Paul Industries designs, builds and services ultrapure water systems in Georgia for biologics, plasma and vaccine plants, solar wafer and cell lines, battery plants, laboratories and power users, from metro Atlanta and Gwinnett to Athens, Covington, Cartersville and the Savannah coast. A Georgia ultrapure plant is shaped by its feedwater, chlorinated Chattahoochee and Lake Lanier water in the metro area and Floridan aquifer or Savannah River water on the coast, and by drought rules that make water recovery part of the design. Paul Industries supplies equipment, builds design-build plants and installs complete systems with loops, testing and turnover records.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
New biologics demand UCB's $2 billion Gwinnett County campus, announced March 2026
Solar wafers and cells Qcells Cartersville cell production began June 2026
Metro Atlanta feedwater Chattahoochee River and Lake Lanier surface water
Coastal feedwater Floridan aquifer under EPD withdrawal caps since 2013
Reviewed November 2026

Who needs ultrapure water systems in Georgia?

The plants that need ultrapure water systems in Georgia fall into four groups: biologics, plasma and vaccine manufacturers around Atlanta and Athens; solar wafer, cell and module plants in northwest Georgia; battery cell plants from Commerce to the coast; and research and quality control laboratories at universities, hospitals and manufacturers. Each group sets a different quality target and a different tolerance for downtime, so the same treatment train is rarely right for two of them.

The market is changing quickly. UCB announced in March 2026 a $2 billion, roughly 460,000 square foot biologics campus at Rowen in Gwinnett County, with six to seven years of design and construction ahead. The Takeda Covington plasma plant received FDA approvals in 2018 and 2019, and Boehringer Ingelheim’s Athens site is the company’s largest research site in the United States and its largest American pet vaccine plant. At the Qcells Cartersville campus, solar cell production began in June 2026 in the first American plant to make ingots, wafers, cells and modules under one roof. These names are market facts that show where demand sits.

Georgia ultrapure water users and what each one asks of the system
UserWhere in GeorgiaWater roleQuality reference
Biologics and plasma manufacturingGwinnett, Newton County, metro AtlantaFeed to Purified Water and WFI generation, labs, buffer and media preparation supportUSP conductivity and TOC; ultrapure grades for analytical labs
Animal health and vaccine plantsAthens and Clarke CountyCompendial water feed, laboratory water, glassware and equipment rinseUSP monographs; ASTM D1193 for laboratory water
Solar ingot, wafer and cell linesCartersville and Bartow CountyWafer rinses after texturing and between wet chemical stepsProcess owner’s specification, often drawn from SEMI and ASTM D5127 grades
Battery cell plantsCommerce, Bartow County, Bryan CountySolvent for water-based anode slurries, cleaning and laboratory useProcess owner’s resistivity, metals and TOC limits
Research and hospital laboratoriesAtlanta, Athens, AugustaAnalytical instruments, cell culture, molecular biologyASTM D1193 Type I and instrument makers’ requirements

Ultrapure water at Georgia biologics, plasma and vaccine sites

Ultrapure water at Georgia biologics, plasma and vaccine sites usually sits alongside compendial waters rather than replacing them: the plant’s product-contact water is USP Purified Water or Water for Injection, while laboratories, analytical instruments and some utility uses run on an ultrapure polishing loop. The pharmaceutical companies in Georgia, USA, as distinct from the country of Georgia, cluster around metro Atlanta, Gwinnett and the corridor east toward Covington and Athens, and their quality systems treat every water system as a validated utility.

That shapes the design. A common pretreatment and reverse osmosis train can feed both a compendial generator and an ultrapure polishing loop, provided the shared equipment is qualified to the stricter requirement and the change control covers both. Pharmaceutical companies in Atlanta and the surrounding counties expect conductivity and total organic carbon measured to USP methods, alarm and trend records kept under data integrity rules, and qualification documents written to the plant’s own templates. Qualification of a new or modified system in Georgia is covered on validation and commissioning in Georgia, and the sector view on biotech.

