Paul Industries designs, builds, starts up and services data center cooling in Montana, from economizer air handlers and dry coolers to chilled water plants and warm-water loops for dense racks, sized to the state’s cold, dry and high-elevation sites. Montana air is cool and dry for most of the year, power prices sit below the national average, and water rights shape every evaporative design. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes data center work across Montana, in all 50 states and abroad.
Request a quote or call 201-450-8280
Why data center cooling in Montana starts with climate, water and power
Data center cooling in Montana has to handle a short, dry summer peak, a long heating season with deep cold, sites at 3,000 to more than 5,000 feet of elevation, and a water law that treats every new evaporative load as an appropriation question. Those four conditions push Montana plants toward free cooling for most hours, toward dry heat rejection or carefully sized evaporation, and toward freeze protection that is designed in rather than added after the first winter.
The national method for sizing a plant, choosing between air and liquid, and laying out chillers, pumps and air handlers is covered on the data center cooling systems page. This page goes into the Montana specifics: the climate numbers for each city, the power and water rules, the projects already announced, and what those facts mean for equipment selection, layout and cost. For a view of the state’s other process industries, see the Montana overview.
Data centers in Montana: announced loads and where they sit
Data centers in Montana are moving from a handful of enterprise rooms toward utility-scale campuses, and NorthWestern Energy’s public announcements give the clearest picture of the loads involved. Each figure below comes from the utility’s own releases; the projects are market facts and remain subject to contracts, permits and regulatory review.
| Announcement | Location | Load stated by the utility | Status in the release |
|---|---|---|---|
| December 19, 2024 | Atlas Power Group data center, Butte | 75 MW beginning in 2026, with up to another 75 MW over the following three to five years | Existing transmission customer; new energy supply service |
| December 17, 2024 | Developer planning new data centers in Montana | At least 50 MW from 2027, growing to 250 MW or more by 2029 | Letter of intent |
| July 30, 2025 | Quantica Infrastructure’s proposed development | Phase 1 of 500 MW, with phased growth to 1 GW | Letter of intent; proposed |
Each of those megawatts of IT load turns into heat that a cooling plant has to reject, so the cooling question scales with the power question. A 75 MW block, for example, needs heat rejection for roughly 75 MW plus the losses in its electrical chain, every hour of the year, and the plant has to stay inside its design limits while new halls come online in phases. Buyers who ask about data centers planned for Montana usually find the answer in these utility filings first, because the power agreement comes before the building permit.
The large new load tariff and the cooling schedule
NorthWestern Energy filed a Large New Load Tariff with the Montana Public Service Commission on March 31, 2026, covering new loads of 5 MW or more, with an electric service agreement that must be reviewed and approved before service for loads above 50 MW. In June 2026 the Governor’s office announced that the Department of Environmental Quality would ask to intervene in the case. For a cooling designer, the tariff matters because demand charges, minimum billing and the size of the approved load all reward a plant with low mechanical power at peak. On a NorthWestern Energy data center, Montana regulators review the committed load, so trimming cooling kilowatts at the hottest hour trims that commitment as well.
How cold, dry and high are Montana data center sites?
Montana data center sites are cold, dry and high by any national comparison: Butte’s airport sits at 5,506 feet and records about 82 cooling degree days in a normal year, while Billings, the warmest of the larger cities, records about 663. Cooling degree days add up how far each day’s mean temperature rises above 65 degrees Fahrenheit, so a low number means few hours when outdoor air is too warm to cool a data hall directly.
| City | Elevation, feet | July normal high / low, F | January normal low, F | Cooling degree days | Heating degree days |
|---|---|---|---|---|---|
| Butte | 5,506 | 81.3 / 45.9 | 7.9 | 82 | 9,129 |
| Helena | 3,828 | 86.1 / 55.1 | 13.5 | 434 | 7,499 |
| Great Falls | 3,664 | 84.3 / 51.4 | 15.0 | 310 | 7,722 |
| Billings | 3,581 | 87.3 / 59.3 | 17.9 | 663 | 6,754 |
| Missoula | 3,192 | 85.4 / 51.5 | 18.0 | 306 | 7,514 |
Two conclusions follow for cooling a data center at these sites. First, night temperatures in July fall into the 40s and 50s, so even the hottest month offers long stretches of full economizer operation, and afternoon peaks are short. Second, heating degree days run between about 6,750 and 9,130, which means the plant spends far more hours protecting coils and piping from freezing than it spends fighting heat. Design data for a specific site should still come from the ASHRAE climatic tables for the nearest station, because the peak hours, not the averages, size the chillers or trim coolers.
