Paul Industries designs, builds and services data center cooling in Hawaii, from chilled water plants and cooling towers for halls in Honolulu and Kapolei to dry cooler and liquid loops for server rooms on Maui, Kauai and Hawaii Island, engineered for a climate that never offers a cold night. An island data hall rejects heat into warm, humid, salty air every hour of the year, buys power at the top of the national price table and waits on ocean freight for every spare part. Paul Industries supplies, installs, starts up and maintains cooling plants that answer all three conditions.
Request a quote or call 201-450-8280
What does data center cooling in Hawaii have to solve?
Data center cooling in Hawaii has to solve four problems at once: steady heat with no winter relief, outdoor air that always carries moisture, commercial electricity at about 2.7 times the national average, and an equipment supply chain that runs across the Pacific. A mainland designer can lean on cold months, cheaper power or a parts warehouse in the same state. A Hawaii designer gets none of those, so the plant has to be efficient in every hour, tolerant of salt, and built from parts the owner can keep on the shelf.
The general methods of moving heat out of a data hall, from CRAH galleries to cold plates, are set out on the national data center cooling systems page. The sections below stay with what is particular to the islands: the weather by the hour, the water, the power, the refrigerant rules as they land in Hawaii, and the way an island site changes how a plant is built and serviced.
Are there data centers in Hawaii, and where are they?
Hawaii has a working data center market, concentrated on Oahu, where carrier-neutral colocation, cable landings and most enterprise IT sit. DRFortress runs a 65,000 square foot colocation facility in Honolulu that has served customers since 2006, and AlohaNAP operates a carrier-neutral interconnection hub in Kapolei with access to the trans-Pacific submarine cable network. On Maui, the Maui High Performance Computing Center, established in 1993, is one of the five Department of Defense Supercomputing Resource Centers and is managed by the University of Hawaii for the Air Force Research Laboratory.
Data centers on Oahu and the neighbor islands
Beyond those named facilities, banks, hospitals, utilities, state and county agencies, the university system and military commands run server rooms and small halls inside larger buildings across the islands. Those rooms are where much of the cooling work happens: an aging CRAC fleet, a chiller that also serves the office tower above, or a rack row that has outgrown air cooling. Both operator sites describe their buildings as sitting outside flood and tsunami zones, which is a reminder that siting and elevation are part of the cooling conversation on an island.
Hawaii weather by the hour: why outside air rarely cools a data hall
Hawaii weather offers almost no free cooling to a data hall, because the NOAA hourly normals for Honolulu never drop below 68.2 degrees Fahrenheit and the normal dew point never drops below 61.5 degrees. Honolulu records zero heating degree days in a normal year and 4,767 cooling degree days, and its hourly normals sit at or above 80 degrees for 2,325 of the year’s 8,760 hours. Hilo is cooler but wetter, Kahului on Maui logs about 39 days a year at or above 90 degrees, and Lihue on Kauai holds a dew point at or above 68 degrees for 3,926 hours a year.
The dew point is the number that matters for an air-side economizer. Air entering a data hall at a 65 degree dew point has to be dried before it reaches the servers or it brings condensation risk to any surface held below that temperature, and drying it takes mechanical cooling. That is why an economizer cycle that runs thousands of hours a year in Oregon or Virginia earns very little in Honolulu, and why Hawaii plants are built around efficient compressors and warm water loops instead.
| Station | Coolest hourly normal | Warmest hourly normal | Dew point range | What it means for the cooling plant |
|---|---|---|---|---|
| Honolulu, Oahu | 68.2 F | 87.4 F | 61.5 to 68.9 F | No economizer season; size heat rejection for about 31 days a year at or above 90 F |
| Kahului, Maui | 65.5 F | 86.9 F | 60.2 to 68.7 F | About 39 days a year at or above 90 F; condensers sized for hot afternoons |
| Hilo, Hawaii Island | 65.1 F | 82.6 F | 58.3 to 70.3 F | Milder air but over 120 inches of rain a year; enclosures and electrical gear need sealing |
| Lihue, Kauai | 67.3 F | 83.9 F | 60.9 to 70.7 F | Dew point at or above 68 F for 3,926 hours; latent load dominates any outside air system |
Which cooling plant suits a Hawaii data hall?
