot water sanitization in suitable grades, and is joined by bead-free or infrared fusion welding. High-purity stainless steel to ASME BPE is used where hot water or compendial service demands it. Paul Industries builds both and documents welds and cleaning.

Who issues discharge permits for RO concentrate in Texas?

The Texas Commission on Environmental Quality issues wastewater discharge permits under the Texas Pollutant Discharge Elimination System, and cities set pretreatment limits for plants discharging to their sewers. Concentrate volume and salt content follow the feedwater, so North Texas plants on Texoma-influenced water plan concentrate handling early in design.

Is brackish groundwater a practical ultrapure water source in Texas?

It can be, with added front-end treatment. Texas has large brackish aquifers and long experience with desalination, and the Water Development Board notes reverse osmosis and electrodialysis reversal are the most common technologies used. A brackish source needs iron and silica control, brackish RO and a concentrate disposal path before the standard ultrapure train.

What purity of ultra pure water for semiconductor tools do Texas fabs specify?

Fabs specify resistivity near the theoretical 18.2 megohm-centimeters at 25 degrees Celsius, with organic carbon, particles, metals, silica, dissolved oxygen and bacteria held to limits set in their own specifications, usually referencing SEMI F63 or ASTM D5127. The tightest limits apply at the point of use, so loop design and monitoring matter as much as the generation train.

What sets the delivery schedule for a new Texas ultrapure water plant?

Water analysis, design and equipment lead times for RO, electrodeionization and polishing skids usually set the schedule more than installation does. After installation, flushing, rinse-up and qualification take additional weeks while resistivity, organic carbon and particle counts settle. Paul Industries builds the schedule from the product specification and long-lead equipment.

Does Paul Industries maintain ultrapure water systems after startup?

Yes. Service contracts from Paul Industries cover RO cleanings, resin and cartridge changes, UV lamps, analyzer calibration, periodic sanitization and loop requalification, each logged for the plant’s records. Texas programs add pre-summer checks on cooling and power, and pre-winter checks on heat tracing and backup power.

Can an existing purified water plant in Texas be upgraded to ultrapure quality?

Often, yes. Adding electrodeionization or mixed-bed polishing, ultraviolet oxidation for organics, degasification and final ultrafiltration, and replacing loop sections that leach, can bring an existing purified water system to ultrapure grade. A Paul Industries survey samples the water after each existing stage, and the upgrade is priced next to a new train so the owner can compare.

What should a Texas plant send to get an ultrapure water system designed?

Send a recent feedwater analysis with its source and any seasonal data, the product flow and purity specification, the number and location of points of use, the loop layout, and any reclaim, discharge or space limits. Paul Industries returns a treatment train concept and a budget figure, then a fixed price once the design is agreed.

Planning ultrapure water for a Texas fab, wafer plant or lab?

Send a feedwater analysis, product flow and purity grade, points of use and any discharge limits. Call 201-450-8280 or request a quote.