Ultrapure water for Georgia solar and battery plants

Ultrapure water for Georgia solar and battery plants is a production utility measured in megawatts of output rather than batches, and an interruption stops a line. In crystalline silicon cell making, wafers are rinsed with deionized water after texturing and between acid cleaning steps, so particle, metals and organic limits on the rinse water reach straight into cell efficiency. At a battery plant in Georgia, water-based graphite anode slurries use deionized water as the solvent for the CMC and SBR binders, and laboratories and cleaning steps draw from the same system.

Both industries arrived in Georgia at scale within a few years. SK Battery America’s Commerce plant supplies cells, Hyundai and LG have completed a battery plant on the Metaplant campus near Savannah, and Hyundai and SK On began initial production at a $5 billion plant in Bartow County in mid-2026. Plants of that size need treatment trains with redundant RO and EDI stages, large storage, continuous monitoring and a maintenance plan that never takes the whole system down at once. The quality targets come from the process owner’s specification, and Paul Industries builds the system to meet them with the analyzers to prove it.

Wastewater is the other side of the same system. Cell plants generate acid and alkaline rinse streams, and battery plants generate cleaning and slurry wash water, so the water balance is drawn for the whole site: the lightest rinses can often return to the RO feed after treatment, RO reject can serve as cooling tower or scrubber makeup, and only the concentrated streams go to wastewater treatment. On a site that has to justify every gallon to its supplier, that balance decides how large the ultrapure plant needs to be.

Which quality grade does a Georgia plant specify?

The quality grade a Georgia plant specifies depends on what the water touches: compendial grades for drug product and its equipment, reagent grades for laboratories, and electronics grades or the process owner’s own limits for solar and battery lines. Pure water’s theoretical resistivity is 18.2 megohm-centimeters at 25 degrees Celsius, and most ultrapure loops are run close to it at the outlet, but resistivity alone says nothing about organics, particles, bacteria, silica or dissolved oxygen, which is where the grades differ.

Biologics, plasma and vaccine plants measure conductivity and total organic carbon to USP methods, chapters 645 and 643, for Purified Water and Water for Injection, and run laboratory loops to ASTM D1193 Type I or instrument makers’ requirements. Solar and battery plants usually write their own specification, borrowing limits from ASTM D5127 electronics grades or the SEMI F63 guide where wafer contact or trace metals matter. Paul Industries turns whichever specification applies into analyzer selection, alarm limits and sampling points, so the plant can prove the grade every day rather than at qualification only.

Lake Lanier water quality, the Chattahoochee and the coastal aquifer

Lake Lanier water quality and Chattahoochee River water quality set the starting point for most ultrapure plants in metro Atlanta, because the region depends on surface water and has little usable groundwater. Buford Dam, completed in 1957, created Lake Lanier with metro water supply as one of its purposes, and county and city plants downstream treat Chattahoochee water with chlorine disinfection before it reaches an industrial customer.

Surface water brings its own pattern. Organic content rises and falls with rain and season, which moves the total organic carbon load on the RO and polishing stages; chlorine must be removed before the RO membranes; and in a drought, reservoirs draw down and source quality can shift. The Georgia Environmental Protection Division declared a statewide Level 1 drought response on April 27, 2026, a reminder that water recovery is now part of an ultrapure plant’s design brief.

The coast is different. Savannah’s Industrial and Domestic plant draws from Abercorn Creek, a Savannah River tributary, and was built mainly to serve industry; elsewhere on the coast, groundwater from the Floridan aquifer has been capped by the EPD since 2013 in Chatham, Bryan and part of Effingham counties, and four new wells in Bulloch County were permitted for 6.65 million gallons a day to serve the area around the Hyundai Metaplant. Near Brunswick, saltwater has been found in the Upper Floridan aquifer since 1957, so chloride is a design input for any Glynn County plant on well water.