The cooling plant that suits a Hawaii data hall depends on the rack density, the water available at the site and how much floor and roof the building offers, but nearly every good island design shares one feature: it runs the chilled or facility water as warm as the IT equipment allows. Warmer water raises chiller efficiency, shrinks the hours a compressor must run at all, and opens the door to dry coolers that need no makeup water.
Data center cooling requirements in the islands are set by the same server inlet envelopes as anywhere else, so the plant choice is about how cheaply and reliably that envelope is held. The table compares the arrangements Paul Industries builds for Hawaii rooms.
| Arrangement | Where it fits in Hawaii | Strengths on an island | What to plan for |
|---|---|---|---|
| Water-cooled chillers with cooling towers | Larger Oahu halls with a reliable water supply | Lowest compressor energy in humid heat; towers reject to wet bulb | Makeup water, treatment and blowdown; salt-tolerant tower materials |
| Air-cooled chillers with coated coils | Rooms with roof space and limited water | No tower water; simpler permitting and service | Higher compressor energy on 90 F afternoons; coil coatings and stainless hardware |
| Warm water loop with dry coolers and trim chiller | Liquid-cooled racks and new high-density rows | Dry coolers carry most of the year with W32 or warmer water; no evaporation | Large coil area; a trim chiller for the hottest hours |
| CRAC units with pumped refrigerant or DX | Small enterprise rooms in office and hospital buildings | Compact; no central plant required | Refrigerant rules for new units from 2027; condenser corrosion |
| Chilled water from a building central plant | Server rooms inside towers, campuses and hospitals | Uses existing chillers and towers | A dedicated loop or heat exchanger so office setpoints do not starve the IT load |
Liquid-cooled racks change the picture most, because a cold plate loop can accept facility water well above anything Honolulu’s air reaches, and the detail of those loops is covered on the data center liquid cooling in Hawaii page.
Heat rejection beside the ocean: salt air, coils and towers
Heat rejection equipment in Hawaii lives in marine air, so coils, fins, fasteners, fan motors and tower structures corrode faster than the same equipment inland on the mainland. Uncoated aluminum fins on an air-cooled chiller or dry cooler near the shore lose capacity as corrosion opens gaps between fin and tube, and the loss shows up as a slow rise in condensing pressure and compressor power that is easy to miss until a hot afternoon trips the machine.
Paul Industries specifies factory coil coatings or coated fin stock, stainless steel fasteners and brackets, sealed electrical enclosures and stainless or fiberglass tower components for island sites, and it sets coil cleaning with fresh water into the maintenance plan. Rooftop equipment is anchored for the wind loads the county building official applies, and every unit is laid out so a coil, fan or pump comes out without a crane where the roof allows it. The data center cooling towers page goes deeper on tower selection and fill.
Water for cooling towers on Oahu
Water for cooling towers on Oahu comes from the Board of Water Supply’s potable system or, in the Ewa and Campbell Industrial Park area, from recycled water. The Board’s Honouliuli Water Recycling Facility in Ewa, opened in August 2000, produces R-1 recycled water for irrigation and reverse osmosis recycled water for industrial users, and is designed for 12 million gallons a day. The Board lists cooling towers among the common uses of recycled water.
A rough rule helps size the question: evaporating one pound of water removes about 1,000 Btu, so a tower rejecting one megawatt of heat purely by evaporation consumes roughly 3,400 pounds, about 410 gallons, an hour before blowdown is counted. At Kalaeloa, also in Campbell Industrial Park, the Board and its developer are developing a reverse osmosis seawater desalination plant planned for 1.7 to 2.55 million gallons a day, with the construction notice to proceed anticipated in fall 2026. Paul Industries designs tower water treatment around whichever source the site uses, and the cooling tower water treatment page explains the chemistry.
Can cold seawater cool a data center in Hawaii?