Elevation and air density
Air at Butte’s elevation carries about 15 percent less mass per cubic foot than sea-level air in the standard atmosphere, and Billings and Great Falls sit near 10 percent less. Fans therefore move more volume for the same heat removal, coil and fan selections need altitude correction, and air-cooled condensers and dry coolers lose some rated capacity. The correction is routine engineering, but it has to be made on every selection sheet; a catalog rating at sea level overstates what the same box delivers in Butte.
Choosing a cooling plant arrangement for Montana sites
The cooling plant that fits a Montana data hall is usually one that runs on outdoor air or dry coolers for the large majority of hours and carries mechanical cooling only as trim for summer afternoons. The right arrangement depends on rack density, the water available, the site’s elevation and the owner’s appetite for outdoor air inside the white space.
| Arrangement | How it works in Montana | Water use | Main design watch points |
|---|---|---|---|
| Direct air-side economizer with evaporative assist | Outdoor air cools the hall most of the year; adiabatic pads or sprays trim the few hot afternoons | Low, seasonal | Humidification in very dry winter air, filtration for dust and wildfire smoke, freeze-safe dampers |
| Indirect evaporative air handlers | Heat exchanger keeps outdoor air out of the hall; dry and wet modes | Low to moderate | Wet-mode water quality, drainable sumps, altitude-corrected fan selections |
| Dry coolers with trim chillers | Closed glycol loop rejects heat to dry coolers; chillers run only near peak | Close to none | Glycol strength, coil freeze margin, sound, snow drifting around the units |
| Water-cooled chillers with waterside economizer | Towers and plate exchangers carry the load in cool weather; chillers in summer | Highest | Water right and supply, tower freeze protection, blowdown discharge |
| Warm-water liquid cooling to dry coolers | Cold plates or rear doors at high supply temperatures reject heat to dry air nearly all year | Close to none | Loop cleanliness, leak detection, a separate air system for the residual heat |
Halls built for dense racks almost always combine two of these: a warm-water liquid loop for the chips and an air system for the memory, storage and power supplies that remain air cooled. The liquid side is covered in depth on data center liquid cooling in Montana, and the chilled water machines themselves on chiller repair in Montana.
Water rights and data center cooling without water
Water rights decide early whether a Montana data center can cool with evaporation, because state law requires a permit from the Department of Natural Resources and Conservation before anyone appropriates water or builds the works to divert or withdraw it. The statute exempts small wells: outside a stream depletion zone, a well of 35 gallons a minute or less and 10 acre-feet a year or less needs no permit, and inside one the limits drop to 20 gallons a minute and 2 acre-feet.
Ten acre-feet is about 3.26 million gallons a year, or roughly 8,900 gallons a day on average. Rejecting heat by evaporation takes roughly 1,000 Btu for each pound of water, so a single megawatt of heat rejected entirely through a tower evaporates on the order of 410 gallons an hour, close to 9,800 gallons a day, before drift and blowdown are counted. A fully evaporative plant much above one megawatt therefore moves out of the exempt-well range and into the permit process, or onto municipal supply where a city has capacity to sell.
That arithmetic is why data center cooling without water gets serious attention in Montana. Dry coolers and air-side economizers use little or none, and the dry climate lets a small evaporative stage cut peak power without large annual volumes. The statute also exempts nonconsumptive geothermal heating or cooling exchange of up to 350 gallons a minute where all the water returns to the same aquifer and the wells meet spacing conditions, which opens a groundwater option on some sites. Paul Industries sizes the water stage, the makeup and blowdown piping and the treatment together, and the water system that feeds them is covered on ultrapure water systems in Montana where a campus needs treated makeup.