Georgia feedwater sources and what each means for the ultrapure treatment train
Region and sourceFeedwater characterPretreatment emphasis
Metro Atlanta: Chattahoochee River and Lake LanierChlorinated surface water with seasonal organic swingsChlorine removal, organics and TOC control, RO fouling protection after storms
Athens, Gainesville and North Georgia reservoirsSurface water from Piedmont reservoirsSimilar to metro Atlanta; temperature swings between seasons
Savannah: Savannah River via Abercorn CreekRiver water treated for industrial and domestic supplyOrganics and particulate control; confirm the disinfectant in use
Coastal wells: Floridan aquiferGroundwater under EPD withdrawal capsMineral and scaling control, high RO recovery to stretch a limited allocation
Brunswick and Glynn County wellsUpper Floridan with a known saltwater zoneChloride monitoring, RO sized for higher dissolved solids

Paul Industries starts every Georgia design with the utility’s latest water quality report and a sampling campaign at the plant’s own connection, because a report averages a year while the RO sees each storm and each dry month.

Designing the treatment train around Georgia conditions

The treatment train for a Georgia ultrapure plant follows the familiar sequence of pretreatment, reverse osmosis, electrodeionization, storage and polishing, but Georgia conditions change the sizing at several points. Pretreatment removes chlorine with activated carbon or sodium bisulfite, controls scale with softening or antiscalant, and filters particulates; double-pass RO removes most dissolved solids and organics; EDI brings resistivity up continuously; and the polishing loop adds 185 nanometer UV for organic destruction, mixed bed ion exchange, degasification where oxygen matters, and final ultrafiltration or point-of-use filters.

Warm water is the first Georgia factor. Atlanta’s July normals are a 90 degree high and a 72 degree low, and feedwater reaching a plant in late summer is warm, which raises RO flux but also microbial growth in storage and carbon beds. Plants that need stable output use feedwater temperature control and design storage, sanitization and recirculation for the warm months. Drought is the second factor: RO recovery, reuse of RO reject and EDI concentrate, and recovery of rinse water all reduce the plant’s draw on a stressed supply, with reject commonly routed to cooling tower makeup or scrubbers where its chemistry fits.

Power is the third. Industrial customers in Georgia paid 7.21 cents per kilowatt-hour on average in 2024, under the 8.13 cent national figure from the EIA, which keeps the running cost of high-pressure pumps, UV and recirculation moderate, but a large loop running continuously at turbulent velocity still adds up. Paul Industries sizes pumps, loop diameters and return velocities against the owner’s draw pattern so the loop is neither starved at peak nor oversized at night. Many Georgia owners first meet the subject when they replace an aging industrial water purification system with one that has to hold an ultrapure specification; the general background on deionized water plants is on industrial DI water systems.

Planning ultrapure capacity for plants that grow in phases

Ultrapure capacity for Georgia plants that grow in phases is planned at the first stage, because the newest biologics, solar and battery plants in the state ramp over years rather than months. UCB has said its Gwinnett campus will take six to seven years to design and build, solar cell lines step up toward their rated output over several quarters, and battery plants add lines as vehicle programs launch.

A phased ultrapure plant is built as parallel trains rather than one large one. Pretreatment, RO and EDI are installed as matched skids with space, headers and valves left for the next skid; storage is sized for the final draw or arranged so a second tank can join without draining the first; and loop headers are run at the final diameter with capped branches where later points of use will go. The controls are written for the full plant from the start, so each new train joins the existing sequence without rewriting it. Paul Industries lays out the full build in the first design, prices the first phase on its own, and keeps the drawings current so each later phase starts from an accurate record.

Monitoring, alarms and records at Georgia sites

Monitoring, alarms and records at Georgia ultrapure sites are what turn a water system into a utility the plant can trust, because water quality changes faster than any sampling program can catch by hand. Online analyzers for resistivity, TOC, particles and, where it matters, dissolved oxygen and silica are placed at the polishing outlet and on the loop return, with temperature-compensated readings and alarm limits tied to the specification.

Regulated plants keep those records under electronic record and audit trail controls, and every alarm, excursion and corrective action is logged; unregulated solar and battery plants use the same data for process control and yield analysis. Paul Industries configures the analyzers, the historian points and the alarm philosophy during design, calibrates the instruments at start-up and includes the calibration certificates and alarm list in the turnover package, so the first month of operation already has a reliable baseline.