Cold seawater is a real cooling resource in Hawaii, because deep ocean water around the islands is far colder than any cooling tower can produce. At the Hawaii Ocean Science and Technology Park in Kailua-Kona, run by the state’s Natural Energy Laboratory of Hawaii Authority, pipelines bring cold deep seawater ashore from depths of 2,000 feet and more, alongside warm surface seawater, for tenants across the 870-acre park.
A data hall on a site with access to that kind of supply can cool its facility water through a titanium plate heat exchanger and run compressors only as backup. Most halls are not on such a site, and a new deep water intake is a major marine project, so for the typical Honolulu building the realistic gains come from warmer water setpoints, efficient chillers and liquid cooling. Paul Industries engineers the plate exchangers, isolation and backup chillers where a seawater supply exists.
How are data centers kept cool when power costs this much?
Data centers in Hawaii are kept cool by plants designed to spend as few kilowatt-hours per kilowatt of IT load as the climate allows, because commercial electricity in Hawaii averaged 36.31 cents per kilowatt-hour in 2025 against 13.37 nationally, according to the EIA. The EIA’s state profile ranks Hawaii first among the states for average retail price, and petroleum remains the state’s primary energy source for generation even as the utilities work toward the 100 percent renewable standard the Public Utilities Commission enforces for 2045.
The gap turns small efficiency points into large sums. A one megawatt IT hall that runs at a power usage effectiveness of 1.40 instead of 1.25 burns an extra 0.15 megawatt around the clock, or 1,314,000 kilowatt-hours a year. At the 2025 Hawaii commercial average that costs about $477,100 a year; at the national figure it would be about $175,700. Variable speed pumps and fans, oil-free or magnetic bearing compressors, warmer water and tight containment all pay back faster in the islands than on the mainland.
Power comes from Hawaiian Electric on Oahu, Hawaii Electric Light on Hawaii Island, Maui Electric on Maui, Lanai and Molokai, and the Kauai Island Utility Cooperative on Kauai, each with its own interconnection and service process for large loads and standby generation.
Refrigerant rules for data center cooling equipment in Hawaii
Refrigerant rules for data center cooling equipment in Hawaii are federal, set by the EPA under the AIM Act, and they bite on two dates. New systems for data centers, computer room air conditioning and IT equipment cooling must use refrigerant with a global warming potential of 700 or less from January 1, 2027, and stand-alone comfort cooling chillers have carried the same 700 limit since January 1, 2025.
The leak repair rule in 40 CFR 84.106 has applied since January 1, 2026 to equipment holding 15 pounds or more of an HFC or a substitute above a GWP of 53. Comfort cooling and other equipment must be repaired once leaks pass 10 percent a year, with a leak rate calculated each time refrigerant is added and repairs due within 30 days. In Hawaii, where a replacement charge and the parts to fix a leak both arrive by sea, keeping a machine tight is a cost question as well as a compliance one. Paul Industries keeps the leak records and plans retrofits or replacements around both dates.
Codes, permits and inspections for a Hawaii cooling plant
Codes for a Hawaii cooling plant come from two levels: the State Building Code Council’s current state codes, which list the 2018 International Building Code, the 2018 International Energy Conservation Code and the 2018 Uniform Plumbing Code, and the county building departments in Honolulu, Maui, Kauai and Hawaii counties that issue permits and may update their own codes. Under the Governor’s emergency proclamation of September 2025, the council’s ability to update the state codes is suspended, so the county edition in force on the permit date is the one the plant is checked against.
Pressure equipment adds a state permit path. The Boiler and Elevator Inspection Branch of HIOSH administers Hawaii’s Boiler and Elevator Safety Law, which covers boilers, pressure vessels and pressure systems; the branch reviews plans for new installations, repairs and modifications and issues permits to operate. Buffer tanks, air separators and compressed air receivers on a data center campus are checked against those rules during design. Refrigeration machinery rooms follow ASHRAE 15, and hydronic piping is built and tested to ASME B31.9.