Power prices and the cost of each cooling kilowatt
Power prices in Montana favor efficient cooling less sharply than in high-price states, but the savings still compound at data center scale. The EIA’s 2025 averages put Montana industrial power at 7.03 cents per kilowatt-hour and commercial power at 11.88 cents, against 8.51 and 13.37 nationally.
Each 100 kilowatts of cooling power that runs all year uses 876,000 kilowatt-hours. At the 2025 industrial average that is about $61,600 a year, and at the commercial average about $104,000. A Montana plant that runs on economizer most of the year can keep its annual mechanical energy far below its design peak, and the design work that gets it there pays back each year the campus operates.
Supply is the other half of the power picture. Montana generated about 26.9 million megawatt-hours in 2024 against retail sales of about 15.6 million (EIA), and NorthWestern has participated in the Western Energy Imbalance Market since June 2021. The cooling plant’s contribution is to keep peak demand low and predictable, which helps any large-load agreement and the standby generation sized behind it.
Refrigerants for new Montana data center cooling equipment
Refrigerant limits for new data center cooling equipment tighten on January 1, 2027, when EPA’s Technology Transitions rule caps refrigerant global warming potential at 700 for data center, computer room air conditioning and IT equipment cooling systems. New comfort-cooling chillers have been held to the same 700 limit since January 1, 2025. Equipment selected for a Montana campus that will be installed in 2027 or later needs a compliant refrigerant on the submittal, and machine rooms need ventilation and detection matched to that refrigerant’s safety class under the mechanical code and ASHRAE 15.
Montana adopted the 2024 International Mechanical Code and the 2024 International Energy Conservation Code with state amendments, effective September 26, 2026. The energy code points data center systems to ASHRAE 90.4, which limits the mechanical load component, so the efficiency of the cooling plant is now a permit document as well as an operating cost.
Freeze protection for a Montana cooling plant
Freeze protection for a Montana cooling plant starts from the fact that Butte’s normal monthly low stays below freezing for seven months of the year, and that cold snaps and wind drive equipment far below those averages. Every water-filled component outdoors, and every coil that sees outdoor air, needs a defined answer for the coldest hour.
- Glycol strength set for the site’s extreme low, with the capacity and pumping penalty of the glycol included in the selections.
- Outdoor air dampers that fail closed, mixing sections that prevent stratified cold air reaching coils, and low-limit controls that act before a coil freezes.
- Cooling towers with basin heaters, bypass to the basin in winter, and drainable piping, or a dry-cooler path that removes the tower from winter service.
- Heat tracing and insulation on makeup lines, condensate drains and instrument taps, and enclosures for pumps and valves that must stay accessible in snow.
- Layout that keeps intakes clear of drifting snow and away from generator and boiler exhaust.
Winter is also when an economizer plant works hardest at humidity control, because very cold outdoor air holds little moisture. Humidification energy and water, or a decision to run a wider humidity band as ASHRAE’s thermal guidelines allow, belong in the same design review.
Cooling data centers across Montana’s cities
Cooling data centers across Montana’s cities follows the same physics everywhere, but each place adds its own constraint, from elevation in Butte to summer heat in Billings and valley smoke in Missoula.
Data center: Butte, Montana
Butte is the coldest and highest of the larger sites, with the fewest cooling degree days in the table above. Economizer hours are long, altitude corrections are largest, and winter protection drives the details. The utility announcements tied to Butte make it the most active place for new data hall cooling in the state.
Data center: Billings, MT
Billings has the warmest summers of the five cities and the most cooling degree days, so trim cooling capacity and evaporative assist earn more of their keep there. Industrial water and wastewater infrastructure around the refineries and the sugar plant gives some sites options that a greenfield parcel lacks.