Loops, materials and installation in operating Georgia plants

Loops, materials and installation decide whether an ultrapure plant keeps its specification at the point of use, because even a well-built treatment train can be undone by a dead leg, a poor joint or a contaminated pipe. Semiconductor-style and solar loops commonly use PVDF with beadless or infrared butt fusion joints; pharmaceutical and hot-sanitized loops use electropolished 316L stainless with orbital welds; and polypropylene serves some lower-grade distribution. Each choice sets its own sanitization method, whether hot water, ozone or chemical.

Installing in a running Georgia plant follows a plan agreed with production: new loop sections are built and tested off-line, flushed and rinsed until resistivity and TOC meet the specification, then tied in during a planned window with the loop drained, cut in and returned under monitoring. Paul Industries fabricates loop modules off site, joins and inspects them to documented procedures, and records each weld or fusion joint for the turnover package. The piping trade is described on process piping in Georgia, joining on industrial welding services in Georgia, and storage vessels for the plant on tank fabrication in Georgia. Vessels in the system, such as pressure filter housings and ion exchange vessels, are checked against the Georgia Boiler and Pressure Vessel Safety Act’s exemptions for small and low-pressure vessels before installation.

Testing and turnover steps for a Georgia ultrapure water system
StepWhat happensRecord the owner receives
Factory acceptanceSkids run with water before shipping; controls and alarms provenFAT report, punch list, as-built skid drawings
Installation checksMaterials, joints, slopes, dead legs and supports verified against drawingsMaterial certificates, weld or fusion logs, slope and dead leg checks
Pressure test and flushLoop tested, flushed and rinsed to the resistivity and TOC targetTest records, rinse-up trend data
Sanitization and start-upFirst sanitization, analyzer calibration, steady operationSanitization record, analyzer calibration certificates
Performance and qualificationSampling at every point of use over an agreed periodPerformance report or IQ, OQ and PQ documents for regulated plants

Who designs and builds ultrapure water systems in Georgia?

Paul Industries designs and builds ultrapure water systems in Georgia, from pretreatment and RO through EDI, storage, polishing and distribution loops, and services them after start-up, for plants in metro Atlanta and Gwinnett, Covington, Athens, Cartersville, Dalton, Rome, Commerce, Augusta and the Savannah coast. From its headquarters at 256 Shore Drive, Kilmarnock, Virginia, the company takes water system work throughout Georgia and the wider Southeast, and in every other state and at plants overseas.

Buyers comparing water purification systems in Georgia can take three routes with Paul Industries: supply-only skids and loop modules built to the owner’s specification, a design-build plant from feedwater study to qualified loop, or complete installation of an engineer’s design. Process water and reuse for food plants, a different duty, is described on process water and reuse systems in Georgia. The same ultrapure work runs in Paul Industries’ headquarters state, on ultrapure water systems in Virginia, and in the Triangle and Charlotte regions on ultrapure water systems in North Carolina. The national design guide is on ultrapure water systems.

What does an ultrapure water system in Georgia cost?

An ultrapure water system in Georgia costs what its flow, quality target, redundancy, loop length and documentation require, and no single published price covers the range from a laboratory loop to a gigawatt-scale cell plant. The main drivers are product flow and peak draw, the resistivity, TOC, particle and metals limits, whether RO and EDI are duplicated, storage volume, loop material and length, the number of points of use, analyzers, and the qualification package a regulated plant needs.

Georgia adds a few line items. Coastal well water under withdrawal caps pushes toward higher RO recovery and reject reuse; metro Atlanta surface water needs robust organics and chlorine control; and drought planning can add reuse tanks and pumps. Operating cost belongs in the same comparison as capital cost: membranes, resin, UV lamps, filters, analyzer reagents, power for pumps and recirculation, sanitization chemicals and the water and sewer charges on reject and blowdown all recur every year. A design that spends more on RO recovery or reject reuse often pays back through lower water and sewer bills within a few years in a drought-prone supply, and Paul Industries sets out both capital and annual running figures when it compares options for an owner. Paul Industries gives a budget range from comparable plants once flow, quality and redundancy are set, then a firm price from the feedwater data, process flow diagram and loop layout.

