Paul Industries provides pressure vessel fabrication in Georgia, designing, fabricating, testing, delivering and setting ASME Section VIII vessels for battery and vehicle plants, pulp and paper mills, poultry and food processors, chemical plants and port industries across the state. Georgia’s boiler and pressure vessel rules require every vessel within the Act to be built to the ASME Code, inspected in fabrication by a National Board commissioned inspector and registered with the National Board, then inspected again in service every three years. Paul Industries builds to that sequence from the first calculation, so the vessel reaches the plant with the nameplate, data report and records the state inspector will look for.
Request a quote or call 201-450-8280
Pressure vessel fabrication in Georgia under the Safety Fire Commissioner’s rules
Pressure vessel fabrication in Georgia follows Rule 120-3-26-.17 of the Safety Fire Commissioner, which requires boilers and pressure vessels to be manufactured to the ASME Boiler and Pressure Vessel Code, makes shop inspection by an inspector holding a National Board commission mandatory, and requires the Code stamping and National Board registration to match. Unfired vessels built under the ASME UM designation for small vessels are relieved of that shop inspection, along with cast iron boilers. Electric boilers carry an Underwriters Laboratories label as well.
So is ASME mandatory in Georgia? For any vessel inside the Act, yes: Rule 120-3-26-.07 adds that no boiler or pressure vessel may be sold for installation in the state unless it meets the adopted codes, standards and rules, and the alternative route for a vessel that cannot be built to the Code is a Georgia State Special permit, described further down. The stamping has to stay visible, too. Insulation and paint may not hide it unless the plant records where it is or attaches a duplicate nameplate outside the cover, which matters on jacketed and insulated process vessels. The national view of design, welding and testing is on the pressure vessel fabrication page; this page covers what is particular to Georgia.
Pressure vessel requirements by state differ mostly in what happens after the vessel leaves the fabricator: who registers it, who inspects it in service, how often, and what a repair needs. Georgia’s answers come from the Boiler and Pressure Vessel Safety Act, now in O.C.G.A. Title 25, Chapter 15, and the rules in Chapter 120-3-26, which since July 2022 have adopted the 2021 editions of the ASME Boiler and Pressure Vessel Code and the National Board Inspection Code, with ASME B31.1 for boiler external piping. Before July 1, 2012 the program sat with the Department of Labor under Title 34, Chapter 11, which is why some vendor documents and older plant procedures still cite that chapter.
Georgia pressure vessel regulations: which vessels the Act reaches
Georgia pressure vessel regulations reach unfired vessels above the size and pressure limits in O.C.G.A. 25-15-16, which leaves out vessels of 5 cubic feet or less at 250 psig or less, 1.5 cubic feet or less at 600 psig or less, and any vessel with an inside diameter of 6 inches or less regardless of pressure. Vessels whose working pressure, internal or external, stays at or below 15 psig are outside the Act at any size, which is where atmospheric and low-pressure tanks belong.
What is considered a pressure vessel under Georgia law therefore starts with the ASME Section VIII scope and then applies the state’s own list. Vessels beyond the reach of Section VIII are excluded, as are research vessels used solely for research, water vessels holding 120 gallons or less, indirect water heaters up to 200,000 Btu per hour of input, 120 gallons of capacity and 210 degrees Fahrenheit, and transport vessels built to DOT specifications. Two exclusions reach large plants: vessels operated for electricity generation and vessels operated as part of a manufacturing process, where the operator carries insurance or self-insurance and an inspector holding the Commissioner’s certificate of competency inspects them regularly to the ASME Code’s minimum safety requirements.