Building a cooling plant for an island site
A cooling plant for an island site is built so that most of the welding, assembly and pressure testing happens before the equipment leaves the fabrication floor. Paul Industries prefabricates pump skids, header assemblies and pipe spools, tests them, labels them to the isometric drawings and crates them in the order they will be installed, so the work inside an operating Honolulu building is mostly setting and bolting.
| Item | Why it matters in Hawaii | How Paul Industries handles it |
|---|---|---|
| Standardized pumps, valves and drives | One spare fits many positions when parts arrive by sea | Common models across the plant and a stocked spares list at turnover |
| Prefabricated skids and spools | Less hot work and shorter outages in occupied buildings | Fabricated, pressure tested and packed in installation order |
| Corrosion protection | Marine air on every site, volcanic emissions on Hawaii Island | Coated coils, stainless hardware, sealed enclosures, coating touch-up in the service plan |
| N+1 or 2N redundancy | A failed compressor waits for parts; redundancy carries the load meanwhile | Redundancy chosen with the owner and proven during commissioning |
| Metering | Every kilowatt is expensive; savings must be proven | Power and thermal meters on chillers, pumps and heat rejection |
| Water source plan | Potable, recycled or seawater supply changes treatment | Treatment designed to the source; blowdown and makeup metered |
Startup and functional testing follow the plan described on the data center commissioning in Hawaii page, and the whole mechanical package, from yard piping to generator cooling, is described on the data center mechanical contractor in Hawaii page.
Siting a data center: Hawaii flood zones, elevation and the cooling yard
Siting a data center in Hawaii puts the cooling yard into the flood and tsunami conversation from the first sketch, because chillers, pumps, switchgear and generator fuel systems are the parts of the plant most often placed at grade. Both Oahu operators named above describe their buildings as outside flood and tsunami zones, and an owner adding capacity to an older building in a mapped zone has to decide early where the new equipment can sit above the design flood elevation the county applies.
Paul Industries lays out island cooling yards with pumps and electrical gear raised on steel platforms where the site requires, condenser equipment kept upwind of generator exhaust and cooling tower drift, and piping routed so that a flooded pit never cuts off chilled water to the hall. On a roof, the same review covers wind uplift, drainage around curbs and service access for coil and fan replacement.
Retrofitting a data center: Honolulu office towers and older server rooms
Retrofitting a data center inside a Honolulu office tower or hospital usually means replacing an aging CRAC fleet, separating the IT cooling from a building chilled water system that resets warmer at night, or adding liquid cooling to a few dense racks without rebuilding the room. Paul Industries surveys the existing loops, flows and electrical capacity, then phases the work so each rack row keeps cooling throughout, with temporary units connected where redundancy is thin.
Hawaii data centers that began as a corner of an office floor often take their chilled water from the building plant through a single pair of risers. A dedicated plate heat exchanger or a small packaged chiller gives the IT load its own setpoint and its own backup, which is often the most valuable change in an older room.
What does data center cooling cost in Hawaii?
The cost of data center cooling in Hawaii is set by the IT load and density, the redundancy target, the plant type, the building’s structure and access, and the island premium on freight and installation in an occupied building. A plant for a 200 kilowatt enterprise room and a plant for a multi-megawatt colocation hall share almost nothing in price, so a figure without the load and redundancy attached would mislead.
Operating cost deserves equal weight. At 2025 Hawaii commercial prices, each continuous kilowatt of cooling overhead costs about $3,180 a year, so a design that trims 100 kilowatts of pump, fan and compressor power saves roughly $318,000 annually. Paul Industries prices efficiency options beside the base plant so the owner sees installed cost and ten-year energy cost together, then fixes the price once the scope is settled.
Who installs data center cooling in Hawaii?
Paul Industries installs data center cooling in Hawaii, designing and building chilled water plants, cooling towers, dry cooler loops, coolant distribution piping and CRAH systems for colocation halls, enterprise rooms, research computing and government facilities on Oahu, Maui, Kauai and Hawaii Island. The work runs under one contract from engineering through fabrication, installation, pressure testing, startup and service, with one set of drawings and records.
Owners comparing approaches can look at how the same service is shaped by a very different climate on the data center cooling in Florida page, where humidity also rules, and by a cooler marine climate on the data center cooling in California page. The West Coast page covers the wider Pacific region.
