Paul Industries delivers data center liquid cooling in Colorado, designing and installing coolant distribution units, cold plate and rear-door loops, facility water piping and the dry coolers or towers that reject the heat, for halls in Denver, Aurora, Boulder, Colorado Springs and the northern Front Range. Dry air and long winters mean a warm-water loop here sheds its heat to outdoor air on most days of the year, with chillers held back for the hottest hours, and the heat it carries is worth recovering for buildings. Altitude, freeze risk and the chemistry of snowmelt water shape the details.
Request a quote or call 201-450-8280
What is different about data center liquid cooling in Colorado?
Data center liquid cooling in Colorado benefits from a climate that cools warm water cheaply and penalizes designs that ignore elevation and frost. What is data center liquid cooling in practical terms? It moves most of the heat from processors and accelerators into a liquid at the rack, through cold plates, rear-door coils or immersion tanks, and carries that liquid to a heat exchanger instead of blowing the heat into room air. Water carries far more heat per unit volume than air, so a liquid loop handles rack densities that would overwhelm a raised floor.
In Colorado, three conditions decide how the rest of the system is built. The semi-arid climate gives a low wet bulb and cool nights, so warm facility water is available from dry coolers or towers almost all year. Elevation lowers the pressure on every open surface, which affects dry cooler capacity, pump suction and the behavior of dissolved air and two-phase fluids. Winters are long and cold, which makes freeze protection mandatory outdoors and makes the heat coming off the racks worth capturing. The national data center liquid cooling page explains CDUs, cold plates and the W classes in general; this page applies them to Colorado sites.
The warm-water example in Golden
The high-performance computing data center at the National Laboratory of the Rockies in Golden, the Department of Energy laboratory renamed from NREL on December 1, 2025, is a working Colorado example of warm-water liquid cooling. The laboratory reports an annualized average PUE of 1.036, requires that 90 percent or more of its computing heat be captured by liquid, and runs with no compressor-based cooling at all. Its towers can make 75 degree Fahrenheit water on the hottest day of the year because Golden’s design wet bulb is 60 degrees, and the computers return water at around 100 degrees.
That warm return water is the building’s primary heat source. It feeds chilled beams and air handlers in heating mode, a snow melt loop at the main entrance and, when there is surplus, a campus district heating loop; in April and October the laboratory reports that excess heat has served other buildings. Heat goes first to reuse, then to a thermosyphon dry cooler when the weather allows, and only then to evaporative towers. The laboratory states that adding the thermosyphon in 2016 cut its annual cooling water use by more than half. Commercial halls rarely reach those figures, but the same principles carry over: warm supply water, dry rejection whenever the air allows, and heat recovery where a building wants it. The facility is cited here as a public research fact, not as a Paul Industries project.
Matching facility water temperature to Front Range weather
Facility water temperature is the single setting that most determines how often a Colorado liquid loop runs without chillers. ASHRAE’s liquid cooling classes run from W17, for IT equipment that needs supply water at or below 17 degrees Celsius, through W27, W32, W40 and W45 to W+, and each step up widens the hours when a dry cooler alone can make the water. The server vendor’s class sets the limit; the facility design then chooses the warmest supply the equipment accepts.
| Class | Facility supply limit | Typical heat rejection in Colorado | Heat reuse potential |
|---|---|---|---|
| W17 | 17 C (62.6 F) | Chillers in summer, economizer in cool months | Low without a heat pump |
| W27 | 27 C (80.6 F) | Towers or hybrid dry coolers most of the year; chiller trim on peak days | Moderate; return water warm enough for preheat |
| W32 | 32 C (89.6 F) | Dry coolers for most hours; adiabatic assist on hot afternoons | Good for low-temperature heating loops |
| W40 | 40 C (104 F) | Dry coolers year round at Front Range design conditions | Strong; return water suits space heating and snow melt |
| W45 and W+ | 45 C (113 F) and above | Dry coolers with wide margin | Strongest; return water reaches useful heating temperatures |
Most current cold plate servers fall in the W27 to W32 range, which on the Front Range means a dry cooler or hybrid plant carries the loop for the large majority of hours. A plant designed this way still keeps a chiller connection or a trim chiller for the few summer afternoons when dry air at altitude cannot hold the setpoint, and for any air-cooled gear in the same hall.
Dry coolers for liquid loops at altitude
Dry coolers serving Colorado liquid loops must be selected at site barometric pressure, because the air crossing the coil is thinner and removes less heat per fan than the catalogue figure taken at sea level. The correction usually means more coil surface or another module, and higher fan speeds on hot days. Because a warm-water loop leaves a wide gap between the water and the outdoor air for most of the year, the penalty is smaller than for a chiller condenser working near its limit.