| Vessel | Georgia treatment | What it means for fabrication |
|---|---|---|
| Small vessel within 5 cu ft and 250 psig, or 1.5 cu ft and 600 psig | Outside the Act | Built to ASME where the specification calls for it; no state permit cycle |
| Any vessel with 6 in inside diameter or less | Outside the Act at any pressure | Pipe-size filters, separators and pots are designed to Section VIII or B31.3 as the service requires |
| Vessel at 15 psig or less | Outside the Act at any size | Atmospheric and low-pressure tanks follow API, AWWA or the tank’s own standard |
| Air receiver up to 16 cu ft (120 gal) and under 250 psig | Relieved of the inspection and certificate sections | ASME construction and a relief valve remain the norm |
| LP gas storage under the fire marshal | Relieved of the inspection sections, unless 2,000 gal or more and modified or altered | Built to ASME with the fire code’s siting and fittings |
| Process vessel at a plant with its own inspection coverage | May be set aside under 25-15-16(a)(13) | Same ASME construction; inspection records move to the plant’s program |
| Reactor, receiver, column or exchanger shell above the limits | Inside the Act | ASME stamp, National Board registration, state permit inspection every three years |
Who regulates pressure vessels in Georgia, then, is the Commissioner of Insurance and Safety Fire through the Safety Engineering Section in Atlanta, with the State Fire Marshal handling LP gas storage and EPD and OSHA covering the emissions and process safety sides of what the vessel holds. Paul Industries confirms the classification with the owner before design starts, because it decides the stamping, the paperwork and who inspects the vessel for its working life.
What does a Georgia vessel design need before the first calculation?
A Georgia vessel design starts with the owner’s process data and the site: design pressure and temperature, maximum allowable working pressure, minimum design metal temperature, contents and their corrosion behavior, corrosion allowance, cyclic service, and the wind, seismic and support loads at the plant. Paul Industries turns that data sheet into Section VIII Division 1 calculations, or Division 2 where wall thickness and inspection savings justify it, with nozzle reinforcement, flange ratings, support design and relief device sizing checked against the same basis.
Georgia sites change some of those inputs. Coastal plants around Savannah and Brunswick see hurricane wind on tall columns and outdoor receivers, and salt air that shapes the coating and insulation jacket specification. Washdown areas in poultry and food plants call for stainless construction, sloped tops and drainable supports. Battery plants specify cleanliness and dryness levels on gas and solvent vessels that go beyond the Code’s own requirements. Material choices follow from there: SA-516 carbon steel for most air, steam and water service, and 304L, 316L or duplex stainless where chlorides, sanitation chemicals or product purity require it.
The pressure vessel GA drawing and the data report
The pressure vessel GA drawing, the general arrangement, is the document a Georgia plant approves before material is ordered: overall dimensions, nozzle schedule with sizes, ratings and orientations, supports and anchor bolt pattern, design and test conditions, materials, weld joint categories, examination level and the nameplate location. Paul Industries issues the GA with the calculations for owner review, revises it once comments are back, and carries the approved revision through fabrication, so the as-built nozzle orientations match the piping drawings at the plant. At turnover the GA goes with the Manufacturer’s Data Report, the material test reports and the hydrostatic test record.
Pressure vessel inspection requirements before the vessel ships
Pressure vessel inspection requirements before shipment in Georgia are the ASME Code’s, made mandatory by the state rule: an Authorized Inspector with a National Board commission reviews the design, verifies materials, monitors welding and examination, witnesses the pressure test and signs the data report before the Code symbol is applied. The vessel is then registered with the National Board, and that registration number is how the state identifies it for life.
How are pressure vessels tested before they leave? Section VIII Division 1 calls for a hydrostatic test at 1.3 times the maximum allowable working pressure, adjusted for the ratio of material stresses at test and design temperature, or a pneumatic test at 1.1 times where water cannot be used. Radiographic or ultrasonic examination, impact testing for low design metal temperatures and postweld heat treatment follow the joint categories, materials and service. Paul Industries keeps each of those records with the vessel so the plant’s file is complete on the day the vessel arrives.
| Step | What happens | Record the plant receives |
|---|---|---|
| Design and GA drawing | Section VIII calculations, nozzle loads, supports, relief sizing | Calculation package and approved GA drawing |
| Material receipt | Plate, heads, forgings and pipe checked against specification | Material test reports traced to heat numbers |
| Welding | Qualified procedures and welders under ASME Section IX | Weld map with procedure and welder identification |
| Examination | Radiography or ultrasonics, surface examinations, dimensional checks | Examination reports |
| Heat treatment where required | Postweld heat treatment for thickness, material or service | Time and temperature charts |
| Pressure test | Hydrostatic or pneumatic test witnessed by the Authorized Inspector | Test record and signed data report |
| Stamping and registration | Nameplate applied, vessel registered with the National Board | Manufacturer’s Data Report with National Board number |
The Georgia pressure vessel permit: new, secondhand and relocated vessels
The Georgia pressure vessel permit process depends on the vessel’s history. A secondhand vessel, one that has changed both location and ownership, needs a permit to install before any work is performed, obtained with a Request to Install a Boiler or Pressure Vessel, the fee and the ASME data report, and a Deputy Inspector inspects it before it is used. A new code vessel enters the state’s records at its first certificate inspection and then holds an operating permit renewed every three years.
