Paul Industries provides industrial welding services in Georgia for manufacturing plants, mills, food processors, battery and automotive sites and port terminals, covering code pipe welding, structural and repair welding, stainless and sanitary welding, and welded fabrication from metro Atlanta to Savannah, Augusta, Macon, Columbus, Dalton and Valdosta. Georgia’s welding demand now runs from the Metaplant and cell plants on the coast and in Jackson County to century-old mills on the fall line, and each job carries the code, the inspection and the hot work rules of the system being welded. Paul Industries fabricates off site, welds in the plant, examines the work and hands over the records.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Building code 2024 IBC with Georgia amendments, from January 1, 2026 (DCA)
Boiler and vessel repairs 2021 NBIC under Georgia Rule 120-3-26
Hot work IFC Chapter 35 with Georgia modifications, plus OSHA 1910.252
Fire watch At least 30 minutes after hot work ends (OSHA 1910.252)
Reviewed November 2026

What sets industrial welding services in Georgia apart?

Industrial welding services in Georgia are shaped by an unusually wide spread of plant types: new automotive, battery and solar plants built since 2019, aerospace manufacturing in Savannah and Marietta, a deep base of food and poultry processing, paper mills and kaolin plants along the fall line, and the Port of Savannah, whose Garden City Terminal is, in the Georgia Ports Authority’s words, North America’s largest single-terminal container facility of its kind. Each of those settings asks for different welding: stainless orbital welds in a dry room, structural repairs on a conveyor gallery, carbon steel steam line welds during a mill outage, or crane rail and dock fender repairs on a terminal.

What stays the same is the paperwork. A code weld in Georgia, as anywhere, is made to a qualified procedure by a welder qualified on that procedure, examined to the extent the governing code requires, and recorded so the owner can show where every weld is and who made it. The national overview of welding processes, codes and records is on the industrial welding services page; this page covers how that applies across Georgia’s plants and under Georgia’s rules.

Welding companies in Georgia: where the plant work is

Welding companies in Georgia that take plant work see it concentrated in five areas: metro Atlanta and its corridors, Savannah and the coast, the fall line cities of Augusta, Macon and Columbus, northwest Georgia around Dalton, Rome and Cartersville, and the agricultural south around Albany, Valdosta and Tifton. The welding mix differs in each, and so do the shutdown patterns plants work to.

Welding services: Atlanta, Marietta and the metro counties

Metro Atlanta’s plant work is spread across food and beverage plants, packaging and distribution centers, hospitals, data centers, and the life sciences campuses growing along Highway 316 toward Athens. In Cobb County, Lockheed Martin’s Marietta plant beside Dobbins Air Reserve Base builds the C-130J Super Hercules, one of several large aerospace and defense sites that keep the region’s fabrication and facility trades busy. Plants buying welding services in Atlanta most often need utility piping tie-ins, stainless process lines, equipment supports and platforms, and repairs to structural steel and machinery bases.

Industrial welding in Savannah, GA, and Ellabell

Industrial welding around Savannah serves the port, the Metaplant and its suppliers at Ellabell in Bryan County, chemical and food plants, and Gulfstream’s headquarters and manufacturing campus, where the company has been based for more than 50 years. Industrial welding in Savannah, GA, includes structural and rail repairs on terminal equipment, piping at plants in Chatham and Effingham counties, and aluminum work for marine and transport equipment, where joint cleaning, oxide removal and AWS D1.2 procedures matter as much as the welder’s hand.

Augusta, Macon, Columbus and the fall line mills

The fall line cities hold paper and pulp mills, kaolin plants, chemical producers and power plants, and their welding comes in two rhythms: steady repair and maintenance welding between outages, and dense, scheduled work during annual or biennial shutdowns. Steam, condensate and liquor piping, tank and chest repairs, slurry line bends worn through by abrasion and structural repairs on conveyor and dryer supports are typical.

Northwest Georgia and the south

Dalton’s carpet and flooring plants, Qcells’ module and cell plants in Dalton and Cartersville, and manufacturing in Rome and Calhoun bring utility piping, process cooling, equipment frames and structural work. South Georgia’s food, peanut, cotton and forest-products plants around Albany, Valdosta, Tifton and Thomasville bring boiler room piping, dryer and conveyor repairs, and tank work.