Outdoor loops in Colorado also need a glycol concentration matched to the coldest expected night, isolation from the indoor technology loop through a heat exchanger, and controls that keep fans and pumps from overcooling the water on a January morning. Freeze protection on a dry cooler is a matter of chemistry and control sequence together: the right percentage of inhibited propylene glycol, flow maintained through every coil circuit, and alarms on low supply temperature. Paul Industries sets those sequences and tests them before the loop carries IT load.
How data center liquid cooling works, step by step, in a Front Range hall
How data center liquid cooling works in a Colorado hall can be followed from the chip outward. Each data center liquid cooling cold plate sits on a processor or accelerator and passes treated coolant through fine internal channels; the warmed coolant leaves through a quick disconnect into the rack manifold. Manifolds feed a row header that returns to a CDU, where a plate heat exchanger hands the heat to facility water and a pump sends cooled coolant back to the racks. Facility water then carries the heat to a dry cooler, a tower or a heat recovery exchanger, depending on the season and the building’s heating demand. On a January day the heat may never leave the building at all; on a July afternoon it goes outdoors through the dry coolers, with chiller trim if the supply temperature starts to climb.
Dew point margin in a dry climate
Dew point margin is wider in a Colorado hall than in a humid one, because the outdoor air that eventually reaches the white space carries little moisture for most of the year. Any liquid-cooled surface colder than the room dew point sweats, so rear-door coils and cold plate manifolds are always supplied above that dew point, and the CDU controls hold supply temperature a set margin above the measured room value. With dry room air, that rule rarely forces the supply temperature up, which leaves room to run rear doors cooler and remove more rack heat. The control still matters on wet summer days and in halls with direct outside-air economizers, where humidity follows the weather; dew point sensors in each zone feed the CDU setpoint so the margin holds automatically.
Dissolved air, pressure and pumps in a mile-high loop
Air management is a larger part of data center liquid cooling challenges at elevation, because gas solubility in water depends on pressure and temperature, and both change around a Colorado loop. The USGS dissolved oxygen tables, for example, compute saturation from barometric pressure as well as temperature. When cool fill water warms inside cold plates, gas comes out of solution; at high points in the piping, where static pressure is lowest, those bubbles collect. Trapped air reduces heat transfer at the cold plate, starves pumps and corrodes metal.
The design answer is a combination of features: pressurization set from the actual site pressure, automatic air vents at every high point, a microbubble separator on the warm return, and a slow fill that pushes air out branch by branch. A data center liquid cooling pump on any loop that is open to atmosphere, such as a tower basin or an immersion tank vent, also has less suction margin at altitude, so net positive suction head available is calculated at site pressure. Two-phase fluids, whose boiling point depends on pressure, need the same care: a vented tank or evaporator at about 84 percent of sea-level pressure boils at a lower temperature than a datasheet written for one atmosphere states, and the vendor’s altitude guidance applies.
Types of data center liquid cooling for Colorado halls
The types of data center liquid cooling used in Colorado halls are the same as elsewhere, but the climate changes which one pays back best and what the building has to provide for each. A data center liquid cooling system based on cold plates suits new high-density rows; rear-door coils suit densifying an existing air-cooled hall; immersion suits purpose-built rooms with structural capacity for heavy tanks.
| Option | What it cools | Colorado considerations | Building work involved |
|---|---|---|---|
| Direct-to-chip cold plates with CDUs | Processors and accelerators; remaining heat to room air | Warm supply water allows dry cooler rejection most of the year | Facility water mains, CDU pads, row manifolds, leak detection |
| Rear-door heat exchangers | The full rack exhaust air | Supply above room dew point; dry winter air lowers condensation risk | Chilled or tempered water to each rack, condensate monitoring |
| Single-phase immersion | Whole servers in dielectric fluid | Tank vents at site pressure; heavy floor loads | Slab capacity, fluid storage, secondary loop to dry coolers |
| Two-phase systems | Chips or tanks through boiling fluid | Boiling point shifts with lower ambient pressure | Vapor management, vendor altitude review, refrigerant-style piping |
| Liquid-to-air CDUs | Small numbers of liquid-cooled racks | Rejects into room air, so the air plant still carries the heat | Minimal piping; adequate CRAH capacity at altitude |
Reading a data center liquid cooling diagram for a Colorado hall
A data center liquid cooling diagram for a Front Range hall usually shows three loops. The technology cooling loop runs from the CDU to the cold plates and stays inside the white space, filled with treated water or a glycol mix. The facility water loop runs from the CDU’s heat exchanger to the plant and carries heat outdoors or to a heat recovery exchanger. The outdoor loop, where dry coolers are used, carries glycol and is separated from the facility loop by a plate exchanger so freeze protection stays outside. Each boundary is a place where ownership, water quality and pressure ratings change, and the diagram should mark all three.