Pressure vessel installation requirements also reach vessels that leave Georgia and come back. A standard vessel taken out of state for temporary use or repair must have the Chief Inspector’s permit to install before reinstallation, and a vessel that is not built to the Code or not registered with the National Board cannot be reinstalled anywhere in Georgia after a change of ownership without a State Special permit. A permit with no action lapses 24 months after issue. Paul Industries prepares the request, data report and drawings for the permit, sets and connects the vessel, and notifies the Safety Engineering Section when it is ready for inspection.
Non-ASME pressure vessels and the Georgia State Special
Non-ASME pressure vessels can enter Georgia service only through a Georgia State Special, a permit for a vessel of special design that cannot be built to the ASME Code, under Rule 120-3-26-.13. The owner sends the Chief Inspector the welding procedures, welder qualification details, shop drawings, material specifications and calculations for approval, and the application has to be signed off by a registered professional engineer or an appropriate ASME Code certificate holder.
The vessel is then inspected and hydrostatically tested, with results recorded on the Commissioner’s forms, and the State Special permit costs $500, with all inspections made by a Deputy Inspector. Outside that route, non-conforming vessels may operate only for hobby, educational or historical purposes with an annual inspection, and a vessel normally based in another state may run in Georgia for up to 7 days on its home state’s certificate. In practice, most owners who start down the State Special path end up with a code vessel, because the engineering and inspection effort approaches that of building one. Paul Industries prices both so the owner can compare.
Georgia pressure vessel inspection once the vessel is running
Georgia pressure vessel inspection in service is a permit inspection every three years under Rule 120-3-26-.08, with an internal inspection at the inspector’s discretion and the work done to Parts 1 and 2 of the National Board Inspection Code. The operating permit fee for a pressure vessel is $30 per three-year cycle, and a fee still unpaid after 60 days suspends the permit, which returns only after payment and a reinspection.
How often do pressure vessels need to be inspected beyond that minimum? More often where the service is corrosive, cyclic or erosive, and the plant’s mechanical integrity program usually sets the real interval. Who inspects pressure vessels in Georgia depends on the plant: an inspector from the Safety Engineering Section, an inspector employed by an insurance company authorized to write boiler and pressure vessel coverage in Georgia, or, for companies that run their own inspection departments, an owner-user inspection agency whose inspectors meet the same competency rules. Owner-user agencies keep inspection reports at the site, report to the Chief Inspector and keep a list of every vessel with its last and next inspection dates.
Paul Industries designs vessels for that life: manways and inspection openings where internals will be checked, nameplates placed so insulation does not bury them, thickness monitoring locations marked on the GA, and relief devices accessible for testing. The records pack is organized the way an inspector reads it, which shortens the first permit inspection.
Where Georgia plants use pressure vessels
Georgia plants use pressure vessels across five large groups of industry: battery and vehicle manufacturing, pulp and paper, poultry and food processing, chemicals, and the port and logistics base around Savannah and Brunswick. Each group asks for different vessels and different paperwork.
| Industry | Typical vessels | Specification emphasis |
|---|---|---|
| Battery and EV manufacturing | Compressed air and nitrogen receivers, solvent recovery vessels, chilled water expansion tanks, dryer vessels | Cleanliness, dryness, fast schedules for phased plant startups |
| Pulp and paper | Blow and flash tanks, steam accumulators, deaerators, condensate receivers, chemical recovery vessels | Corrosion allowance, thickness monitoring, outage-driven replacement |
| Poultry and food processing | Ammonia receivers and accumulators, retorts, hot water and CIP vessels, air receivers | Process safety documentation, stainless washdown construction |
| Chemicals and specialty products | Reactors, columns, separators, jacketed process vessels | Material selection for the chemistry, B31.3 interfaces, relief system design |
| Port, terminals and logistics | Air receivers, LP gas and fuel system vessels, fire protection pressure tanks | Coastal coating systems, siting under the fire code |
| Life sciences around Atlanta | Clean steam, WFI and process vessels with ASME BPE finishes | Surface finish, documentation for qualification |
Battery and EV plants from Bryan County to Bartow County
Georgia’s battery and vehicle build-out spans the state. Hyundai Motor Group Metaplant America in Ellabell, Bryan County, assembles the IONIQ 5; SK Battery America in Commerce has supplied battery cells to it since April 2025; and the Hyundai and SK On battery joint venture in Bartow County, near Cartersville, began commercial production in mid-2026, with a planned capacity of 35 gigawatt-hours once fully ramped. Plants of that kind run large compressed air, nitrogen and process cooling systems, and they add capacity in phases, so receivers and process vessels are often ordered against a fixed line startup date. Paul Industries fabricates those vessels to the plant’s cleanliness specification and schedules delivery to the phase they serve.