Georgia regions and the welding plants there ask for most
RegionTypical plantsCommon welding workGoverning codes
Metro Atlanta and MariettaFood, beverage, packaging, hospitals, life sciences, aerospace sitesUtility and stainless piping, platforms, machinery basesASME B31.3, B31.9, AWS D1.1, ASME BPE
Savannah, Ellabell and the coastPort terminals, automotive and battery plants, chemical and food plantsStructural and rail repairs, process piping, aluminum fabricationAWS D1.1, D1.2, ASME B31.3
Augusta, Macon, ColumbusPaper and pulp mills, kaolin and chemical plants, power plantsOutage piping, tank and chest repairs, wear repairsASME B31.1, B31.3, NBIC Part 3, API 653
Dalton, Rome, CartersvilleFlooring plants, solar plants, general manufacturingCooling and utility piping, equipment frames, structural steelASME B31.3, AWS D1.1
Gainesville, Athens and statewide poultryPoultry and food processors, vaccine and biologics plantsAmmonia piping, stainless equipment repair, sanitary weldsASME B31.5 for refrigeration, B31.3, ASME BPE
Albany, Valdosta, TiftonFood, agricultural and forest-products plantsBoiler room piping, dryer and conveyor repairs, tanksASME B31.1, AWS D1.1, API 653

How the Metaplant, battery plants and solar plants change welding work

The Metaplant at Ellabell, its battery joint venture, SK Battery America’s plants in Commerce and the Qcells plants in Dalton and Cartersville changed welding work in Georgia by adding large volumes of clean utility piping, stainless tube and structural steel to a market that was mostly maintenance and outage welding. These plants are market facts about where demand sits in the state, and the welding they need follows from their processes.

Automotive body and paint shops need compressed air, process cooling and paint system piping, and heavy structural work for conveyors, robot bases and mezzanines. Cell plants need orbital welded stainless tube for dry air, nitrogen and solvent service, where every joint is a potential leak path and weld color, purge quality and leak testing are checked before the system is accepted. Solar plants combine stainless water and gas lines with thermoplastic chemical piping, which is fused or socket-welded to its own procedures rather than arc welded.

New plants also bring a second wave of work once they run: modifications as lines are rebalanced, added equipment, and repairs to supports and frames under vibration. Paul Industries takes both the construction-phase welding and the change work that follows, on the same procedures and records system, so an owner keeps one welding file for a building rather than several.

Welding codes Georgia plants specify, by job

Georgia plants specify welding codes by the system being welded: ASME B31.3 for process piping, B31.1 for boiler and power piping, ASME BPE for bioprocessing lines, AWS D1.1 for structural steel, AWS D1.2 and D1.6 for aluminum and stainless structures, the National Board Inspection Code for boiler and vessel repairs, and API 653 for repairs to aboveground storage tanks. Procedure and welder qualification for the pressure codes follow ASME Section IX, and for structural work follow the qualification rules in the AWS code itself.

Welding codes by job type at Georgia facilities
JobConstruction codeQualificationTypical examination
Process and utility pipingASME B31.3ASME Section IXVisual on all welds, radiography or ultrasonic by fluid service
Steam and boiler pipingASME B31.1ASME Section IXVisual, volumetric by size, pressure and temperature
Bioprocess and sanitary linesASME BPEASME Section IXVisual and borescope, weld coupons, documented heat tint acceptance
Structural steelAWS D1.1AWS D1.1 prequalified or qualified WPSVisual, ultrasonic on complete joint penetration welds as specified
Aluminum and stainless structuresAWS D1.2, AWS D1.6Per the codeVisual, penetrant
Boiler and pressure vessel repairNBIC Part 3ASME Section IXAs the repair plan and inspector require, then pressure test
Aboveground storage tank repairAPI 653ASME Section IXPer API 653, including shell and bottom repair examination

Sanitary welding for food and biologics plants adds visual criteria that the pressure codes do not cover: the AWS D18.1 and D18.2 documents set out discoloration levels for stainless tube welds, and ASME BPE sets acceptance criteria for product-contact welds. After welding, stainless lines in those plants are cleaned and passivated; the passivation services in Georgia page covers corrosion at welds in wet food plants.