Fill water and coolant chemistry on Front Range supplies
Fill water for a Colorado technology cooling loop needs treatment before it goes in, because Front Range potable water carries chloramine disinfectant and a hardness that changes through the year. Denver Water describes its supply as 100 percent surface water from mountain snow runoff, disinfected with chloramines, and soft to moderately hard depending on season and collection system. Cold plates have fine channels and mixed metals, so the loop is filled with deionized or reverse osmosis water and a corrosion inhibitor package, or a premixed glycol coolant, as the IT vendor specifies.
Data center liquid cooling system maintenance then centers on that chemistry: monthly or continuous checks of conductivity, pH, inhibitor level and glycol percentage, filter differential pressure, and particle and bacteria counts. Paul Industries supplies and installs the makeup water treatment as part of the loop, and the ultrapure water systems in Colorado page covers the purification equipment in more depth.
Heat reuse through a Colorado winter
Heat reuse makes more sense in Colorado than in most data center markets because the heating season is long and the return water from a warm-water loop is hot enough to use. Return water in the 95 to 104 degree range heats office space through low-temperature coils or radiant floors, melts snow on walks and loading docks, and preheats domestic water. With a heat pump in the loop, the same heat reaches temperatures suitable for older hot water heating systems.
Reuse needs a customer for the heat. On a single-building campus it is the office and support space; on a mixed-use site it may be a neighboring building or a district loop. Paul Industries designs the heat recovery exchanger, isolation and controls so that the IT loop always has a guaranteed rejection path when the heating load disappears in summer.
Densifying existing halls while new campuses wait
Liquid cooling has become a practical way to add computing in Colorado without a new building, because several Front Range jurisdictions paused or capped new data centers in 2026. Denver stopped accepting applications for new primary-use data centers and expansions from May 21, 2026 to May 21, 2027 while letting existing and permitted facilities continue; Longmont capped data center energy use at 5 percent of the regional grid or 100 MW; and Broomfield paused data centers of 10 MW or more for 18 months. In that climate, a data center with liquid cooling added to existing rows adds density inside a building that already has its approvals.
The constraint then becomes power and the existing plant. Liquid cooling colocation upgrades usually start with a survey of electrical capacity, floor loading, the chilled water plant’s ability to supply warmer water, and pipe routes through the live hall. Where utility capacity is the limit, the energy saved by retiring air-side fans and running warmer water frees some of the service for IT load. Xcel’s April 2026 large-load tariff filing at the Colorado PUC, covering loads of 50 MW or more, adds to the case for wringing more computing out of every contracted megawatt.
Startup and acceptance of a Colorado liquid loop
Startup of a liquid loop in Colorado follows a fixed sequence, and each step produces a record the owner keeps. Data center liquid cooling piping is pressure tested before insulation, flushed until filters stay clean, filled with treated water or coolant, and degassed before any server connects. Leak detection is tested by wetting each sensor, and CDU pumps are failed over under load to confirm redundancy.
| Step | What is done | Colorado-specific check | Record delivered |
|---|---|---|---|
| Pressure test | Hydrostatic or pneumatic test of mains, headers and manifolds | Test gauge readings logged against site barometric pressure | Signed test report with hold times |
| Flush and clean | High-velocity flush through temporary strainers | Flush water treated to avoid chloramine and hardness deposits | Filter inspection log and water samples |
| Fill and degas | Slow fill with treated water or coolant, venting at high points | Pressurization set from site pressure; microbubble separator confirmed | Fill volume, coolant analysis, vent log |
| Freeze protection | Glycol concentration verified on outdoor loops | Concentration matched to the site’s coldest design night | Refractometer readings by circuit |
| Leak detection | Each sensor wetted and alarm traced to the monitoring system | Drip trays under manifolds above live equipment | Point-to-point alarm checklist |
| Integrated failover | Pump, CDU and power failover under simulated IT load | Dry cooler and chiller handover tested in cold and warm modes | Trend data and pass or fail sheet |
Startup ties into the wider commissioning plan described on the data center commissioning in Colorado page, which carries the loop through integrated systems testing with the electrical plant.
What does a liquid-cooled row cost in Colorado?