Data center cooling work from Paul Industries in Hawaii
Paul Industries delivers Hawaii data center cooling as supply-only equipment and prefabricated skids, as a design-build package, or as complete installation of an owner’s engineered design, followed by maintenance, coil cleaning, water treatment checks and repair for the life of the plant. Chiller service for existing rooms is covered on the chiller repair in Hawaii page, and makeup and fill water for liquid loops on the ultrapure water systems in Hawaii page.
Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, the base for its data center cooling in Virginia work, and it takes projects across Hawaii, in all 50 states and abroad. The Hawaii page lists the full range of plant work on the islands. To start, send the IT load and density, the island and building, the water source and the redundancy target, or request a quote.
Standards referenced: ASHRAE TC 9.9 thermal guidelines and liquid cooling classes · ASHRAE 15 · EPA Technology Transitions rule (40 CFR Part 84, Subpart B) · EPA leak repair rule, 40 CFR 84.106 · 2018 International Energy Conservation Code (Hawaii state energy code) · 2018 International Building Code (Hawaii state building code) · 2018 Uniform Plumbing Code · Hawaii Boiler and Elevator Safety Law and HAR Title 12, chapters 220 to 225.1 · ASME B31.9 · ASME Boiler and Pressure Vessel Code Section VIII
Frequently asked questions
Who installs cooling for data centers in Honolulu or a Kapolei data center?
Paul Industries installs cooling plants for data rooms and colocation halls in Honolulu, Kapolei and the rest of Oahu, including chilled water plants, cooling towers, dry coolers and CRAH systems. Oahu holds the state’s carrier-neutral facilities and cable landings, so most dense IT load sits there. Send the IT load, the building and the redundancy target, and Paul Industries returns a plant layout and a budget figure.
Does Paul Industries cool server rooms and research computing on Maui?
Paul Industries designs and builds cooling for server rooms and computing facilities on Maui, from Kahului to Kihei. Kahului’s normals show about 39 days a year at or above 90 degrees Fahrenheit, so condensers and dry coolers there are sized for the heat. Equipment is coated for salt air and laid out for service from the roof or the yard.
Who handles data center cooling in Hilo, Kona and Lihue?
Paul Industries handles data center cooling on Hawaii Island and Kauai, in Hilo, Kona and Lihue. Hilo is milder but receives over 120 inches of rain a year, so electrical enclosures and condenser sections need sealing, while Lihue’s air holds a dew point at or above 68 degrees for nearly 4,000 hours a year. Plants are prefabricated and tested before shipment, then set and connected on site.
How many data centers are in Hawaii?
Hawaii’s commercial colocation market centers on Oahu, with a large carrier-neutral facility in Honolulu and an interconnection hub in Kapolei, plus a Department of Defense supercomputing center on Maui. Beyond those, banks, hospitals, utilities, government agencies and the university system run server rooms inside their own buildings across the islands. Paul Industries cools both the dedicated halls and the rooms tucked into larger buildings.
Where are data centers in Hawaii usually located?
Data centers in Hawaii cluster on Oahu, in Honolulu’s business districts and in Kapolei on the Ewa plain, where the submarine cable landings and the densest power and fiber networks are. Operators describe their buildings as sitting outside flood and tsunami zones, which shapes where chillers, pumps and generators go on a site. Neighbor island rooms tend to serve government, hospitals and the university.
Will there be data centers in Hawaii beyond today's Oahu facilities?
Growth in Hawaii depends on power, water and land more than on demand, since every new megawatt of IT load needs an interconnection from the island utility and a plan for heat rejection in a climate with no winter. Any new hall will face the 2027 refrigerant limit for data center cooling equipment. Paul Industries prices cooling plants for new halls and expansions as soon as the load and site are known.
How much cooling does a Hawaii data hall need compared with a mainland one?
A Hawaii data hall needs the same capacity to remove its IT heat as a mainland hall, since servers produce the same heat anywhere, but it runs that capacity mechanically for far more hours. Honolulu has zero heating degree days in a normal year, so there is no season when outside air does the work. Plants are therefore sized with redundancy and efficiency in mind for continuous duty.