Pressure vessel fabrication, Savannah and the coastal chemical plants
Pressure vessel fabrication for Savannah, Brunswick and the coast serves pulp and paper, chemical and port industries. Seven of Georgia’s eight remaining pulp mills date from before 1961, according to the state forestry task force’s January 2026 report, so many coastal and river mill vessels are replacements for units that have reached the end of their corrosion allowance. Paul Industries builds replacements to the original nozzle layout where the piping stays, or to an updated design where the process has changed, and plans the swap inside the mill outage. Chemical plant work is covered on the chemical manufacturing page.
Pressure vessel fabrication, Atlanta and the metro plants
Pressure vessel fabrication for Atlanta and the metro counties centers on food and beverage plants, hospitals, universities, data centers and the growing life sciences base, where vessels are smaller, often stainless, and installed inside occupied buildings. Rigging paths, floor loading and the 2-hour rated rooms Georgia requires around larger steam boilers shape the vessel’s dimensions as much as its process duty. Poultry processors in Gainesville and Hall County, part of the top broiler-producing state in 2024 by USDA figures, add ammonia system vessels whose fabrication records feed the plant’s process safety file.
Delivering and setting large vessels at Georgia sites
Large vessels reach Georgia sites by road, rail or water, and the state’s ports give heavy and oversize equipment more routes than most. The Georgia Ports Authority’s Mayor’s Point terminal in Brunswick handles breakbulk and project cargo on a 1,750-foot berth with CSX and Norfolk Southern rail, and Colonel’s Island in Brunswick has been the nation’s top gateway for autos and heavy machinery two years running. For vessels too large for highway shipment as one piece, Paul Industries plans the route, or builds the vessel in sections with field closure welds made under the Code and inspected on site.
At the plant, Paul Industries sets the vessel on its foundation, levels and grouts it, connects the piping and relief devices, and supports the first certificate inspection or the Deputy Inspector’s inspection for secondhand units. Hydrostatic tests at the site, when the owner wants a field test after setting, are covered under hydrostatic testing, and the connecting piping under process piping in Georgia.
How are Georgia vessels repaired, altered or rerated?
Repairs and alterations on Georgia pressure vessels follow Rule 120-3-26-.15: an inspector’s permission before work begins, methods from the National Board Inspection Code, work carried out under a National Board “R” certificate of authorization or an owner-user’s jurisdictional approval, an R-1 report within 30 days of every welded repair, and an R-2 for every alteration, with both registered with the National Board.
Georgia’s definition of an alteration is broad. Any change to an item on the original data report that affects pressure capability counts, and so does a paper change: raising the maximum allowable working pressure or the design temperature is an alteration, as is lowering the minimum temperature enough to require additional mechanical tests. A rerate for a new process duty therefore goes through the R-2 route even when no metal is cut. Paul Industries reviews the original data report and thickness readings, runs the rerate calculations, and decides with the owner whether a rerate, a repair or a new vessel is the better answer. Welded repairs and nozzle additions in the field are covered under industrial welding services in Georgia.
What does pressure vessel fabrication in Georgia cost?
The cost of pressure vessel fabrication in Georgia is driven by the vessel itself: diameter and length, design pressure and temperature, material, wall thickness, the number and size of nozzles, internals and jackets, the examination level, postweld heat treatment, surface finish for sanitary service, and delivery to the site. State charges are small next to that. A permit to install for a secondhand vessel starts at $100 under the fee rule, doubled if the vessel is installed without one, the operating permit is $30 every three years, and a State Special permit is $500 before engineering and inspection costs.