Data center liquid cooling cost in Colorado depends on the number and capacity of CDUs, the length and material of facility water mains, the heat rejection route, the work needed inside a live hall, and whether heat recovery is included. Running cost is where warm-water designs earn their keep: at Colorado’s 2025 average industrial electricity price of 9.02 cents per kilowatt-hour (EIA), every 100 kilowatts of continuous fan, pump or compressor power removed from the cooling plant is worth about $79,015 a year. Retiring air-side fans and chiller hours is how a liquid loop pays back.
Paul Industries prices liquid cooling from the rack count and heat load per rack, the IT vendor’s W class and coolant specification, drawings of the hall and plant, and the planned phasing, and shows CDUs, piping, heat rejection, controls and commissioning as separate lines.
Who provides liquid cooling for data centers along the Front Range?
Paul Industries provides liquid cooling for data centers along the Front Range and across Colorado. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey, then Pennsylvania, the company takes data center work across Colorado and in all 50 states. Among data center liquid cooling providers, it carries the whole scope under one contract: it designs the loops, selects CDUs and dry coolers at site elevation, prefabricates headers and manifolds off site, installs and pressure tests the piping, fills and treats the loops, and services the system after turnover. Owners choose supply-only delivery of CDUs and manifolds, design-build from a rack density and W class, or complete installation.
The same approach runs through the company’s work in its headquarters state on data center liquid cooling in Virginia and in seismic California on data center liquid cooling in California. In Colorado, liquid loops connect to the plants described on data center cooling in Colorado, to the chillers maintained under chiller repair in Colorado, and to the full mechanical scope on data center mechanical contractor in Colorado.
Paul Industries on Colorado liquid loops
Paul Industries builds data center liquid cooling solutions for Colorado that run warm, reject heat to dry air whenever the weather allows, survive the coldest nights and return useful heat to the building. Facility piping follows the practices on the process piping in Colorado page, and the state overview sits on the Colorado hub and the Southwest page. Send rack counts, densities and the IT vendor’s cooling specification, and request a quote.
Standards referenced: ASHRAE TC 9.9 liquid cooling classes (W17 to W+) · ASHRAE Thermal Guidelines for Data Processing Environments · ASME B31.9 Building Services Piping · ANSI/ASHRAE Standard 90.4 · 2021 International Mechanical Code
Frequently asked questions
Who installs liquid cooling for dense racks in Denver and Aurora?
Paul Industries installs CDUs, row manifolds, rear-door coils and facility water piping for dense racks in Denver and Aurora data halls, including live colocation suites. Work in an operating hall is phased by row, with hot work controls, drip protection and pressure testing before any server connects. Call 201-450-8280 or request a quote with rack counts and drawings.
Does Paul Industries build liquid cooling for research computing in Boulder and Golden?
Yes. Paul Industries designs and installs warm-water liquid loops, CDUs and dry cooler heat rejection for research computing rooms in Boulder, Golden and the rest of the northern Front Range. Where a building can use the heat, the design adds a heat recovery exchanger and controls so return water warms offices or laboratories in winter while the IT loop keeps a guaranteed rejection path.
Who does liquid cooling for data centers at Colorado Springs elevations above 6,000 feet?
Paul Industries does liquid cooling for data centers in Colorado Springs, from single high-density rows to full halls. The city sits a little higher than Denver, so dry coolers, pumps on vented systems and two-phase equipment are all checked against lower site pressure. Loops are filled with treated water, degassed carefully and tested under load before turnover.
Are data centers liquid cooled in Colorado today?
Some are, mainly high-performance and research computing and newer high-density rows, while most enterprise and colocation space is still air cooled. The National Laboratory of the Rockies in Golden runs a warm-water liquid-cooled computing center with no compressor cooling. As rack densities rise, owners add cold plate rows or rear-door coils to existing halls rather than replacing the air plant.
Data center liquid cooling vs air cooling: which uses less water in Colorado?
A warm-water liquid loop rejecting to dry coolers usually uses the least water, because the warm supply temperature lets dry air do the work for most of the year. Air-cooled halls served by evaporative towers use the most. Air-cooled halls on air-cooled chillers use little water but more electricity. Liquid cooling therefore helps an owner meet both a water figure and an energy target.
Do data centers use liquid cooling with dry coolers in Colorado winters?
Yes, and winter is when dry coolers work best. The concern is freezing, not capacity. Outdoor loops carry inhibited propylene glycol at a concentration matched to the coldest design night, a plate heat exchanger keeps glycol out of the technology loop, and controls modulate fans and bypass valves so the water is never overcooled. Low-temperature alarms protect every circuit.