Boiler and pressure vessel weld repairs under Georgia’s Title 25 rules

Boiler and pressure vessel weld repairs in Georgia fall under the Boiler and Pressure Vessel Safety Act, now codified at O.C.G.A. Title 25, Chapter 15, and the Rules for Boilers and Pressure Vessels, Chapter 120-3-26, which Safety Engineering, a section of the state Insurance and Safety Fire Commissioner’s office, administers. The rules adopt the 2021 ASME Boiler and Pressure Vessel Code and the 2021 National Board Inspection Code, and give state inspectors access to any premises where boilers or vessels are being repaired.

A welded repair or alteration to a boiler or pressure vessel is made under the National Board R program, following NBIC Part 3, with the inspector consulted on the repair plan before work begins and accepting the completed repair. The repair is documented on the NBIC report forms, the weld procedure and welder qualifications are recorded, and the vessel is pressure tested where the repair requires it. Paul Industries plans these repairs around the inspection and the outage, cuts out and replaces the damaged material, and returns the vessel with its documentation; the boiler repair in Georgia and pressure vessel fabrication in Georgia pages cover the equipment side.

Tube leaks in fire-tube and water-tube boilers, cracked nozzles, corroded shells on air receivers and process vessels, and worn heat exchanger shells are the most frequent repairs at Georgia plants. On the boiler external piping, B31.1 applies, and weld repairs there follow the same code that built the line.

Special inspection of structural welds under Georgia’s 2024 building code

Structural welding on Georgia building projects is inspected under Chapter 17 of the International Building Code, which Georgia adopted in its 2024 edition with 2026 state amendments effective January 1, 2026. For structural steel, the code requires special inspection of welding following the quality assurance provisions of AISC 360, with welding itself done to AWS D1.1 and complete joint penetration welds commonly examined ultrasonically.

Special inspection applies when the work is part of a permitted building project: a new mezzanine, a platform with a building permit, a pipe rack carrying loads into the building structure, or modifications to roof steel for new equipment. The owner engages the special inspector under the building department’s program, and the welding contractor supplies the welding procedure specifications, welder qualification records and material certifications the inspector reviews. Paul Industries prepares that file before the steel goes up, so inspection holds do not stall the schedule.

Repairs to existing plant steel outside a permitted project, such as a cracked conveyor stringer or a corroded platform beam, are still welded to AWS D1.1, with the repair procedure, material match and examination stated in the repair plan and kept in the owner’s records.

Hot work rules at Georgia plants

Hot work at Georgia plants is governed by the International Fire Code as adopted with Georgia modifications by the Safety Fire Commissioner in Rule 120-3-3, whose Chapter 35 covers welding and other hot work, and by federal OSHA’s welding rule, 29 CFR 1910.252, because Georgia has no state OSHA plan for private employers. Most plants also follow NFPA 51B in their own hot work programs.

In practice that means a written hot work permit issued by the plant, combustibles cleared or protected within the required distance, openings and cracks covered, fire extinguishing equipment at hand, and a fire watch during the work and for at least 30 minutes after it ends, as OSHA 1910.252 requires. Poultry and food plants add sanitation concerns, since spatter and grinding dust on product-contact surfaces become a food safety issue, and dusty plants such as feed mills, flour handling and kaolin dryers add combustible dust controls. Inside battery plants, solvent areas bring flammable vapor checks and gas testing before any arc is struck.

Paul Industries works to the plant’s own hot work program, prefabricates as much as possible off site to keep hot work inside the plant short, and schedules the remaining welds where they create the least exposure, such as during sanitation shifts in food plants or during planned stops in solvent areas.

Stainless and sanitary welding for Georgia food and biologics plants

Stainless and sanitary welding at Georgia food and biologics plants is done with gas tungsten arc welding, orbital wherever the joint allows, with an inert gas purge inside the tube so the root stays smooth and free of heavy oxidation. In poultry plants, the welds that matter most are on equipment, brine and chill systems and the supports and frames that sit in washdown zones, where a rough or discolored weld becomes a site for corrosion and for bacteria to settle.

On biologics and vaccine sites, including those in the Athens and Highway 316 area, product-contact welds are logged one by one with weld coupons, borescope records and isometric weld maps, because those records feed directly into system qualification. Paul Industries welds, inspects, cleans and passivates the lines and hands the weld documentation to the validation team, alongside the process piping in Georgia records for the rest of the system.