Data center: Great Falls, Montana
On the open plains around Great Falls, prevailing wind direction shapes the yard: it helps dry coolers shed heat in summer and decides where intakes sit and where snow drifts in winter, so air handler and dry cooler layout starts with a wind review.
Data center: Missoula, MT, and the western valleys
Missoula and the western valleys see wildfire smoke in many summers and temperature inversions in winter, which argue for indirect economizers or filtration and controls that can close the outdoor air path quickly when particulate rises.
Data center: Helena, MT
Helena hosts state agency and enterprise rooms more often than hyperscale halls. For those smaller rooms, a data center construction Montana project usually means a chilled water or glycol retrofit inside an existing building, with economizer coils added where the air handling allows.
Data center: Bozeman, MT
Bozeman’s research computing and the optics and software firms around the university tend toward small, dense rooms. Rear-door heat exchangers or a compact glycol loop to a rooftop dry cooler often fit better there than a large air system, and the work has to suit buildings that stay occupied throughout.
Economizer controls that survive a Montana year
Economizer controls in Montana have to switch cleanly among full free cooling, partial free cooling with trim, and full mechanical cooling many times a season, because a dry 85 degree afternoon can follow a 45 degree morning. Poor changeover logic is the usual reason a plant with excellent climate data still runs its chillers more than it should.
Paul Industries writes and tests sequences that lock out mechanical cooling below a defined outdoor condition, stage dry coolers and trim chillers by leaving water temperature rather than by schedule, reset chilled or facility water temperature upward whenever the IT load allows, and protect coils with mixed air and low-limit logic in the cold. Sensors for outdoor temperature and humidity are placed out of direct sun and away from exhaust, and every setpoint is trended during the first full year so the plant can be tuned once the real load arrives.
Running and upgrading cooling in an operating Montana hall
Upgrading cooling in an operating Montana hall is planned around the seasons, because the cool months give spare economizer capacity that summer does not. Chiller replacements, piping tie-ins and controls changes are scheduled for spring and autumn, when outdoor air can carry the load while a machine is out, and winter work is planned around freeze risk on any opened outdoor line. Each step runs under a written method of procedure with redundancy confirmed before isolation, and the result is tested under load before the next step starts. Commissioning of new and modified systems is covered on data center commissioning in Montana.
A data center cooling service contract in Montana covers seasonal changeovers as well as routine maintenance: glycol testing before winter, damper and low-limit checks, tower winterization or startup, filter changes after smoke events, and trend review of economizer hours against design. Paul Industries offers that program alongside installation, so the team that built the plant knows its controls sequences when it services them.
How much does data center cooling cost in Montana?
Data center cooling cost in Montana depends first on the IT load and rack density, then on the plant arrangement, the water path and the amount of mechanical cooling kept for peak hours. A dry-cooler and economizer plant avoids most water infrastructure but needs more coil and fan capacity; a water-cooled plant costs less in heat rejection area but brings towers, treatment, makeup supply and possibly a water right application.
Other drivers are altitude corrections that enlarge fan and coil selections, freeze protection and heat tracing, enclosures and snow management, electrical service for the mechanical plant, temporary cooling during cutovers, and the phasing that matches cooling to the power the utility delivers in each year. Energy is the recurring cost: at Montana’s 2025 industrial average, every 100 kilowatts of cooling power running continuously costs about $61,600 a year. Paul Industries prepares a budget range from comparable scope once load, density and site are known, then a firm price when drawings and the water path are fixed.
Who designs and installs data center cooling in Montana?
Paul Industries designs and installs data center cooling in Montana, covering chilled water and glycol plants, dry coolers, economizer air handlers, cooling towers, warm-water liquid loops, piping, controls integration, testing, startup and service. Work is offered as supply only, design-build, or complete installation, and the same contract can cover the mechanical scope around the plant described on data center mechanical contractors in Montana.
Paul Industries is an East Coast contractor headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work across Montana, the Mountain West and the West Coast, and in every other state. Projects on the East Coast follow the same method, as on data center cooling in Virginia, and northern sites with similar winters are covered on data center cooling in Wisconsin.