Why does altitude matter for a data center liquid cooling pump?
Any pump drawing from a surface open to atmosphere, such as a tower basin or vented tank, has less net positive suction head available at Colorado elevations, because atmospheric pressure is lower. A pump that is fine at sea level can cavitate on the same duty here. Closed loops are pressurized, but their pressurization setpoint and air vents still need to account for site pressure.
Can liquid cooling heat warm buildings in a Colorado winter?
Yes. Return water from a warm-water loop reaches the mid-90s to low 100s Fahrenheit, which suits low-temperature heating coils, radiant floors and snow melt. The Golden laboratory uses its computing heat as its building’s primary heat source and has shared surplus with other buildings. A heat pump lifts the temperature further for older hot water systems.
Why can't Denver tap water fill a cold plate loop directly?
Denver’s potable water carries chloramine disinfectant and a hardness that shifts with the season, and both attack or clog the fine channels in cold plates. The loop is therefore filled with deionized or reverse osmosis water plus a corrosion inhibitor, or with a premixed glycol coolant, following the IT vendor’s specification. The fill water treatment is supplied and installed with the loop.
How is a data center liquid cooling leak detected and contained?
Rope or spot sensors run under manifolds, CDUs and quick disconnects, with drip trays wherever piping passes over live equipment. Sensors report to the monitoring system and, on many designs, close isolation valves on the affected branch. During startup each sensor is wetted and its alarm traced end to end. Flow and pressure trends on each CDU flag slow losses before they show as water on the floor.
What separates data center liquid cooling companies on a Colorado project?
Look for selections checked at site elevation, freeze protection on every outdoor circuit, a documented fill water treatment plan, pressure and flush records for every section, and one contract that covers CDUs, piping, heat rejection and service. Paul Industries carries all of those under a single scope, from design through startup and maintenance.
Can a Colorado colocation hall add liquid-cooled rows without new building approvals?
Adding liquid-cooled rows inside an existing, permitted hall usually proceeds under mechanical and electrical permits for the work, which is why densification is attractive while new campuses face moratoria. Each jurisdiction decides whether a scope counts as an expansion, so Paul Industries confirms the permit path with the building department before design is finalized.
How often does a liquid loop in Colorado need maintenance?
Coolant chemistry is checked monthly or monitored continuously, filters are inspected when differential pressure rises, glycol concentration on outdoor loops is verified before each winter, and pumps and CDUs follow the manufacturer’s service intervals. Annual work includes a full coolant analysis, valve exercising, leak detection testing and a review of trend data for slow losses.
What data center liquid cooling technologies suit an immersion room at altitude?
Single-phase immersion tanks with a secondary water loop to dry coolers suit Colorado well, provided tank vents, fluid expansion and pump suction are checked at site pressure. Two-phase immersion relies on fluid boiling, and lower ambient pressure lowers the boiling point, so the vendor’s altitude guidance governs. Floor loading and fluid storage are reviewed for every immersion room.
Can rear-door heat exchangers run cooler in a dry Colorado hall?
Often, yes. A rear-door coil must stay above the room dew point to avoid condensation, and Colorado indoor air is dry for most of the year, so the dew point limit sits low. That allows a cooler supply and more heat removed per rack. Dew point sensors in each zone keep the supply temperature above the limit on humid days and in halls that bring in outside air.
Does Paul Industries sell CDUs and manifolds for Colorado projects as a supply-only order?
Yes. Paul Industries supplies CDUs, row manifolds, prefabricated headers and dry coolers selected for site elevation, with pressure test records and documentation for the installer of record. Design-build and complete installation are offered on the same equipment, with startup, fill, degassing and failover testing included.
What information starts a liquid cooling estimate for a Colorado hall?
Send rack counts and heat load per rack, the IT vendor’s W class and coolant specification, drawings of the hall and existing plant, electrical capacity, floor loading, the site elevation, water source and any heat reuse opportunity, and the phasing plan. Paul Industries uses that to size CDUs and heat rejection and prices each part separately.
How does data center liquid cooling work alongside an existing chilled water plant?
A CDU’s heat exchanger connects to the building’s chilled water or condenser water loop and isolates the technology loop. Where the plant can supply warmer water to the CDUs than to the CRAHs, a separate warm-water header or blending station serves the liquid rows. That lets the chillers run at higher efficiency and opens more economizer hours in Colorado’s dry climate.
Bringing high-density racks into a Colorado data hall?
Send rack counts, heat per rack, the IT vendor’s cooling specification and drawings of the hall. Call 201-450-8280 or request a quote.