How much does a pressure vessel cost once those drivers are known? Paul Industries prepares a budget range from comparable scope as soon as it has a data sheet or a sketch, then a firm price once the GA drawing and calculations are agreed. Schedule matters as much as price on most Georgia projects, so the quote states the drawing, material, fabrication and delivery milestones together. Owners can buy a vessel on a supply basis, a design-build package with the piping and controls, or a complete installation.
Who fabricates pressure vessels in Georgia?
Paul Industries fabricates pressure vessels for Georgia plants, from small stainless receivers for Atlanta food plants to large carbon steel process vessels for coastal mills and chemical plants. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, after years when it was based in northern New Jersey and then Pennsylvania, Paul Industries takes vessel work across Georgia, throughout the East Coast, in all 50 states and at plants abroad. Plants comparing states will find pressure vessel fabrication in Virginia, the headquarters state, and pressure vessel fabrication in North Carolina.
Vessels rarely stand alone. Boilers and the deaerators and blowdown tanks around them are covered by boiler repair in Georgia, atmospheric storage and process tanks by tank fabrication in Georgia, and qualification of vessels in regulated plants by validation and commissioning in Georgia. Paul Industries carries the vessel, its piping and its startup under one contract and one schedule.
Code vessels from Paul Industries for Georgia plants
Paul Industries designs and fabricates ASME Section VIII pressure vessels for plants across Georgia, with calculations, the GA drawing, National Board shop inspection, the pressure test, registration and the records pack for the state’s permit inspection. The work extends to delivery, setting, piping connections, relief devices, repairs and rerates under the NBIC, and State Special submissions where the design has to depart from the Code. Send the data sheet or a sketch with pressure, temperature, contents, capacity and nozzle needs, and request a quote.
Standards referenced: Georgia Boiler and Pressure Vessel Safety Act, O.C.G.A. 25-15-10 et seq. · Rules of the Safety Fire Commissioner, Chapter 120-3-26, Boilers and Pressure Vessels · ASME Boiler and Pressure Vessel Code, 2021 edition, Section VIII, Divisions 1 and 2 · ASME Section IX · National Board Inspection Code (NBIC), 2021 edition · ASME B31.3
Frequently asked questions
Who builds pressure vessels for plants around Savannah, Brunswick and the Georgia coast?
Paul Industries builds ASME pressure vessels for pulp and paper mills, chemical plants and port industries around Savannah, Brunswick and along the coast. Coastal vessels get coating and insulation jacket systems for salt air, and tall vessels are designed for hurricane wind loads. Replacements for aging mill vessels are planned into the outage, with the new unit built to the existing nozzle layout where the piping stays.
Does Paul Industries supply vessels for battery plants in Bryan County, Jackson County and Bartow County?
Paul Industries supplies compressed air and nitrogen receivers, solvent recovery vessels, expansion tanks and process vessels for battery and vehicle plants in Bryan County, Jackson County, Bartow County and elsewhere in Georgia. Those plants specify cleanliness and dryness beyond the Code and add capacity in phases, so Paul Industries fabricates to the plant specification and schedules each delivery to the phase it serves.
Which vessels do Atlanta, Gainesville and Augusta plants order most often?
Atlanta and metro plants order stainless process vessels, receivers and hot water vessels for food, beverage, healthcare and life sciences work. Gainesville and Hall County poultry processors order ammonia receivers, retorts and washdown-grade vessels. Augusta and the Savannah River corridor order mill and chemical process vessels. Paul Industries builds each to the ASME Code and the Georgia registration rules.
Do pressure vessel requirements by state change how a Georgia vessel is built?
The ASME construction is the same in every Code state; what changes is registration, in-service inspection and repair. Georgia requires National Board shop inspection and registration, a permit inspection every three years, and NBIC repairs with R-1 or R-2 reports to the Chief Inspector. A vessel built for Georgia service carries the nameplate and data report the state inspector expects, so the first permit inspection goes smoothly.
Is there a separate Georgia pressure vessel code?
Georgia does not write its own construction code. The Georgia pressure vessel code is the ASME Boiler and Pressure Vessel Code and the National Board Inspection Code, adopted through Chapter 120-3-26 of the Safety Fire Commissioner’s rules, plus Georgia’s own requirements for permits, inspection intervals, fees, repairs and State Special vessels. The Act itself is O.C.G.A. 25-15-10 and the sections after it.
How are state of Georgia pressure vessels identified and tracked?