Paul Industries on Montana data center cooling
Paul Industries takes Montana data center cooling from the first load and site review through equipment selection, prefabricated piping, installation, freeze protection, testing and startup, then services the plant for the life of the hall. Owners, developers and colocation operators can bring a concept, a design to build, or an operating plant that needs more capacity. More on the sector is on the data centers industry page. Send the IT load, rack density, site and water source and request a quote.
Standards referenced: 2024 International Mechanical Code (Montana adoption, ARM Title 24, Chapter 301) · 2024 International Energy Conservation Code (Montana adoption) · ASHRAE 90.4 · ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASHRAE 15 · EPA Technology Transitions rule (AIM Act) · Montana Water Use Act, MCA 85-2-302 and 85-2-306
Frequently asked questions
Who installs data center cooling for a data center in Butte, Montana?
Paul Industries installs data center cooling in Butte, including dry coolers, economizer air handlers, chilled water and glycol plants and the piping and controls between them. Butte sits at 5,506 feet with about 82 cooling degree days in a normal year, so plants there run on outdoor air or dry coolers most of the time, and the selections carry altitude corrections and freeze protection for winter lows that average below 8 degrees Fahrenheit in January.
Does Paul Industries handle data center cooling in Billings and eastern Montana?
Yes. Paul Industries designs, installs and services data center cooling in Billings, Laurel and across eastern Montana. Billings has the warmest summers of the larger Montana cities, with a July normal high of 87.3 degrees and about 663 cooling degree days, so trim chillers and evaporative assist carry more hours there than in Butte or Great Falls, and the water path deserves early attention.
Who builds data center cooling plants in Missoula, Kalispell and western Montana?
Paul Industries builds data center cooling plants in Missoula, Kalispell and the western valleys. Those sites see summer wildfire smoke and winter inversions, so the plant design often favors indirect economizers or controls that close the outdoor air path when particulate rises, with filters sized for smoke seasons. Paul Industries sizes the air side, the dry coolers and any trim cooling together, then installs, tests and starts the plant.
How many data centers are planned for Montana?
NorthWestern Energy has announced three large data center loads: supply to Atlas Power Group’s Butte data center starting at 75 MW in 2026, a letter of intent with a developer for at least 50 MW from 2027 rising to 250 MW or more by 2029, and a letter of intent for Quantica Infrastructure’s proposed development with a 500 MW first phase. Each depends on contracts, permits and regulatory review, and smaller enterprise and colocation rooms operate across the state.
Does a Montana data center need a water right to run cooling towers?
Usually, once the plant evaporates more than a small volume. Montana requires a DNRC permit to appropriate water, with an exemption for wells of 35 gallons a minute or less and 10 acre-feet a year or less outside stream depletion zones. A tower rejecting one megawatt of heat by evaporation uses roughly 9,800 gallons a day, which already exceeds the exempt annual volume, so larger evaporative plants need a permit or municipal supply.
Can a Montana data center be cooled without cooling towers?
Yes, and many should be. Dry coolers with trim chillers, air-side economizers and warm-water liquid cooling can reject heat with little or no water, and Montana’s cool nights and dry air make them practical for most of the year. A small evaporative stage for summer peaks often lowers mechanical power enough to justify its limited water use. Paul Industries models annual water and energy for each option before the owner commits.
What does NorthWestern Energy's large new load tariff mean for cooling design?
The tariff NorthWestern filed on March 31, 2026 covers new loads of 5 MW or more and adds minimum billing, collateral and, above 50 MW, an electric service agreement reviewed and approved before service. A cooling plant with low peak power reduces the capacity the owner commits to and the demand it pays for, so economizer hours, trim chiller sizing and pump energy become part of the commercial case as well as the engineering.
Which refrigerants can new data center cooling units in Montana use after 2027?
From January 1, 2027, EPA’s Technology Transitions rule limits new data center, computer room air conditioning and IT equipment cooling systems to refrigerants with a global warming potential of 700 or less. New comfort-cooling chillers have had the same limit since January 1, 2025. Equipment ordered for a Montana campus should show a compliant refrigerant on the submittal, and machine rooms need ventilation and detection to suit that refrigerant’s safety class.