Welding on live lines and inside Georgia mill outages

Welding on a live line at a Georgia plant, such as a hot tap to add a branch to a running steam, water or gas header, is planned as an engineered job rather than a routine weld. The plan confirms the remaining wall thickness by ultrasonic readings at the weld location, checks the flow and pressure inside the pipe so the heat of welding is carried away without burn-through, selects a low-hydrogen procedure qualified for in-service conditions, and sets out the tapping machine, valve and isolation steps. API RP 2201 is the usual reference for safe hot tapping practice, and the plant’s management of change process applies where the line is in a covered process.

Mill outages at Augusta, Savannah-area and south Georgia paper and pulp operations are the opposite case: everything is shut down at once and dozens of repairs compete for one fixed window. Paul Industries prepares outage welding as a package, with repair procedures approved, spools and patches fabricated in advance, and an examination crew scheduled so welds are cleared as they are finished rather than in a queue at the end.

Proving a weld: examination methods Georgia owners specify

Georgia plant owners prove welds with the same examination methods used nationally, chosen by code, joint and access: visual examination on every weld, liquid penetrant and magnetic particle for surface flaws, radiography and ultrasonic testing for volumetric flaws, and pressure or leak testing for the finished system. Inside operating plants, ultrasonic methods, including phased array, often replace radiography because they need no exclusion zone for radiation and let production continue in the next bay.

Examination personnel are qualified under the employer’s written practice to ASNT SNT-TC-1A or a comparable standard, and their reports name the method, the acceptance criteria and the result for each weld. Those reports join the weld map, the welding procedure and welder qualification records, and the material certificates in the turnover file a Georgia owner keeps.

Weld examination methods and where they fit in Georgia plants
MethodFindsBest useLimits to plan around
Visual (VT)Surface profile, undercut, porosity, discolorationEvery weld, before any other methodNeeds access and lighting; borescope for tube interiors
Liquid penetrant (PT)Surface-breaking cracks and porosityStainless and aluminum, root and cap checksSurface must be clean and dry; residue removed after on sanitary lines
Magnetic particle (MT)Surface and near-surface flawsCarbon steel structural and pressure weldsFerromagnetic material only
Radiography (RT)Volumetric flaws, lack of fusion, slag, porosityPipe butt welds where the area can be clearedRadiation exclusion zone, film or digital records to keep
Ultrasonic and phased array (UT, PAUT)Volumetric flaws and their depthHeavy wall pipe, structural CJP welds, work inside running plantsQualified procedure and calibration blocks for each joint type
Pressure or leak testLeaks through the completed systemEvery finished pressure system before serviceTest medium, isolation of equipment, signed record

Licensing, permits and prevailing wage for Georgia welding projects

Georgia licenses construction trades through two boards: the Construction Industry Licensing Board, created by Chapter 14 of O.C.G.A. Title 43, for electrical, plumbing, conditioned air, low-voltage and utility contracting, and the State Licensing Board for Residential and General Contractors under Chapter 41. The license that applies to a project follows the system being built and the scope of the contract, so welding on a plumbing or conditioned air system sits inside that trade’s permitted work, while welding on process systems and structural steel at a plant follows the owner’s specification and, for building work, the building permit.

Georgia has no state prevailing wage law for private projects. Work funded or assisted by the federal government is covered by the federal Davis-Bacon Act, and the contract states the basis on which labor is paid.

What does industrial welding cost at a Georgia plant?

Industrial welding at a Georgia plant costs according to the code and examination required, the material, the access and the share of work done inside a shutdown, so an hour of structural repair welding and an orbital welded stainless joint with borescope records are priced very differently. Off-site fabrication lowers cost on most jobs, because shop welding is faster and better controlled than welding inside a running building.

Other cost drivers are preheat and postweld heat treatment on heavy carbon and alloy steel, radiography or ultrasonic examination percentages, scaffolding and lift access, confined space entry, fire watch and gas monitoring, and the documentation the owner needs at turnover. Paul Industries gives a budget range from comparable scope and a firm price once the scope, drawings and access plan are set.

Who provides industrial welding services in Georgia?

Paul Industries provides industrial welding services in Georgia, including code pipe welding, structural and repair welding, stainless and sanitary welding, boiler and vessel repairs to the NBIC, and welded fabrication supplied or installed, for plants statewide. Formerly based in northern New Jersey and then Pennsylvania, Paul Industries now has its headquarters at 256 Shore Drive in Kilmarnock, Virginia, and works as an East Coast contractor across Georgia and in all 50 states.