Georgia identifies the vessels it inspects by their ASME stamping and National Board registration number, which is why the rules require the stamping to stay visible or a duplicate nameplate to be fitted outside insulation. The operating permit, inspection reports and any R-1 or R-2 forms all reference that number. Paul Industries places nameplates where the inspector can read them without removing insulation.
How often do pressure vessels need to be inspected under Georgia's pressure vessel rules?
Georgia’s pressure vessel rules set a permit inspection every three years, with the internal inspection at the inspector’s discretion and all inspections done to NBIC Parts 1 and 2. Plants with corrosive, cyclic or high-temperature service usually inspect more often under their own mechanical integrity programs. Paul Industries designs inspection openings and thickness monitoring points into the vessel so those inspections are practical.
What are the pressure vessel installation requirements for a used vessel in Georgia?
A used vessel that has changed location and ownership needs an approved permit to install before work starts, filed with the data report and fee, and a Deputy Inspector’s certificate inspection before use. A non-code or unregistered vessel cannot be reinstalled after a change of ownership without a State Special permit. Paul Industries reviews the used vessel’s data report, thickness readings and history before the owner commits to it.
Do air receivers need a Georgia operating permit?
Air receivers of 16 cubic feet, or 120 gallons, or less operating under 250 psig are relieved of Georgia’s inspection and certificate sections, and very small receivers within 5 cubic feet at 250 psig are outside the Act entirely. Larger receivers are inside it and carry a three-year operating permit. Paul Industries builds receivers of every size to ASME Section VIII with relief valves sized to the compressor.
Can a plant's own inspectors inspect its pressure vessels in Georgia?
Companies that run a regularly established inspection department can operate as an owner-user inspection agency for the pressure vessels they own and use, with inspectors meeting the same certificate of competency requirements as state and insurance inspectors. The agency keeps reports at the site, sends a true report of each inspection to the Chief Inspector and keeps a list of every vessel with its inspection dates.
Is a rerate an alteration in Georgia even if no welding is done?
It is. Georgia defines an alteration to include nonphysical changes such as raising the maximum allowable working pressure or the design temperature, and lowering the minimum temperature enough to require additional mechanical tests. A rerate is therefore documented on an R-2, registered with the National Board and sent to the Chief Inspector within 30 days. Paul Industries runs the rerate calculations and prepares the package.
What hydrostatic test does Georgia expect at an in-service inspection?
When a hydrostatic test is applied to a pressure vessel at inspection, Georgia’s rules call for at least one and one-half times the maximum allowable working pressure, except where ASME Section VIII Division 1 permits otherwise, with water at 70 degrees Fahrenheit or warmer. Other test media may be used when the contents rule out water. Paul Industries plans test pressure, blinds and venting with the inspector.
Can a vessel built in another state be installed in Georgia?
A new vessel built anywhere to the ASME Code, with National Board shop inspection and registration, can be installed in Georgia and enters the state’s records at its first certificate inspection. A vessel normally operated in another state may run in Georgia for up to 7 days on its home state’s certificate. Paul Industries fabricates vessels for Georgia sites to the state’s rules from the start.
Who needs to approve a non-ASME vessel before it runs in Georgia?
The Chief Inspector approves a Georgia State Special after reviewing the welding procedures, welder details, shop drawings, material specifications and calculations, with the application signed off by a registered professional engineer or an appropriate ASME Code certificate holder. The vessel is then inspected and hydrostatically tested by a Deputy Inspector, and the permit fee is $500.
How long does a custom pressure vessel for a Georgia plant take?
The schedule runs from drawing approval, through plate and forging lead times, fabrication, examination, heat treatment and the witnessed test, to delivery. Material availability usually sets the pace for carbon and stainless plate, heads and large forgings. Paul Industries gives the drawing, material, fabrication and delivery milestones with the quote and orders long-lead items as soon as the GA drawing is approved.
What should go into a Georgia pressure vessel quote request?
Send the design pressure and temperature, minimum design metal temperature, contents, capacity or dimensions, material preference, nozzle list, support type, any jacket or internals, the site location in Georgia and the required delivery date. A sketch or existing data report helps for replacements. Paul Industries returns a budget range and schedule, then a firm price once the GA drawing is agreed.
Need a code vessel built for a Georgia plant?
Send the data sheet or sketch with design pressure, temperature, contents, capacity and the nozzle list. Call 201-450-8280 or request a quote.