Is an air-side economizer worth building for a Honolulu data center?
An air-side economizer earns very little in Honolulu, because the hourly normal dew point never drops below 61.5 degrees Fahrenheit and outside air must be dried before it reaches the servers. Drying it takes the same compressors the economizer was meant to rest. A warm water loop serving liquid-cooled racks or rear door coils gives a far better return on Oahu.
Can a data center cooling tower on Oahu use recycled water?
A cooling tower on Oahu can use recycled water where the Board of Water Supply’s network reaches the site, mainly around Ewa and Campbell Industrial Park. The Honouliuli facility produces R-1 water and reverse osmosis recycled water for industrial users, and the Board lists cooling towers among the common uses. Paul Industries designs the treatment, filtration and blowdown control around the recycled supply.
Which refrigerants can new data center cooling units in Hawaii use?
From January 1, 2027, new data center, computer room and IT equipment cooling systems in Hawaii must use refrigerants with a global warming potential of 700 or less, under the EPA Technology Transitions rule. Stand-alone comfort chillers have been under the same 700 limit since January 2025. Paul Industries selects equipment that meets the limit for the install date and records the refrigerant data for the owner.
What does the 2026 EPA leak repair rule mean for a Hawaii CRAC or chiller?
The EPA leak repair rule applies from January 1, 2026 to units holding 15 pounds or more of an HFC refrigerant. Owners calculate a leak rate every time refrigerant is added and repair comfort cooling and similar units once leaks pass 10 percent a year, within 30 days. Paul Industries locates and repairs leaks, runs the verification tests and keeps the records the rule expects.
How does salt air affect dry coolers and air-cooled chillers in Hawaii?
Salt air corrodes uncoated aluminum fins, steel fasteners and fan components, and the corrosion opens gaps between fin and tube that cut heat transfer. The result is rising condensing pressure, higher compressor power and eventual high pressure trips on hot afternoons. Coated coils, stainless hardware, regular fresh water rinsing and sealed electrical enclosures keep heat rejection equipment near its rated capacity for far longer.
Does Hawaii's building code require economizers in data centers?
Hawaii’s current state energy code, as listed by the State Building Code Council, is the 2018 International Energy Conservation Code, and the counties administer permits and may adopt their own updates. Economizer and efficiency requirements are checked against the edition the county applies on the permit date. Paul Industries documents the code path for each plant and the efficiency measures that meet it in Hawaii’s climate.
Do chilled water buffer tanks at a Hawaii data center need a state permit?
Hawaii’s Boiler and Elevator Safety Law covers boilers, pressure vessels and pressure systems, and the HIOSH Boiler and Elevator Inspection Branch reviews plans and issues permits to operate for covered equipment. Buffer tanks, air separators and compressed air receivers are checked against those rules during design. Paul Industries supplies ASME vessels with their data reports and prepares the installation paperwork for the branch.
How much water does a data center cooling tower in Hawaii evaporate?
A tower rejecting one megawatt of heat by evaporation consumes roughly 410 gallons of water an hour before blowdown, because evaporating each pound of water removes about 1,000 Btu. Blowdown adds to that depending on the water chemistry and cycles of concentration. Hawaii towers run every hour of the year, so annual use is high, and Paul Industries meters makeup and blowdown so the owner sees it.
Does Paul Industries supply cooling equipment for a Hawaii data center without installing it?
Paul Industries supplies chillers, dry coolers, pump skids, coolant distribution piping and prefabricated spools for Hawaii projects as supply-only packages, tested and crated in installation order. The same packages are offered with design-build or complete installation. Each shipment comes with drawings, test records and a spares list sized for an island site.
What should a Hawaii owner send for a data center cooling quote?
Send the IT load and expected density per rack, the island and building, the existing cooling equipment and its age, the water source, the redundancy target and any growth plan. Recent power bills for the cooling equipment help price efficiency options. Paul Industries returns a budget range from comparable plants and then a firm price once the scope is defined.