Among pipe welding companies in Georgia, the work that matters to an owner is the documented kind: procedures and welder qualifications on file before the first arc, examination to the code, and a weld map that matches the system. Paul Industries runs welding that way under one contract with the piping, vessels and equipment it connects. The Virginia welding program is on the industrial welding services in Virginia page for the headquarters state, and work in the Carolinas on the industrial welding services in North Carolina page. Related Georgia work includes tank fabrication in Georgia, and the wider region is on the Southeast page and the Georgia page.

Industrial welding from Paul Industries across Georgia

Paul Industries welds, fabricates and repairs pipe, structures, tanks, vessels and equipment at Georgia plants as supply-only weldments, design-build packages or complete installations, with the procedures, qualifications, examination reports and weld maps each job needs. Plants in Atlanta, Savannah, Augusta, Macon, Columbus, Athens, Gainesville, Dalton, Rome, Albany and Valdosta can send drawings, photos and the governing code. Call 201-450-8280 or request a quote.

Standards referenced: ASME Section IX · ASME B31.3 Process Piping · ASME B31.1 Power Piping · ASME BPE · AWS D1.1 Structural Welding Code, Steel · AWS D1.2 Structural Welding Code, Aluminum · AWS D1.6 Structural Welding Code, Stainless Steel · AWS D18.1 and D18.2 · National Board Inspection Code Part 3 · API 653 · API RP 2201 · AISC 360 · ASME B31.5 Refrigeration Piping · ASME B31.9 Building Services Piping · ASNT SNT-TC-1A · 2024 International Building Code with 2026 Georgia amendments · International Fire Code with Georgia modifications (Rule 120-3-3) · NFPA 51B · OSHA 29 CFR 1910.252 · Georgia Boiler and Pressure Vessel Safety Act (O.C.G.A. Title 25, Chapter 15)

Frequently asked questions

Which welding companies in Atlanta, GA handle code welding inside operating plants?

Paul Industries handles code welding inside operating plants in Atlanta, Marietta, Norcross, Gwinnett and the rest of the metro area, including B31.3 process and utility piping, stainless sanitary lines and AWS D1.1 structural repairs. Welds are made to qualified procedures, examined to the code and logged on a weld map, and the work is scheduled around production and the plant’s hot work permit program.

Who handles plant welding near the Port of Savannah and the Metaplant at Ellabell?

Paul Industries handles plant welding around the Port of Savannah, Garden City, Pooler, Rincon and Ellabell in Bryan County, including structural and rail repairs on terminal equipment, process and utility piping at plants in Chatham, Effingham and Bryan counties, and aluminum and stainless fabrication. Coastal work gets coatings and fasteners chosen for salt air.

What should a mill expect from welding companies in Augusta, GA during an outage?

A mill in Augusta should expect welding companies to arrive at an outage with procedures, welder qualifications and material already approved, spools and repair parts fabricated in advance, and a weld-by-weld plan for examination and testing. Paul Industries works that way at paper, kaolin and chemical plants in Augusta, Macon, Sandersville and Columbus, so the outage time goes to installation rather than paperwork.

Do welding companies in Rome, Georgia take work at Dalton and Cartersville plants?

Paul Industries takes welding work at plants in Rome, Dalton, Cartersville, Calhoun and the rest of northwest Georgia, serving flooring, solar and general manufacturing plants with utility and cooling piping, stainless tube, equipment frames and structural steel. Welding inside solar and battery plants is planned around clean areas and solvent zones, with gas testing before hot work.

Are there welding companies in Valdosta, GA for plant and process work in south Georgia?

Paul Industries takes plant and process welding in Valdosta, Albany, Tifton, Thomasville and across south Georgia, for food, agricultural and forest-products plants. Typical jobs are boiler room steam and condensate piping, dryer and conveyor repairs, tank repairs to API 653 and equipment supports. Send drawings or photos and the operating schedule for a scope.

How do plants judge the top welding companies in Georgia for industrial work?