Ultrapure water systems from Paul Industries in Georgia

For Georgia biologics, plasma, vaccine, solar, battery and laboratory sites, Paul Industries takes ultrapure water from design and fabrication through supply, installation, testing, start-up, service and maintenance, with supply-only, design-build and complete installation routes. To price a system, send the product flow and peak draw, quality targets, points of use, the feedwater source with any recent water quality data, and the space available. Call 201-450-8280 or request a quote. More Paul Industries work for Georgia plants is listed on the Georgia page.

Standards referenced: ASTM D1193 (reagent water) · ASTM D5127 (electronics and semiconductor water) · SEMI F63 · USP <645> Water Conductivity · USP <643> Total Organic Carbon · ASME BPE · ISPE Baseline Guide, Volume 4: Water and Steam Systems · Georgia Boiler and Pressure Vessel Safety Act, O.C.G.A. 25-15-10 et seq.

Frequently asked questions

Which contractor builds ultrapure water systems for biologics sites in Gwinnett County and around Rowen?

Paul Industries builds ultrapure water systems for biologics and life sciences sites in Gwinnett County, including the Rowen area near Dacula and the Lawrenceville and Buford corridors. These sites usually pair a compendial water plant with ultrapure laboratory loops, so the shared pretreatment and RO stages are designed and qualified to the stricter requirement. Send the flow, quality targets and points of use to start a design.

Does Paul Industries install ultrapure water systems near Covington and in Newton County?

Paul Industries installs ultrapure water systems near Covington and across Newton, Rockdale and Walton counties for plasma, pharmaceutical and manufacturing plants. Plants there draw treated surface water, so chlorine removal and organics control lead the pretreatment design, and new loop sections are built and rinsed off-line before tying into a running system during an agreed production window.

Who builds ultrapure water systems in Athens for vaccine and research sites?

Paul Industries builds ultrapure water systems in Athens and Clarke County for vaccine manufacturing, animal health research and university laboratories. Laboratory loops there commonly target ASTM D1193 Type I water at the outlet, while production areas run on compendial water fed from the same pretreatment. Paul Industries designs the train so both grades are met and documents each for the site’s quality system.

Does Paul Industries take ultrapure water work in Cartersville, Dalton and Rome?

Paul Industries takes ultrapure water work in Cartersville, Dalton, Rome and the rest of northwest Georgia, where solar wafer, cell and module plants and battery manufacturing have grown quickly. Those plants run around the clock, so systems are built with redundant RO and EDI trains, large storage and continuous resistivity and TOC monitoring, and maintenance is staged so production water never stops.

Who installs ultrapure water systems for plants near Savannah and the Hyundai Metaplant area?

Paul Industries installs ultrapure water systems for plants near Savannah and in Bryan, Effingham and Bulloch counties, including battery and automotive suppliers around the Hyundai Metaplant. Coastal feedwater comes from the Savannah River system or the Floridan aquifer under EPD withdrawal caps, so high RO recovery and reuse of reject water are designed in from the start to stretch the plant’s allocation.

Which pharmaceutical companies in Georgia need ultrapure water?

Pharmaceutical companies in Georgia that need ultrapure water include biologics, plasma and vaccine manufacturers around Gwinnett, Covington and Athens, plus contract laboratories and medical device makers in metro Atlanta. Their product water is usually USP Purified Water or WFI, while laboratories and analytical instruments need ultrapure grades. Paul Industries designs systems that deliver both from one qualified pretreatment train where the plant’s quality system allows.

Why does Chattahoochee River water quality matter to an ultrapure plant in Atlanta?

Chattahoochee River water quality matters because most of metro Atlanta’s supply comes from the river and Lake Lanier, and surface water carries organic matter that rises after storms and changes with the season. That organic load reaches the RO membranes and the TOC polishing stage. Paul Industries sizes carbon, RO and UV stages for the worst months of the year and confirms the disinfectant the supplying utility uses.

How does a drought affect an ultrapure water plant in Georgia?