Does elevation change cooling equipment selections in Montana?
Yes. In the standard atmosphere, air at Butte’s 5,506 feet carries about 15 percent less mass per cubic foot than at sea level, and air at Billings and Great Falls about 10 percent less. Fans move more volume for the same heat, air-cooled condensers and dry coolers lose some rated capacity, and engine-driven equipment derates. Paul Industries applies the altitude correction on every coil, fan and heat rejection selection before the equipment is ordered.
What happens to an outside-air economizer in Montana when wildfire smoke arrives?
Smoke raises fine particulate that clogs filters and can deposit on electronics, so outside-air plants need a way to close the outdoor path and recirculate when an outdoor particulate sensor trips. Indirect economizers keep outdoor air out of the hall and avoid the problem; direct economizers need high-efficiency filtration and enough mechanical or evaporative capacity to carry the load with dampers closed. Paul Industries sets those sequences and tests them before turnover.
How is a Montana dry cooler loop protected against a January cold snap?
Glycol strength is set from the site’s extreme low temperature with a margin, and Montana cold snaps run well below the monthly normals, so outdoor loops often use concentrations that give protection far below zero Fahrenheit. Higher concentrations cost pump energy and heat transfer, so the selection balances freeze margin against summer performance. Paul Industries tests concentration at startup and before each winter as part of a service program.
How does ASHRAE 90.4 enter a Montana data center permit?
Yes. Montana adopted the 2024 International Energy Conservation Code with state amendments effective September 26, 2026, and that code points data center mechanical systems to ASHRAE 90.4, which caps the mechanical load component, the cooling, fan, pump and heat rejection power divided by IT power. Plants designed around economizers and dry coolers meet that limit comfortably in Montana’s climate, but the calculation still has to be documented for the permit.
Can an older Montana server room switch to economizer operation?
Often, yes. A chilled water room can add a plate heat exchanger or dry cooler loop that carries the load in cold weather, and an air-cooled room can add economizer dampers or indirect units where the building allows. In Montana the cool months are long, so the energy saved each year is large compared with the work. Paul Industries surveys the room, the roof or yard space and the controls before proposing a phased retrofit.
When should cooling work be scheduled in an operating Montana data hall?
Spring and autumn suit most upgrades, because outdoor air can carry much of the load while a chiller or pump is out of service and outdoor piping can be opened without freeze risk. Winter work is possible for indoor scope with heated enclosures for any exposed lines. Summer is kept for testing at peak load. Paul Industries plans each step under a written method of procedure with redundancy confirmed before isolation.
Can a Montana project buy dry coolers, chillers and piping skids on a supply-only basis?
Yes. Paul Industries supplies dry coolers, chillers, pumps, plate exchangers, prefabricated piping and skids on a supply-only basis, and also offers design-build and complete installation. Supply-only packages arrive with altitude-corrected selections, factory test records and the documentation that installation and commissioning call for. Owners can move from supply to installation on the same contract as the project develops.
Are there Montana data center incentives that affect cooling choices?
Incentive programs change with each legislative session, so the cooling design should not depend on them. The factors that reliably shape cooling choices are the large-load power terms, water rights, the 2024 energy code and Montana’s climate. Paul Industries prices plant options on those fixed facts, and any program in force at construction time is then added to the owner’s financial model as a bonus rather than a premise.
Which project details let Paul Industries price Montana data center cooling?
Send the IT load by phase, expected rack densities, the site or building, elevation if known, the water source and any water right, the utility service plan, redundancy target and the server inlet range the operator wants to hold. Drawings of an existing room help with retrofits. Paul Industries returns a plant concept with options, an annual energy and water estimate, and a budget range, then a firm price once the design is fixed.
Have a Montana data hall that needs cooling?
Send the IT load by phase, rack density, site, water source and redundancy target. Call 201-450-8280 or request a quote.