Plants judge the top welding companies in Georgia for industrial work by documentation and control: qualified procedures for each code and material, welder qualifications that cover the positions and thicknesses on the job, examination to the code, hot work discipline, and a weld map at turnover. Paul Industries provides that file with every code job, along with fabrication, installation and testing under one contract.

Who can make a welded repair on a boiler or pressure vessel in Georgia?

A welded repair on a boiler or pressure vessel in Georgia is made under the National Board R program to NBIC Part 3, which Georgia adopts through Rule 120-3-26, with the inspector consulted on the repair plan and accepting the completed repair. Paul Industries plans and performs these repairs, documents them on the NBIC report forms and pressure tests the vessel where the repair calls for it.

Does Georgia require a hot work permit for welding in a manufacturing plant?

Georgia’s fire code, the International Fire Code as modified by the Safety Fire Commissioner, requires hot work permits and precautions under its Chapter 35, and federal OSHA’s 29 CFR 1910.252 sets fire prevention rules for welding at private workplaces. The plant issues the permit under its program; Paul Industries follows it, clears or protects combustibles and keeps a fire watch.

How long must a fire watch stay after welding at a Georgia plant?

A fire watch at a Georgia plant stays for at least 30 minutes after welding or cutting ends, which is the minimum in OSHA 29 CFR 1910.252, and many plant programs set longer periods where combustibles or concealed spaces are involved. Paul Industries keeps the fire watch for the period the plant’s permit states and records it on the permit.

Which structural welds on a Georgia building project need special inspection?

On a Georgia building project under the 2024 International Building Code with Georgia amendments, structural steel welding gets special inspection under Chapter 17, following AISC 360 quality assurance. Complete joint penetration welds are commonly examined ultrasonically on top of visual inspection. Paul Industries supplies the procedures, qualifications and material records the special inspector reviews.

Can welding be done during the sanitation shift at a Georgia poultry plant?

Welding is commonly done during the sanitation shift or a scheduled downtime at a Georgia poultry plant, once the area is released by the plant and protected from spatter and grinding dust. Paul Industries prefabricates parts off site, keeps hot work to the planned window, cleans the work area and returns it ready for pre-operational inspection before production restarts.

How are stainless welds checked for a biologics plant along the Highway 316 corridor?

Stainless welds for a biologics plant along the Highway 316 corridor between Atlanta and Athens are checked visually and with a borescope for root profile and discoloration against ASME BPE criteria, with weld coupons made at the start of each shift or setup change. Each weld goes on an isometric weld map with the welder and procedure, and the file goes to the validation team.

What welding is needed at a battery or automotive plant in Georgia?

Battery and automotive plants in Georgia need orbital welded stainless tube for dry air, nitrogen and solvent service, compressed air and process cooling piping, paint system piping, and heavy structural welding for conveyors, robot bases and mezzanines. Paul Industries welds both the construction-phase systems and the changes that follow as production lines are rebalanced.

Does welding on a private Georgia plant project owe prevailing wage?

Welding on a private Georgia plant project does not fall under a state prevailing wage law, because Georgia has none. Projects funded or assisted with federal money are covered by the federal Davis-Bacon Act, which sets wage rates for covered work. Paul Industries states the labor basis in each proposal so the owner knows how the project is priced.

How much do industrial welding services cost at a Georgia facility?

Industrial welding services at a Georgia facility cost according to code, material, examination, access, shutdown work and documentation, so prices are set per job rather than by a flat hourly figure. Off-site fabrication usually lowers the total. Paul Industries gives a budget range from comparable work and a firm price once drawings, access and the inspection plan are known.

Can Paul Industries fabricate welded assemblies off site for a Georgia plant?

Paul Industries fabricates welded assemblies off site for Georgia plants, including pipe spools, platforms, stairs, equipment frames, skids, supports and tank and vessel components. They ship with procedure and welder records, material certificates and examination reports, and Paul Industries installs them at the plant or supplies them for installation on the plant’s schedule.

What should be sent to price industrial welding services in Georgia?

To price industrial welding services in Georgia, send drawings or photos of the work, the material and thickness, the governing code or owner specification, examination requirements, the access and shutdown windows, and the plant’s hot work and safety requirements. A budget range comes back first from Paul Industries, followed by a firm price when the scope is settled.

Need welding at a Georgia plant, mill or terminal?

Send drawings or photos, the material, the governing code and the shutdown window. Call 201-450-8280 or request a quote.