A drought affects an ultrapure water plant in Georgia by tightening the supply it draws from and making waste water a cost the owner notices. Since Georgia’s 2026 drought declaration, owners have asked for higher RO recovery, reuse of RO reject and EDI concentrate as cooling tower or scrubber makeup, and rinse water recovery. Each step cuts draw without changing the product water quality at the point of use.

What water does a battery plant in Georgia need for anode slurry?

A battery plant in Georgia uses deionized water as the solvent for water-based graphite anode slurries made with CMC and SBR binders, so water purity affects slurry consistency and electrode quality. The resistivity, metals and organic limits come from the cell maker’s process specification. Paul Industries builds the purification system and analyzers to meet that specification and keeps the records the plant’s quality team audits.

How is a new point of use added to a running ultrapure loop in a Georgia plant?

A new point of use is added to a running ultrapure loop by prefabricating the branch and valve off site, scheduling a short drain-down with production, cutting in with a zero-dead-leg fitting, and rinsing and sanitizing the affected section until resistivity and TOC return to specification. Paul Industries samples the new outlet before release and records the change for the plant’s change control file.

Can one pretreatment train serve both an ultrapure loop and a Purified Water generator?

One pretreatment train can serve both an ultrapure loop and a Purified Water generator when the shared equipment is designed and qualified for the stricter duty, sized for both peak draws and maintained so one system’s work does not starve the other. Georgia biologics and plasma plants often take this route to save space and water. Paul Industries sets out the split, redundancy and qualification scope during design.

Which loop material suits a Georgia solar or battery plant?

A Georgia solar or battery plant usually suits PVDF loops joined by beadless or infrared butt fusion, because PVDF leaches very little and handles ozone or chemical sanitization, while electropolished 316L stainless suits hot-sanitized pharmaceutical loops. The choice depends on the quality target, sanitization method and temperature. Paul Industries recommends the material against the process owner’s specification and records every joint.

How does Georgia's summer heat affect an ultrapure water system?

Georgia’s summer heat warms the feedwater reaching a plant, and with Atlanta’s July nights averaging 72 degrees, storage tanks and carbon beds sit in conditions that favor microbial growth. Warmer water also raises RO flux and changes analyzer temperature compensation. Paul Industries designs for the warm months with recirculation, sanitization frequency and, where output must stay steady, feedwater temperature control.

Do ultrapure water vessels in Georgia need state pressure vessel inspection?

Ultrapure water vessels in Georgia need state inspection only when they fall under the Boiler and Pressure Vessel Safety Act and outside its exemptions, which include vessels of five cubic feet or less at 250 psig and vessels working at 15 psig or less. Large pressure filters or ion exchange vessels can exceed those limits. Paul Industries checks each vessel’s volume and design pressure during submittals.

What does an ultrapure water service contract cover in Georgia?

An ultrapure water service contract in Georgia covers analyzer calibration, RO cleaning and membrane condition reviews, EDI performance checks, UV lamp and filter replacement, resin exchange, loop sanitization, sampling at points of use and trend reviews of resistivity, TOC and particles. Paul Industries schedules the work around production so the plant keeps water, and reports each visit against the specification.

What sets the price of an ultrapure water system in Georgia?

The price of an ultrapure water system in Georgia is set by flow and peak draw, the quality target, redundancy of RO and EDI, storage, loop material and length, the number of points of use, analyzers and the qualification package. Coastal well water and drought planning can add recovery and reuse equipment. Paul Industries gives a budget range from comparable plants, then a firm price from feedwater data and layout.

What schedule should a Georgia plant expect for a new ultrapure water system?

A new ultrapure water system for a Georgia plant runs from a few months for a laboratory loop to well over a year for a large production plant, driven by equipment lead times, loop fabrication, installation windows in an operating building, rinse-up and qualification. Prefabricated skids and loop modules shorten field time. Paul Industries builds a schedule from the plant’s production calendar before committing to dates.

What should a Georgia site send to get an ultrapure water system designed?

A Georgia site should send the product flow and peak draw, the quality targets for each point of use, the number and location of outlets, the feedwater source and any water quality data, available space and utilities, and whether the system must be qualified. Paul Industries uses that package to propose a treatment train, a loop layout and a budget range, then refines them after sampling the feedwater.